Tender Brief : Carrying Out The Various Running Contract Works Under A Full Deposit Scheme At Various Places Town Of Edd Nakur Sre-2 Safe Cartage Of St / Pcc Poles Up To 13 Mtr. From Esc, Sre / Je Store To Site Of Work At Various Sites Including Loading & Unloading At Both Ends. ( Dist.Up To 40 Km. ) 3 Safely Cartage Of Other Complete Line Material / 11 Kv Xlpe Cable / Abc Cable ( Except Pcc / St Poles ) From Esc, Sre / Je Store To Site Of Work At Various Sitesincluding Loading, Unloading At Both Ends. ( Dist.App. 0 To 40 Km. ) 4 Safe Cartage Of 25 / 63 / 100 Kva T / F From Esc, Sre, To ... Read More
Tender Value
₹
Ref. Document
Submission Date
26-09-2022
Participated Bidder List
3 No of Bidder(s)
| Sr No. | Bidder Name | Bid Analytics | Technical Bid | Financial Bid | AOC | Bid Value | Rank |
|---|---|---|---|---|---|---|---|
| 1 | cnet-technologies | Bid Analytics | 5,24,340 | L2 | |||
| 2 | cnet-technologies | Bid Analytics | 4,99,275 | L1 | |||
| 3 | cnet-technologies | Bid Analytics | 5,50,525 | L3 |
Work Detail
carrying out the various running contract works under a full deposit scheme at various places town of edd nakur sre-2 safe cartage of st / pcc poles up to 13 mtr. from esc, sre / je store to site of work at various sites including loading & unloading at both ends. ( dist.up to 40 km. ) 3 safely cartage of other complete line material / 11 kv xlpe cable / abc cable ( except pcc / st poles ) from esc, sre / je store to site of work at various sitesincluding loading, unloading at both ends. ( dist.app. 0 to 40 km. ) 4 safe cartage of 25 / 63 / 100 kva t / f from esc, sre, to the site of work including loading & unloading at both ends. ( dist. upto 40 km. ) 5 safe cartage of ct / pt unit from esc, sre, to the site of work including loading & unloading at both ends. ( dist. upto 40 km. ) 6 safe cartage ofmetering cubicalfrom esc, sre, to the site of work including loading & unloading at both ends. ( dist. upto 40 km. ) 7 erection of single support on st / pcc poles up to 13 mtrlong with complete fitting of all accessories of11 kv / lt line. complete. 8 erection of double pole on st / pcc poles up to 13 mtr longwith complete fitting with all accessories complete. 9 fixing of 11 kv stay rods by digging of pits in block of 600x600x300 mm. &with new brick and nozzling of stay wire 7 / 10 swg and fitting the same on the pole 10 earthing of poles by earthing rod 11 providingoflt clamp with nuts bolts made of new ms flat iron 50x6 mm on pcc poles 12 providing of lt shekel insulator of size 100x115mm 13 providing ofnuts & bolts for lt shekel insulator of size 180x19mm half threading. 14 providingof x-arm holding clamps pcc / st poles with nuts bolts made of new ms flat iron 50x6 mm 15 providingoff-brackets for pcc / st poles with nuts bolts made of new ms flat iron 50x6 mm 16 providingof stay clamppcc / st poles with nuts bolts made of new ms flat iron 50x6 mm 17 providingof double pole clamp on pcc / st poles with nuts bolts made of new ms flat iron 50x6 mm 18 providingofi-hook clampfor pcc / st poles with nuts bolts made of new ms flat iron 50x6 mm 19 providingofsuspension clamp with i-hook 20 providingofdead end clamp with i-hook 21 providing ofpiercing connector 25 / 50 / 95 sq. mm. 22 laying, lifting, stringing, sagging jumpring & binding ofacsr weasel conductor for 11kv / lt lineincluding complete. 23 laying, lifting, stringing, sagging jumpring & binding ofacsr rabbit conductor for 11kv / lt line including complete. 24 laying, lifting, stringing, sagging jumpring & binding ofacsr dog conductor for 11kv / lt line including complete. 25 laying, lifting, stringing, proper sagging abc cable of size 3x50+1x35+1x16 / 3x95+1x70+1x16 / 3x120+1x95+1x16 sq.mm. including fixing ofall accessories. 26 safe installation of 25 / 63 / 100 kva t / f on the double pole with complete fittings including making connections and commissioning. 27 safe installation ofct / pt unit on the double pole with complete fittings including making connections and commissioning. 28 safe installation ofmetering cubical in the room with complete fittings including making connections and commissioning. 29 laying, lifting, stringing proper sagging of 11 kv xlpe cable 3x35 / 3x70 / 3x120 / 3x185 sq mm of includingcomplete etc 30 providing of11 kv cable terminationskit out door & indoor of size 3x35 / 3x70 / 3x120 / 3x185 sq mm. 31 fixing& making of11 kv cable terminationskit out door & indoor of size 3x35 / 3x70 / 3x120 / 3x185 sq mm. 32 laying and making connections of lt pvc / xlpe cable 4x16 / 4x25 / 4x35 / 3.5x50 / 3.5x70 / 3.5x150 / sq.mm. from t / f to double pole ( approx to 20 mtr ) . 33 off shooting of tree branches touching the 11 kv / lt line.
View Original Notice/Document
Result Documents
Tender Documents
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender
Financial Evaluation In Progress
Financial bids are currently under review. Awarded bidder information will be published after final evaluation.