View Bid Results For Navigational Equipment Tenders

We found 47 Bid Results related to navigational equipment tenders. You can find Contractor details who won navigational equipment tenders along with contract details in Bid awards announcements section.

Filters
Stage
28
16
3
Tender Publishing Platform
19
28
State / UT
15
7
6
5
4
4
3
3
3
2
2
2
2
2
1
1
Contract Value
25
10
9
3
Publish Date
0
0
0
0
0
Sector
10
16
7
7
5
4
2
2
2
1
1
Ownership
3
37
6
4
Within keyword
Active filters:
Showing 1–1 of 47 tenders matching your filters
Contract Date: Ref. Documents Contract Value : 1.00 Lakh
Government Departments No of Bidders 1
7.
Defence #10365851 Price Bid
Tender For 1St Dry Dock Repair And Maintenance Of Mechanized Boat Ravi; 1 DECK SIDE/ HULL SIDE: - A. Parts to be replaced :-All zinc anodes of hull are required to be replaced with new one and Zink Anode bolts of both main engines to be replaced. (1 Job) 2 Keel protecting plate screw at front portion to be replaced & keel protecting plate make serviceable. (1 NO) 3 01 set sea chest non returning valves required to be replaced. (1 SET) 4 All defective side ‘D’ fenders to be replaced. (1 Job) 5 All side portable pneumatic fenders to be replaced. (04 Nos) 6 All railing to be check, defective and damaged portion to be replaced. (1 Job) 7 Canopy cover required new in heavy duty and canopy SS frame repaired. (1 Job) 8 Required canopy cover in all lights. (1 Job) 9 B. Services to be carried out :- In side passenger cabin and pilot house side wall required lamination and FRP work. (1 Job) 10 All FRP body including hull to be check and defective portion required to be repaired. (1 Job) 11 Rubber packing of Hatch cover of engine room, wheel house, crew cabin and front deck required to be replaced. (1 Job) 12 ANCHORING SYSTEM A. Parts required to be replaced :-35 Mtr SS anchor chain 10 mm dia to be provided. (1 No) 13 30 Kgs grapnel anchor with P.P. rope approximate 19 mm x 120 feet to be provided (1 No) 14 Anchor winch and lifting motor required to be replaced. (1 no) 15 CABINParts required to be replaced :-Pilot, passenger seat with back rest and hand rest foam & Rexene to be Replaced. (1 set) 16 Floor mat required completely replaced in crew cabin (1 Job) 17 Crew cabin mattress with cover, 04 bed sheets, Pillow with cover required to be provided. (1 Job) 18 WINDOW CURTAIN A. Parts required to be replacedAll side window glasses curtain required new fitting with holder. (1 Set) 19 WIPERA. Parts required to be replaced :-Window Wiper motor along with blades and holder (arms) to be replaced (1 Set) 20 Window Wiper water spray system to be check and defective item to be replaced. (1 Set) 21 Main Engine Make and Types- 2 x Cummins, QSB 6.7 4801D1 Ref No QSB6.7 4801NT, Power: 473 HP 3000 RPM. Both the Main Engine with complete Accessories required complete overhauling and servicing / calibration with OEM genuine spares from OEM/Authorised dealer. (for Both engine)Engine Srl No. 74135449 (Stbd) & 74127698 (Port)Engine Model No.-QSB 6.7 INT 473 HP Run Hours (Port) – 5853.50 Hrs, (Stbd)- 5854.00 Hrs(**New spare parts to be replaced from OEM/Authorised dealer)MAIN ENGINE AND ENGINE ROOM :-A.Parts required to be replaced :- All sea water line, Bilge, suction and fire line with all valve required cleaning by chemical and pressure test. If any found damage/poor condition required to be replaced. (01 Job) 22 Both main engine and gear box mounting and vibration pad required to be replaced. (2 Set) 23 Both main engine inter cooler and oil cooler required to be replaced. (2 Set) 24 Battery of both main engine-02 x 02 (180 AH), 04Nos, DG Set-01 No (120AH) and emergency battery-(180 AH), 02Nos required to be replaced.(7 Nos) 25 Convertor of 24-volt DC to 13.7-volt 10 AMP required replaced. (1 No) 26 All defective safety device required to be replaced (1 set) 27 Complete hose pipe & flexible pipe required to be replaced. (01 Job) 28 Flexible fuel line with clamp required to be replaced (1 Job) 29 Defective Exhaust pipes /flanges/mufflers required to be replaced. (1 Job) 30 Sea water pump and fresh water pump required to be replaced. (02 Set) 31 All retaining /non-retaining /delivery valves with flange, spindles required to be overhauling and defective parts required to replace. (1 Job) 32 All gaskets and nuts and bolts of retaining, non-retaining valve and discharge valve to be replaced (1 Job) 33 Both engine all kind of Engine harness and Engine sensors required to be replaced. (1 Job) 34 Both engine Alternator to be replaced. (2 Nos) 35 Both Main Engine, Lube oil filters, fuel filters, coolant, engine oil etc need to be replace with OEM recommended consumable items and spares from OEM/OEM authorised dealer. (01 Job) 36 B. Services required to be carried out :-All accessories i.e. Turbo charger, water cooler, self-starter, fuel pump, fuel injectors etc required complete overhauling/ servicing / calibration and defective spare parts to be replaced. (1 Job) 37 All Fire hydrant, with accessories & nozzles required to be serviced and fire hose required to be replaced. Also, defective parts required to replace. (1 Job). 38 Engine alarms check, operational instruments to be made operational. (1 job) 39 Electrical fire pump/ Bilge pump complete overhauling with replacing shaft and bearing and impeller etc. Also, defective item to be replaced. (1 Job) 40 DG SET A. Parts required to be replaced :-8 KVA DG set (Marine grade) required to be replaced with new version in same capacity with complete accessories of reputed brand for which availability of spare parts easily in market. (1 No) 41 One additional new 01 HP mono block pump to be provided for use in emergency basis (1 No) 42 FIRE ALARMA.Parts required to be replaced :-All fire alarm system to be service and be made operational and horn system made with 24volt, stainless steel small size dual (marine grade) is required to be replaced. (1 Job) 43 Defective wiring, switches, cables and sensors of fire alarm required to be replaced. (1 Job) 44 Fire hose box on aft deck found wasted, same to be renewed (01 No) 45 DeckD D fire pump found wasted, same to be replaced ( 01 No) 46 BLOWERS A. Services to be carried out :-All blower and exhaust motor to be to be replaced with same capacity and make. Also base of blower and exhaust fan be required to be replaced by SS & FRP ( 01 Job) 47 STEERING SYSTEM:-Hydraulic steering system to be overhauled and hydraulic oil to be replaced (01 No) 48 Solenoid switch required to be servicing ( 01 Set) 49 GEAR BOX (**New spare parts to be replaced from OEM/Authorised dealer spare parts)A.Parts to be replaced :-Both gear box complete overhauling & defective parts to be replaced.( 01 Set) 50 Both M/E gear box coupling oil seal, recommended gear oil as per OEM required to be replaced. (2 Set) 51 Gear oil cooler servicing and sensors to be replaced. (2 Nos) 52 PROPULSION UNIT (**New spare parts to be replaced from OEM/Authorised dealer spare parts)A.Parts to be replaced :-Propeller shaft to be replaced (fit with proper alignment) (2 Nos) 53 Rudder & Rudder Bush, ‘P’ bracket bush, foundation bolt, Sturn tube bush and gland bush required to be replaced. (fit with proper alignment)( 02 Set) 54 P’ bracket foundation hanging bolt to be replaced and foundation to be made water proof. (repair and realignment) ( 01 Job) 55 SPECIAL EQUIPMENTA. Parts to be replaced :-All navigation lights, deck light, wheel house light & crew cabin light, defective bulbs, switches, wiring (24 Volt and 230 Volt),Deck panel board defective switches and lights required to be replaced. (1 Job) 56 One Digital multi-functional display to be provided at appropriate place in cabin preferably at wheel house console. Also feed of all navigational equipment’s like RADAR, Echo Sounder, Magnetic Compass, AIS etc should be synchronised in above multifunctional display.( 01 Job) 57 360-degree marine type CCTV camera at mast to be fitted with complete display and UPS.( 01 Set) 58 B. Services to be carried out :-GPS system required servicing with calibration (1 No) 59 Magnetic compass required to be serviced and calibrate. (1 No) 60 SEARCH LIGHTSA. Parts to be replaced :-Search light required to be replaced.(02 Nos) 61 Flood lights required to be replaced with (LED). (1 Set) 62 LIFE SAVING EQUIPMENT Life rafts required to be servicing and to be install on the roof of boat (if IRS permit) (2 Nos) 63 Hazardous duty life jackets to be replaced. (6 Nos) 64 Life buoys SOLAS approved with 30 Mtr life lines to be replaced. (4 Nos) 65 Distress signals of the vessel should be replaced. EPIRB, SART, AIS to be serviced & make operational. (1 Set) 66 FIRE FIGHTING EQUIPMENT’S:All fire extinguishers required to be replaced as per FFA plan. (1 Job) 67 TANKSAll tank air vents required to be replaced. (1 Job) 68 Fuel Tank to be cleaned, top cap to be renewed and leak testing to be carried out (02 Nos) 69 TOILETToilet system required servicing:Pipe line of toilet to be cleaned, discharge motor to be renewed and toilet flushing and whole system required to be operational. Pressure water system to be overhauled & make operational. (1 Job) 70 One additional discharge motor to be provided as spare. (1 No) 71 AC & VENTILATIONS Air conditioning unit required servicing/overhauling, AC cooling pump required to be replaced and other air condition related defective item to be replaced, also refill refrigerant gas. (1 Job) 72 Operating panel board check and defective items to be replaced. (1 Job) 73 MISCELLANEOUS A. Parts to be replaced :-All DC bunks fans to be replaced (6 Nos) 74 All water tight door seal rubber packing required to be replaced and testing to be carried (1 Job) 75 Door defective locking system required to be replaced. (1 No) 76 Water leakage from wheel house roof and crew cabin wall side required to be repaired with roof sealing. (1 Job) 77 1 KVA Inverter UPS system required to be provided for emergency lighting. (1 No) 78 B. Services to be carried out :-Manual bilge pump required to be serviced. (1 No) 79 Visual/manual fuel pipe measuring system may be installed outside the tank to check the fuel level. The fuel supply line to both main engine and DG set be made completed. (1 No) 80 ELECTRICAL SIDE Insulation resistance (merger test) and OEM recommended preventive maintenance to be carried out and the following electrical items should be made operational/functional. All electronic components, controls and wiring used on engine and the boats are to be marine version complying with IP 65 rating.All electrical cable line (AC and DC line) is required to be repaired and make it serviceable by replacing defective parts. Also all line to be lying in cable tray. (1 Job) 81 All electrical panel board with line required checking and be in functional Condition. (1 Job) 82 Cabin and exhaust fans with toilet exhaust fan be checked and servicing and make operational. (Defective parts required to be replaced.) (1 No) 83 Multi Bty isolator 24Volt DC, 80 AMP 3 Pin, 2 Out required to be replaced. (2 Nos) 84 Shore supply socked to be renewed. (1 Job) 85 PAINTINGUnder water hull surface cleaning and paintingPainting Scheme:Pen guard HB primer (Epoxy primer) 01 Coat – 100 Micron (DFT)Safe guard universal ES grey tie coat 01 Coat – 100 Micron (DFT) Sea Quantum pro-u light red- 01 coat – 150 micron (DFT) (Silyl Acrylate Anti-fouling self-polishing paint) Sea quantum pro-u-dark red – 01 coat – 150 micron (DFT)(Silyl Acrylate anti-Fouling self-polishing paint) Metal oxide paint & primer to jet units. Under water portion anti-fouling paint (Safe Guard Universal ES Grey, Pen Guard HB Primer, Sea Quantum Pro-U, Light Red, Sea Quantum Pro-U Dark Red) to be required as per international maritime organization (IMO) scheme. Painting should be done as above painting scheme:i. All above water painting as vessel requirement Above water level complete cleaning surface finishing and lamination wherever required and painting as per vessel painting scheme.ii. All vessel outer body required paintingVessel outer body cleaning and complete painting in disruptive pattern as per original painting scheme. Fire retardant paint inside the cabin and engine room to be carried out. (01 Job) 86 LMG & MMG Protection shielded NIJ – level-III & safety guard of gun mount required re-fitting/servicing. (01 Job) 87 Bollard and cleat checked and serviced. (01 Job) 88 Charges for Dry Docking/Piloting/Inspection and Insurance (1 Job)
Contract Date: Ref. Documents Contract Value : Ref. Document
Government Departments No of Bidders 3
8.
Water Resources and Irrigation #10170722 Price Bid
Tender For Annual Afloat Repair Works Of “Sl Pamba” At Iwt Maradu Terminal Kochi, During The Year 2024-25; 1 Chipping, wire brushing, buffing, grinding& cleaning of above water level up to deck area including Super structure includes wheel house top, rear seating arrangement, Steering gear compartment inside, Radar compartment inside Engine room inside & also engines foundation base frames, various pipes, machinery & other fitting etc. b) Store, bath room (toilet), Mast & other fittings etc.c) Engines (3 no) shall be cleaned properly and painted with spray paint. including labour and material charges. 2 Painting of the above mentioned areas with 2 coat epoxy primer and . 2 coats of epoxy marine quality enamel of existing colour properly including labour and material Cost. 3 Renewal of damaged M.splate of 5 mm thickness (BIS 2062 steel, Grade B) after the vessel at Stern gear Compartment of ship building quality after removal of the damaged plates by gas cutting and other fittings safely. Labour and material cost 4 Renewal of2 no RPM meter gauge in wheel house with cables including labour charges 5 b)Cost of Spare parts (Actual+10%) will be reimbursed 6 Checking and rectification of electrical defects while using D.C & AC make the equipments such as horn, navigational lights, other lights & fans in Accomodation and wheel house areas in good working conditionincluding labour charges 7 b)Cost of Spare parts (Actual+10%) will be reimbursed 8 Servicing of rotory pump fitted in radar compartment and Fuel rotory pump fitted with Auxillary generator and makein good working condition including labour charges 9 b)Cost of Spare parts (Actual+10%) will be reimbursed 10 Cleaning of bilge pipelines (blockages to be cleared) bilge inlets to be checked and renew damaged pipelines and make in good working condition 11 Fabrication of air went pipe base fitted above accomodation area, and flag pole fitted to the aft side of the vessel to be renewed including laboour and material 12 Fabrication and re fitting of searchlight stand (folding stand required) and supply &fitting of new search light of good qualityincluding labour charges 13 b)Cost of Spare parts (Actual+10%) will be reimbursed 14 Supply and fitting of new wiper blades and also renewal of intermediate clamp for one wiper for smooth operation 15 Fabrication and fitting of new hand rails in damaged areas including labour and material charges 16 Reparing and renewal of damaged chair foundation and handles with new one including labour and material charges 17 Cleaning of diesel tanks after removing of diesel from the tanks. Removing & storing of HSD in barrels to be done with safe. Labour & material Charges 18 Re writing of vessel name, logo, registration no, port of registry etc on name plates fixed and also draft marking, draft line on both Port and STBD sides as per the existing style including labour and material cost.
Contract Date: Ref. Documents Contract Value : Ref. Document
Statutory Bodies & Commissions/Committees No of Bidders 3
Contract Date: Ref. Documents Contract Value : 14,986
Statutory Bodies & Commissions/Committees No of Bidders 3
Maharashtra View Result →
13.
