Tender Brief : Annual Rate Contract For Improvement / Erection Of Ht / Lt Network & Creation / Augmentation Of Sub Stations Of Various Capacities Under Various Schemes Including Maintenance / Emergent Nature / Restoration Works Falling Under The Jurisdiction Of Electricdivision Jpdclkishtwar For The Year 2022-23- 1 Unloading Of St Pole13 Mtr Long 2 Average Carriage Of St Pole13 Mtr Long Upto 100 Mtr 3 Average Carriage Of St Pole 13 Mtr Long Upto 100 - 200 Mtr 4 Erection Ofst Pole 13 Mtr Long 5 Unloading Of St Pole11 Mtr Long 6 Average Carriage Of St Pole 11 Mtr Long Upto 100 Mtr 7 A... Read More
Tender Value
₹
60,00,000
Submission Date
21-05-2022
Participated Bidder List
10 No of Bidder(s)
| Sr No. | Bidder Name | Bid Analytics | Technical Bid | Financial Bid | AOC | Bid Value | Rank |
|---|---|---|---|---|---|---|---|
| 1 | cnet-technologies | Bid Analytics | 1,06,307 | L4 | |||
| 2 | cnet-technologies | Bid Analytics | 1,12,040 | L5 | |||
| 3 | cnet-technologies | Bid Analytics | 1,48,857 | L8 | |||
| 4 | cnet-technologies | Bid Analytics | 43,649 | L2 | |||
| 5 | cnet-technologies | Bid Analytics | 43,233 | L1 | |||
| 6 | cnet-technologies | Bid Analytics | 2,57,632 | L10 | |||
| 7 | cnet-technologies | Bid Analytics | 1,47,575 | L7 | |||
| 8 | cnet-technologies | Bid Analytics | 47,646 | L3 | |||
| 9 | cnet-technologies | Bid Analytics | 1,68,290 | L9 | |||
| 10 | cnet-technologies | Bid Analytics | 1,38,059 | L6 |
Work Detail
annual rate contract for improvement / erection of ht / lt network & creation / augmentation of sub stations of various capacities under various schemes including maintenance / emergent nature / restoration works falling under the jurisdiction of electricdivision jpdclkishtwar for the year 2022-23- 1 unloading of st pole13 mtr long 2 average carriage of st pole13 mtr long upto 100 mtr 3 average carriage of st pole 13 mtr long upto 100 - 200 mtr 4 erection ofst pole 13 mtr long 5 unloading of st pole11 mtr long 6 average carriage of st pole 11 mtr long upto 100 mtr 7 average carriage of st pole11 mtr long upto 100 - 200 mtr 8 erection ofst 11 mtr pole 9 unloading of st pole 9 mtr long 10 average carriage of st pole 9 mtr long upto 100 mtr 11 average carriage of st pole 9 mtrlong upto 100 - 200 mtr 12 erection ofst 9 mtr pole 13 unloading of st pole 8 mtr long 14 average carriage of st pole 8 mtr long upto 100 mtr 15 average carriage of st pole 8mtr long upto 100 - 200 mtr 16 erection ofst 8 mtr pole 17 cement bottoming in 1:2:4 ratio of st poles of all sizes ( material for cement bottoming is to be provided bydepartment ) 18 cement bottoming in 1:2:4 ratio of st poles of all sizes ( material for cement bottoming is to be provided by contractor ) 19 branch cutting of ht / lt lines 20 unloading of line materials such as acsrconductor, nut and bolts, c.i / m, s chennels, ht / lt cables , link / do / go / hgsets etc…etc 21 average carriage of line material upto 100 mtr 22 average carriage of line materialupto 100 - 200 mtr 23 fixing ofc.i / m s channels 8 / 9 / 10 feet long with nut and bolts 24 fixing ofc.i / m s channels 4 / 5 / 6 / 7 feet long along with braces andnut and bolts 25 fixing ofc.i / m s angle iron 8 / 9 / 10 feet long with nut and bolts 26 fixing of c.i / m s angle iron 3 / 4 / 5 feet long with nut and bolts 27 installation of link / do / hg / knife / la set 28 insatalltion of go set 29 fixing / installation of 11 kv pin insulators with pins 30 fixing / installation of 11 kv disc insulators with fittings 31 unloading of ct / pt unit 32 average carriage of ct / pt unit upto 100 mtr 33 average carriage of ct / pt upto 100 - 200 mtr 34 erection of ct / pt unit along with trivector meter 35 erection of ctpt unit 36 loading of 25 / 63 / 100kva transformer ( new / repair ) 37 unloading of 25 / 63 / 100kva transformer ( new / repair ) 38 tightening of loose conductor sq / weasel / dog 39 route clearance for making path 40 survey of route alignment for new lines ( ht / lt ) 41 guard nettingin htlines 42 iron work such as fabrication of steel work at site 43 drilling of holes at site 44 erection / installation of mccb complete job 45 mounting of 250 / 400 / 500 / 630kva transformer 46 fixing of11 kv jumpers 47 painting of poles with channel / brace / clamps complete job 48 fixing of lt circuit component of substation ( lt cables, thimbles, busbar, shackle insulators ) with fuse set / mccbwith box 49 earthing of substation complete ( poles, transformer, ct / pt, la ) 50 