BRR : 10586140
Tender Brief : Tender For Construction Of Entrance Gate Near Of Mandi Samiti In Auraiya - Earth work in exacavation in trenches for foundations and for pipes cables etc. in ordinary soil(loam clay or sand) including lift upto 1.5 m and dressing of sides and ramming of bottom sand disposal of surplus excavated earth as directed by the Engineer i/c with in a lead of 50m. 2 Providing and laying base concrete 1:4:8 Cement f/sand and 40mm gaugestone ballastincluding supply of all material labour T&P etc all completeS.I. 281 3 R.C.C. workfoundation/column with cement approved coarse sand and 20 mm. guage appro... Read More
Tender Value
₹
12,89,852
Submission Date
17-03-2025
Participated Bidder List
3 No of Bidder(s)
| Sr No. | Bidder Name | Bid Analytics | Technical Bid | Financial Bid | AOC | Bid Value | Rank |
|---|---|---|---|---|---|---|---|
| 1 | cnet-technologies | Bid Analytics | 13,02,724 | L2 | |||
| 2 | cnet-technologies | Bid Analytics | 13,15,622 | L3 | |||
| 3 | cnet-technologies | Bid Analytics | 12,88,536 | L1 |
Work Detail
tender for construction of entrance gate near of mandi samiti in auraiya - earth work in exacavation in trenches for foundations and for pipes cables etc. in ordinary soil(loam clay or sand) including lift upto 1.5 m and dressing of sides and ramming of bottom sand disposal of surplus excavated earth as directed by the engineer i/c with in a lead of 50m. 2 providing and laying base concrete 1:4:8 cement f/sand and 40mm gaugestone ballastincluding supply of all material labour t&p etc all completes.i. 281 3 r.c.c. workfoundation/column with cement approved coarse sand and 20 mm. guage approved stone grit im the proportion of 1:1.5:3 in lintels of doors and windows excluding supply of reinforcement and its fixing and binding the same with 24 bwg binding wire and including necessary centering and shuttering etc.and also including supply of all materials, labour and tools and plants etc, required for proper completion of the works. strength of the concrete shall not beless than m-200. 4 r.c.c. work plinth/slab beamwith cement approved coarse sand and 20 mm. guage approved stone grit im the proportion of 1:1.5:3 in lintels of doors and windows excluding supply of reinforcement and its fixing and binding the same with 24 bwg binding wire and including necessary centering and shuttering etc.and also including supply of all materials, labour and tools and plants etc, required for proper completion of the works. strength of the concrete shall not beless than m-200. 5 r.c.c. work for slab1:2:4cement c/sand and stone grit including rein forcement and its binding etc all complete s.i.284 6 mild steel or iron work such asrb orr.c.c. workincludingetcall complete .s.i. 504 7 providing and laying red stone with lean concrete of(600x600mm sizes thickness 10 mm) with water absorptinn les than 0.80% and conforming to is:15622, of approved brand and manufucturer in desirid colours and shads 8 ist class brick work in 1:4 cement and c /sand of 1.25 f.m. mortar in foundation plinth including supply of all materials, labour and t&p etc. required for proper completion of work. n.s. 9 12mm thick cement plaster 1:4 cement and c/sand mortar including supply of all material labour t&p etc all complete, s.i. 13.4 chapter 13 10 finishingwallswith two coat of acrylic smooth extirior paints of best quality including supply of all materail, lobours etc all complete . 11 two coat app. birla putty including supply of all material etc all complete .chapter 15 s.i, n0 30-13.80 12 supply and fixing of statue on the top of gate and designon both side all complete, etc all 13 painting two coat over priming coat (but including cost of priming coat) on steel and other metal surfaces up to 10 cm. width or girth or small articles not exceeding 0.10sqm in area white superior synthetic enamel such as luxol3,hi-gloss apcolite superlac, dulux specified brushing to give an even shade and including cleaning the surface of all dirt,dust and other foreign matter sand papering and stoping including cost of all materials, labour tools and plants etc. required for proper completion of the work. for wooden surface. 14 providing & fixing of inaugration ston/bord with detail of work and chairmen/e.o./ shabhashad/engineer name mention on ston/ bord complete with meterail,etc all complete . 15 providing landscaping on the booth side of the intrance gate all complete as per dirction of engineer in charge 16 electrical work item 1 to 25 as per esmited etc all complte
View Original Notice/Document
Result Documents
Tender Documents
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender
Financial Evaluation In Progress
Financial bids are currently under review. Awarded bidder information will be published after final evaluation.
PriceBid
Similar Tenders Results