Defence #9162766 Technical Bid
Procurement Of Se And Fc Items Under Ard Safety Equipment And Flying Clothing Items , List Of Items , Scissors Brass Tailor 9 , Industrial Sewing Machine , Electric Blower C / W Accessories 230 Watt , Digital Weighing Balance 0-15 Kgs Upto 3 Decimal , Floor Cleaner For Bay , Stop Watch Table Top , Sealing Machine Small , Sealing Machine Big , Thermometer Wet & Dry ( Hydrometer ) , Scissors 6 , Scissors 12 , 06 Men M / S Surakshal / Rc / Wsurvival Eqpts , Adlr L / R 10 Men Sar , Co2 Cylinder For 10 Men L / R ( Air Crew ) , Co2 Cylinder Mk 9D ( 300 Gms ) , Co2 Cylinder For Frailj ( 33 Gms ) , Operating Head Smallfor Co2 Cyl 28 Gms , Ty Repair Kit For Psp , First Aid Kit For Psp , Sea Activated Cell For Mslr , Pack Cover For Psp Type Cc , Edw 125 Ml For Psp , Seat Cushion For Psp , Tape 50Mm S / A Black W / P At 60 , Inflation Bag , Quick Release Coupling For Psp ( M+F ) , Sealing Washer , Nylon Cord 1Mm ( 50 Lbs ) , Fibre Washer For Psp ( Co2 To Inlet ) , Thread Linen 3Kg , Ear Phones , Skull Caps ( Set Of 02 ) , Short Connector For Lwih ( Tan Make ) , Visor Cover For Lwih ( Ctk&Alh ) , Boom - Mike Forlwih ( Ctk&Alh ) , Long Connector Forlwih ( Shakti Make ) , Core Valve , Lanyard Operating , Tape Self Adhesive 2 Wide , Needle Size-10, 16, 17, 18, 19, 20, 21, 22 ( Each ) , Talcum Powder , Colin Spray For Visor Cleaning , Floating Line 6Mm ( 150 Mtrs ) , Soluble Bobbin , Hand Paddle For Mslr , Ty Repair Kit For Mslr , Edw 500 Ml ( Pkt ) , Efr 500 Gms ( Pkt ) , Long Connector Forlwih ( Tan Make ) , Fluorescent Sea Marker , Cover Protection D40590 For Operating Head , Aircrew Navigational Bag For Observer , Overall Flying ( Fr ) Size-5 , Overall Flying ( Fr ) Size-6 , Overall Flying ( Fr ) Size-7 , Overall Flying ( Fr ) Size-8 , Overall Flying ( Fr ) Size-9 , Overall Flying ( Fr ) Size-10 , Overall Flying ( Fr ) Size-11 , Overall Flying ( Fr ) Size-12 , Bag Air Travel Polypropylene / Moulded Plastic ( Suit Case ) , Lwih ( With Boom Mike ) Size-Large , Lwih ( With Boom Mike ) Size-Medium , Lwih ( With Boom Mike ) Size-Small , Boot Flying ( S-5 ) , Boot Flying ( S-6 ) , Boot Flying ( S-7 ) , Boot Flying ( S-8 ) , Boot Flying ( S-9 ) , Boot Flying ( S-10 ) , Boot Flying ( S-11 ) , 6 Safety Glow Light Stick ( Yellow ) , Cylume Sos Light Green , First Aid Kit For Aircrew Mk-Ii , Gloves - Fr ( Smalll ) ( Size-5, 6, 7 ) , Gloves - Fr ( Medium ) ( Size-8, 9, 10 ) , Gloves - Fr ( Large ) ( Size-11, 12 ) , Knife Aircrew
Contract Date: Ref. Documents Contract Value : Ref. Document
Government Departments No of Bidders 8
17.
Law and Justice #9089683 Technical Bid
Tender For Supply Of Marine Navigational Equipment
Contract Date: Ref. Documents Contract Value : Ref. Document
Government Departments No of Bidders 3
Andhra Pradesh View Result →
18.
Defence #9069440 Technical Bid
Procurement Of Se & Fc Item Under Annual Review Of Demand 2020-21 , Safety Equipment And Flying Cloting Items : , Lp ( Air ) Compressor Hp / 2 Pressure 150 Psi , Vaccum Cleaner C / W Accessories , Stop Watch Table Top , Glass Magnifying 2 , Test Rig Helicopter Rescue Strop , Roller Rubber Sheet , Plier , 04 Men M / S L / R C / W Survival Eqpts , 06 Men M / S Suraksha L / R C / W Survival Eqpts , 10 Men Suraksha M / S L / R C / W Survival Eqpuipments , Psp Type Cc W / C Assy ( With Single Seater L / R ) , Co2 Cylinder For 04 Men L / R ( Air Crew ) , Co2 Cylinder Mk 9D ( 300 Gms ) , Co2 Cylinder For Frailj , Miniflare Pistol For 16Mm Cartridge With Pouch , Operating Head Small For Co2 Cyl 28 Gms , Desalting Appartus , Heliograph 4X4 , Pack Cover For Psp Type Cc , Knife Clasp For Psp , Seat Cushion For Psp , Nylon Cord 1Mm ( 50 ) Lbs , Velcro Tape 1 White ( Male ) , Velcro Tape 1 White ( Female ) , Ear Seals , Mic Muff , Skull Caps ( Set Of 02 ) , Boom - Mike For Lwih ( Ctk&Alh ) , Long Connector For Lwih ( Shakti Make ) , Pad Protection 125X200 Mm , Inflation Bag With Cover , Valise ( Type 85 ) For 7 / 10 Men L / R , Line Resque And Quiot , Talcum Powder , Nylon Cord 2 . 5 Mm ( 150Lbs ) , Ty Repair Kit For Mslr , Aircrew Navigational Bag For Observer , Overall Flying ( Fr ) Size-5 , Overall Flying ( Fr ) Size-6 , Overall Flying ( Fr ) Size-7 , Overall Flying ( Fr ) Size-8 , Overall Flying ( Fr ) Size-9 , Overall Flying ( Fr ) Size-10 , Overall Flying ( Fr ) Size-11 , Bag Air Travel Polypropylene / Moulded Plastic ( Suit Case ) , Lwi Helmet ( With Boom Mike ) Size-Large , Lwi Helmet ( With Boom Mike ) Size-Medium , Aircrew Torch , Boot Flying ( S-5 ) , Boot Flying ( S-6 ) , Boot Flying ( S-7 ) , Boot Flying ( S-8 ) , Boot Flying ( S-9 ) , Boot Flying ( S-10 ) , Boot Flying ( S-11 ) , Boot Flying ( S-12 ) , Watch Wrist Aircrew , 6 Safety Glow Light Stick ( Yellow ) , Torch Cell , First Aid Kit For Aircrew Mk-Ii , Gloves - Fr ( Small ) , Gloves - Fr ( Medium ) , Gloves - Fr ( Large ) , Knife Aircrew , Savlon Liquid Bottle , Floor Cleaner For Bay , Tape Measuring 1 . 5 Mtr , Schrader Valve Repair Tool , Tape Cotton Rot Proof , Tape Fabric 2 Wide , Tape Masking , Inflation Bag With Cover
Contract Date: Ref. Documents Contract Value : Ref. Document
Government Departments No of Bidders 6
Contract Date: Ref. Documents Contract Value : Ref. Document
Government Departments No of Bidders 7
Contract Date: Ref. Documents Contract Value : Ref. Document
Government Departments No of Bidders 3
Contract Date: Ref. Documents Contract Value : Ref. Document
Boards / Undertakings / PSU No of Bidders 4
Contract Date: Ref. Documents Contract Value : Ref. Document
Government Departments No of Bidders 3
25.
Power #8753058 Technical Bid
Providing Manpower On Contract Basis For Various Lighthouses ( Lakshadweep ) Under Directorate Cochin For The Period Of One Year From 01 . 04 . 2020 To 31 . 03 . 2021And Likely To Be Extended For Another Two Years , Providing Security Personnel Unarmed One In Each Shift Preferably From Ex-Serviceman In Three Shifts For Round The Clock Duty In The Statstic Sensor Station Minicoy , Kiltan , Agathi , Kalpeni & Androth Lighthouse For Round The Clock Watch And Ward Duty To Safeguard The Lighthouse Operational Establishment / Equipment And The Entire Compound And Premises . The Person Should Keep A Vigilant Approach In Allowing The Entry Of Persons In And Out Of The Lighthouse Compound And Should Maintain A Register For The Purpose Of Registering Inward And Outward Movement Of Visitors To The Lighthouse Compound , Providing Lighthouse Attendant In The Statstic Sensor Station Agathi Lighthouse To Safeguard The Lighthouse Operational Establishment / Equipment And The Entire Compound And Premises . The Person Should Keep The Equipments Cleaned And Provide Required Assistant To The Operatioal Staff At Static Senor Station And Maintennace Of Garden At Lighthouse Etc , Providing Attendant On Contract Basis For Manning Lighthouse Stations Including Gardening Work At Amini/ Chetlath/ Bitra/ Kadamath/Lighthouses Under Directorate , Cochin For The Period One Year . The Person Are Needed For Manning The Lighthouses At Amini , Bitra , Chetlath And Kadamath Lighthouses In Lakshadweep . The Person Should Have A Minimum Technical Qualification Of Iti In Electronic /Electrician/ Radio And Television Or Retired Attendant From Dgll . , Providing House Keeping Person On Contract Basis For Cleaning And Gardening Work For The Lighthouse Stations At Kalpeni/ Kavarathi/ Kiltan Island Under Directorate , Cochin Ffor A Period Of One Year . The Person Are Needed For House Keeping Work At Kiltan , Kalpeni And Kavarathi Lighthouses In Lakshadweep . , Providing Personnel For The Service Of Navigational Assistant Grade Iii ( Contract ) For A Period Of One Year For Dgps Station Minicoy Lighthouse . The Person Should Attend The Lightkeeping /Monitoring Of Dgps And Maintenance Of Equipments Etc As Per The Direction Of Station In Charge And Have A Minimum Qualification Of Diploma In Electonic/ Electrical And Elecronics ( Three Years Course ) , Providing Field Assisant On Contract Basis For Manning The Statstic Sensor Station At Kiltan ( 3 Person ) , Agathi ( 4 Person ) , Kalpeni ( 3 Person ) & Androth ( 3 Person ) Lighthouse In The U T Lakshadweep Under Directorate Cochin . The Person Are Needed For Manning The Static Sensor Stations Attached To Various Lighthouses In Lakshadweep Group Of Island In Three Shifts . The Person Should Have A Minimum Technical Qualification Of Diploma In Electronic Engineering Or Retired Technical Official From Dgll . ( 13 Persons For 12Months )
Contract Date: Ref. Documents Contract Value : Ref. Document
Government Departments No of Bidders 7
Lakshadweep View Result →
26.
Power #8753054 Technical Bid
Providing Manpower On Contract Basis For Various Lighthouses ( In Mainland ) And Deep Bhavan Cochin For Various Works Under Directorate Cochin For The Period Of One Year From 01 . 04 . 2020 To 31 . 03 . 2021And Likely To Be Extended For Another Two Years , Providing Security Personnel Unarmed One In Each Shift Preferably From Ex-Serviceman In Three Shifts For Round The Clock Duty In The Statstic Sensor Station At Mount Dilli ( 3 Person ) , Ponnani ( 3 Prson ) , Vypin ( 3 Person ) & Thangasery Point ( 3 Person ) Lighthouse For Round The Clock Watch And Ward Duty To Safeguard The Lighthouse Operational Establishment / Equipment And The Entire Compound And Premises . The Person Should Keep A Vigilant Approach In Allowing The Entry Of Persons In And Out Of The Lighthouse Compound And Should Maintain A Register For The Purpose Of Registering Inward And Outward Movement Of Visitors To The Lighthouse Compound , Providing Field Assisant On Contract Basis For Manning The Statstic Sensor Station At Mount Dilli ( 3 Person ) , Ponnani ( 3 Prson ) , Vypin ( 3 Person ) & Thangasery Point ( 3 Person ) Lighthouse Under Directorate Cochin . The Person Are Needed For Manning The Static Sensor Stations Attached To Various Lighthouses In Kerala Coast In Three Shifts . The Person Should Have A Minimum Technical Qualification Of Diploma In Electronic Engineering Or Retired Technical Official From Dgll . ( 12 Persons For 12Months ) , Providing Security Personnel Unarmed One In Each Shift Preferably From Ex-Serviceman In Three Shifts For Round The Clock Duty In The Deep Bhavan Cochin For Round The Clock Watch And Ward Duty To Safeguard The Office Establishment / Equipment And The Entire Compound And Premises . The Person Should Keep A Vigilant Approach In Allowing The Entry Of Persons In And Out Of The Lighthouse Compound And Should Maintain A Register For The Purpose Of Registering Inward And Outward Movement Of Visitors To The Deep Bhavan Premises , Providing Cleaning Staff At Deep Bhavan Complex Including Compound And In Front Of Its Outside Area Cleaning The Inside Floors And Walls Of Office Building With Soft Brooms And Moping The Floor With Clean Water Mixed Cleaning Solution Daily In The Morning Hours . The Office Building Will Be Opened At 08 . 00 Hrs And Kept It Free For The Cleaning Work Up To 09 . 00 Hrs . All Cleaning Work To Be Completed Before 0900 Hours - 1700 Sq . M Cleaning The Toilets And Urinals Of The Building With Phenyl At Least Twice In A Day I . E . Morning Before 09 . 00 Hrs And Afternoon 1400 Hrs . The Garbage In The Waste Basket To Be Removed And Disposed In The Corporation Waste Bins Early In The Morning And Afternoon At 1400 Hrs To Avoid Foul Smell In The Premises . Maintain The Garden Inside The Compound Including Watering Manuaring What So Ever Required For The Garden Including Removing Grass And Bushes Inside The Complex , Providing Personnel For The Work Of Data Entry Operator For A Period Of 12 Months For The Directorate Of Lighthouses & Lightships Cochin Is Needed For Of The Administration / Development/ Stores Section In Placeof Vacant Post Of Lower Division Clerck , Providing Personnel For The Work Of Junior Hindi Transilator For A Period Of 12 Months For The Directorate Of Lighthouses & Lightships Cochin Is Needed For Of The Administration / Development/ Stores Section . The Person Should Have A Minimim Qualification Of Degree In Hindi With Diploma In Hindi Translation From Any Recongnaised Unuiversity , Providing Technical Assisant On Contact Basis For Nais In The Rcc At Directorate Of Lighthouses And Lightships , Deep Bhavan For 12 Months . The Person Are Needed For Monitoring The Regional Control Centre Of Nais And Master Control Station Of Automation System In Three Shifts . The Person Should Have A Minimum Technical Qualification Of Diploma In Electronic Engineering With Three Years Experiance Incommunication System ( 2 Person 12 Months = Total 24 Months ) , Providing Personnel For The Service Of Navigational Assistant Grade Iii ( Contract ) For A Period Of One Year For Various Lighthouses In Main Land Stations Kasargod , Chetwai , Alappuzha , Anjengo And Azhikode . The Person Should Attend The Lightkeeping /Monitoring Of Dgps And Maintenance Of Equipments Etc As Per The Direction Of Station In Charge And Have A Minimum Qualification Of Diploma In Electonic/ Electrical And Elecronics ( Three Years Course ) , Providing Technical Assistant For Construction Site For Supervision & Quality Control At Valiyazhikal Lighthouse Site . ( Person Should Have A Techncal Qualification Of Diploma In Civil Engineering With Three Yeaqrs Of Experiance Or Bachlers Degree In Civil Engineering ) , Providing Office Attendant To Assist J E ( C ) For Measurements And Other Site Offic Work For The Construction Site Of Valiyazhikal Lighthouse Site . ( Person Should Have Qualification Of Xth Standard ) , Providing House Keeping Person For Cleaning And Gardening Work On Contract Basis For Manning Lighthouse Stations At Anjengo/ Beypore/ Chetwai/Mountdilli Lighthouses , Providing Counter Staff For Issuing Ticket To The Visitors Of Lighthouse Tower Of Vizhinjam , Thangasery , Alleppey , Vypin Lighthouse From 9 . 00Hrs To 12 . 00Hrs And 14 . 00Hrs To 19 . 00Hrs For Period Of One Year ( They Will Be Provided With Weekly Off On Monday Or Any Other Day Decided By The Department ) , Providing Unarmed Security Personnel For A Period Of One Year At . Kadalur Point , Beypore , Chetwai , Azhikode , Manakkodam , And Lighthouse For Watch And Ward Duty To Safeguard The Lighthouse Operational Establishment / Equipment And The Entire Compound And Premises . The Person Should Keep A Vigilant Approach In Allowing The Entry Of Persons In And Out Of The Lighthouse Compound And Should Maintain A Register For The Purpose Of Registering Inward And Outward Movement Of Visitors To The Lighthouse Compound , Providing Counter Staff For Issuing Ticket To The Visitors Of Lighthouse Tower Of Kannur Lighthouse From 9 . 00Hrs To 12 . 00Hrs And 14 . 00Hrs To 19 . 00Hrs For Period Of One Year ( They Will Be Provided With Weekly Off On Monday Or Any Other Day Decided By The Department ) , Providing House Keeping Person For Cleaning And Gardening Work On Contract Basis For Manning Lighthouse Stations At Kannur Lighthouse , Providing Person For Maintanance Of Heritage Museum At Kannur Lighthouse , Providing Unarmed Security Personnel For A Period Of One Year At . Kannurlighthouse For Watch And Ward Duty To Safeguard The Lighthouse Operational Establishment / Equipment And The Entire Compound And Premises . The Person Should Keep A Vigilant Approach In Allowing The Entry Of Persons In And Out Of The Lighthouse Compound And Should Maintain A Register For The Purpose Of Registering Inward And Outward Movement Of Visitors To The Lighthouse Compound , Providing Security Staff For Checking The Entry Of The Visitors To The Lighthouse Tower Of Vizhinjam , Thangasery , Alleppey , Vypin From 9 . 00Hrs To 12 . 00Hrs And 14 . 00Hrs To 19 . 00Hrs For Period Of One Year ( They Will Be Provided With Weekly Off On Monday Or Any Other Day Decided By The Department
Contract Date: Ref. Documents Contract Value : Ref. Document
Government Departments No of Bidders 6
27.
