BRR : 10686882
Tender Brief : Supply Of Materials For Mw ( Cons ) Restoration Of Fallen Fortress Wall, Ratnagiri, Anantapuramu, Andhra Pradesh-2 Cost And Supply Of Kankar Lime Packed In Air Tight Bags Including Loading And Un-Loading Charges, Stacking At The Work Spot As Directed By The In-Charge. 3 Cost And Supply Of River Sand Including Loading And Un-Loading Charges, Stacking At The Work Spot As Directed By The In-Charge. 4 Cost And Supply Of Brick Surkhi Including Loading And Un-Loading Charges, Stacking At The Work Spot As Directed By The In-Charge. 5 Cost And Supply Of Jaggery Including L... Read More
Tender Value
₹
21,92,232
Submission Date
01-06-2022
Participated Bidder List
3 No of Bidder(s)
| Sr No. | Bidder Name | Bid Analytics | Technical Bid | Financial Bid | AOC | Bid Value | Rank |
|---|---|---|---|---|---|---|---|
| 1 | cnet-technologies | Bid Analytics | 21,12,843.19 | L1 | |||
| 2 | cnet-technologies | Bid Analytics | |||||
| 3 | cnet-technologies | Bid Analytics | 21,15,697.76 | L2 |
Work Detail
supply of materials for mw ( cons ) restoration of fallen fortress wall, ratnagiri, anantapuramu, andhra pradesh-2 cost and supply of kankar lime packed in air tight bags including loading and un-loading charges, stacking at the work spot as directed by the in-charge. 3 cost and supply of river sand including loading and un-loading charges, stacking at the work spot as directed by the in-charge. 4 cost and supply of brick surkhi including loading and un-loading charges, stacking at the work spot as directed by the in-charge. 5 cost and supply of jaggery including loading and un-loading charges, stacking at the work spot as directed by the in-charge. 6 cost and supply of karakkai including loading and un-loading charges, stacking at the work spot as directed by the in-charge. 7 cost and supply of 40mm hbg metal including loading and un-loading charges, stacking at the work spot as directed by the in-charge. 8 cost and supply of pebble stones including loading and un-loading charges, stacking at the work spot, cutting into required sizes as directed by the in-charge. 9 cost and supply of rr stone including loading and un-loading charges, stacking at the work spot as directed by the in-charge. 10 cost and supply of ¾” dia tata chisel rod ( 6” ) including conveyance loading and un-loading at site of work as directed by the in-charge 11 cost and supply of charcoal including loading and un-loading charges, stacking at the work spot as directed by the in-charge. 12 cost and supply of 100mm dia stone cutting blade including conveyance loading and un-loading at site of work as directed by the in-charge
View Original Notice/Document
Result Documents
Tender Documents
| Download | File Name | File Description |
|---|---|---|
| Download | c47b10f9-b973-4ded-9d55-0e748fe5e4eb | Tender Documents |
| Download | BOQ_724435 | Tender Documents |
| Download | Cover1 | Tender Documents |
| Download | Cover2 | Tender Documents |
| Download | Cover3 | Tender Documents |
| Download | Cover4 | Tender Documents |
| Download | Cover5 | Tender Documents |
| Download | Cover7 | Tender Documents |
| Download | Tendernotice_1 | Tender Documents |
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender
Financial Evaluation In Progress
Financial bids are currently under review. Awarded bidder information will be published after final evaluation.
PriceBid
Similar Tenders Results