BRR : 10767735
Click Here To View Tendering Authority. Price Bid City/State :  bijnor, Uttar Pradesh
Tender Brief : Various Work Like Releasing New Connection / Shifting Of Lines / Pole / Increasing Capacity Etc. Under Deposit Scheme For Future Under Jurisdiction Of Edd-Ist, Bijnor.- 1 Safe Carriage Of Following Material From Store Centre To Site / Je Store With Loading & Unloading At Both Ends Respectively Distance With In 40 Kms. 2 Pcc Pole 8.5 Mtr. Long 3 Pcc Pole 9 Mtr. Long 4 S.T. Pole 11 Mtr. Long 5 S.T. Pole 13 Mtr. Long 6 11 / 33 Kv Ct / Pt Unit 7 11 / 33 Kv Pilfer Proof Metering Cubical 8 11 / 0.4 Kv 25 Kva T / F 9 11 / 0.4 Kv 63 Kva T / F 10 11 / 0.4 Kv 100 Kva T / F ... Read More
Tender Value
5,00,000
Submission Date
23-02-2023
Participated Bidder List
2 No of Bidder(s)
Sr No. Bidder Name Bid Analytics Technical Bid Financial Bid AOC Bid Value Rank
1 cnet-technologies Bid Analytics 80,542 L1
2 cnet-technologies Bid Analytics 1,08,000 L2
Work Detail
various work like releasing new connection / shifting of lines / pole / increasing capacity etc. under deposit scheme for future under jurisdiction of edd-ist, bijnor.- 1 safe carriage of following material from store centre to site / je store with loading & unloading at both ends respectively distance with in 40 kms. 2 pcc pole 8.5 mtr. long 3 pcc pole 9 mtr. long 4 s.t. pole 11 mtr. long 5 s.t. pole 13 mtr. long 6 11 / 33 kv ct / pt unit 7 11 / 33 kv pilfer proof metering cubical 8 11 / 0.4 kv 25 kva t / f 9 11 / 0.4 kv 63 kva t / f 10 11 / 0.4 kv 100 kva t / f 11 loading & safe carriage & unloading of heavy other line material ( other than pole ) such as acsr weasal / dog conductor, m.s. angle, m.s. channel, stay rod, earthing rod, 11 kv cable, l.t. cable, 33 kv xarmetc. from store centre to site / je store distance with in 40 kms. and back cartage of material if required. 12 erection of single pole suitable for 11 kv line on pcc / st pole with fixing accessries complete. 13 erection of double pole suitable for 11 kv line on pcc / st polewith fixing accessries complete. 14 erection of try pole suitable for 33 kv line on stp pole with fixing accessries complete. 15 erection of four pole suitable for 33 kv line on stp pole with fixing accessries complete. 16 digging of pits of required size 17 pcc pole 8.5 mtr. long 18 pcc pole 9 mtr. long 19 s.t. pole 11 mtr. long 20 s.t. pole 13 mtr. long 21 grouting of supports in cc 1:4:8 ( cement, sand & 40 mm brick ballast ) . grouting will be done in the block of size ( 450x450 ) mm x 1 / 6th of full length of the support up to ground level, 300 mm plinth, above the ground level with cc 1:3:6 ( cement, coarse sand & stone grit ) with muffing as per drawing. work includes back filling and proper ramming. 22 pcc pole 8.5 mtr. long 23 pcc pole 9 mtr. long 24 s.t. pole 11 mtr. long 25 s.t. pole 13 mtr. long 26 grouting of stay rods ( 16x1800 ) / ( 20x1800 ) mm. including all work of excavation, cement, concreting in size ( 0.60x0.60x0.30 ) m in ratio 1:4:8 cement, sand, 40 mm brick ballast as per drawing, including back filling of soil and proper ramming etc. 27 fixing, tightening & nozzling of stay wire with stay rod with the poles of required tension as per drawing, including providing & fixing of stay insulators of 11 kvand stay clamps. 28 fixing, tightening & nozzling of stay wire with stay rod with the poles of required tension as per drawing, including providing & fixing of stay insulators of 33 kvand stay clamps. 29 earthing of supports with m.s. earth rod of including excavation of pit and driving m.s. rod 3-0 m apart from support and 0.5 m below the ground level and connecting below the earth electrodes with the help of g.i. wire no. 8 swg and earthing lugs. 30 laying, spreading, lifting and final sagging of 3 phases of acsr weasal conductor in accordance with line chart including binding and fixing of all accessories in conductor conductor in parallel in 11 kv / l.t. line. 31 laying, spreading, lifting and final sagging of 3 phases of acsr rabbit conductor in accordance with line chart including binding and fixing of all accessories in conductor conductor in parallel in 11 kv / l.t. line. 32 laying, spreading, lifting and final sagging of 3 phases of acsr dog conductor in accordance with line chart including binding and fixing of all accessories in 03 nos. conductor in parallel. 