Defence #8724029 Technical Bid
Tender For Short Refit Work Package 50T Tug Sahas-1 Short Refit Work Package:- General Service. Scaffolding ( With Material ) To Be Arranged For Survey Purpose For A Total Number Of 80 Days. Quote For Services. 2 Fire Sentries With Necessary Fire Fighting Equipment, To Fight Fire Are To Be Provisioned. Quote For Services. 3 Cleaning Of All Tanks And Provide Gas Free Certificate. The Vendor Is To Be Provide All Consumables Required For Cleaning. Repair Plating, Structures And Fittings Of Water Ballast Tank And Fresh Water Tank As Per Survey Report. Damaged Area To Be Blasted Up To Bare Metal And Recoated As Per Existing Paint Scheme. Quote For Services. 4 Degutting & Regutting – Removal And Refiting Of Panels ( Approx 30 Sqm ) And Pipes. Quote For Both Services And Material. 5 Carry Out Non-Destructive Testing For Bollards, Fairleads And Hull Structure Including Stiffening Members In The Vicinity. ( A ) Survey To Be Done In Presence Of Nsry / Fab Survey Teams And Survey Reports To Be Provided. ( B ) Requirement To Undertake Renewal Of Structures, Based On Survey Report, To Be Included In Sow. Quote For Services And Material. 6 Testing Of Wt Compartment. All Tanks, Cofferdams And Sea Tubes Which Have Been Repaired By Build-Up / Renewal Or Have Been Subjected To Hot Work Through Welding Of Pad Piece / Foundation On Any Of Their Boundaries, Are To Be Air Pressure Tested. The Pressure Applied Should Never Exceed That Which Corresponds To A Pressure Of 0.2 Kh / Cm2 ( 02 Mtr Of Water Or 0.2 Bars Or 2 1 / 2 Ibf / In2 ) . Ballast Tank - Qty 03 , Fuel Tank – Qty 05, Fw Tank – Qty 02, Misc Tank - 04. Clearance Of Areas, Subject To Apt Will Be Accorded By Nsry / Fab Survey Team. Quote For Services . 7 Mast And Riggings. ( A ) Examine Mast Structure, Whip Aerial Platforms And The Surrounding Structure On Deck, Eye Plates, Load Carrying Members, For Signs Of Corrosion. Examine Bolted, Riveted And Intermittent Welded Structure Connections For Signs Of Fracture. Portable And Semi Portable Fittings To Be Removed For Closer Examination Of Structure Underneath. Defect To Be Rectified And Paint To Be Restored. All Marks Of Corrosion And Rust Are To Be Removed. Requirement Of Paint And Other Consumables To Be Catered For By The Vendor. Quote For Services And Material. 8 ( A ) Test All Standing & Running Riggings Fitted On Mast Structure Along With Associated Fittings. Renew All Wire Ropes And Associated Fittings As Necessary. ( B ) Carry Out Load Testing Of All Deck Eye Plates ( Qty 14 ) , Bottle Screws ( Qty 14 ) And Provide Load Test Certificate. Damaged Eye Plates And Bottle Screws Are To Be Renewed By The Vendor, Together With Relevant Load Test Certificates / Guarantee / Warrantee. Quote For Services. 9 Steel Renewal. Any Requirement To Include Transportation Of Steel And Preparation Of The Plates, Including Shaping And Positioning At Location Has To Be Catered For By The Vendor.Quote For Services. 10 Funnel. Examine, Clean And Restore Paint Of Eye Plates And Surroundings Structure, Funnel Structure ( Internal And External ) . Portable Or Semi-Portable Fittings That Obscure Structure Are To Be Removed And To Be Recoated Before The Fittings Are Replaced. Requirement To Ensure That Damaged Areas Requiring Steel Renewal Together With Paint Renewal Will Have To Be Undertaken By The Vendor. Quote For Services And Material. 11 Accommodation And Office. Repair / Renewal Of Wooden Furniture And Wooden Fittings Including Table, Chairs And Wooden Cupboards In Compartment And Accommodation Spaces. Quote For Services And Material. 12 Repair / Renewal Of Bunks, Mess Lockers And Their Securing Arrangements. Lockers And Securing Arrangements That Are Beyond Repairs, Are To Be Replaced With Suitable Alternatives. Quote For Services And Material. 13 Repair / Renewal Of Defective Deck Covering And Renewal Of Deck Plates Underneath As Per Survey Report Of Yard. Deck Coverings Being Renewed, Should Be Those That Have Been Approved By Navy. Quote For Services And Material. 14 Anchor, Chain Cable And Cable Locker. Lay Out All Cables, Survey Cable And Shackles, Break, Clean And Grease All Joining Shackles, Strip And Grease Slip In Cable Locker. Re-Arrange Cable Length To Ensure Equality Of Wear. Re-Mark Cable Length. Examine Hull Associated Fittings. Examine All Spare Chain Cable And Fittings, Clean And Coat With Boiled Linseed Oil. Dismantle Anchor. Clean And Grease Trunion Pin And Housing. Grease To Be Used:- Lg-280 Patt.No. 0474 / 910-0502. Hydrojet Lasting Of The Anchor Chain Cable To Be Carried Out. The Machined Surfaces Of The Joints Of Lugless Joining Shackles Are To Be Examined For Corrosion And All Such Shackles Are To Be Stripped, Greased And Re-Assembled. The Anchor, Chain And Cable Locker To Be Restored To Factory Fit Functionality. Quote For Services And Material. 15 Machinery Spaces. Clean All Bilges Using Approved Chemical Method. Clean Out All Limber Holes And Drain Holes. Examine Structures Not Covered By Lagging, Paying Particular Attention To Position Where Water Is Likely To Accumulate, Junctions Of Longitudinal With Side Platings And Machinery Bearers With Bottom Plating, Horizontal Surfaces Such As Tank Tops, Horizontal Stiffeners And Structure Obscured By Cable Plating. Portable Fittings That Obscure Structure Are To Be Removed For Examination Of Structure Behind. Carry Out Surface Preparation In Accordance With No 53 / 16 And Recoat The Damage Paint. Disposal Of Sludge ( Approx 50 Tons ) To Be Catered For By The Vendor. Consumables For Cleaning Also To Be Catered For By Vendor. Paint Scheme Restoration In All Areas As Per Existing Navy Standards. Quote For Services And Material. 16 Check The Condition Of The Vibration Mounts. Clean And Apply Necol Lacquer. Spm Readings Of Equipment Will Need To Be Certified By Nsry / Engg / Ele Teams. Vibration Damping If Not Adequate, Will Need To Be Replaced By The Vendor After Grouping Of Mounts. Certification I.R.O The Same May Be Provided. Quote For Services And Material. 17 Renew Damaged / Perished Lagging At Various Places Using Pin Method. Renew Paint Scheme Of Affected Areas Before Renewal Of Lagging. All Consumables Are To Be Catered For By The Vendor. Quote For Services And Material. 18 Capstan ( Oem - Geeta Engg ) . All Structural And Functional Defects Pertaining To Motor And Capstan Assembly To Be Rectified By The Vendor By Repairs / Renewal. Requisite Fluids To Be Positioned For Lubrication. Motor Spm Values And Power Ratings For Safe Operation To Be Proved During Trials. Offer For Trials To Ss Post Completion. 19 Anchor Windlass ( Oem - Geeta Engg ) . All Structural And Functional Defects Pertaining To Motor And Capstan Assembly To Be Rectified By The Vendor By Repairs / Renewal. Requisite Fluids To Be Positioned For Lubrication. Motor Spm Values And Power Ratings For Safe Operation. Offer For Trials To Ss Post Completion. Quote For Services And Material / Spares. 20 Renewal Of Mushroom Head With Spindle And Valves. Renewal To Also Include Safety Nets / Fasteners As Per Requirement / Joints And Gaskets. Quote For Services And Material. 21 Sewage Treatment Plant ( Oem – M / S Eva Coy N40ce ) . ( A ) Functioning Of Level Switches Of V-1 Tank. Operate All The Valves Which Have Not Been Changed From A Set Position To Prevent Jamming. Carryout De-Sludging Of V-2 Tank By Back-Flushing Line. Clean The Seawater ‘Y’ Type Strainer At The Inlet To ‘Bookcell’. Check Macerator Pump Oil Level By Removing The Pipe Plug Located On Top Of The Pump Casing. Oil To Be Renewed. Vendor To Cater For Disposal Of 5 Ton Sludge Associated With Stp System. Overhauling Of System And Auxiliaries To Be Undertaken. Qc Coverage For Overhauling To Be Provided By Nsry / Qc Team. Ber Valves / Pipes / Joints And Fittings To Be Renewed. All Fluid Replenishment To Be Undertaken As Required. ( B ) Clean Air Supply Filter / Regulator Element In Solvent By Removing The Screws That Secure The Air Chamber To The Filter Body. Drain, Inspect & Clean The ‘Bookcell’. Remove Large Deposits Of Hard Material With Diluted Hydrochloric Acid. Post Completion Of Routines, Operate System And Inspect For Leaks And Proper Cell Amperage. ( C ) Inspect The Tightness Of Belt And Check Leakage From Gland Of Discharge Pump. Repack The Gland ( If Required ) . Quote For Services And Material / Spares. 22 Macerator Pump. Carry Out The Following :- ( A ) Check To Ensure There Are No Leakages From The Main Seals. Renew Drive End Bearing And Seals If Required. ( B ) Check And Ensure That The Impeller Rotates Freely With No Vibration. ( C ) Inspect And Tighten Nuts And Bolts As Necessary. ( D ) Check Overload Units Operating Correctly. ( E ) Check All Valves For Correct Operation. ( F ) Remove Drain Plugs Provided At Each End Of The Bracket Of The Electric Motor And Allow Any Accumulated Moisture To Drain Away And Replace Plugs. Note. Replacement Of The Pump Assembly To Be Undertaken By The Vendor, If The Discharge Rate Does Not Meet Oem Designed Standards. Quote For Services And Material / Spares. 23 Clean And Lubricate All Plug Cock Valves. Lubricate Valves In Fully Opened Or Fully Closed Position Only. Quote For Services And Material. 24 ( A ) Undertake Effluent Test From Nabl Accredited Lab And Check Compliance To Marpol Norms. ( B ) Carry Out In-Situ Calibration Of Fixed H2s Sensor. Certificate Of Calibration To Be Obtained From The Oem. Date Of Calibration And Next Due Date Should Be Clearly Indicated On The Certificate. ( C ) Sewage Pollution Prevention Certificate Valid For Duration Of Five Years From A State Authorised Accredited Agencies As Specified In Mepc 115 ( 51 ) And 227 ( 64 ) For The Ship Adopted On 01 Apr 04 As Per Regulation 5 Of Revised Annex Iv Of Marpol 73 / 78 ( Ncd 3930, Issue 3, Sep 16 Is Relevant ) . Quote For Services. 25 Towing Hook With Quick Release Mechanism ( Oem - M / S Nautiluis Eng & Construction Company ) . Carry Out Load Testing Of Towing Hook And Undertake Repairs. Job Involves Serviceability Of Release Line And Repairs. Replacement Of The Towing Hook With Quick Release Mechanism To Be Undertaken If Existing Unit Exceeds Service Life / Not Functioning As Per Design. Quote For Services And Material / Spares. 26 Grease Filters Inside Exhaust Trunking In Galleys To Be Cleaned And Preserved. Renew If Defective. Quote For Services And Material. 27 Doors - Water Tight And Non-Wt Doors. Check Clips, Hinges For Looseness And Wedge Pieces For Signs Of Wear. Examine Leather Washers, Toridal Sealing Rings And Rubber Sealing. Renew Worn Out Parts And Carry Out Chalk Test Of All Wt Doors. Quote For Services And Material. 28 Scuttles & Windows. Check Hinge Fitting, Toughened Glass And Glass Rails For Looseness And Sign Of Wear / Damage. Renew Worn Out Parts As Necessary. Windows – Qty 32, Scuttles – Qty 18. Quote For Services And Material. 29 Hatch And Manholes. Survey Hatch And Manholes Covers. Remove And Clean Hatch And Tumbler Hinges & Pins. Apply Grease. Deteriorated Hatches And Manhole Covers To Be Fabricated. Securing Fasteners Wherever Damaged To Be Renewed With Stainless Steel Fasteners As Per Recommendations Of Survey Team. Carry Out Chalk Test Of All Wt Hatches And Renew Worn Out Parts As Necessary. Quote For Services And Material. 30 Ladders. Repair The Ladders With Associated Footsteps. Structural Defects In The Ladder Assembly Other Than Steps Also To Be Catered.Quote For Services And Material. 31 Single Arm Boat Davit ( Oem - Hemant Engg ) . Overhauling Of Boat Davit Along With Motor Assembly. Offer For Trials To Ss Post Completion. Structural And Functional Defects Of The Single Arm Boat Davit To Be Rectified By Repairs / Renewal Of Components. Quote For Services And Material. 32 Survey Wire Rope, Spare Gear And Other Associated Lifting Gears. Renew As Necessary. Renewal Of Wire Ropes To Be Undertaken As Per Existing Naval Guidelines. Quote For Services And Material. 33 Carry Out Load Testing With Davit Fully Rigged Up. After Completion Of Load Test, Examine The Complete Davit Structure And Associated Lifting Gears For Flaws, Distortion, Defects Etc. Flaws Must Be Examined And Repairs To Be Undertaken, Followed By Retesting. Quote For Services And Material. 34 Water Accumulation Observed On Both Side Of Foxle. Scupper System To Be Re-Positioned For Clearance Of Water Accumulation. Painting In Areas Affected By Hot-Work / Steel Renewal To Be Restored By Vendor. Quote For Services And Material. 35 02 Bullwark Doors Damaged. Hinges Corroded. To Be Renewed. Mat – Ms. Quote For Services And Material. 36 Bullwark Damaged / Deformed At Various Location. To Be Repaired / Renewed. Mat – Ms. Quote For Services And Material. 37 ( A ) Rubber Fenders On Both Side Of Tug Found Damaged / Perished. Fenders To Be Renewed. Length- 50 Mtr. ( B ) Securing Fasteners For Fenders Found Perished / Corroded. To Be Manufactured As Per Sample And Fitted Back. Note. Deformation Of Base Structure / Strengthening Members On To Which The Fenders Are Secured Are To Be Surveyed And Deformations, If Any To Be Rectified By Hotwork / Steel Renewal. Quote For Services And Material. 38 Wooden Fenders Damaged In Port And Stbd Side. To Be Renewed. Job Involves Re-Fitment Of Fenders On Ship Side. Quote For Services And Material. 39 Natural Air Vent Of All Compartments Wire Mesh Broken, Air Vent Corroded, Flaps Rubber Beading Perished. Hinges And Butterfly Nuts Corroded. To Be Renewed. Quote For Services And Material. 