BRR : 10778987
Click Here To View Tendering Authority. Price Bid City/State :  Solan, Himachal Pradesh
Tender Brief : Tender for Earthwork In Excavation For Structures As Per Drawing And Technical Specification Clause 305.1 Including Setting Out Construction Of Shoring And Bracing ,Removal Of Stumps And Other Deleterious Materials And Disposal Of Surplus Excavated Earth Upto All Leads And Lifts Dressing Of Sides And Bottom And Backfilling In Trenches With Excaveted Suitable Materials And Disposing Of Unserviceable Material, Disposed Earth To Be Levelled And Neatly Dressed As Per Mord Specification And As Per The Direction Of Engineer-In- Charge , Providing And Laying Plain Cement Concrete 1:5:10 (One Cement ... Read More
Tender Value
9,72,210
Submission Date
16-12-2025
Participated Bidder List
2 No of Bidder(s)
Sr No. Bidder Name Bid Analytics Technical Bid Financial Bid AOC Bid Value Rank
1 cnet-technologies Bid Analytics 10,30,540.99 L2
2 cnet-technologies Bid Analytics 10,11,096.82 L1
Work Detail
tender for earthwork in excavation for structures as per drawing and technical specification clause 305.1 including setting out construction of shoring and bracing ,removal of stumps and other deleterious materials and disposal of surplus excavated earth upto all leads and lifts dressing of sides and bottom and backfilling in trenches with excaveted suitable materials and disposing of unserviceable material, disposed earth to be levelled and neatly dressed as per mord specification and as per the direction of engineer-in- charge , providing and laying plain cement concrete 1:5:10 (one cement isto five sand isto ten graded crushed stone aggregate 40 milimetre( forty milimetre) nominal size for plain /reinforced concrete in open foundation complete as per drawings and technical specifications clause 802,803,1202 &1203 and curing complete including the cost of form work and carriage of materials in all leads lifts as per the direction of engineer-in-charge. , providing centering and shuttering including strutting ,propping etc. and removal of form for floor to ceiling up to all heights and removal of the same:complete as per hp. pwd. specifications of 1990 volume-i including carriage of materials, labour, tool and plant through all modes of transportion within all leads and lifts and as per direction of engineer-in- charge. , in columns, pillars, piers,abutments,posts and struts. in all floor level in all heights. , in lintels ,beams, plinth beams,girders,bressumers and cantilevers up to any depth in all floor level in all heights. , reinforced cement concrete work in beams, suspended floors,roofs having slopes up to 15o landings,balconies,shelves,chajjas,lintels, bands,plain window sills,staircases and spiral stair cases above plinth level upto floor five level,excluding the cost of centering, shuttering finishing and reinforcement with 1:1.50:3 (one cement isto one point five course sand isto three graded stone aggregate 20.00 (twenty milimeter) nominal size. complet
View Original Notice/Document
Result Documents
Tender Documents
Download File Name File Description
Download 66b0678b-1fca-44af-9f58-00872dbb7eaf financialevaluation notice
Download boqcomparativechart boq document
Download finance_180949 aoc document
Download finsummary_180949 aoc document
Download File Name File Description
Download 3GHSBatal Tender Documents
Download BOQ_180949 Tender Documents
Download d7332afd-4b07-4bc5-9a5d-80c28691f053 Tender Documents
Download Tendernotice_1 Tender Documents
Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

Financial Evaluation In Progress

Financial bids are currently under review. Awarded bidder information will be published after final evaluation.

PriceBid
Similar Tenders Results
TenderDetail
Loading tenders