BRR : 10894735
Click Here To View Tendering Authority. Aoc City/State :  Jaunpur, Uttar Pradesh
Tender Brief : Tender for Earth Work In Cutting Or In Embankment In Ordinary Soil Excavation To Be In The Form Of Regular Pits Not Exceeding 1/2 Meter (20) In Depth And Earth Work In Embankment To Be In 20 Cm (8) Layers Including Ramming And Dressing The Surface To Required Level And Slopes And Also Including 1.500 M (5Ft) Lift And 30M (100) Lead The Earth From Cutting To Be Used In Making Embankment Or To Be Depodited As Spoil Banks Within 30M (100) Distance. , Construction Of Granular Sub-Base By Providing Close Graded Material , Spreading In Uniform Layers With Motor Grader On Prepared Surface , Mixing B... Read More
Tender Value
80,00,000
Contract Value
₹ 53,60,277.52
Saving / Difference
₹ 26,39,722 ▲
Submission Date
24-03-2026
Contract Date
03-07-2026
Completion Date
180 days
Participated Bidder List
3 No of Bidder(s)
Sr No. Bidder Name Bid Analytics Technical Bid Financial Bid AOC Bid Value Rank
1 cnet-technologies Bid Analytics 59,94,722.5 L2
2 cnet-technologies Bid Analytics 60,12,780.7 L3
3 cnet-technologies Bid Analytics 53,60,277.52 L1
Work Detail
tender for earth work in cutting or in embankment in ordinary soil excavation to be in the form of regular pits not exceeding 1/2 meter (20) in depth and earth work in embankment to be in 20 cm (8) layers including ramming and dressing the surface to required level and slopes and also including 1.500 m (5ft) lift and 30m (100) lead the earth from cutting to be used in making embankment or to be depodited as spoil banks within 30m (100) distance. , construction of granular sub-base by providing close graded material , spreading in uniform layers with motor grader on prepared surface , mixing by mix in place method with rotavator at omc , and compacting with vibratory rollar to achieve the desired density , complete as per clause 401 , construction of granular sub-base by providing close graded material , spreading in uniform layers with motor grader on prepared surface , mixing by mix in place method with rotavator at omc , and compacting with vibratory rollar to achieve the desired density , complete as per clause 401 (for cc) , providng & laying , spreading and compacting stone aggregates of specific sizes (22.4-53 mm s.s.b) .to water bound macadam specification including spreading in uniform thickness , hand packing , rolling with smooth roller 80-100 kn in stage to proper grade and camber , applying and brooming , crushable screening to fill-up the interstices of coarse aggregate , watering and compacting to the require density grading 3 as per technical specification clause 405.(for cc) , providing , laying and spreading material on a prepared subgrade adding cement @2% by weight to the spread material manually, mixingin place with rotavator and compacting with the road roller at omc to achieve the desired unconfined compressive strength and to form a layer sub base. , providing , laying and spreading material on a prepared subgbase adding cement @ 4% by weight to the spread material manually, mixingin place with rotavator and compacting with the road roller at omc to achieve the desired unconfined compressive strength and to form a layer sub base. , providing and applying tack coat with bitumen vg-10 pressure distributor at the rate of 0.30 kg. per sqm on the prepared granular surface treated with primer & cleaned with hydraulic broom as per technical specification clasue 503. , providing, laying and rolling of open - graded premix surfacing of 20 mm thickness composed of 13.2 mm. to 11.2 mm aggregates either using penetration grade bitumen or emulsion to required line. grade and level to serve as wearing coarse on a perviously prepared base, including mixing in suitable plant , laying and rolling with a three wheeled 80-100 kn static roller capacity, finished to required level and grades to be followed by seal coat of either type a or type b or type c as per technical specification clasue 508. , providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using type c seal coat as per technical spefification clause -510. , construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per clause 1501.2.2 m 30 (grade), coarse and fine aggregates conforming to is: 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete withshovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of construction and expansion, construction joints.etc complete. , construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table 300.2 with lead upto 1000 m as per technical specification clause 303.1. , construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table 300.2 with lead upto 1000 m as per technical specification clause 303.1.(for cc) , earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work. , plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. , reinforced cement concrete complete as per drawing and technical specifications. (rcc grade m20) , supplying, fitting and placing uncoated hysd bar reinforcement in foundation complete as per drawing and technical specifications , construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table 300.2 with lead upto 1000 m as per technical specification clause 303.1. , sand filling in foundation trenches as per drawing & technical specification , plain/reinforced cement concrete in open foundation complete as per drawing and technical specifications. (pcc grade m15 using batching plant & manual placing) , plain/reinforced cement concrete complete as per drawing and technical specifications.rcc grade m30 using batching plant , construction of weep holes with 100mm dia ac pipe as per direction of e/i. , back filling behind abutment, wing wall and return wall complete as per drawing and technical specification , the routine maintenance of above link road including embankment,patri,pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in cb condition and keep the entire road surface and structure in defect free condition during the entire maintenance period which begins from the actual completion date and ends after five years.