40 Sounding Points Of Fresh Water Tank Threads Worn Out. To Be Repaired / Renewed. Quote For Services And Material. 41 Securing Bracket Of Fire Hose Box Corroded At Multiple Locations. To Be Renewed. Quote For Services And Material. 42 Lifebuoy With Self Igniting Light And Smoke Signal ( Mob Marker ) Quick Release Type To Be Renew On Bridge Deck. Quote For Service And Mat. 43 Fibre Sheet For Weather Deck Canopy Damaged. To Be Renewed. Quote For Services And Material. 44 Platform For Head Bollard Corroded / Damaged. To Be Repaired / Renewed. Quote For Services And Material. 45 Platform For Quarterdeck Bollard Corroded / Damaged. To Be Repaired / Renewed. Mat - Wood. Quote For Services And Material. 46 ( A ) Fisherman Plate Along With Securing Pin Corroded. To Be Manufactured As Per Existing Plate And Pin ( Qty 02 ) . ( B ) Bottle Screw For Anchor Chain Stopper Corroded. To Be Renewed ( Qty 02 ) . Quote For Services And Material. 47 Life Raft Stowing Brackets ( Qty 02 ) Along With Sliding Ladder Damaged / Corroded. To Be Repaired / Renewed And Operational. Job Involves Renewal Of Life Raft Securing Straps. Quote For Services And Material. 48 Serviceability Checks Of Life-Rafts ( Qty 02 ) And Hru ( Qty 02 ) By Nabl Accredited Agency. Webbing Of Life-Raft To Be Renewed, If Damaged Beyond Repair. Quote For Services And Material. 49 Covers ( Both Compressor Safety Mesh Cover And Control Panel Cover ) For 02 Ac Compressor Units On Upper Deck Damaged / Broken. To Be Manufactured. Mat - Al Plate. Quote For Services And Material. 50 15 Cm Ms Strip On Upper Deck Wt Doors Damaged / Corroded. To Be Manufactured And Welded In-Situ. Quote For Services And Material. 51 Internal Super Structure - Repair Works To Be Under Taken On Internal Hull Structure Including Bulkhead And Fittings As Per Survey Report. Painting To Be Under Taken Post Repairs. Quote For Services And Material. 52 Refrigerator On-Board Defective. To Be Repaired / Renewed. Quote For Services And Material. 53 01 Weather Deck Locker Damaged. To Be Repaired / Renewed. Quote For Services And Material. 54 Executive Chairs Fitted At Wheel House Observed To Be Damaged. To Be Renewed. Quote For Services And Material. 55 Engine Room Blower Wire Mesh And Securing Ms Strips Broken / Corroded. To Be Renewed. Quote For Services And Material. 56 Sunmica And Wooden Beading Of Dining Hall Table Broken / Damaged. To Be Repaired / Renewed. Quote For Services And Material. 57 Canvas Covers Of Following Deck Equipment Torn / Perished. To Be Renewed. Windlass, And Control Stand, Rescue Boat, Search Light ( Qty 02 ) , Magnetic Compass, Capstan And Capstan Control, Boat Davit Motor, Me And Da Exhaust And Intake. Quote For Services And Material. 58 Anchor Cleaning Sea Water Line Chocked / Damaged. To Be Repaired / Renewed. Quote For Services And Material. 59 Mob Stand ( Qty 04 ) And Bracket Damaged. To Be Renewed. Quote For Services And Material. 60 ( A ) Foundation Of Port And Stbd Search Light Found Deteriorated. Repair To Be Carried Out. ( B ) Rotating Mechanism Of Port And Stbd Search Lights To Be Renewed. Quote For Services And Material. 61 Hull Survey. Clean All Tank Tops, Bilges Of Machinery Spaces And Other Accessible Internal Surfaces Of Underwater Hull. Damaged Area To Be Blasted And Paint To Be Restored As Per Existing Paint Scheme. Quote For Services And Material. 62 Underwater Platings. ( A ) Remove Marine Fouling From The Hull Using Hydro Jet With Maximum Pressure Not Exceeding 3000 Psi. ( B ) Areas Where Breakdown Of Abrasive Anticorrosive Paints Observed, To Be Blasted And Recoated With Full Paint Scheme. ( C ) Paint Scheme On Full Underwater Hull And Boot Top Including Wind And Water Areas I.E. Area Up To 500Mm Above Boot Top Area Is To Be Restored. ( D ) Application Of One Coat Of A / F Paint On Underwater Hull And Boot Top Area To Be Carried Out Post Adequate Surface Preparation. Quote For Services And Material. 63 Draught Marks. Draught Marks To Be Painted With Paint Scheme As Under Water Area And Top Coat To Be Painted With White Paint. ( A ) Fwd ( B ) Midship & ( C ) Aft. Renew Defective Draught Marks. Quote For Services And Material. 64 Above Water Area ( Ship Side, Superstructure And Fittings, Davit, Windlass, Capstan ) . ( A ) Clean The Hull Using Hydro Jet With Maximum Pressure Not Exceeding 3000 Psi. Damaged Area To Be Blasted Up To Bare Metal. ( B ) Carry Out Painting Of Above Water Area With High Performance ( Hpp ) Advanced Hybrid Coating System For Above Water Area ( Ship Side & Superstructure ) As Per Paint Scheme Mentioned Below:- ( I ) 02 Coats Of Primer To Achieve 80 Microns Dft. ( Ii ) 02 Coats Of Ral 7040 Colour Specification To Achieve 80 Microns Thickness. ( Iii ) Total Dft - 320 Microns. Note. Navy Approved Paint To Be Used. Requirement Of Paint, Other Consumables And Staging To Be Catered For By The Vendor. Quote For Services And Material. 65 Life Saving Appliances. ( A ) Stretcher ( Qty 01 ) For Life Saving Damaged. To Be Renewed. Size - Standard. ( B ) First Aid Box Locker Damaged At Various Location. To Be Renew And Fitted On Specific Locations. ( Oem - M / S Godrej & Boyce Mfg Co Ltd. ) . ( C ) Life Jacket With Light And Whistle Damaged ( Qty 19 ) . To Be Renewed As Per ( Lsa Code Msc 207 ( 81 ) ) . Testing Of Life Jackets To Be Carried Out. Quote For Service And Material. 66 Water Filter Cum Purifier Defective / Damaged In Crew Dining Hall. To Be Renewed. Job Involves Fitment. Quote For Services And Material. 67 Following Defective Wc And Bathroom Accessories To Be Renewed. ( A ) Shower - 05, ( B ) Water Tap - 06, ( C ) Urinal With Full Fittings And Accessories - 03, ( D ) Commode With Full Fittings And Accessories - 04, ( E ) Two Way Basin / Sink - 04. Note. Defective Valves And Reducers, To Be Renewed. Quote For Services And Material. 68 Carryout Chemical Cleaning Of All Trunkings. Renew Perished / Damaged Trunkings On Upper Deck And Mess. Paint To Be Restored Post Repairs As Per Existing Paint Scheme ( Qty - 80 Sqm ) . Quote For Services And Material. 69 Hose Box Damaged / Broken At Various Location ( Qty 07 ) . Securing Brackets Corroded. To Be Manufactured And Refitted In-Situ. Mat - Grp. Quote For Services And Material. 70 Weather Deck & Bridge Top Deck Corroded / Undulation At Various Location. Hydro Blasting To Be Under Taken Prior Survey. Defects To Be Rectified As Per Survey Report Of Yard. ( A ) Aarea To Be Painted With High Performance Non- Skid Coating System For Weather Decks ( Hpp ) Paint Scheme As Mentioned Below Post Defect Rectification And Plate Renewal As Per Survey Report. ( B ) 07 Years Guarantee Paint Scheme Of Da Grey Colour To Be Used. ( C ) Navy Approved Paint Scheme To Be Used. ( D ) Paint Scheme Of Weather Deck And Platforms:- ( I ) 01 Coat Primer Coat - Dft 50 Microns. ( Ii ) 01Coat Anti Corrosive Intermediate Coat - Dft 200 Microns. ( Iii ) 01 Coat Non-Skid Top Coat - Dft - 800 Micron. ( Iv ) Total Dft - 1050 Microns. Note. Paint To Be Restored As Per Paint Scheme Post Repair And Inspection. Paint To Be Provided By Refitting Firm.Quote For Services And Material. 71 Combing Around Wheel House Deck Corroded / Damaged. To Be Repaired / Renewed In Situ. Mat - Ms Quote For Services And Material. 72 Panelling Damaged / Corroded At Various Location. To Be Renewed. Mat - Ss. Job Involves Removal Of Existing Panels And Fitment. Quote For Services And Material. 73 02 Mooring Rope Reel, 01 Towing Rope Reel And 01 Cable Reel Broken. To Be Manufactured And Replaced In-Situ. Job Involves Welding And Cutting Assistance And Fitment. Quote For Services And Material. 74 ( A ) Ships Name Box Along With Lighting Arrangement Defective. To Be Renewed. Mat - Ms ( Qty – 02 ) . ( B ) Ships Name Board On Port And Stbd Side To Be Renewed. Mat - Wood ( Qty – 02 ) . Quote For Services And Material. 75 Microtech Damaged At Various Location. Removal Of Old Microtech To Be Undertaken. Surface Preparation To Be Carried Out For Hull Survey. Defects To Be Rectified As Per Survey Report Of Yard. Microtech To Be Renewed Post Application Of Primer On Deck. Quote For Services And Material. 76 Dado Area In Wet Compartment Corroded / Damaged. To Be Repaired / Renewed. Job Involves Removing Of Gutting Degutting Of Panels. Quote For Services And Material. 77 Heavy Duty Tyre Fenders Of Barge Found Damaged. Renewal Of Fenders To Be Carried Out. Hot Work Required For Removal And Fitment Of Tyre Fenders To Be Carried Out ( Qty -20 ) With 60 Eye Pads And 16 Mm Galvanised Chain Along With D Shackle. Undertake Apt Of Hot Work Tanks If Any. New Heavy Duty Tyre Fenders To Be Provided By Firm. Quote For Services And Material. 78 Wire Mesh And Ball Valve Of Air Vent On Upper Decks Be Replaced If Required. Structural Defects On Air Vents To Be Repaired. Quote For Services And Material. 79 Strip, Clean And Overhaul Domestic Fresh Water System Valves, Stop Cock ( Qty 05 ) , Basin Beep Cock ( Pillar ) ( Qty 04 ) , Sink Beep Cock ( Pillar ) ( Qty 01 ) . Mat - Brass ( Chrome Plated ) . Quote For Services And Material. 80 ( A ) Ventilation Flaps Of All Compartments, Wire Mesh Broken, Air Vent Corroded, Flaps Rubber Beading Perished, Hinges And Butterfly Nuts Corroded, Ventilation Lowers Damaged / Corroded. To Be Renewed ( Qty 16 ) . ( B ) Punka Lowers Damaged At Various Trunkings. To Be Renewed And Fitted. Material To Be Provided By Firm ( Qty - 05 ) . Quote For Services And Material. 81 Cathodic Protection Sacrificial Anodes-Renew Sacrificial Anodes Fitted To Under Water Hull, Voith Blade, Rope Guard, Shaft Tunnel, Stern Tubes, Inlet And Outlets, Seachest, Biges And Cofferdams. 82 Enginering Dl: ( Port And Stbd Main Engine, Wartsilla, Model : 8L-26 2000H ) :- Carry Out 2000 Hourly Routine Of Main Engine :- ( A ) Check Engine Oil Leakage, Fixation Of Piping, Cables And Wring Rectify Leakage And Loose Cable Connection. N ( B ) Check Engine On Bolt Connection, Repair Loose Bolts. N ( C ) Check Engine Drain Points Of Charge Air Receiver And Possible Water. N ( D ) Check Oil Level, Charge Oil If Required. N ( E ) Check Foundation Bolt And Chocks. Repair If Required. N ( F ) Renew Fuel And Lub Oil Filter. N ( G ) Clean Centrifugal Filer. N ( H ) Drain Starting Air Vessels And Air Treatment Units. N ( J ) Servicebility Checks Of Ht And Lt Cooling Water. N ( K ) Clean Air Compressor By Water Injection. N ( L ) Inspect And Clean Air Filter To The Turbo Charger. N ( M ) Check Function Of By-Pass And Waste Gate Assembly. N ( N ) Lubricate Fuel Control Mechanism Linkage. N ( P ) Check If Alarm And Safety System Is On With Running Engine, Rectify If Not Working. N ( Q ) Check Function Of Measuring Devices, Calibrate If Not Working Properly. N ( R ) Check Function Of Oil Mist Detector, Calibrate If Not Working Properly. N ( S ) Check Operation Of Turning Gear And Start Inter Lock Device, Repair / Calibrate If Malfunctioning. N ( T ) Check / Adjust Valve Clearance. N ( U ) Main Engine Ups Control Panel Door Damaged. To Be Renewed. N ( V ) Main Engine Fresh Water Cerculating Pump No.1 Breaker Tripping Frequently. Defect To Be Rectified. N ( W ) Both Me Lcp Display Malfunctioning. To Be Renewed. N ( X ) Turbocharger Outlet Temperature Sensor Faulty, To Be Replaced ( Port Main Engine ) N ( Y ) Both Main Engine Starting Air Line Water Trap Valves To Be Overhauled N ( Z ) Both Pre-Heater To Be Dismantled, Mechanically Cleaned And Boxed Back. System To Be Pressure Tested And Proved For Operation Post Fitment Of Pre-Heater. Test Pr- 3 Kg / Cm2. N ( Aa ) Both Pre- Hetaer Circulating Pump Alongwith Motor To Be Overhauled N ( Ab ) Main Engine Expansion Tanks ( Qty - 03 ) To Be Cleaned And Paint To Be Restored As Per Paint Scheme. Respective Sight Glass ( Qty-01 ) To Be Renewed. N ( Ac ) Stbd Main Engine Rpm Not Exceeding Beyond 260 At Idle As Against 600 Rpm, Defect To Be Rectified ( M / S Wartsila Engine ) N ( Ad ) Fuel Injectors Of Both Main Engines To Be Calibrated ( M / S Wartsila Engine ) N ( Ae ) Governor Calibration Of Stbd Main Engine To Be Undertaken ( M / S Europe Actuatore ) N ( Af ) Excessive Lub Oil Consumption On Both Main Engine. Dr To Be Undertaken N N 83 ( Port And Stbd Da, M / S Cummins India Ltd, 3000H ) :- Carry Out 3000 Hourly Routine :- N ( A ) Remove Injectors. Clean, Inspect, Repair & Calibrate With New Spares. N ( B ) Remove Heat Exchanger. Clean & Pressure Test. N ( C ) Remove Turbocharger. Clean, Inspect & Repair With New Repair N Kit ( Check Turbocharger End Play And Radial Clearance ) Ntighten Nut & Cap Screw Of Air Inlet And Exhaust System. Ncheck Vibration Damper Visuallyrepair If Defective. N ( D ) Replace Belts And Accessories. N ( E ) Check All Cut-Out & Safety Controls. Renwe If Defective. N ( F ) Flush Cooling System With Restore Plus, Run Engine To Bring It To Operating Temperature. Stop The Engine Reflush Cooling System With Portable Water 2-3 Times. Refill Cooling System With Coolant. Run The Engine For Three To Five Minutes. N ( G ) Post Completion Of Routines, Start The Engine And Check All Gauges, Replace If Required, Check For Oil / Water Leakage, Exhaust Leakage, Stop The Engine And Recheck Engine Oil Level, Top Up If Required. After Necessary Inspection Restart The Engine. Run At Idle Speed For 15 Minutes; Carry Out Safety Device Checks. Undertake Full Load Trials On Completion. Post Complition Of Routine Carry Out Sdc Checks And Load Trails, Calibrate / Renw Defective Safety Divices. N ( H ) Da Control Panel Door Damaged. To Be Renewed. 