BRR : 10217216
Click Here To View Tendering Authority. Price Bid City/State :  Karaikal, Puducherry
Tender Brief : Supply Of Material For The Work Of Construction Of Harvesting Structure Threshing Floor Including Pucca Storage At Thiruvettakudy Vp In Kottucherry Commune-Collection and Supply of Fine sand including stacking to standard departmental gauage for Pre-measurement at the site as directed by the Engineer-in-charge. 2 Collection and Supply ofGravel including stacking to standard departmental gauage for Pre-measurement at the site as directed by the Engineer-in-charge. 3 Collection and Supply of Portland Cement 4 Collection and Supply of Stone Aggregate (Single size) :40 mm nominal size includin... Read More
Tender Value
17,31,462
Submission Date
24-06-2025
Participated Bidder List
1 No of Bidder(s)
Sr No. Bidder Name Bid Analytics Technical Bid Financial Bid AOC Bid Value Rank
1 cnet-technologies Bid Analytics 17,21,882 L1
Work Detail
supply of material for the work of construction of harvesting structure threshing floor including pucca storage at thiruvettakudy vp in kottucherry commune-collection and supply of fine sand including stacking to standard departmental gauage for pre-measurement at the site as directed by the engineer-in-charge. 2 collection and supply ofgravel including stacking to standard departmental gauage for pre-measurement at the site as directed by the engineer-in-charge. 3 collection and supply of portland cement 4 collection and supply of stone aggregate (single size) :40 mm nominal size including stacking to standard departmental gauage for pre-measurement at the site as directed by the engineer-in-charge. 5 collection and supply ofstone aggregate (single size) : 20 mm nominal sizeincluding stacking to standard departmental gauage for pre-measurement at the site as directed by the engineer-in-charge. 6 collection and supply of stone aggregate (single size) : 10 mm nominal size including stacking to standard departmental gauage for pre-measurement at the site as directed by the engineer-in-charge. 7 collection and supply of coarse sand (zone iii)including stacking to standard departmental gauage for pre-measurement at the site as directed by the engineer-in-charge. 8 collection and supply of common burnt clay f.p.s (non modular) bricks class designation 3.5 9 hire charges of wall form panel 1250x500 mm 10 hire charges of 100mm channel shoulder 2.5m long 11 hire charges of double clip (bridge clip) 12 hire charges of single clip 13 hire charges of m.s.tube 40mm dia 14 supply of twisted steel / deformed tmt bars fe-500d 15 hire charges offlame retardant face insulating , impregnated fibre board 12mm thick 16 supply of bitumen hot sealing compound : grade a 17 supply of bitumen solution primer of approved quality 18 supply of dehradun white lime 19 supply of welding by electric plant 20 supply of mild steel tubes hot finished welded type. 21 supply of red oxide zinc chromate primer 22 supply of galvanised steel j or l hooks 8mm dia 23 supply of precoated galvanised iron profile sheet 0.5mm tct 24 supply of mild steel sheetsfor tanks 25 supply of structural steel such as tees, angles channels and r.s.joists 26 supply of iron pintels including welded pin 27 supply of mild steel sheets with bolts and nuts to rest on pintels 28 supply of synthetic enamel paint in black or chocolate shade 29 supply ofplasticizer / super plasticizer 30 supply of c.i.pile shoe 31 supply of m.s.clamps for pile shoe 32 hire charge for loader including operating staff,diesel& lubricant oil etc,complete. 33 hire charge for hydraulic excavator (3d) with driver and fuel including operating staff,diesel& lubricant oil etc,complete. 34 hire charge for vibrator(needle type 40mm) including operating staff,diesel& lubricant oil etc,complete. 35 hire charges of concrete mixer 0.25 to 0.40 cum with hooper including operating staff,diesel & lubricant oil etc,complete. 36 hire charges of diesel road roller 8 to 10 tonne including operating staff,diesel & lubricant oil etc,complete. 37 hire charge of hydraulic piling rig with power unit etc.,complete accessories and shifitin including operating staff,diesel& lubricant oil etc,complete. 38 hire charge for pumping of concrete-h/c of pump, piping work, & accessories etc including operating staff,diesel& lubricant oil etc,complete. 39 hire charge production cost of concrete by batch mix plant(rolling every layer and top-most layer ) including operating staff,diesel& lubricant oil etc,complete. 40 supply and fixing of r.c.c. precast citizen name board size of 3.5 feet breadth, 6.00 feetheight and 2 inches thick with painting, drawing work, lettering the name board work. the rate includingcost of 1:2:4 p.c.c., earth work and refilling for fixing of post, loading unloading and transport charges etc.,complete as per the standard drawingofmord. mgnrega
View Original Notice/Document
Result Documents
Tender Documents
Download File Name File Description
Download 8bd83963-a63a-46c6-a819-f6b0f3510d58 financialevaluation notice
Download boqcomparativechart boq document
Download finance_19165 aoc document
Download finsummary_19165 aoc document
Download File Name File Description
Download 6e035e22-62a2-4ae2-ad9f-cd7ced3966e8 Tender Documents
Download BOQ_19165 Tender Documents
Download Tendernotice_1 Tender Documents
Download Tendernotice_2 Tender Documents
Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

Financial Evaluation In Progress

Financial bids are currently under review. Awarded bidder information will be published after final evaluation.

PriceBid
Similar Tenders Results
TenderDetail
Loading tenders