BRR : 10626638
Click Here To View Tendering Authority. Price Bid City/State :  Selaqui Dehradun, Uttarakhand
Tender Brief : Annual Operation & Maintenance Of Electrical Infrastructure Of Street Lights And Water Supply At Iie-Selaqui , Street Light Maintenance , Pump House Maintenance With Amc Of Electrical Items , Lifting Vehical / Hydra Required For Overhead Street Lights Maintenance Purpose ( On Hire Basis ) ( 02Days / Month ) , Repair Of 60Watt Led Street Lights By Replacement Of Damaged / Diffused Drivers 60Watt Make-C&S . , Phillips , Havells , Bajaj ( As Per The Site Requirement ) Including Material Charges But Excluding Labour Charges , For Pharma City Selaqui . Dlp 6 Months , Repair... Read More
Tender Value
Ref. Document
Submission Date
25-08-2020
Participated Bidder List
7 No of Bidder(s)
Sr No. Bidder Name Bid Analytics Technical Bid Financial Bid AOC Bid Value Rank
1 cnet-technologies Bid Analytics 7,31,832.33 L4
2 cnet-technologies Bid Analytics 7,39,078.19 L5
3 cnet-technologies Bid Analytics 7,60,815.79 L7
4 cnet-technologies Bid Analytics 7,07,276.9 L2
5 cnet-technologies Bid Analytics 7,48,739.35 L6
6 cnet-technologies Bid Analytics 7,08,484.54 L3
7 cnet-technologies Bid Analytics 6,76,361.21 L1
Work Detail
annual operation & maintenance of electrical infrastructure of street lights and water supply at iie-selaqui , street light maintenance , pump house maintenance with amc of electrical items , lifting vehical / hydra required for overhead street lights maintenance purpose ( on hire basis ) ( 02days / month ) , repair of 60watt led street lights by replacement of damaged / diffused drivers 60watt make-c&s . , phillips , havells , bajaj ( as per the site requirement ) including material charges but excluding labour charges , for pharma city selaqui . dlp 6 months , repair of 60watt led street lights by replacement of damaged / diffused pcb plates 60watt make-c&s . , phillips , havells , bajaj ( as per the site requirement ) including material charges but excluding labour charges for pharma city , selaqui . dlp 6 months . , repair of 90watt led street lights by replacement of damaged / diffused drivers 90watt make-c&s . , phillips , havells , bajaj ( as per the site requirement ) including material charges but excluding labour charges for sidc selaqui . dlp 6 months . , repair of 90watt led street lights by replacement of damaged / diffused pcb plates 90watt make-c&s . , phillips , havells , bajaj ( as per the site requirement ) including material charges but excluding labour charges . dlp 6 months . , repair of 150watt led high mast lights by replacement of damaged / diffused drivers 150watt make -c&s . , phillips , havells , bajaj ( as per the site requirement ) including material charges but excluding labour . dlp 6 months , repair of led high mast lights replacing damaged / diffused pcb plates 150watt make -c&s . , phillips , havells , bajaj ( as per the site requirement ) including material charges but excluding labour . dlp 6 months . , repairing of street lights / high mast electrical control panel replacing 3pole power contactor 100amp including material charges but excluding labour . one in each , total 02 panels ( as per the requirement raised by engineer-in charge ) , repairing of street lights / high mast electrical control panel replacing timer auto light , including material charges but excluding labour . one in each , total 02 panels ( as per the requirement raised by engineer-in charge ) , repairing of street lights / high mast electrical control panel replacing 3pole mccb , 100amp including material charges but excluding labour . one in each , total 02 panels ( as per the requirement raised by engineer-in charge ) , repairing of street lights / high mast electrical control panel replacing isolator 02 way 40 amps including material charges but excluding labour . 02 in each , total 02 panels ( as per the requirement raised by engineer-in charge ) , replacing the burnt / damage pvc 1 . 5 sqmm single core wire by required size of frls copper cable excluding labour . , supply of pvc xlpe power cable 1 . 1 kv grade armoured size 4x 16 sqmm excluding labour , laying of one number pvc insulated & pvc sheatehed / xlpe power cable 1 . 1 kv grade upt o 35sqmm size direct in ground inclduing excavation sand cushioning protective covering and refilling the trench extra as required . , erection of steel tubler or rail pole strut in cement concrete 1:3:6 foundation i ( aggregate 40mm nominal size ) including excavation and refilling and secured with holding clamps , bolts , nuts etc required ( dsr 11 . 4 ) , supply and fixing of pre-fab water proof street light pole boxes ( powder coated chocolate colour ) size 300mm x 00mm x150mm mada of crca sheet of thickness 1 . 6mm with arrangement / connection of 3phase incoming and outgoing supply and 01 nos 06amp b-curve mcb complete in all respect , wages / labour charges paid to electricians deputed at respective industrial estates of siidcul for o&m work ( for 8months ) , wages / labour charges paid to helpers deputed at respective industrial estates of siidcul for o&m work ( for 8 months ) , annual maintenance of main supply transformer for street lights inclduing dehydration of transformer oil , oti / wti calibration etc . ( once in year ) , service charges of dg sets ( 50kva ) installed at siidcul offices / back up projects of street lights inclduing material and labour . ( 02 services per year ) , repairing and rewinding of 35hp motor submersibile tubewell complete in all respect including lowering and lifting upto 150 meter , labour & material ( as per requirement ) , repairing of 35hp / 10 stage submersibile pump by repair / replacement of pump-bush , sleeves , necking etc . complete in all respect inclduing labour & material . ( as per requirement ) , repairing of submersibile motor control electrical panel by replacing 01 no ml4 contactor including material & excluding labour ( as per the requirement raised by engineer-in charge ) , repairing of submersibile motor control electrical panel replacing 01 no 200amp kit kat switch complete in all respect including material & excluding labour . ( as per the requirement raised by engineer-in charge ) , repairing of submersibile motor control electrical panel by replacing 200amp tpn sfu complete in all respect including material & excluding labour . ( as per the requirement raised by engineer-in charge ) , replacement of power cable ( 3x6sqmm ) for supply to submersibile motor pump complete in all respect including material & labour charges . ( as per requirement ) , rewinding & repairing of 15hp water supply motor with taking out and fixing in position complete in all respect inclduing material and labour charges . , repairing of water supply motor control electrical panel replacing 01 no 200amp kit kat switch complete in all respect including material & excluding labour . ( as per the requirement raised by engineer-in charge ) , repairing of water supply motor control electrical panel by replacing 200amp tpn sfu complete in all respect including material & excluding labour . ( as per the requirement raised by engineer-in charge )
View Original Notice/Document
Result Documents
Tender Documents
Download File Name File Description
Download 8d224a19-e097-4e68-bb9c-3f104534c958 financialevaluation notice
Download boqcomparativechart boq document
Download finance_30031 aoc document
Download finsummary_30031 aoc document
Download File Name File Description
Download Tendernotice_1 Tender Documents - Tender Document
Download ElectricalInfraselaqui Tender Documents - Tender Document
Download BOQ_30031 Tender Documents - BOQ in Percentage format
Download A46FA6E0-8062-4981-87DD-C602E23670F4 Tender Documents - Tender Notice
Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

Financial Evaluation In Progress

Financial bids are currently under review. Awarded bidder information will be published after final evaluation.

PriceBid
Similar Tenders Results
TenderDetail
Loading tenders