84 Port And Stbd Voith Turbo Schneider, Model - 21 R 5 / 150-2:- Carry Out Docking Routines And 5000 Hourly Routines :- ( A ) Check The Screw Joint Renew If Dfective. N ( B ) Check For The Leakage From Blade Shaft Sealing, If There Any Keajage Rectify It. N ( C ) Check For The Leakage From Main Seal, Change Seal If Defective. N ( D ) Check Main Gear Toothing For Any Damage, Rpair It If Damaged. N ( E ) Check The Input Gear Rpair It If Damaged. N ( F ) Check For The Leakage From Mounting Gear. If There Is Any Leakage Rectify It. N ( H ) Check For Leakage From The Propeller Well. If There Is Any Keajage Rectified It. N ( J ) Check For Correct Fuctionnig Of Rotor Space Ventilation Repaired It If Defective. N ( K ) Renew Corrosin Protection. Note. Quote For Services And Material / Spares. N 85 Fuel And Lub Oil Centrifuge Make-Alfa Laval Pa 605:- Carry Out Five Yearly Routines On Fuel And Lub Oil Centrifuge :- ( A ) Clean And Inspect Inlet And Outlet Pipe Threads, Paring Disc, Housings And Frame Hood. Renewed Damaged / Defective Parts. N ( B ) Clean And Inspect Separator Bowl, Top Disc, Bowl Discs, Distributor, Nozzles In Bowl Body, Sliding Bowl Bottom, Discharge Mechanism, Threads On Bowl Hood And Bowl Body, Bowl Spindle Cone And Bowl Body Nave, Renewed Damaged / Defective Parts. N ( C ) Clean And Inspect Oil Mist Fan, Oil Pump, Water Tank, Bowl Spindle, Ball Bearing Housing, Indentations And Radial Bobble Of Bowl Spindle, Renewed Damaged / Defective Parts. N ( D ) Clean Oil Sump, Change Oil And Oil Filling Device. N ( E ) Clean And Inspect Friction Coupling, Renewed If Defective. N ( F ) Replace Electric Motor Bearing. N 86 Ows Make-Suyash, Modle-Sd0.5:- Carry Out Five Yearly Routines :- ( A ) Replace Coalesce. N ( B ) Replace Adsorber Elements. N ( C ) Replace Stuffing Box Packing. N ( D ) Check Stator And Rotor, Replace Worn Out Component. N ( E ) Replace Zinc Anode. N ( F ) Check Oil Level Of Pump Gear, Fill Up If Required. N ( G ) Open The Inspection Port Of The Oil Separator Housing, The Oil Separator Housing And The Adsorber Housing. Replace Worn Out Parts. N ( H ) Remove The Sludge And Clean Container. N ( I ) Check Seal And Piston Valves, Replace Damaged Seal And Components. N ( J ) Replace Sensor Electrode. N ( K ) Checks The Function Of Heater, If Defective Replace It. N ( L ) Shore Suuply Connection Box Damaged. Box To Be Renewed To Ensure Water Tight Integrity. N 87 Reciprocating Air Compressors Make Elgi ( Model Hp 10 300 ) :- Carry Out 1000 Houlry Routines Of Air Compressor :- ( A ) Change Oil. N ( B ) Observed Noise And Vibration. N ( C ) Check Fasteners, Renwed If Dfective. N ( D ) Check For Air Leakage, Rectify If There Any Air Leakage. N ( E ) Adjust Pressure Setting As Per Manual. N ( F ) Change Inlet Air Filter. N ( G ) Clean Breather Valve. N ( H ) Inspect Valves, Renewed If Defective. N ( I ) Check Nrv, Repaired If Defective. N ( J ) Check Cooler, Repaired If Defective. N 88 Co2 Fire Fighting System:- Carry Out Sr Yearly Routines On Co2 Fire Fighting System :- ( A ) Carry Out Survey Of Piping. Repair / Renew As Required. N ( B ) Calibrate Weighing Beam Scale ( Where Fitted ) . N ( C ) Check All Flexible Hoses For Cracks, Embrittlement And Sign Of Cracking. Renew Them After Assessing The Condition N ( D ) Overhaul Non-Return Valves And Safety Stop Valves ( Where Fitted ) . N ( E ) Remove And Inspect Cylinder Operating Heads. Test For Correct Functioning. N ( F ) Renew Bursting Discs Fitted In Pipe System ( Where Fitted ) . N ( G ) Weigh The Co2 Cylinder Using Beam Scale. If The Weight Falls Below 10% Of Initial Weight, Recharge The Cylinders. Maintain Record In Log Book. N ( H ) Admit Lp Air Into Ring Main Checking The System For ( J ) Leaks. Ensure That All The Discharge Pipes And Nozzles Are Clear. Calibrate Pressure Gauges Fitted In The System. N ( K ) Check Audio Visual Alarm Function, Limit Switches In Control Penal For Operation, Renewed If Defective . Note- Quote For Services And Material / Spares 89 Serviceability Checks Of Co2 Fire Fighting Control System To Be Undertaken And Repaired With Spares As Required. Note- Quote For Services And Material / Spares 90 Hinges To Be Provided On Chequred Plates Of Engine Room For Operating System Valves. Note- Quote For Services And Material / Spares 91 Sea Water Suction Strainers :- Remove Inspect, Clean And Paint With Epoxy Coating For Following Suction Strainers : Main Sea Chest, Bilge Suction And Da Suction. Renew If Required. Mat - Ss As Per Sample Note- Quote For Services And Material / Spares 92 System Pipelines :- Removal, Chemical Clean And Repair System Pipelines. Pressure Testing To 1.5Xworking Pressure ( Kg / Cm2 ) , Undertake Fitment Onboard And Prove For Satisfactory Performance :- Galvanised Steel ( A ) 100Mm 93 ( B ) 80Mm 94 ( C ) 65Mm 95 ( D ) 50Mm 96 Copper. ( A ) 40Mm 97 ( B ) 32Mm 98 ( C ) 25Mm 99 ( D ) 20Mm 100 ( E ) 18Mm 101 ( F ) 15Mm 102 Cu-Ni ( A ) 125Mm 103 ( B ) 100Mm 104 ( C ) 80Mm 105 ( E ) 65Mm 106 ( F ) 50Mm 107 ( G ) 40Mm 108 ( H ) 25Mm 109 System Pipelines :- Renew With End Fittings, Pressure Test To 1.5Xworking Pressure ( Kg / Cm2 ) , Fit Onboard And Prove. ( A ) Air Vent & Filling System, 150Mm 110 100Mm 111 65 Mm 112 50 Mm 113 Copper ( A ) Lub Oil & Sanitary System, 40Mm 114 32Mm 115 25Mm 116 20Mm 117 18Mm 118 15Mm 119 12Mm 120 Both Main Engine Fly Wheel Safety Guards Damaged. Guards To Be Manufactured. Note- Quote For Services And Material / Spares 121 Flap Cover Perished, To Be Renewed N ( A ) Stbd Main Engine Exhaust Funnel. N ( B ) Provision Of New Dd Compressure Exhaust Outlet Flap Cover Note- Quote For Services And Material / Spares 122 External Fire Fighting System Make-Jason Engg Ais, Modle-Sru-C255 Vk1.8Ccw-02 :- Port Fi Fi Clutch Lub Oil Cooler To Be Cleaned And Pressure Test To Be Carried Out. Serviceability Checks Of System To Be Undertaken Including Necessqary Spares. Note- Quote For Services And Material / Spares 123 Lub Oil Transfer Pump Make-Tushaco, Modle-R-20-Dg :- Pump To Be Overhauled View High Vibration. Note- Quote For Services And Material / Spares 124 External Fire Fighting System:- Actuator Of Nozzle Of Fifi System On Top Of Bridge Not Operating. Same To Be Repaired / Renewed Note- Quote For Services And Material / Spares 125 Following Defects On Fifi System N ( A ) Clutch Not Engaging In Remote Mode. Dr To Be Undertaken. N ( B ) Fifi System Pipe Line Cracked / Damaged At 08 N Locations. Leakages To Be Rectified And System To Be Pressure Tested. Dia- 300 Mm, Mat- Cu Ni N ( C ) Operating Wheels Of Fifi System Valves ( 08 Nos ) Damaged. Same To Be Renewed. N ( D ) Hydraulic Valves Of Fifi System To Be Overhauled With Spares, Size - 300Mm, Qty-02 Note- Quote For Services And Material / Spares 126 Pressure Regulating Valves N ( A ) Operating At High Pressure Than Normal ( 01 In No ) , To Be Overhauled ( Range- 30 To 5 Bar ) N ( B ) Prv Operating At High Pressure Than Normal ( 02 Nos ) , To Be Overhauled ( Range- 30 To 9 Bar ) Note- Quote For Services And Material / Spares 127 Both Ru Tank Sight Glass Damaged. To Be Renewed. Note- Quote For Services And Material / Spares 128 Overhaul Air Starting Motor Of Main Engine, Make Wartsila Note- Quote For Services And Material / Spares 129 Fresh Water System Filling Point At Weather Deck Perished Same To Be Renewed With Flanges ( Aprrox Length- 0.25 Mtr. Mat-Gun Metal, Dia-65 Mm Nnote- Quote For Services And Material / Spares 130 Repair / Renewal Of Hand Pump Fitted On Foxle Note- Quote For Services And Material / Spares 131 Following Oil Pressure Setting To Be Adjusted On Both Voith-: ( A ) Lub Oil Pressure ( B ) Control Oil Pressure , Rotor Oil Pressure. 132 Voith Turbo Schneider, Model - 21 R 5 / 150-2 :- Following Voith Parameter Not Showing In Mcr Alarm Monitor Panel:- ( A ) Control Oil Pressure, ( B ) Lub Oil Pressure, ( C ) Rotor Oil Pressure, ( D ) Bearing Oil Temperature. To Be Rectified. 133 Safety Device Checks To Be Undertaken On Both The Voith System 134 Air Starting Motor Of Port Main Engine Defective, To Be Repaired With Oem Listed Spares As Required . 135 Valves Of Various Systems :- Removal, Overhauling, Pressure Testing And Fitment Of Following System Valves:- ( A ) 65 Mm Sdnr Valve 136 ( B ) 65 Mm Sd Valve 137 ( C ) 80 Mm Gate Valve 138 ( D ) 80Mm Globe Valve 139 ( E ) 125 Mm Strom Valve 140 ( F ) 150 Mm Sdnr Valve 141 ( G ) 200 Mm Gate Valve 142 ( H ) 200 Mm Butter Fly Valve 143 ( J ) 300 Mm Butter Fly Valve 144 ( K ) 100 Mm Gate Valve 145 ( L ) 40 Mm Sdnr Valve 146 ( M ) 40 Mm Globe Sd Valve 147 ( N ) 40 Mm Sd Valve 148 ( O ) 32 Mm Sd Valve 149 ( P ) 15 Mm Sdnr Valve 150 ( Q ) 65 Mm Strom Valve 151 ( R ) 80 Mm Strom Valve 152 ( S ) 125 Mm Sdnr Valve 153 ( T ) 50 Mm Quick Shut Down Valve 154 ( U ) 50 Mm Sdnr Valve 155 ( V ) 20 Mm Sdnr Valve 156 ( W ) 25 Mm Quick Shut Down Valve 157 ( X ) 15 Mm Cock Valve 158 Remove, Dismantle, Chemically Clean, Assemble And Pressure Test To Required Pressure With Spares For The Following N ( A ) Lub Oil Heat Exchangers Of Both Main Engine N ( B ) Both Alfa Cooler To Be Insitu Dismantled, Nmechanically Cleaned And Boxed Back With New Gaskets. System To Be Pressure Tested And Proved For Operation Post Fitment Of Coolers. Test Pr- 3.5 Kg / Cm2. N ( C ) Existing Inlet And Outlet Pipe Of Both Alfa Coolers To Be Repaced With Cu-Ni Pipe. Length- 0.3 Mtr, Mat- Ss, Dia- 80 Mm N ( D ) Sea Water Inlet Pressure Guage Line Adaptor Of Both Alfa Cooler Damaged, To Be Renewed Note- Quote For Services And Material / Spares 159 Renewal Of Hot Lagging For Da And Main Engine Compartment Note- Quote For Services And Material / Spares 160 Temperature Gauges Of Various System Lines To Be Renewed. Note- Quote For Services And Material / Spares 161 Suction And Discharge Pressure Gauges Of Various System Lines To Be Renewed. Note- Quote For Services And Material / Spares 162 Overhauling Of Fire Hydrants To Be Carried Out.Note- Quote For Services And Material / Spares 163 Leakage Observed From Dirty Oil Pipe Flange. Brazing And Pressure Test To Be Carried Out. Mat-Cu Ni, Dia-50 Mm. Note- Quote For Services And Material / Spares 164 Leakage Observed From Fuel Filling Line In Engine Room. Pipe To Be Replaced. Dia-50 Mm. Lenght-0.5Mtr, Mat-Ms.Note- Quote For Services And Material / Spares 165 Port Main Engine Breather Line Cracked. Pipe To Be Renewed. Mat-Ms, Dia-85 Mm, Length-0.5 Mtr.Note- Quote For Services And Material / Spares 166 Both Da Lub Oil Temperature Increasing. Both Lub Oil Cooler To Be Cleaned And Pressure Tested.Note- Quote For Services And Material / Spares 167 Both Da Sea Water Pressure Line Perished. Line To Be Replaced. Dia-5 Mm. Lenght-10 Mtr, Mat-Copper. Note- Quote For Services And Material / Spares 168 Port Main Engine Speed Sensor No-St173 And Temperature Sensor Is Not Operational. Sensors To Be Replaced With New Sensor. Note- Quote For Services And Material / Spares 169 Lub Oil Leakage Observed From Turbo Charger Return Line. Defect To Be Rectified. 170 Fuel Centrifugal Filter Of Main Engine Defective. Fuel Centrifugal To Be Replaced. Note- Quote For Services And Material / Spares 171 Air And Co2 Bottles To Be Pressure Tested At 1.5 Times Of Working Pressure. 172 Electrical Dl:Clean Winding And Ventilation Ducts. Check Condition Of Winding Insulation Including End Connections And Renew Windings If Insulation Values Below 1 M Ohm. Check Stator Connection For Good Contact, Retighten Screws. Replace Earthing Terminals. Carry Out The Complete Overhaulling Of Excitation Panel And Replace Spares Required For Factory Designed Performance. Check For Healthiness Of Avr. Avr Tuning To Be Undertaken By Vendor If Required Based On Trial / Performance Reports. Vendor To Also Cater For Avr Replacement If Required. Load Trials To Prove Performance Of Alternator To Be Undertaken By The Vendor. Requisite Load Bank Also To Be Arranged By The Vendor. Quote For Services And Spares. 