BRR : 10225889
Tender Brief : Tender For Breakdown Of 33 Kv And 11 Kv Lines In Future Due To Natural Calamity In The Area Of Sub-Division Fifth Baraut Under Power Distribution Division Ii Baraut Work Related To-1 , Lt / Ht On Site For Replacement Of Broken Damaged Pcc / Stp, Loading Of Pole From Storage Center / Baghpat / Meerut / Reaching The Site, Erecting Pole By Digging Pit, Hanging The Wires By Applying Clamp, Cross Arm, Insulator Etc. On The Pole | Switch On The Power Supply. 2 , New Pole ( Pcc / Stp ) For Installation Of Low Hanging Wires / Av Cables At Site Loading / Transportation Of Pole... Read More
Tender Value
₹
Ref. Document
Submission Date
13-06-2023
Participated Bidder List
3 No of Bidder(s)
| Sr No. | Bidder Name | Bid Analytics | Technical Bid | Financial Bid | AOC | Bid Value | Rank |
|---|---|---|---|---|---|---|---|
| 1 | cnet-technologies | Bid Analytics | 2,01,500 | L2 | |||
| 2 | cnet-technologies | Bid Analytics | 2,02,000 | L3 | |||
| 3 | cnet-technologies | Bid Analytics | 1,99,500 | L1 |
Work Detail
tender for breakdown of 33 kv and 11 kv lines in future due to natural calamity in the area of sub-division fifth baraut under power distribution division ii baraut work related to-1 , lt / ht on site for replacement of broken damaged pcc / stp, loading of pole from storage center / baghpat / meerut / reaching the site, erecting pole by digging pit, hanging the wires by applying clamp, cross arm, insulator etc. on the pole | switch on the power supply. 2 , new pole ( pcc / stp ) for installation of low hanging wires / av cables at site loading / transportation of pole from storage center to site erection of pole, clamp on pole, cross arm, insulator etc. to start the power supply by continuously hanging the wires. 3 , pole repair work by welding additional channel / angle / iron strip to st pole ( 04 m / 11 m / 13 m ) damaged due to corrosion etc. near the ground near the site. ( required | channel / angle / strip to be paid by the tenderer ) 4 loose wire / ab cable / new wire ( lt line / vt line ) pull-tightening per span and maintaining safe ground clearance. 5 to straighten the polo by pulling it diagonally when the soil / boulder / packing. work of straightening the pole by filling and tightening the staywire. 6 the work of starting power supply from clear line by cutting / pruning the branches of trees covered on lt / 11 kv / 33 kv line. 7 , 02 nos pole, stay bear and other fittings for double pole construction. transporting the material from the storage center to the work place ( including loading and unloading ) , erecting poles by digging pits and fitting double | pole preparation ( decentralized material to be paid by the tenderer )
View Original Notice/Document
Result Documents
Tender Documents
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender
Financial Evaluation In Progress
Financial bids are currently under review. Awarded bidder information will be published after final evaluation.
PriceBid
Similar Tenders Results