testing and commissioning of ct / pt unit 51 testing and commissioning of substation 52 laying of acsr conductor on ground 20 / 30 mmsq 53 laying of acsr conductor on ground 50 / 100 mmsq 54 stringing of acsr conductor 20 / 30mmsq / squirell / weasel 55 stringing of acsr conductor 50 / 100 mmsq / rabbit / dog 56 erection of guys in ht / lt line complete job 57 fixing of u-clamps and shackle insulators with nut and bolts 58 fixing of suspension / anchoring clamps 59 laying of ht ab / xlpe cable 25 / 35 / 50 mmsq 60 laying of ht ab / xlpe cable 70 / 95 / 120 mmsq 61 laying of ht ab / xlpe cable 150 / 185mmsq 62 laying of ht ab / xlpe cable 240 / 300 mmsq 63 laying of lt ab / xlpe cable 25 / 35 / 50 mmsq 64 laying oflt ab / xlpe cable 70 / 95 / 120 mmsq 65 laying of lt ab / xlpe cable 150 / 185mmsq 66 laying of lt ab / xlpe cable 240 / 300 mmsq 67 dismantling of old ht ab / xlpe cable 25 / 35 / 50 mmsq 68 dismantling of old ht ab / xlpe cable 70 / 95 / 120 mmsq 69 dismantling and carriage to storesht ab / xlpe cable 150 / 185mmsq 70 loading / unloading and carrriage of ht ab cable of 50 / 120 / 240 mmsq 71 dismantling of oldlt ab / xlpe cable 25 / 35 / 50 mmsq 72 dismantling of old lt ab / xlpe cable 70 / 95 / 120 mmsq 73 dismantling of oldlt ab / xlpe cable 150 / 185mmsq 74 dismantling of oldlt ab / xlpe cable 240 / 300 mmsq 75 fixing of heat shrinkable outdoor kit for ab / xlpe cables ofht / lt lines 76 fixing of mid spanstraight jointer kit for ab / xlpe cables ofht / lt lines 77 dismantling of oldlt ab / xlpe cable 240 / 300 mmsq 78 testing and commissioning of ab / xlpe cables ofht / lt lines 79 inspection of ab / xlpe cables ofht / lt lines 80 dismantling ofold squirell acsr conductor 81 dismantling ofold weasel acsr conductor 82 dismantling of old rabbitacsr conductor 83 dismantling ofold dog acsr conductor 84 dismantling of pin / disc / shackle insulators 85 dismantling of oldm s channels 8 / 9 / 10 feet long 86 dismantlingof old ms channels 4 / 5 / 6 / 7 feet long along with braces 87 dismantling of old m s angle iron 8 / 9 / 10feet long 88 dismantling of oldms angle iron4 / 5 / 6 / 7 feet long 89 dismantling of oldlink / do / hg / knife / la set 90 dismantling of old go set 91 dismantling of old 11kvjumper 92 dismantling ofdamaged lt circuit component of substation ( lt cables, thimbles, busbar, shackle insulators ) with fuse set / mccbwith box 93 un-mounting of 25 / 63 / 100kva transformer 94 un-mounting of 250 / 400 / 500 / 630kva transformer 95 dismantling of existingpcc pole 9 mtr long 96 dismantling ofexisting pcc pole 8 mtr long 97 dismantling of existing st pole 13 mtr long 98 dismantling ofexisting st pole 11 mtr long 99 dismantling ofexisting st pole 9 mtr long 100 dismantling ofexisting st pole 8 mtr long 101 construction of cemented platform ( 8x8x6 feet ) for 630 / 400 kva substation along with mesh fencing of 6 feet height ( if material to be provided by department for this item ) 102 construction of cemented platform ( 8x8x6 feet ) for 630 / 400 kva substation along with mesh fencing of 6 feet height ( if material to be provided by contractor for this item ) 103 carriage of t and p items 104 watch and ward of material 105 fixing of single / three phase meters along with service line 106 erection of db / meterbox on pcc / st poles 107 write back of dismantled material such as acsrconductor, c.i / m, s chennels, ht / lt cables , link / do / go / hgsets etc…etc to divisional storezelnakishtwar 108 re- erection of uprootedst poles poles 8 / 9 / 11 / 13 mtrslong 109 average carriage of 25kva upto 100 mtr 110 average carriage of 63 kva upto 100 mtr 111 average carriage of 100 / 250 / 400 / 630 kva upto 100 mtr through mechanical / manual means 112 loading of 250 / 400 / 500 / 630 kva transformer by mechanical / manual means 113 unloading of 250 / 400 / 500 / 630 kva transformer by mechanical / manual means 114 average carriage of 250 / 400 / 500 / 630 kva for 100 -200 mtr by mechanical / manual means 115 average carriage of 25kva dt from 100-200 mtrmanually 116 average carriage of 63kva dt from 100-200 mtr manually 117 average carriage of 100 kva 100 - 200 mtr through mechanical / manual means
View Original Notice/Document
Result Documents
Tender Documents
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender
Financial Evaluation In Progress
Financial bids are currently under review. Awarded bidder information will be published after final evaluation.
PriceBid
Similar Tenders Results