BRR : 10291868
Click Here To View Tendering Authority. Price Bid City/State :  saharanpur, Uttar Pradesh
Tender Brief : Construction of 4 lane bypass from NH 709 B. Chuneti via Bambata Road to K. 171 Devla of Delhi Yashnotri Garg in the jurisdiction of Electricity Distribution Sub-Division BYTBI under Electricity Distribution Division-II Saharanpur, according to the sanctioned allocation in Purna Jaya Scheme by Saharanpur. Under the 33/11 KV power sub-station, the work of shifting the 11 KV Naharpur Kaudar line (near the camp in Site Savatpur Nawada) and the line going to Village Chhidwana Road of Industrial Third Fouder, powered by BYTI.-2 Safe cartage of ST poles 11 Mtr. from ESC, SRE/JE store to site of wor... Read More
Tender Value
18,67,000
Submission Date
04-11-2024
Participated Bidder List
6 No of Bidder(s)
Sr No. Bidder Name Bid Analytics Technical Bid Financial Bid AOC Bid Value Rank
1 cnet-technologies Bid Analytics
2 cnet-technologies Bid Analytics 19,25,814 L2
3 cnet-technologies Bid Analytics 18,50,578 L1
4 cnet-technologies Bid Analytics 19,39,034 L3
5 cnet-technologies Bid Analytics 19,57,360 L4
6 cnet-technologies Bid Analytics
Work Detail
construction of 4 lane bypass from nh 709 b. chuneti via bambata road to k. 171 devla of delhi yashnotri garg in the jurisdiction of electricity distribution sub-division bytbi under electricity distribution division-ii saharanpur, according to the sanctioned allocation in purna jaya scheme by saharanpur. under the 33/11 kv power sub-station, the work of shifting the 11 kv naharpur kaudar line (near the camp in site savatpur nawada) and the line going to village chhidwana road of industrial third fouder, powered by byti.-2 safe cartage of st poles 11 mtr. from esc, sre/je store to site of workincluding loading & unloading at both ends.(dist.up to 40 km.) 3 safely cartage of other complete line material(except st poles/11 kv xlpe cable) from esc, sre/ je store to site of workincluding loading, unloading at both ends.( dist.upto 40 km.) 4 safely cartage of11 kv xlpe cable size 3x120sq mm from esc, sre/ je store to site of workincluding loading, unloading at both ends.( dist.up to 40 km.) 5 erection of double pole on st poles11 mtr longwith complete fitting with all accessories complete. 6 fixing of 11 kv stay rods by digging of pits in block of 600x600x300 mm. &withnozzling of stay wire 7/10 swg and fitting the same on the pole 7 concreting of stay rod inratio 1:4:8 with ist class brick ballast with cement, sand 8 earthing of poles by earthing rod with gi wire. 9 providing and fixing of stone ped 300x300x75 10 providing ofall type ms clamp for st poles with nuts bolts made of new ms flat iron 50x5 mm. 11 providing ofnuts & bolts of various sizes. 12 providingof11 kv cable terminationskit out doorof size3x120 sq mm. 13 providing of hdpe pipe 160mmdia 14 providing of g.i. pipe 100mm 4 dia class b 15 removal of oldweaselconductorfrom the existing 11kv lines with making roll of conductor and shifting the same to esc, sre/j.e store including loading and unloading at both ends. 16 providing and fixing of number plate with clamp on the each pole. 17 providing and fixing 11 kv danger board with clamp nuts & bolts. for st poles made of3mm thick foam sheet (8 x 6) with 18 providing and fixing of gi barbed wire on the each pole. 19 providing ofred oxide paints (british/asian/enamel paint) 20 providingof alluminium paint (british/asian/enamel paint) 21 painting ofst poles 11 mtr, sp-55with 2 coats of synthetic enamel paint after one coat of ready mix primer as well as rubbing/cleaning of surface as required for proper completion of work. and remaining by aluminium paint including all channels/clamps etc. 22 drilling of earthunder road crossing1.5 mtr. deepand laying of 2 no. parreral hdpe pipe 160 mm dia on 0.5 meter distance by drill machine/jcb machine/ labour. 23 laying of11 kv xlpe cable 3x120sq mm in the2 no. parreral hdpe pipe 160 mm dia on 0.5 meter distance. 24 fixing & making of 11 kv cable heat shrinkable terminationskits of size 3x120 sq mm of outdoor. 25 fixing of g.i. pipe 100mm 4 dia 3.5 mtr. long at the both side of double pole. 26 hanging ofcable ond/pafter fixing of outdoor terminations kits work as per site condition with jumpring complete. 27 fabrication charges of angle & channal 28 concreting of st poles sp-55, 11 mtr.long with cement concreting in bolck of 600x600x1500 mm. in ratio 1:4:8 with cement, sand and brick ballast size 1x1.5 with plinth. 29 dismantling of existingpcc poleafter opening of complete accessories.
View Original Notice/Document
Result Documents
Tender Documents
Download File Name File Description
Download 14a02534-38ea-41ad-9ec9-3913c6c38b91 financialevaluation notice
Download boqcomparativechart boq document
Download finance_1694001 aoc document
Download finsummary_1694001 aoc document
Download File Name File Description
Download b12ba124-a026-48b2-96d3-8ba9aba5762b Tender Documents
Download 65 Tender Documents
Download BOQ_1694001 Tender Documents
Download Tendernotice_1 Tender Documents
Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

Financial Evaluation In Progress

Financial bids are currently under review. Awarded bidder information will be published after final evaluation.

PriceBid
Similar Tenders Results
TenderDetail
Loading tenders