33 guarding between two poles single poles, double poles etc. to guard l.t. line, telephone and river crossing, road crossing etc. with g.i. wire no. 6, 8 & 10 swg. 34 removal of old existing transformers from double pole / plinth after dismantling h.t. & l.t. connections along with back cartage from work site to store centre includng loading & unloading at both ends distance with in 40 kms. 35 11 / 0.4 kv 25 kva t / f 36 11 / 0.4 kv 63 kva t / f 37 11 / 0.4 kv 100 kva t / f 38 mounting of erection of following transformers of different capacities, on double pole / plinth alongwith fixing of clamps and nuts & bolts with proper binding / jumpering etc. 39 11 / 0.4 kv 25 kva t / f 40 11 / 0.4 kv 63 kva t / f 41 11 / 0.4 kv 100 kva t / f 42 safely laying of 11 kv ab cable size of cable 3x50 sq. mm. 43 safely laying of 11 kv ab cable size of cable 3x95 sq. mm. 44 safely laying of 11 kv ab cable size of cable 3x120 sq. mm. 45 safely laying of 11 kvcable size of all size 46 safely laying of 33 kvcable size of all size 47 erection distribution box with connection 48 laying of underground 11 kv cable after digging of trench including cost of sand & brick complete in all respect. 49 laying of underground 33 kv cable after digging of trench including cost of sand & brick complete in all respect. 50 dismantling of old ct / pt unit from d / p. 51 mounting of ct / pt unit on double pole. 52 dismantling of old metering cubical. 53 mounting the metering cubical on foundation & grouting with rag bolts. 54 filling & fixing of 11 kv cable jointing kit 55 filling & fixing of 33 kv cable jointing kit 56 fixing of g.i. pipe 6 dia on double pole with providing & fixing clamps and bolts & nuts complete in all respect. 57 providing & fixing of danger board / number plate at each location as per specification of the drawing. 58 wrapping of barbed wire on 11 kv sp-55 s.t. poles / 8.5 mtr. pcc poles, as anti climbing device for a length of 0.9 mtr. wire pitch / gap 13 mm. and fixing upper and lower end keeping, lower end at a height of 2.75 mtr. from the ground complete with providing and fixing of lower end & upper end clamps made of m.s. flat 40x5 mm. complete with nuts & bolts. 59 dismantling of old existing supports with all accessories for shifting of line complete in all respect. 60 pcc pole 8.5 mtr. long 61 pcc pole 9 mtr. long 62 s.t. pole 11 mtr. long 63 s.t. pole 13 mtr. long 64 fixing of x-arm of 11 kv line with nuts & bolts & washers as per respo norms complete in all respect. ( provided by department for shifting of line ) 65 fixing of insulators ( provided by department ) : 66 11 kv pin insulator with pin 67 11 kv disc insulator with fitting 68 33 kv pin insulator with pin 69 33 kv disc insulator with fitting 70 providing & fixing of insulators & clamps: 71 11 kv holding clamp with bolts & nuts ( all type ) 72 33 kv holding clamp with bolts & nuts ( all type ) 73 11 kv f-bracket with bolts & nuts 74 11 kv e-bracket with bolts & nuts 75 33 kv f-bracket with bolts & nuts 76 33 kv e-bracket with bolts & nuts 77 p.g. clamp for weasal conductor 78 p.g. clamp for dog conductor 79 l.t. shackle insulator with bolts & nuts 80 l.t. clamp with bolts & nuts 81 g.i. pipe 6 dia 82 senspection clamp with i-hook 83 dead end clamp with i-hook 84 prc 85 pvc cable 1x35 for d / b 86 back cartage of dismentaled ct / pt unit from work site to store centre bijnor with loading & unloading at both ends distance with in 40 kms. 87 back cartage of dismentaled metering cubical from work site to store centre bijnor with loading & unloading at both ends distance with in 40 kms. 88 back cartage of dismentaled cable / conductor from work site to store centre bijnor with loading & unloading at both ends distance with in 40 kms. 89 back cartage of dismentaled all type iron scrap from work site to store centre bijnor with loading & unloading at both ends distance with in 40 kms. 90 back cartage of dismentaled all other items except above from work site to store centre bijnor with loading & unloading at both ends distance with in 40 kms.
View Original Notice/Document
Result Documents
Tender Documents
Download File Name File Description
Download cd7816f4-6c27-466a-b164-f49122edd28c financialevaluation notice
Download boqcomparativechart boq document
Download finance_1279817 aoc document
Download finsummary_1279817 aoc document
Download File Name File Description
Download e91be8ce-818e-47a7-9535-b4fc5b83b284 Tender Documents
Download BOQ_1279817 Tender Documents
Download Tendernotice_1 Tender Documents
Download T_29 Tender Documents
Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

Financial Evaluation In Progress

Financial bids are currently under review. Awarded bidder information will be published after final evaluation.

PriceBid
Similar Tenders Results
TenderDetail
Loading tenders