BRR : 10434493
Tender Brief : Consultancy Services For Balance Works Of Land Acquisition Plan , Forest Clearances Proposals And Other Pre Construction Activities In Respect Of Detailed Project Report ( Drp ) For Sainj-Luhri-Jalori-Banjar-Aut Road Excluding Jalori Pass Tunnel Of Nh-3 , Remuneration For Local Staff ( Inclusive Of Per Diem Allowance ) , Team Leader Cum Senior Highway Engineer , Senior Survey Engineer , Environmental Specialist , Quantity Surveyor/ Documentation Expert , Land Acquisition Expert , Utility Expert , Sub Professional Staff ( To Be Assessed By Consultant As Per Requirement Of Assign... Read More
Tender Value
₹
Ref. Document
Submission Date
06-09-2021
Participated Bidder List
3 No of Bidder(s)
| Sr No. | Bidder Name | Bid Analytics | Technical Bid | Financial Bid | AOC | Bid Value | Rank |
|---|---|---|---|---|---|---|---|
| 1 | cnet-technologies | Bid Analytics | 64,60,000 | L1 | |||
| 2 | cnet-technologies | Bid Analytics | 60,00,000 | L2 | |||
| 3 | cnet-technologies | Bid Analytics | 1,24,85,000 | L3 |
Work Detail
consultancy services for balance works of land acquisition plan , forest clearances proposals and other pre construction activities in respect of detailed project report ( drp ) for sainj-luhri-jalori-banjar-aut road excluding jalori pass tunnel of nh-3 , remuneration for local staff ( inclusive of per diem allowance ) , team leader cum senior highway engineer , senior survey engineer , environmental specialist , quantity surveyor/ documentation expert , land acquisition expert , utility expert , sub professional staff ( to be assessed by consultant as per requirement of assignment and one sub-professional be a fresh graduate ) , position , position , position , position , position , position , position , support staff ( inclusive of per diem allowance ) note: to be assessed by consultant as per requirement of assignment , office manager , typist , office boy , night watchman , transportation ( fixed costs ) , the vehicles hired by the consultant shall include the cost for rental , drivers , operation , maintenance , repairs , insurance , etc . , duty travel to site ( fixed costs ) , trips , office rent ( fixed costs ) the rent cost includes maintenance , cleaning , repairs , etc . , office rent , office supplies , utilities and communication ( fixed costs ) , office supplies drafting , supplies computer , running costs , domestic and international communication , office furniture and equipment ( rental ) , office furniture and equipment , reports and document printing , monthly report ( 3 copies per month ) , updated environment and social impact , strip plan with l . a . reports , draft la and clearances i report , final la and clearances i report , draft environmental assessment report& rap , final environmental assessment report& rap , updated bill of quantities , updated cost estimates , draft 3 ( a ) , 3 ( a ) and 3 ( d ) & 3g notification for land acquisition ( 3 copies each ) , la & clearances ii report , investigation ( fixed cost ) ( lumpsum ) , land acquisition studies , any other investigations/surveys , fixing boundary pillars , procuring and fixing boundary pillars and its installation , complete in all respect as per irc:25 , 1967: wherever the proposed alignment follows the existing alignment , the boundary pillars shall be fixed at an interval of 200m on either side of proposed right of way . wherever there is a proposal of realignment of the existing highway and/or construction of new bypasses , consultant shall fix boundary pillars along the proposed alignment on the extreme boundary on either side of the project highway at 50 m interval , land acquisition team including support staff and logistics/transportation , ex-land revenue inspector/officer or equivalent , ex-kanoogo/girdwar or equivalent , ex-patwari or equivalent , typist ( 2 nos . x6months ) , peon , logistics for land acquisition team , computer including necessaryperipherals ( 2 nos . x6 months ) , printers ( 2 nos . x 6 months ) , vehicles ( bolero or equivalent ) with monthly running limit of 4000 km , estimate of expatriateconsultants ( name and position to be filled in below columns by the bidder ) , position , position , moblization and demoblization- international airfares ( fixed costs ) ( to be filled by bidders in below columns ) , moblization and demoblization-inland travel in home country ( fixed costs ) , other miscellaneous expenses ( like da , internal travel expenses other incidentals ) ( fixed cost )
View Original Notice/Document
Result Documents
Tender Documents
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender
Financial Evaluation In Progress
Financial bids are currently under review. Awarded bidder information will be published after final evaluation.
PriceBid
Similar Tenders Results