BRR : 10555683
Click Here To View Tendering Authority. Price Bid City/State :  at site, Delhi
Tender Brief : Servicing And Routine Maintenance Of Air Conditioners , Servicing Of Existing Installed Wtac/ Stac/Cgac Of 1 . 5 Tr & 2 . 0 Tr Capacity Ac And Water Coolers Of 80/150/250 Lph , Checking For Unit , Inspection Greasing , Oiling Etc . I/C Chemical Cleaning Of Condensing & Cooling Coil With High Pressure Pump Changing The Air Filter , Checked & Tightening All Electric Connections , Testing The Machine Etc . As Reqd . ( Tentative Service Period From 10 . 03 . 2021 To 30 . 03 . 2021 ) . , Supply & Charging R-22/410/407/32/134A Gas In The Existing Wtac/Stac / Of 1 . 5/2 . 0 Tr Unit I/C Pr... Read More
Tender Value
9,10,540
Submission Date
16-03-2021
Participated Bidder List
8 No of Bidder(s)
Sr No. Bidder Name Bid Analytics Technical Bid Financial Bid AOC Bid Value Rank
1 cnet-technologies Bid Analytics 4,74,573.45 L7
2 cnet-technologies Bid Analytics 3,40,997.23 L3
3 cnet-technologies Bid Analytics 4,32,051.23 L5
4 cnet-technologies Bid Analytics 6,10,061.8 L8
5 cnet-technologies Bid Analytics 3,37,446.12 L2
6 cnet-technologies Bid Analytics 4,48,987.27 L6
7 cnet-technologies Bid Analytics 4,27,316.42 L4
8 cnet-technologies Bid Analytics 2,99,567.66 L1
Work Detail
servicing and routine maintenance of air conditioners , servicing of existing installed wtac/ stac/cgac of 1 . 5 tr & 2 . 0 tr capacity ac and water coolers of 80/150/250 lph , checking for unit , inspection greasing , oiling etc . i/c chemical cleaning of condensing & cooling coil with high pressure pump changing the air filter , checked & tightening all electric connections , testing the machine etc . as reqd . ( tentative service period from 10 . 03 . 2021 to 30 . 03 . 2021 ) . , supply & charging r-22/410/407/32/134a gas in the existing wtac/stac / of 1 . 5/2 . 0 tr unit i/c pressure testing , flushing the system and gas charging complete as reqd . , replacement of following capacity compressor in the existing wtac/split ac making copper pipe connection , brazing pressure testing and supplying and charging refrigerant gas i/c cutting the copper piping dismantling of the old compressor complete as reqd . ( make:- hitachi/ whirlpool/ kirloskar as per compatibility of air conditioner ) , a ) 1 . 5 tr , b ) 2 . 0 tr , providing & replacement wtac/stac/ ctac fan motor capacity 1/4 to 1/8 hp including dismantling the burned motor from the existing unit & fixing of new motor , making connections testing , commissioning etc . as reqd . ( make:- lg/ voltas/ as per compatibility of air conditioner ) , supplying & fixing 25 mm diameter pvc heavy duty pipe for drainage in the existing split type ac unit with supporting clamps etc . complete as reqd . ( make :- polycab/ finolex/ akg ) , supplying , fixing , testing and commissioning of interconnecting copper refrigerant pipe of size of 1/4 discharge side & 1/2 suction side from indoor unit to outdoor unit alongwith closed cell nitrite rubber insulation as per specification properly supported with clamps etc . complete as reqd . ( make :- mandev / malaysia ) , providing and fixing of ( 3x2 . 5 sq . mm ) pvc insulated & pvc sheathed copper conductor circular flexible cable and commissioning etc . as required . ( make:-finolex/rr kable/ skytone/ havells/ polycab/ralison / bencab ) , relocating of existing installed stac of 1 . 5 tr & 2 . 0 tr capacity with outdoor unit , from its location to another location , i/c testing & commissioning etc . as required . , supplying and replacement of following defective spare parts in the existing ac unit i/c connection testing etc . complete as required . ( dismantle material retained by contractor ) ( make:- shiva/ tibkon/ shrada/ havells ) , a ) running capacitor - 36 mfd/45 mfd , b ) starting capacitor- 80/100 mfd , repair of damaged pcb of indoor & outdoor unit including tightening the loose connection , testing the machine etc . as reqd . , supplying & replacement of remote control system with remote ( wireless/with wire remote ) in the existing installed window/split type ac i/c all interconnection , testing and commissioning complete as reqd . ( l . g/ azure/ voltas or different suitable make ) , supplying and replacement of wornout/defective copper condenser coil with same size of design suitable for following capacity split type ac out door unit i/c breezing the all copper pipe with all distribution joints of make sure the connection with capillary tube linking dryer duly proper etc pressure testing leak detection , vaccumizing the unit , gas charging etc complete as reqd . ( dismantle retaine by contractor ) , a ) 1 . 5tr capacity , providing , fixing suction / discharge valve of 5/8 inch and 1/4 inch of split air conditioner unit including brazing the valve with compressor suction and discharge line etc . as required . , supplying & replacement of following capacity split type ac indoor unit i/c testing , commissioning etc . as required . , a ) 1 . 5 tr , b ) 2 . 0 tr , supplying and replacement of following capacity split type ac outdoor unit . , a ) 1 . 5 tr , b ) 2 . 0 tr , comprehensive & routine maintenance of wtac/stac/ unit & water cooler i/c attending day to day complaints from 9am to 5pm & rectifying the defects , supplying & replacement of worn out parts such as capacitors , starting relays , selector switches , sleeves , knobs , front grills connectors etc . which required to be replace during routine maintenance & monthly cleaning of filters etc . ( replacement of compressor , condenser fan , blower , fan/blower motor , coils , main lead , gas charging etc . not covered under routine maintenance ) complete as per terms & condition and direction of engineer-in-charge . ( 102 nos . x 7 months=714nos . ) ( note:-the comprehensive maintenance will start after 01month of servicing of acs ) , credit for dismantle material . , a ) worn out 1 . 5/2 . 0 tr capacity compressor , b ) burn out fan motor 1 , 1/2 , 1/4 , 1/8 , , c ) refrigerant copper pipe , d ) worn out condenser coil , e ) running/starting capacitors , f ) split type ac indoor unit 1 . 5/2 . 0tr , g ) split type ac outdoor unit 10 . 5/2 . 0tr , h ) suction /discharge valve
View Original Notice/Document
Result Documents
Tender Documents
Download File Name File Description
Download 9f71a499-f792-4c78-abea-6cb5f63880f6 financialevaluation notice
Download boqcomparativechart boq document
Download finance_255310 aoc document
Download finsummary_255310 aoc document
Download File Name File Description
Download Tendernotice_1 Tender Documents - nit
Download Tender Tender Documents - Tender
Download BOQ_255310 Tender Documents - BOQ
Download 0AC430E1-D6FA-4F1E-880D-36CD7529C4C5 Tender Documents - Tender Notice
Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

Financial Evaluation In Progress

Financial bids are currently under review. Awarded bidder information will be published after final evaluation.

PriceBid
Similar Tenders Results
TenderDetail
Loading tenders