(including cost of material t&p labour but excluding gst) for 1st year maintenance cost (for pc) , the routine maintenance of above link road including embankment,patri,pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in cb condition and keep the entire road surface and structure in defect free condition during the entire maintenance period which begins from the actual completion date and ends after five years.(including cost of material t&p labour but excluding gst) for 2nd year maintenance cost (for pc) , the routine maintenance of above link road including embankment,patri,pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in cb condition and keep the entire road surface and structure in defect free condition during the entire maintenance period which begins from the actual completion date and ends after five years.(including cost of material t&p labour but excluding gst) for 3rd year maintenance cost (for pc) , the routine maintenance of above link road including embankment,patri,pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in cb condition and keep the entire road surface and structure in defect free condition during the entire maintenance period which begins from the actual completion date and ends after five years.(including cost of material t&p labour but excluding gst) for 4th year maintenance cost (for pc) , the routine maintenance of above link road including embankment,patri,pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in cb condition and keep the entire road surface and structure in defect free condition during the entire maintenance period which begins from the actual completion date and ends after five years.(including cost of material t&p labour but excluding gst) for 5th year maintenance cost (for pc) , the routine maintenance of above link road including embankment,patri,pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in cb condition and keep the entire road surface and structure in defect free condition during the entire maintenance period which begins from the actual completion date and ends after five years.(including cost of material t&p labour but excluding gst) for 1st year maintenance cost (for cement concrete road & culvert) , the routine maintenance of above link road including embankment,patri,pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in cb condition and keep the entire road surface and structure in defect free condition during the entire maintenance period which begins from the actual completion date and ends after five years.(including cost of material t&p labour but excluding gst) for 2nd year maintenance cost (for cement concrete road & culvert) , the routine maintenance of above link road including embankment,patri,pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in cb condition and keep the entire road surface and structure in defect free condition during the entire maintenance period which begins from the actual completion date and ends after five years.(including cost of material t&p labour but excluding gst) for 3rd year maintenance cost (for cement concrete road & culvert) , the routine maintenance of above link road including embankment,patri,pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in cb condition and keep the entire road surface and structure in defect free condition during the entire maintenance period which begins from the actual completion date and ends after five years.(including cost of material t&p labour but excluding gst) for 4th year maintenance cost (for cement concrete road & culvert) , the routine maintenance of above link road including embankment,patri,pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in cb condition and keep the entire road surface and structure in defect free condition during the entire maintenance period which begins from the actual completion date and ends after five years.(including cost of material t&p labour but excluding gst) for 5th year maintenance cost (for cement concrete road & culvert)
View Original Notice/Document
Result Documents
Tender Documents
Download File Name File Description
Download 6f46d5cb-6155-4a1f-99f6-b7c116372f5d technicalevaluation notice
Download techsummary_2102992 document
Download 2a9b0874-d4fc-4c38-891f-6bddb148ba66 financialevaluation notice
Download boqcomparativechart document
Download a3731993-12ba-4030-bd27-2b6b40700f4a result notice
Download finsummary_2102992 document
Download File Name File Description
Download 9b1a3e87-ffd7-4c52-beae-0ee3cd35ae3b Tender Documents
Download BOQ_2102992 Tender Documents
Download T2 Tender Documents
Download Tendernotice_1 (8) Tender Documents
Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

✦ ✦ ✦
Awarded Bidder(s)
1
cnet-technologies
Rank : L1 (Lowest)
Bid Amount : ₹ 1,00,00,000
Similar Tenders Results
TenderDetail
Loading tenders