173 Navigation Control Panel To Be Overhauled And Repair Of Defective Lamps To Be Undertaken . Note- Quote For Services And Material / Spares 174 Repair Of Mb Sre Amplifier Unit To Be Carried Out 175 Emergency Lights With Assembly In Various Locations Defective. To Be Replaced With New Lights. Quote For Services And Spares. N 176 Fifi Monitor Remote Operation Non-Ops. Suspected Cable Damaged. Cable To Be Replaced And Rotary Switch To Be Renewed. Cable Specifications : 1 Sq Mm, 2 Core. Note- Quote For Services And Material / Spares 177 Carry Out Sr Routines Of All Transformers Fitted Onboard With Oem Recommended Components As Required:- ( A ) Using A Soft Brush And Vacuum Cleaner, Clean And Blow-Out Dust Nand Dirt From The Terminal Insulation Block, Between Lamination And Nthe Side And Bottom Ventilation Grills. N ( B ) Check Tightness Of All Connections And Earth Bonding Straps. Tight Loose Connections. N ( C ) Check All Lamination Securing Nuts For Tightness. Tight Loose Nuts. N ( D ) Examine Condition Of Insulation And Cable Spills For Sign Of Ncracking And Over-Heating. Change Low Insulations / Damaged Cable. N ( E ) Grease Threads Of Cover Securing Nuts And Bolts Using Anti-Seize Ngrease And Replace Covers. N ( F ) Examine Shock / Vibration Mountings, Renew If Required. N ( G ) Clean Out Using Soft Brush And Blower. N ( H ) Check All Connections And Terminal Screws Are Tight. N ( I ) Examine All Wiring For Signs Of Deterioration. Renewed Defective N ( J ) Examine Components For Over-Heating / Cracking And Capacitors Nfor Leakage. Renewed Defective Parts. N ( K ) Revarnishing Of The Coils To Be Undertaken Post Routines N N 178 Motors & Starters:- Carry Out Overhauling Of Following Motors And Starters ( Including Remote Operation ) . Motor Bearings To Be Replaced And Trials To Be Offered To Ship Staff. Rewinding Of The Motors To Be Undertaken If Insulation Values Below 1 M Ohm. Replacement Of Ber / Aber Motors To Be Undertaken As One To One Replacement. Vendor To Also Cater For Dismantling And Refitment Of The Motor. Equipment Performance To Be Restored To Factory Designed Condition. Replacement Of All Defective Parts To Be Catered By The Vendor. Note- Quote For Services And Material / Spares - ( A ) Fire & Gs P / P ( 7.5Kw ) 179 ( B ) Bilge Ballast Gs Pp ( 11Kw ) 180 ( C ) Fo Transfer Pump ( 0.75Kw ) 181 ( D ) Lo Transfer Pp ( 0.75Kw ) 182 ( E ) E / Room Supply Fan ( 7.5Kw ) 183 ( F ) Dirty Oil Pp ( 0.75Kw ) 184 ( G ) Lub Oil Cetrifuge ( 0.75Kw ) 185 ( H ) Voith Cooling Pp ( 3.7Kw ) 186 ( J ) Windlass Motor ( 5.6Kw ) 187 ( K ) Capstan Motor ( 7.5Kw ) 188 ( L ) O / Bilge Water Seperator ( 0.55Kw ) 189 ( M ) Boat Davit ( 7.5Kw ) 190 Lighting Circuit Cable And Switches ( 30 Nos ) At Various Locations Perished / Damaged. Cable / Switch Renewal To Be Undertaken. Cable Specifications 2.5 Sq Mm, 2 Core. 191 Rewinding Of 10Kva Lighting Transformers View Low Insulation Of Primary And Secondary Windings. Note- Quote For Services And Material / Spares 192 Sart Battery To Be Replaced And Instruments To Be Tested On Board. Battery Specification 12 V, 7 Ah. Note- Quote For Services And Material / Spares 193 Renewal Of 08 In No. Mob Fitted On Weather Deck, Type Lsa Code Msc 207 ( 81 ) . Note- Quote For Services And Material / Spares 194 Repair Of Navigational Lights Fitted On Main Mast Qty - 04 . Note- Quote For Services And Material / Spares 195 Replacement Of Test Equipments:- Multimeter Make- Fluke. 196 Tong Tester . Make- Fluke. 197 Analog Megger. Make- Fluke. 198 Replacement Of Battery And Hrg ( Hydrostatic Release Gear ) Of Epirb. Battery Specs - 12 V, 7 Ah.Note- Quote For Services And Material / Spares 199 Echo Sounder Calibration Including Fitting Of Hull Appendages To Be Undertaken. Printer Fitted In Wheel House Defective. To Be Replaced. Note- Quote For Services And Material / Spares 200 E / R Alarm Panel Display Monitor Not Working. To Be Replaced. 201 Split Ac Fitted In Wheel House Defective. To Be Repaired. Note- Quote For Services And Material / Spares 202 Control Batteries Of Da To Be Replaced. 12 V 120 Ah 203 Control Batteries Of Da To Be Replaced . 12 V 150 Ah 204 Control Batteries Of Da To Be Replaced . 12 V 180 Ah 205 Control Batteries Of Da To Be Replaced . 12 V 200 Ah 206 Tank Content Gauges ( Nivo System ) Not Working. Functional Checks All Gauges To Be Carried Out. Defective Components And Sensors To Be Replaced. Tank Level Calibration To Be Undertaken Thereafter. Display Module Serviceability Checks And Calibration To Be Undertaken. Replace If Ber / Defective. Quote For Services 207 Tubelight Fitted Onboard At Various Locations To Be Replaced With Led Tubelights . Note- Quote For Services And Material / Spares 208 Serviceability Of Magnetic Compass And Anemometer To Be Undertaken Followed By Calibration With Spares. Renew If Defective. Qoute For Services And Spares 209 Air Whistle Not Working. Overhauling And Repair To Be Undertaken With Oem Recommended Components As Required. Quote For Services And Spares 210 E / R General Calling Alarm Not Working. To Be Repaired 211 Spt Fitted Onboard At Various Locations Found Defective, To Be Replaced. 212 Window Wiper And Associated Mechanisms And Clear View In Wheel House Defective. To Be Renewed Including Spares. Quote For Services And Spares. 213 E / R Alarm Panel Display Key Board In Wheel House Not Working. To Be Repaired With Oem Recommended Components As Required. 214 03 In No Flood Light And 02 In No Search Light Not Working. To Be Replaced. Note- Quote For Services And Material / Spares 215 Port Main Engine Emergency Stop Push Button Is Defective At The Wheel House. To Be Replaced With New One. 216 Renewal Of Flood Lights Fitted In Engine Room With Led Lights. Note- Quote For Services And Material / Spares 217 Double Pole Switch With Single Way Are Defective. To Be Replaced With New One. Note- Quote For Services And Material / Spares 218 Deck Lights Guard / Fitting Are Broken. To Be Replaced With New One. Note- Quote For Services And Material / Spares 219 Repair Gps Display Unit Garmin With Oem Recommended Components As Required And Undertake Serviceability Checks. Note- Quote For Services And Material / Spares 220 Tru Batteries Not Holding Charge. To Be Replaced With New One 12V 180 Ah Maintenance Free Batteries . Note- Quote For Services And Material / Spares 221 Following Defective. To Be Repaired / Replaced N ( A ) Wall Mounted Fan Defective ( 20 Nos ) . N ( B ) Galley Hot Plate ( 02 Nos ) 222 5Kva Ups Defective. Batteries To Be Renewed. Battery Specification 12 V, 150 Ah ( 2 Nos ) 223 Deck Washing Machine Non Opertional To Be Renewed. Note- Quote For Services And Material / Spares 224 Lighting Switches Are Broken At Various Locations. To Be Replaced With Holder Assembly. Note- Quote For Services And Material / Spares 225 Serviceability Checks Of Navigational Radar Including Vswr And Power Output Checks. Replace Defective Transreceiver Pcb And Other Components As Necessary. Qoute For Services And Spares. 226 Hull Spares: Capstan Fixed Contacts. ( Ser No. 18 ) 227 Moving Contacts ( Ser No. 213 ) 228 Indicating Lamps ( Red ) . ( Ser No. 210 ) 229 Fuse Links ( Ser No. 206 ) 230 Controller Contacts ( Fixed ) ( Ser No. 190 ) 231 Controller Contacts ( Moved ) ( Ser No. 190 ) 232 Friction Lining For Disc Brake ( Ser No. 14 ) 233 Boat Davit Limit Switch ( Ser No. 31 ) 234 Fuse Elements ( 2A, 4A, 32A ) ( Ser No. 200 ) 235 Indicating Lamps ( Red ) ( Ser No. 206 ) 236 Push Button ( Green ) ( Ser No. 206 ) 237 Liner For Brake ( Ser No. 25 ) 238 Fuse For ( 1A, 2A, 4A, 10A, 16A, 32A ) ( Ser No. 178 ) 239 Master Controller Contact Kits ( Ser No. 177 ) 240 Contractor Kits ( Ser No. 174 ) 241 Lamps ( Ser No. 173 ) 242 Bearing For Motor ( Ser No. 179 ) 243 Friction Liner For Disc Brake ( Ser No. 14 ) 244 Gland Packing, Walker Remix ( P.No.Bba2522-879 ) ( Ser No. 26 ) 245 Indication Lamps ( Ser No. 21 ) 246 Mp Filter Hp0372a10an, Italy ( P. No. Hp0372a10an ) ( Ser No. 24 ) 247 Washer Od 100X1d 80 ( Ser No. 24 ) 248 Main Engine, Wartsilla, Model : 8L-26 Spares :- Fuel Filter ( 4761002 ) ( Ser No. 82 & 158 ) 249 Filter Paper ( 4713047 ) ( Ser No. 82 & 158 ) 250 Gasket ( 1072002 ) ( Ser No. 82 & 158 ) 251 Gasket ( 1072003 ) ( Ser No. 82 & 158 ) 252 O-Ring 20X3 ( 121007 ) ( Ser No. 82 & 158 ) 253 O-Ring ( 4712063 ) ( Ser No. 82 & 158 ) 254 Gasket ( 4712062 ) ( Ser No. 82 & 158 ) 255 Screw ( 218003 ) ( Ser No. 82 & 158 ) 256 Valve ( 2180049 ) ( Ser No. 82 & 158 ) 257 O-Ring ( 2180059 ) ( Ser No. 82 & 158 ) 258 Starting Air Pipe ( 2180063 ) ( Ser No. 82 & 158 ) 259 Sealing Ring ( 2180076 ) ( Ser No. 82 & 158 ) 260 O-Ring ( 2180077 ) ( Ser No. 82 & 158 ) 261 Washer ( 2180085 ) ( Ser No. 82 & 158 ) 262 Gasket ( 2180086 ) ( Ser No. 82 & 158 ) 263 Following Spares Main Diesel Alternator Model:6Cta8.3D / M ( Mandatory Spares ) :- Element Lub Oil ( Lube Oil Filter ) Make : Fleetguard ( 3401544 ) ( Ser No. 83 ) 264 Ring Compress ( 3919918 ) ( Ser No. 83 ) 265 Ring Compress ( 3922686 ) ( Ser No. 83 ) 266 Ring Retainer ( 3920692 ) ( Ser No. 83 ) 267 Ring, Oil Piston ( 3921919 ) ( Ser No. 83 ) 268 Regulator, Vol. Stamford Mx321, Eoo-23212 ( 2890759 ) ( Ser No. 83 ) 269 Rectifier ( 2890014 ) ( Ser No. 83 ) 270 Bearing, Main ( Thrust ) ( 3944153 ) ( Ser No. 83 ) 271 Bearing, Main ( Thrust ) ( 3944158 ) ( Ser No. 83 ) 272 Bearing Crank ( Thrust ) ( 3944163 ) ( Ser No. 83 ) 273 Valve, Intake ( 3924492 ) ( Ser No. 83 ) 274 Valve, Intake ( 3921444 ) ( Ser No. 83 ) 275 Collet, Valve ( 3901177 ) ( Ser No. 83 ) 276 Guide, Valve ( 3925863 ) ( Ser No. 83 ) 277 Injector ( 3926787 ) ( Ser No. 83 ) 278 Valve Spring ( 3991085 ) ( Ser No. 83 ) 279 Gasket, Exh. Ou; ( 3873509 ) ( Ser No. 83 ) 280 Valve Insert ( 3970278 ) ( Ser No. 83 ) 281 Bearing Connection ( 3901430 ) ( Ser No. 83 ) 282 Piston Pin ( 3934046 ) ( Ser No. 83 ) 283 Fuel Filter ( 3931063 ) ( Ser No. 83 ) 284 Valve Insert ( 3908830 ) ( Ser No. 83 ) 285 Element Air Cleaner ( 3814313 ) ( Ser No. 83 ) 286 Element Air Cleaner ( 3814312 ) ( Ser No. 83 ) 287 Gasket Set ( Gasket Turbo ) ( 3755843 ) ( Ser No. 83 ) 288 Belt V Ribbed ( 3289124 ) ( Ser No. 83 ) 289 Seal, Valve St ( 3927642 ) ( Ser No. 83 ) 290 Bolt, Connection ( 3928870 ) ( Ser No. 83 ) 291 Nut Connection ( 3934864 ) ( Ser No. 83 ) 292 Pump Fuel Injector ( 5263870 ) ( Ser No. 83 ) 293 Tube Injector ( 5271935 ) ( Ser No. 83 ) 294 Sensors, Pr. ( 2 To 10 Bar ) ( 4911882 ) ( Ser No. 83 ) 295 Sensors ( Temperature ) ( 4911877 ) ( Ser No. 83 ) 296 Pump, Sea Water ( 4963510 ) ( Ser No. 83 ) 297 Seal Oil ( 3942535 ) ( Ser No. 83 ) 298 Seal Oil ( 5259499 ) ( Ser No. 83 ) 299 Seal Injector ( 3909886 ) ( Ser No. 83 ) 300 Gasket Exhaust ( 3932063 ) ( Ser No. 83 ) 301 Gasket Gear , H ( 3944293 ) ( Ser No. 83 ) 302 Gasket Cover ( 3939258 ) ( Ser No. 83 ) 303 Gasket Hydraulic ( 3940245 ) ( Ser No. 83 ) 304 Gasket Cylinder ( 3938267 ) ( Ser No. 83 ) 305 Washers Lock ( 611 ) ( Ser No. 83 ) 306 Screw Hex, Flange ( 3243948 ) ( Ser No. 83 ) 307 Plug Pipe ( S911b ) ( Ser No. 83 ) 308 Hardness Wiring ( 3875359 ) ( Ser No. 83 ) 309 Control Governor ( 3974704 ) ( Ser No. 83 ) 310 Washer Plain ( 640 ) ( Ser No. 83 ) 311 Nut Heavy Hex ( 204 ) ( Ser No. 83 ) 312 Screw Haxagon ( 112C ) ( Ser No. 83 ) 313 Washers Plain ( S602 ) ( Ser No. 83 ) 314 Washers Lock ( 604 ) ( Ser No. 83 ) 315 Clamp Hose ( 43828 ) ( Ser No. 83 ) 316 Brace, Tube ( 101470 ) ( Ser No. 83 ) 317 Clip ( 107460 ) ( Ser No. 83 ) 318 Screw Hexagon ( 109 ) ( Ser No. 83 ) 319 Connection Ex ( 3814793 ) ( Ser No. 83 ) 320 Flange, Weld ( 3226087 ) ( Ser No. 83 ) 321 Clip ( 500694 ) ( Ser No. 83 ) 322 Screw Hexagon 112C ) ( Ser No. 83 ) 323 Screw Hexagon ( 1137 ) ( Ser No. 83 ) 324 Nut Hex Heavy ( 204 ) ( Ser No. 83 ) 325 Nut Hex Heavy ( 203 ) ( Ser No. 83 ) 326 Washers Lock ( 604 ) ( Ser No. 83 ) 327 Washers Lock ( 611 ) ( Ser No. 83 ) 328 Washers Plain ( 640 ) ( Ser No. 83 ) 329 Gasket Exhaust Ou 2880039 ) ( Ser No. 83 ) 330 Gasket Dia 135 Pcd 115 Dia ( 3940245 ) ( Ser No. 83 ) 331 Washer Plain ( 640 ) ( Ser No. 83 ) 332 Connection Se ( 2867840 ) ( Ser No. 83 ) 333 Connection Se ( 2867838 ) ( Ser No. 83 ) 334 Tools :-½ Breaker Bar-15’’ Long ( Ser No. 83 ) 335 Procurement Of Following Spares Of Voith Turbo Schneider Propulsion Type Vsp 28R5 / 234-2Ae45 Kw Rpm ( Mandatory Spares ) :- Shaft Seal Ring Adck-300X340x16 ( H01.067195 ) ( Ser No. 84 ) 336 Round Cord Ring V-420X4.5Nbr70 ( H01.086366 ) ( Ser No. 84 ) 337 O - Ring 560X5 Nbr70 ( H01.032840 ) ( Ser No. 84 ) 338 O- Ring 454X8 Nbr 70 ( H01.064102 ) ( Ser No. 84 ) 339 Bulb Lamp 35X18.5-24V 5W ( H01.095322 ) ( Ser No. 84 ) 340 Filter Element Hydac 12782361300R020 ( H01.016221 ) ( Ser No. 84 ) 341 Repair Kit ( H01.012435 ) ( Ser No. 84 ) 342 Alfa Laval Fuel Oil Centrifuge:- Major Service Kit - 546670-07-08 343 Ows Make-Suyash, Modle-Sd0.5:- Cover Gasket ( 8320025002 ) ( Ser No 86 ) 344 Coaleser Element ( 2704002501 ) ( Ser No 86 ) 345 Sacrificial Anode ( 6453020001 ) ( Ser No 86 ) 346 Set Stuffing Box-Packing ( 546040207Ep1 ) ( Ser No 86 ) 347 Desicator Cartridge ( 51110Em027 ) ( Ser No 86 ) 348 Reciprocating Air Compressors Make Elgi ( Model Hp 10 300 ) :- V Belt ( 000905283 ) ( Ser No 87 ) 349 Inlet Air Filter ( 022100929 ) ( Ser No 87 ) 350 Gasket Free End Civer ( 020365450 ) ( Ser No 87 ) 351 Gasket Fly End ( 000425510 ) ( Ser No 87 ) 352 Gasket Valve Flate ( 000411530 ) ( Ser No 87 ) 353 Valve Finger Type ( 0003300950 ) ( Ser No 87 ) 354 Valve Finger Type ( 000330970 ) ( Ser No 87 ) 355 Gasket ( 0001004A ) ( Ser No 87 ) 356 Anchor Windlass:- Packing For Top Cover ( 02211-6235-1015 ) ( Ser No. 19 ) 357 Friction Lining For Slipping Clutch ( 02-18-6232-Sc-875240 ) ( Ser No. 19 ) 358 Spring For Slipping Clutch ( 02-18-6232-Sc-875270 ) ( Ser No. 19 ) 359 Rivets For Friction Lining ( 02-18-6232-Sc-875 ) ( Ser No. 19 ) 360 Friction Lining For Emb ( B-Emb-2451-B-3024 ) ( Ser No. 19 ) 361 Rivets For Friction Lining ( A-Emb-1900-180-3092 ) ( Ser No. 19 ) 362 Spring For Emb ( B-Emb-2451-B-3017 ) ( Ser No. 19 ) 363 Procurement Of Following Maintenance Free Lead Acid Batteries ( A ) 120 Ah - 12 Nos ( Ser No. 19 ) 364 ( B ) 150 Ah - 12 Nos ( Ser No. 19 ) 365 ( C ) 180 Ah - 12 Nos ( Ser No. 19 ) 366 ( D ) 200 Ah - 10 Nos ( Ser No. 19 ) 367 Fuse ( 0219-6232-9000-F1-F10 ) ( Ser No. 19 ) 368 Indication Lamp ( 02-19-6232-9000-H1-H2 ) ( Ser No. 19 ) 369 Service Charge For Third Party Inspection ( For Hull Survey And Qc )
Contract Date: Ref. Documents Contract Value : Ref. Document
Government Departments No of Bidders 7
Contract Date: Ref. Documents Contract Value : 49,875
Government Departments No of Bidders 1
West Bengal View Result →
Contract Date: Ref. Documents Contract Value : 14,986
Statutory Bodies & Commissions/Committees No of Bidders 3
Maharashtra View Result →
35.
