BRR : 10184478
Tender Brief : Tender For In View Of The Lok Sabha Elections-2024 In Edd-Barhaj It Is Very Necessary To Get Electrification Work Done At The Following Places Due To The Presence Of Polling-Booths In Primary Schools Under The Jama Yojana, The Work Of Necessary Electrification Is Done By Making Electricity Connection Of 12 Additional Primary Schools On Semi-Turn Basis Under Electricity Distribution Division Barhaj, With Safe Transportation, Dismantling And Backloading Of Goods Related To The Proposed Lines From The Respective Power Storage Center To The Work Site. Pcc Pole 8.5 Meter Residual Line Materi... Read More
Tender Value
₹
3,50,000
Submission Date
10-05-2024
Participated Bidder List
3 No of Bidder(s)
| Sr No. | Bidder Name | Bid Analytics | Technical Bid | Financial Bid | AOC | Bid Value | Rank |
|---|---|---|---|---|---|---|---|
| 1 | cnet-technologies | Bid Analytics | 3,58,037.85 | L2 | |||
| 2 | cnet-technologies | Bid Analytics | 3,70,146.46 | L3 | |||
| 3 | cnet-technologies | Bid Analytics | 3,49,014 | L1 |
Work Detail
tender for in view of the lok sabha elections-2024 in edd-barhaj it is very necessary to get electrification work done at the following places due to the presence of polling-booths in primary schools under the jama yojana, the work of necessary electrification is done by making electricity connection of 12 additional primary schools on semi-turn basis under electricity distribution division barhaj, with safe transportation, dismantling and backloading of goods related to the proposed lines from the respective power storage center to the work site. pcc pole 8.5 meter residual line material with transformer and acsr weasel / dog conductor lt abc cable ( 3x50+1x35+1x16 ) sqmm erection of single pcc pole with all fittings erection of double pcc pole with all fittings poll testing meaning of pole. meaning of transformer. spreading the conductor. tightening the sheathing by sagging it on the insulator and winding on each pole. ht line 3 phase 3 wire spreading lt abc cable. tightening the sheathing by sagging it on the insulator and winding on each pole. making and jumping of 11 / 0.4 kva transformer with all fittings 10 kva stay erection. gnatting. nosing and tightening as per requirement. work of fitting of tf channel. fitting work of distribution box. distribution box ( will be country by firm ) stone pad ( will be dev by firm ) lt clamp ( to be developed by the firm ) lt cycle insulator ( to be developed by the firm ) cross arm holding clamp ( to be paid by the firm ) f. beckett ( must be checked by firm ) 10 sqmm single core pvc cable ( to be paid by the firm ) lt pvc armored cable 2x4 sqmm ( to be checked by the firm ) nut bolt ( to be paid by the firm ) suspension clamp ( will be country by firm ) eye hook ( must be checked by the firm ) pershing clamp ( to be checked by the firm ) clamp for top channel. dropper and tf channel ( to be decided by the firm )
View Original Notice/Document
Result Documents
Tender Documents
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender
Financial Evaluation In Progress
Financial bids are currently under review. Awarded bidder information will be published after final evaluation.
PriceBid
Similar Tenders Results