BRR : 10689848
Click Here To View Tendering Authority. Price Bid City/State :  Pratapgarh, Uttar Pradesh
Tender Brief : Supply Of Materials For Pot Holes And Patch Repair Work In Kalakankar Block In Year 2021-22 - 1 Collection Of Granular Sub Base ( G.S.B ) Shankargarh Duly Stacked At Road Site Including Loading, Unloading, Carriage Upto Site, And Stacking And Cost Of Material, Labour T&P Etc. Including Royality But Excluding G.S.T. As Per Direction Of E / I 2 Collection Of 53-22.4 Mm Gauge S.S.B. Machine Broken Duly Stacked At Road Site Including Loading, Unloading, Carriage Upto Site, And Stacking And Cost Of Material, Labour T&P Etc. Including Royality But Excluding G.S.T. As Per Direction Of E... Read More
Tender Value
15,00,000
Submission Date
23-06-2021
Participated Bidder List
2 No of Bidder(s)
Sr No. Bidder Name Bid Analytics Technical Bid Financial Bid AOC Bid Value Rank
1 cnet-technologies Bid Analytics 14,42,912.29 L1
2 cnet-technologies Bid Analytics 14,82,198.4 L2
Work Detail
supply of materials for pot holes and patch repair work in kalakankar block in year 2021-22 - 1 collection of granular sub base ( g.s.b ) shankargarh duly stacked at road site including loading, unloading, carriage upto site, and stacking and cost of material, labour t&p etc. including royality but excluding g.s.t. as per direction of e / i 2 collection of 53-22.4 mm gauge s.s.b. machine broken duly stacked at road site including loading, unloading, carriage upto site, and stacking and cost of material, labour t&p etc. including royality but excluding g.s.t. as per direction of e / i 3 collection of stone dust screening duly stacked at road site including loading, unloading, carriage upto site, and stacking and cost of material, labour t&p etc. including royalty but excluding g.s.t as per direction of e / i 4 collection of 13.2 mm gauge kabrai grit duly stacked at road site including loading, unloading, carriage upto site, and stacking and cost of material, labour t&p etc. including royalty but excluding g.s.t as per direction of e / i 5 collection of 11.2 mm gauge kabrai grit duly stacked at road site including loading, unloading, carriage upto site, and stacking and cost of material, labour t&p etc. including royalty but excluding g.s.t as per direction of e / i 6 collection of 6.70 mm gauge kabrai grit duly stacked at road site including loading, unloading, carriage upto site, and stacking and cost of material, labour t&p etc. including royalty but excluding g.s.t 7 collection of 2.36 mm gauge kabrai grit duly stacked at road site including loading, unloading, carriage upto site, and stacking and cost of material, labour t&p etc. including royalty but excluding g.s.t 8 collection of local sand duly stacked at road site including loading, unloading, carriage upto site, and stacking and cost of material, labour t&p etc.as per direction of e / i 9 earth in excavation in ordinery soil for foundation and trenches lead up to 30m. and lift upto 1.5m. as per direction of e / i 10 concrete with 4 cm. gauge stone ballast, fine sand of 1.25 f.m. and cement in proportion of 8:4:1 in foundation and under floors, including supply of all materials, labour and t&p etc. required for proper completion of the work. si no 5.13 ( 281 ) as per direction of e / i 11 supply, laying and fixing of 600 mm dia h.p. np3 including cartage upto site laying with coller joint filling in cement mortor with jute, labour t&p etc. as per direction of e / i 12 supply, laying and fixing of 350 mm dia h.p.np3 including cartage upto site laying with coller joint filling in cement mortor with jute, labour t&p etc. as per direction of e / i 13 first class brick work in 1:3 cement and coarse sand of 2.5 f.m. mortar in foundation and plinth including supply of all materials, labour and t&p etc required for proper completion of the work. si.307 as per direction of e / i 14 repair to pots holes and remove of loose material, trimming of side, cleaning of surface, providing tack coat, 20 mm thick primix carpet and seal coat type-c ( labour only for odr ) as per technical specification clausees 1904.2, 503 and 508.1 as per direction of e / i 15 collection of dry fuel wood including cost of material loading, unloading, carriage upto site, and stacking and cost of material, labour t&p etc. including royality but excluding g.s.t. as per direction of e / i
View Original Notice/Document
Result Documents
Tender Documents
Download File Name File Description
Download d3529b9d-feed-4732-8245-46a8b2a9578b financialevaluation notice
Download boqcomparativechart boq document
Download finance_918357 aoc document
Download finsummary_918357 aoc document
Download File Name File Description
Download BOQ_918357 Tender Documents - BoQ
Download Tendernotice_1 Tender Documents - Tender_Notice
Download 3296B087-E82D-4744-90A6-64C09296CEF5 Tender Documents - Tender Notice
Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

Financial Evaluation In Progress

Financial bids are currently under review. Awarded bidder information will be published after final evaluation.

PriceBid
Similar Tenders Results
TenderDetail
Loading tenders