BRR : 10367385
Click Here To View Tendering Authority. Price Bid City/State :  dhampur, Uttar Pradesh
Tender Brief : Tender For To Provide New Connections And Other Work In Full Deposit Scheme In Edd 2 Dhampur(Running), Construction of power line, pole/line shifting / for issuing new connections to consumers on the basis of running contract on the request of consumers under the full deposit scheme under Electricity Distribution Division-II Dhampur under Electricity Distribution Board, Dhampur. All work like capacity building etc. is to be done through external agency, 1 Cartage of PCC/ST pole from ESC Bijnor to above site including loading & unloading at the both end . 2 Cartage of Line material( conducto... Read More
Tender Value
8,00,000
Submission Date
25-09-2024
Participated Bidder List
3 No of Bidder(s)
Sr No. Bidder Name Bid Analytics Technical Bid Financial Bid AOC Bid Value Rank
1 cnet-technologies Bid Analytics 7,91,100 L3
2 cnet-technologies Bid Analytics 7,88,100 L2
3 cnet-technologies Bid Analytics 7,86,100 L1
Work Detail
tender for to provide new connections and other work in full deposit scheme in edd 2 dhampur(running), construction of power line, pole/line shifting / for issuing new connections to consumers on the basis of running contract on the request of consumers under the full deposit scheme under electricity distribution division-ii dhampur under electricity distribution board, dhampur. all work like capacity building etc. is to be done through external agency, 1 cartage of pcc/st pole from esc bijnor to above site including loading & unloading at the both end . 2 cartage of line material( conductor, cable, xlpe cable etc.) from esc bijnor to above site including loading & unloading at the both end . 3 cartage of transformerfrom esc bijnor to above site including loading & unloading at the both end .25kva 4 cartage of transformerfrom esc bijnor to above site including loading & unloading at the both end .63kva 5 cartage of transformerfrom esc bijnor to above site including loading & unloading at the both end .10 kva 6 digging of pits for pole. 7 digging for dp 8 grouting of pcc/st pole . 9 digging of stay. 10 earting of pcc/st pole (as per respo norms.) 11 laying straighting sagging and binding of acsr weasel conductor on line. (as per respo norms.) 12 laying straighting sagging and binding of different sizes of abc cable on line. (as per respo norms.) 13 carageand erection of 11 kv pilfer resistant metring cubcle 14 11 kv ct/pt metring pole 15 making of jointing kit 16 laying of xple cable of different sizes (as per respo norms). 17 erection of pcc/st pole(as per respo norms.) 18 erection of double pole(as per respo norms.)
View Original Notice/Document
Result Documents
Tender Documents
Download File Name File Description
Download e01f26ed-99f0-497b-8605-a6aa23916364 financialevaluation notice
Download boqcomparativechart boq document
Download finsummary_1660084 aoc document
Download File Name File Description
Download caf7c9aa-e986-4850-af5f-3a252111ebf3 Tender Documents
Download BOQ_1660084 Tender Documents
Download TDoc22 Tender Documents
Download Tendernotice_1 Tender Documents
Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

Financial Evaluation In Progress

Financial bids are currently under review. Awarded bidder information will be published after final evaluation.

PriceBid
Similar Tenders Results
TenderDetail
Loading tenders