BRR : 10364670
Tender Brief : Tender For Garbage Collection Center Construction Work Basda Brahman Padla - For foundation, trench and drain etc. digging of soil upto 1.5 m depth, tamping the bottom, pouring water, grooming the sides, taking out the excavated soil, filling the foundation with soil again, empty spaces and disposal of the remaining soil upto a distance of 50 m.2 In cement concrete foundation or floor, put 40 mm nominal size stone aggregate (Crusher Broken)/ brick aggregate in cement-sand mixture in the ratio of 1 cement: 4 sand: 8 aggregate and tamping, including tamping. With stone aggregate (Crusher Broken... Read More
Tender Value
₹
6,75,000
Submission Date
08-07-2025
Participated Bidder List
2 No of Bidder(s)
| Sr No. | Bidder Name | Bid Analytics | Technical Bid | Financial Bid | AOC | Bid Value | Rank |
|---|---|---|---|---|---|---|---|
| 1 | cnet-technologies | Bid Analytics | |||||
| 2 | cnet-technologies | Bid Analytics | 6,75,000 | L1 |
Work Detail
tender for garbage collection center construction work basda brahman padla - for foundation, trench and drain etc. digging of soil upto 1.5 m depth, tamping the bottom, pouring water, grooming the sides, taking out the excavated soil, filling the foundation with soil again, empty spaces and disposal of the remaining soil upto a distance of 50 m.2 in cement concrete foundation or floor, put 40 mm nominal size stone aggregate (crusher broken)/ brick aggregate in cement-sand mixture in the ratio of 1 cement: 4 sand: 8 aggregate and tamping, including tamping. with stone aggregate (crusher broken)3 in foundation and plinth, stone layer-fill in cement-gravel mixture, closing the side cracks and tamping etc. cement gravel 1:64 masonry of superstructure to be completed in cement mortar 1:6. masonry of foundation and plinth first class bricks in cement gravel 1:6 or 1:8 mortar including closing of side cracks and wetting.5 masonry work of 112 mm and 75 mm width of first class bricks in foundation superstructure in cement gravel mortar 1:4 including wetting.6 soil work in filling by digging a pit on the side of the road and lifting 1.5 meter of soil and taking it upto 50 meter, breaking lumps and laying in 25 cm layers and pressing and leveling and making camber.7 cement plaster on the wall by mixing cement gravel in 1:6 ratio, scraping joints and regular wetting for 14 days. supply and fixing of 22 gauge iron steel corrugated sheet 20 mm8 0.80 mm thickness with j or l hooks and 8 mm dia bolts and nuts bitumen wire (complete work) cost of scissors and purlins is not included. analysis shade size 18.3 m x 0.9 m for 184 sqm, 0.54 nos. of sheet size 2.5x0.9 m (121.5 sqm) and 54 nos. of sheet size 2.8x0.9 m (136.08 sqm) = 257.58 sqm9 cement concrete 1:2:4 mixture of 50 mm thickness, consisting of 1 cement, 2 gravel, 4 stone or bricks mixed with ballast of 12 m, including pouring, ramming, pressing and leveling etc.10 iron work in grill/gate etc. including cutting, mounting and fixing of flat cones, t and corrugated (channel) etc.11 supply of 15 cm high stones for dry trench under the floor and complete work of trenching12 display board and photo contingency
View Original Notice/Document
Result Documents
Tender Documents
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender
Financial Evaluation In Progress
Financial bids are currently under review. Awarded bidder information will be published after final evaluation.
PriceBid
Similar Tenders Results