Water Resources and Irrigation #7670798 AOC
Upgradation Of Ibs Equipments -Purchase Of Small Boat For The Study Of Small Rivers And Canals Upgradation Of Ibs Equipments -Purchase Of Small Boat For The Study Of Small Rivers And Canals , Supplying 4Mtr Frp Survey Boat Including Gst, 1 . Supplyingfrpsurvey Boat For Sedimentation Division – 1 Nowith Following Particulars &Specifications. - • Length:4.00 Mtr. • Width : 1.65 Mtr • Depth ( Hull ) : 0.61Mtr. • Draught : 0.24Mtr. • Displacement : 0.8Ton. • Compliment: 03People.Boatspecifications :- 1. This Is Meant For Using In Calm Water Only. 2.Hull Lamination Will Be As Per The Standard 3.Materials Used For Moulding Shall Be Approved Quality.4.Obm, Remote Controlled Obm Accessories / Steering System Shall Be Installed Provided All Theese Including Obmhas To Be Supplied By Customer. 5.12Vdc- Domestic System. 6.Deck Fittings:-6.1 12V Horn - 01 No. 6.212V Navigational Lights - 01 Set 6.312V Wiper- 01 No. 6.412V Cabin Fan- 01 Nos. 6.512V Cabin Lights- 03 Nos. 6.6Ss Bollard- 01 No. 6.7 Ss Cleat- 02 Nos.7Forepeak Locker Space - 01 No.8. Fuel Tank-24Ltr.9. Battery 12Vdc, 65 Ah-01 No.10. Void Space Between Deck And Hull Will Be Filled With Buoyancy Materials. 11.Frp Web Frame / Stiffeners Of 600 Mm Spacedbonded Withadequatelayersofcsm & Wr. 12. Extra Lamination At Obm Mounting Portion.13. Entrance To The Cabin Shall Be From Aft Deck.14. Fire Extinguisher 2 Kg - 01 No. 15. Firebucket - 01 No.16 .Lifebuoy - 01 Nos.17 .Lifejacket - 05 Nos.18 Self Igniting Light - 01 No. 19 Pp Rope For Anchoring / Mooring - 03 Nos. 20. 15 Kg Anchor- 01 No. 21 .Exterior Under Water Will Be Antifouling And Above Dwl Mirror Finish Andcolour Shall Be Painted As Per Customer”S Choice. 22 Interiorflooring Shall Be Mat Finish And Resincoating. , Appendix - B Purchasing 9.9 Hp Four Stroke Out Board Motor Remote Controlled Engine Including Installation Cost , Appendix C - Purchasing Trailer Of 1 Ton Capacity For Mobilizing The Boat To The Required Sites
Contract Date: Jan 13, 2023 Contract Value : 5.23 Lakh
Government Departments No of Bidders 2
Contract Date: Ref. Documents Contract Value : 25.97 Lakh
Government Departments No of Bidders 7
Andaman And Nicobar Islands View Result →
39.
Defence #4239789 AOC
Bids Are Invited For Custom Bid For Services - L45 Water Jet Compartment Supply Fan Motor Make System Air 05 Hp 10 50 Hz Not Working Windings Showing Low Insulation Phase To Phase And Phase To Motor Body Motor Rewinding And Overhauling To Be Carried Out And To Be Proved.. , Custom Bid For Services - L46 03 In Nos Window Wipers Not Working Properly See Excessive Corrosion Of Window Wiper Arms Defective Solenoid Valves Damaged And Choked Pipe Lines All Defective Solenoid Valves And Damaged Pipe Lines To Be Renewedrepaire.. , Custom Bid For Services - L47 30 In Nos Fluorescent Tube Lights Faded Acrylic Covers And Broken Tube Light Holders Causing Low Illumination Tube Light Fittings To Be Renewed As Per Sample In Accordance With Cghq Policy Regarding Replacement Of Fluor.. , Custom Bid For Services - L48 Rubber Shock Mounts Of Following Equipment Peeling Off Deteriorated View Aging Effect New Rubber Shock Mounts To Be Installed In Way Job Includes Removal Of Old Shock Mounts And Fitment Of New A Navigation Lights Port.. , Custom Bid For Services - L49 Earthling Straps To Be Fabricated Along With All Required Spares As Per Sample And Fitted For Following Equipment In Upper Decks A Shore Supply Connection Box 01 No B Submersible Starter Panels 02 Nos C Deck Crane Cont.. , Custom Bid For Services - L50 01 In No Navigation Light Stern Light Not Working View Defective Electrical Supply Cable And Holders Defective Supply Cable To Be Renewed As Per Sample And Proved For Satisfactory Operation Cable 20 Mtrs , Custom Bid For Services - L51 01 In No Me Control Battery Charger Found Defective During Didr Battery Charger Pcb Found Worn Out Defect To Be Rectified And Proved For Satisfactory Operation Make Master Volt Type Mass Charger 24303 , Custom Bid For Services - L43 01 In No Rectifier Unit 130A For Navigational Communicational Equipments Backup Found Defective Didr Carried Out Suspect And Following To Be Repaired Renewed A Rectifier Unit Base Uprooted B Pata Cable To Be Renewed L.. , Custom Bid For Services - L44 01 In No Submersible Pump Motormake Azcue Type Drb2002g50v 10 Tph Winding Found Low Insulation And Frequently Tripping When Switching On Power Supply Defect To Be Rectified And System Proved For Satisfactory Operation Total Quantity :
Contract Date: Ref. Documents Contract Value : 4.94 Lakh
Statutory Bodies & Commissions/Committees No of Bidders 8
41.
Banking and Finance #3825938 AOC
Corrigendum - Rate Contract For Design And Communication-2 Linear Power Point Slide Presentation 3 Development Of Linear Power Point Slide Presentation / Slide Show Including Content, Design Of All Template Screens, And Slide Transitions, Without Internal Hyperlinks ( Per Slide 4 Development Of Linear Slide Presentation / Slide Show In Flash Including Content, Design Of All Template Screens, And Slide Transitions, Without Internal Hyperlinks, Excluding 2-D / 3-D Animation Of Text / Visuals / Graphics Within Slides ( Rate Per Slide ) 5 Development Of Linear Slide Presentation / Slide Show Including Content, Design Of All Template Screens, And Slide Transitions Excluding 2-D / 3-D Animation Of Text / Visuals / Graphics Within Slides ( Rate Per Slide ) 6 Finishing Of Linear Power Point Slide Presentation / Slide Show ( Text Slides Provided By Client ) Including Design Of Templates Such As Title Slide, Running Slide, New Section Slide, Concluding Slide, And Slide Transitions ( Rate Per Slide ) 7 Insertion Of Video-Clip In Slide Presentation / Interactive Presentation ( Rate Per Video Clip ) , Excluding Video Conversion, Editing Charges. 8 Insertion Of Photo Gallery Without Category In Interactive Presentation With Thumbnail And Enlarged View, Navigational Controls, And Slide Show Options ( Rate Per 10 Images ) 9 Insertion Of Photo Gallery In Interactive Presentation With Linear Slide Show Option ( Rate Per 10 Images ) 10 Addition Of Download / Save Images Feature To Photo Gallery ( Rate Per 10 Images ) 11 Multiple Background Music / Sound Track Options In Interactive Presentation ( Rate Per Additional ( Excluding One ) Sound Track ) Excluding The Cost Of Background Music And Sound Composition 12 Design Of New Link To Existing Interactive Presentation Including Design Of New Pages ( Rate Per Link ) 13 Addition Of New Link ( S ) To All Existing Relevant Pages In Existing Interactive ( Rate Per Page ) 14 Electronic Direct Mailer 15 Content And Design Of Electronic Direct Mailer Using Images And Text In Html Format With External Hyperlinks 16 Revision / Updation / Editing In Existing Electronic Direct Mailer In Terms Of Content, Layout And Html Conversion ( Per Emailer ) 17 Bulk Emailing Services • Sorting Data According To Email Software. 18 • Conversion Of Data Into Format Compatible To Email Software ( Csv Or Txt Or Xls ) . 19 • Creation Of Email Design In Jpeg Format 20 • Conversion Of Jpeg Into Html Format. 21 • Uploading Emailer On Server. 22 • Making It Browser Compatible 23 • Add Attachments In .Jpeg, .Pdf, .Ppt, .Swf, .Zip, Etc. 24 • Adding ‘Unsubscribe’ Feature 25 • Scheduling The Date For Posting Of Message 26 • Adding Tracking Feature 27 • Email Reports For Email-Tracking ( For Every 1000 Emails ) 28 Interactive Presentation 29 Interactive Presentation With / Without Background Music And 2D Animation Excluding Video-Editing, Video Insertion Charges And Animation Charges ( Rate Per Link ) 30 Updation In Existing Interactive Presentation Without Affecting The Basic Design Or Structure ( Rate Per Link ) 31 Section B: Photo / Audio / Video 32 Video Spot / Tvc / Audio-Visual / Documentaries / Short Films In Hd Format Nconsolidated Rate Includes Charges For Script / Storyboard, Location Recce, Travel Outside Jaipur Upto 200 Kilometers, Artists, Video Shoot In Hd Format, Editing, 2-D Animation Of Text And Graphics, Titling / Sub-Titling / Text, Music, Voiceover Artist Fee, Mastering And Studio Charges. N Nexclusions: N• Reimbursement At Actual For Journey Beyond 200 Km: Journey Would Be Undertaken By Rail ( First Class / Ac-2T ) Or By Road Or By Air ( If Needed; Economy Class ) . The Agency Will Have To Submit Supporting Documents I.E. Used Tickets Or Bill For Hiring Vehicles Etc. To Support Its Claim. N• Endorsements: Rates Do Not Include Endorsement Fee Or Arrangement Fee For Endorsement Made By Top Personality ( Artist / Singer / Celebrity ) Npayment Of Royalties: Payment Of Royalty / Credit For Copyright Purposes To Any Public / Private Organization Or Person For Using Any Input In Production Would Be The Responsibility Of The Agency 33 Video Spot / Tvc ( Master Version ) 34 Upto 60 Seconds 35 Above 60 Seconds ( Rate Per 60 Seconds ) 36 Video Spot Language Version ( Over And Above The Master Version ) 37 Upto 60 Seconds 38 Above 60 Seconds ( Rate Per 60 Seconds ) 39 Re-Voiceover Charges 40 Re-Editing Charges 41 Documentaries / Short Films ( Master Version ) 42 Above 2 Minutes Upto 5 Minutes 43 Above 5 Minutes Upto 15 Minutes 44 Above 15 Minutes Upto 30 Minutes 45 Documentaries / Short Films Language Version ( Over And Above The Master Version ) 46 Above 2 Minutes Upto 5 Minutes 47 Above 5 Minutes Upto 15 Minutes 48 Above 15 Minutes Upto 30 Minutes 49 Radio Spot: Consolidated Rates For Radio Spot With Script ( With Words And / Or Music ) 50 Duration Upto 30 Sec 51 Duration 31 To 60 Sec 52 Duration Above 60 Sec ( Per 30 Sec ) 53 Re-Recording Of Voice-Over And Finishing Of Radio Spot. These Charges Would Be Admissible If Script Is Changed After Production Is Carried Out As Per The Approved Script. 54 Duration Upto 30 Sec 55 Duration 31 To 60 Sec 56 Duration Above 60 Sec ( Per 30 Sec ) 57 Radio Jingle / Song / Signature Tune: Radio Creative Which Is Partially Or Fully Music-Based, With Original Music Composition 58 Upto To 60 Sec 59 Duration Above 60 Sec ( Per 30 Sec ) 60 Re-Recording Of Jingle / Song / Signature Tune: These Charges Would Be Admissible If Script Is Changed After Production Is Carried Out As Per The Approved Script And Artists Have To Be Called Again For Recording. 61 Upto To 60 Sec 62 Duration Above 60 Sec ( Per 30 Sec ) 63 Conversion Of Video To Various Formats 64 .Avi Or .Mpg To .Flv Format 65 .Mp4 To .Flv / .Vob Format 66 .Mov To .Flv / .Mp4 / .Avi Format 67 .Avi To .Mpg / .Mov / .Mp4 / .Vob Format 68 .Swf To .Flv Format 69 Conversion Of Aspect Ratio From 4:3 To 16:9 ( Or Vice Versa ) 70 Conversion Into J2k Format 71 Conversion Of Audio To Various Formats 72 .Wav To .Mp3 Format 73 .Mp3 To .Wav Format 74 2D Animation Clip / Av Using Still Images, Background Music, Text / Graphic 2D Animation, With / Without Voice Over 75 Upto 60 Sec 76 Above 1 Min Upto 5 Min 77 Above 5 Min Upto 15 Min 78 3D Animation Clip / Av Using Still Images, Background Music, Text / Graphic 2D Animation, With / Without Voice Over 79 Upto 60 Sec 80 Above 1 Min Upto 5 Min 81 Above 5 Min Upto 15 Min 82 Recording Of Audio Clip Voice Over Including Script & Studio Charges 83 Upto 30 Sec 84 Above 30 Min Upto 1 Min 85 Above 1 Min ( Rate Per Additional 30 Sec ) 86 Recording Of Audio Clip For Role Play / Screenplay Including Script & Studio Charges 87 Upto 1 Min 88 Above 1 Min Upto 5 Min 89 Above 5 Min Upto 15 Min 90 Section C Web Site Design & Development 91 Design Of Complete Responsive Website Including Need Assessment, Planning Of Structure, Features & Functionalities, Nomenclature Of Links, Content Development In English / Hindi, Design Of Home Page And All Guis ( Front-End And Back-End / Admin Section Pages ) Using Css, Div Based, Web 2.0 Techniques, Cms, Etc. Pursuing Best Practices Of W3c Standards With Multiple Browser Compatibility. ( Rate Per Page Excluding Domain Name Registration, Hosting, Server Space And Programming Cost. These Will Be Paid At Actual On Submitting Invoice. ) 92 Quality Check / Planning Of Structure Or Web Architecture Of Website / Web Application And Design Implementation By Departments / State Government’S Software Development Agency ( Rate Per Page / Link ) 93 Programming / Development Cost For Website: Detailed Analysis And Specification Building Of The Requirements. Understanding The Requirements Of The Application, Development Of The Database With All The Data Structures. Effective Planning For Developing Methodologies & Procedures For Quality Assurance. Employing The Latest Technology Of Web 2.0 Technologies And Working Out All The Navigational & Accessibility Issues. Preparation Of Document To Understand The Entire Work-Flow. W3c Standard Validation, User Friendly Navigation, Browser Compatibility, Search Engine Friendliness Incorporating Cascading Style Sheets ( Css For Easy Layout Changes ) , Rollover Menus, Multiple Menus.Complete Testing And Debugging Of The Website ( Conducting Integration Testing, Scalability Testing, Resolution Testing And Cross-Browser Compatibility Testing ) ( Rate Per Page / Link ) 94 Design Of Home Page Only, Including Need Assessment, Planning Of Structure & Quick-Links, Features & Functionalities, Nomenclature Of Links And Content In English / Hindi 95 In Jpeg / Psd Format 96 In Html / Aspx / Php Format 97 Gui Design Of Front-End Web Pages ( Per Page ) 98 In Jpeg / Psd Format 99 In Html / Aspx / Php Format 100 Section D Nmobile Application Development N ( Iphone, Ipad, Android, Windows And Blackberry ) Ncomplete Mobile App Development From Design To Development Of Either Native Or Browser Or Hybrid Applications Including Concept Development, Information Design & Architecture, Prototyping, Ui & Ux Design, Features & Functionalities, Nomenclature Of Links, Content Development In English / Hindi, Design Of Splash Page And All Guis ( Front-End Pages ) Using Coding As Per Sdk Guidelines ( Frameworks, C, C++, Java Programming, Back-End Development And Integration ) Content Management System & Database Integration, Debugging ( Excluding Developer Account Setup And App Registration Cost ) N 101 Designing Of App Screens ( Rate Per Screen ) 102 Adaptation Of Designs In Multiple Screen Sizes As Per Device & Orientation ( Rate Per Screen ) 103 Application Development ( Rate Per Man-Hour ) 104 Integrating Static Links ( Rate Per Man-Hour ) 105 Integrating Pop Up Ads ( Rate Per Man-Hour ) 106 Updation In Existing App ( Rate Per Man-Hour ) 107 Preparation For App Store Submission & Uploading App In App Store 108 Conversion Of App From One Platform To The Another ( Rate Per Man-Hour ) 109 Section E Printing 110 Invitation Card Printing ( 7” X5” ) On Chaggalcandido 260 Gsm Paper Including 1-2 Color Screen Printing & Matte Gold Embossing ( Per Card ) 111 Envelope ( 7.25” X 5.25” ) On Regina Blanc 100 Gsm Paper Including 1-2 Color Screen Printing & Matte Gold Embossing ( Per Envelope ) 112 Section F: Organisation / Brand / Project Identity 113 Organisation / Brand / Project Identity Graphic Unit And Brand Colours Including Brand Guideline And Templates For: 114 • Visiting Card 115 • Letter Head 116 • Cd / Dvd Surface 117 • Envelope 118 • E-Mail Signature 119 • Power-Point Presentation Slide Template 120 Graphic Unit For Special Purpose Use ( Conference, Event, Etc. ) 121 Namestyle Unit Only Without Graphic For Special Purpose Use 122 Development Of 2-D Mascot / Character Illustration ( Per Character ) 123 Adaptation Of Mascot / Character In Different Poses For Use In Various Materials ( Per Rendering ) 124 Section G: Photography And Videography Nincluding Camera & Photographer’S Fee Excluding Cost Of Models And Props ( High-Resolution Digital ) N 125 Creative Photography Assignment Charges For Print & Electronic Mediums Including Special Lights, If Required ( Per Day ) 126 Photography For Event / Conference / Workshop Coverage 127 Full Day ( Upto 8 Hours ) 128 Half Day ( Upto 4 Hours ) 129 Photography With Drone In Hd Format ( Per Day ) 130 Professional Video Shoot ( Hd Format ) Video Shoot For Event / Conference / Workshop Coverage Including Camera & Tripod Charges & Cameraman’S Fee, Excluding The Cost Of Media 131 Full Day ( Up To 8 Hours ) 132 Half Day ( Up To 4 Hours ) 133 Video Shoot For Interview / Byte Capturing Including Camera & Tripod Charges & Cameraman’S Fee, Lapel Mic But Excluding The Cost Of Media ( Per Day ) 134 Video Shoot For Interview / Byte In 4K Format ( Per Day ) 135 Creative Video Shoot Including Recce, Camera, Tripod Charges & Cameraman’S Fee, Directors Fee, Crew Charges Excluding The Cost Of Media ( Per Day ) 136 Creative Video Shoot In 4K Format Including Recce, Camera, Tripod Charges & Cameraman’S Fee, Directors Fee, Crew Charges Excluding The Cost Of Media ( Per Day ) 137 Video Shoot With Drone In Hd Format ( Per Day ) 138 Video Shoot Equipment On Hire Including Operator / Operating Crew ( Per Day ) 139 26’ Manually-Operated Crane 140 32’ Manually-Operated Crane 141 26’ Jimmy Jib Crane 142 32’ Jimmy Jib Crane 143 Straight / Round Tracks And Trolley 144 Hmi 2.5 Kv Light 145 Solar 2 Kv Light 146 Multi 20 Light 147 Multi 10 Light 148 Baby Light 149 Boom Rod Mic 150 Lapel Mic 151 Wide Angle Lens Attachment 152 Fish-Eye Lens Attachment 153 Audio Mixer 154 Video Mixer 155 Electric Trolley 156 Cutter Stand 157 Extension Board 158 Reflector 159 Generator 160 Section H Print Material ( Per Item ) Ncontent Editing, Design And Layout, Digital Artwork Of ( Excluding Third Party Costs Like Photo Sourcing, Photography, Pre-Press Scanning, Etc. ) ( Content Will Be Provided By Bip ) : N 161 Annual Report 162 Cover ( Upto 4 Surfaces ) 163 Thematic Pages ( Per Surface ) 164 Financial Pages ( Per Surface ) 165 Leaflet ( Per Surface ) 166 Corporate / Promotional Publication ( Brochures / Booklets / Souvenir, Etc. ) 167 Cover ( 4 Surfaces ) 168 Inner Page ( Per Page ) 169 Folder 170 Folder ( Per Surface ) 171 Folder With Pocket 172 Planner / Note Book / Diary 173 Cover ( 4 Pages ) 174 Regular Inner Sheet ( Per Surface ) 175 Thematic / Separator Sheet ( Per Surface ) 176 Calendar ( Per Side ) 177 Cd / Dvd Surface Design 178 Pen Drive Surface Design 179 3-Dimensional Informative Mailer Including Concept & Design ( Excluding Production ) 180 Creative Greeting / Invitation 181 Concept & Design ( Per Surface ) 182 3-Dimensional Invitation Concept & Design ( Excluding Production ) 183 Identity Card 184 Master Design ( Per Surface ) 185 Adaptation ( Per Adaptation ) 186 Delegate Card 187 Master Design ( Per Surface ) 188 Adaptation ( Per Adaptation ) 189 Corporate Giveaway ( Concept & Design ) Excluding Production 190 Poster Design 191 Box Design 192 Data Entry ( Per 500 Words ) 193 Rework / Updation / Revision In The Existing Publication In Terms Of Content And Layout, And Digital Artwork ( Per Page ) 194 Re-Sizing Of Existing Document / Publication / Brochure, Etc. Without Any Content Changes ( Per Page ) 195 Image-Based Static Visual Communication Including Any Of Image, Graphic, Text, Etc. For Posting On Social Media Or Internet ( Per Visual ) 196 Carry Bag Design 197 Certificate 198 Cd / Dvd Case / Cover Design 199 Pendrive Case / Cover Design 200 Scheme Card / Credit Card Design 201 Mug Design 202 T-Shirt Design 203 Newsletter ( With Research, Article Writing, Photograph Sourcing, Layout ) 204 Mast / Format Design 205 First 4 Pages 206 Each Additional Set Of 4 Pages ( Per Set ) 207 Badges / Lapel Pin ( Per Surface ) 208 Lanyard 209 Cap Design 210 Mouse Pad Design 211 Customization Of Collaterals ( Per Adaptation ) 212 Exhibition Booth Design 213 Theme & Layout For Exhibition Booth 214 Design & Digital Artwork Of Panel ( Per Panel ) 215 Layout For Raw Space 216 3D Installation Design 217 Event Stage Setting & Backdrop Structure Design 218 Electronic Backdrop For Watchout 219 Slides For Watchout 220 Audio Visual Content For Watchout With Script, Animation, Background Music, With / Without Voice Over Using Text, Images And / Or Videos ( Upto 30 Sec ) 221 Backdrop For Events 222 Wall Treatment ( With Images And / Or Graphics ) 223 Voucher / Ticket / Coupon Design 224 Gift Tag / Sticker ( Per Surface ) 225 Wrapping Paper Design ( Per Surface ) 226 Customisation Of Collaterals ( Per Adaptation ) 227 Design For Mass Media 228 Design For Daily Press / Magazine ( Design Including Concept, Content / Copy, And Artwork; But Excluding Scanning And All Third Party Input Costs ) 229 ( Rate Per Creative ) 230 Updation / Revision In Text / Size Adaptation Of Existing / Approved Mass Media Creative ( Per Creative ) 231 Conversion Of Existing / Approved Colour Mass Media Creative Into Black & White ( Per Creative ) 232 Advertorial For Daily Press / Magazine ( Content, Layout And Digital Artwork ) Magazine ( Per Page ) 233 Advertorial For Daily Press / Magazine ( Content, Layout And Digital Artwork ) Newspaper: Quarter Page 234 Advertorial For Daily Press / Magazine ( Content, Layout And Digital Artwork ) Newspaper: Half Page 235 Advertorial For Daily Press / Magazine ( Content, Layout And Digital Artwork ) Newspaper: Full Page 236 Section I: Out-Of-Home: Design And Digital Artwork ( Excluding Scanning And All Third-Party Input Costs ) 237 Banner / Kiosk / Bus Back Panel Design 238 Hoarding / Unipole / Gantry Design 239 Bus Shelter Design ( All Surfaces ) 240 Vehicle Design ( Each Surface ) 241 Complete Vehicle Design 242 Signage Design 243 Wall Painting Design 244 Stand-Alone Panel Design 245 Resizing / Updation Of Existing Out-Of-Home Creative Without Any Content Changes ( Per Adaptation ) 246 Section J: Visuals 247 Complex Illustration ( Per Item ) 248 Data Representation / Graphs / Charts ( Per Item ) 249 Development Of Outline Maps ( Non-Cartographic / Non-Gis Illustrations ) ( Per Map ) 250 Image Scanning And Basic Enhancement ( Per Sq. Inch ) 251 Heavy System-Work At 300 Dpi ( Per Sq. Inch ) 252 Digital Collage At 300 Dpi For Print ( Per Sq. Inch ) 253 Digital Collage For Web / Presentations ( Per Sq. Inch ) 254 3D Modelling, Texture Mapping And Final Rendering In 3D Studio Max Of The Given 2D Drawing ( Per Man Hour ) 255 Section K: Content Work 256 Translation ( Material Provided By Bip ) 257 English To Hindi ( Per 100 Of Source Language ) 258 Hindi To English ( Per 100 Of Source Language ) 259 Revision / Updation / Editing 260 English ( Per 100 Words Of Source Material ) 261 Hindi ( Per 100 Words Of Source Material ) 262 Speech Writing 263 Hindi ( Per 100 Words ) 264 English ( Per 100 Words ) 265 Letter Writing 266 Hindi ( Per 100 Words ) 267 English ( Per 100 Words ) 268 Article / Writeup / Document 269 Hindi ( Per 100 Words ) 270 English ( Per 100 Words ) 271 Press Release 272 Hindi ( Per 100 Words ) 273 English ( Per 100 Words ) 274 Coordination Fee For Translation & Type Setting From / Into Languages Other Than English And Hindi As A % Of The Translators Bill. ( Such Translations And Type Setting Will Be Paid For At Actuals ) 275 Section L: Bulk Sms Sending 276 • 9Am To 9Pm Delivery 277 • No Dnd Number Delivery 278 • No Sender Id 279 Task Includes: 280 • Sorting And Conversion Of Data According To Sms Software 281 • Managing Dissemination And Sending 282 • Scheduling 283 • Sms Copy In 160 Characters 284 It Is To Be Noted That The Above Lists Are Non-Exhaustive, And Tasks Of Similar Competency Can Be Assigned To The Selected Bidder’S List Of Services. 285 Section M: Social Media Management 286 Creating Profile Page ( If Needed ) For Social Networking Sites ( Like Facebook, Linkedin, Twitter, Instagram ) And Maintaining The Pages On A Monthly Basis. Content Development For 8 - 10 Posts To Include Text / Visual-Based Content; Audio-Visual, Slide Show Etc. Advertising Fee To Be Paid At Actual. [ Rate Per Platform / Per Month ] . 287 Section N: Bulk Emailing Services 288 • Sorting Data According To Email Software. 289 • Conversion Of Data Into Format Compatible To Email Software ( Csv Or Txt Or Xls ) . 290 • Creation Of Email Design In Jpeg Format 291 • Conversion Of Jpeg Into Html Format. 292 • Uploading Emailer On Server. 293 • Making It Browser Compatible 294 • Add Attachments In .Jpeg, .Pdf, .Ppt, .Swf, .Zip, Etc. 295 • Adding ‘Unsubscribe’ Feature 296 • Scheduling The Date For Posting Of Message 297 • Adding Tracking Feature 298 • Email Reports For Email-Tracking ( For Every 1000 Emails ) 299 Section O: Digital Flip Book 300 Conversion Of An Existing / Printed Publication ( Brochure / Book / Booklet / Etc. From Soft Copy ) Into A Flip-Book With Digital Pages And Easy Navigation, Flipping Pages With Features Like Indexing, Search, Print, Mail, Save Excluding Animation ( Per Page ) 301 Section P : Website For Mobile / Cell Phone 302 Design And Development Of Mobile Sites Homepage 303 Design And Development Of Static Mobile Site ( Rate Per Link ) 304 Development Of Form / Dynamic Links Within The Mobile Site ( With Database ) 305 Development Of Form / Dynamic Links Within The Mobile Site ( Without Database ) 306 Photo Gallery Application Within The Mobile Site 307 Updation In Existing Mobile Website In Text, Images, Etc Without Affecting The Basic Design Or Structure ( Rate Per Revised Link ) 308 Section Q : Consultation Charges ( If The Meeting Requires Travel Out Of Jaipur, Cost Of Travel And Accommodation During Travel Will Be Borne By Bip According The Bip Ta / Da Rules For Dgm Level ) 309 Consultation On Marketing Support / Strategy / Roll-Out Plan ( Cost Per Meeting ) 310 Consultation On Vendor Coordination ( Production Agencies Of Bip ) ( Cost Per Meeting ) 311 Production Supervision & Coordination With Vendors ( As A Percentage Of Vendor’S Bill ) 312 Section R : Seo ( Search Engine Optimization ) Keywords To Be Targeted: Upto 25 313 Onpage Optimization ( Rate Per Month ) : 314 Meta Tag Optimization 315 Title Tag Optimization 316 Code Optimization & Modifications 317 Broken Link Check 318 Alt Tag Optimization 319 Url Mode Rewrite 320 Xml Sitemap + Rss Feed 321 Content Optimization 322 Offpage Optimization ( Rate Per Month ) : 323 Google Analytics & Webmaster Account Setup 324 Website Submissions To Search Engines ( Google, Bing & Yahoo ) 325 Manual Directory Submission 326 Manual Article Submission 327 Press-Release Submission 328 Blogs Promotion 329 Article Submission 330 Social Book Marking ( Sbm ) 331 Cost Per Extra Set Of 5 Keywords ( Over And Above 25 Keywords ) 332 Offpage Seo Specific Content Development In English ( For Blog, Article & Press-Release Submission ) ( Rate Per 100 Words ) 333 Section S : Creative For Mobile / Digital Media Excluding Sending / Circulation 334 Static Creative Design ( Per Creative ) 335 Adaptation Of Existing Creative For Mobile / Social Media ( Per Creative ) 336 Video-Based Creative For Mobile ( Per Video ) 337 Low Resolution Render Of Existing Video For Mobile ( Per Video ) 338 Design Of Infographics For Use In Social Media / Digital / Print Media ( Per Infographic ) 339 Section T : Splash Page / Landing Page For Electronic Mail / Internet Advertising Campaigns ( Rate Per Page ) 340 Design & Development Of Static Splash Page In Html Format Excluding Form 341 Design & Development Of Static Splash Page In Html Format Including Form 342 Design & Development Of Animated Splash Page In Html Format Excluding Form 343 Design & Development Of Animated Splash Page In Html Format Including Form 344 Section U : Mobile Application Development 345 ( Ios, Android And Windows ) 346 Complete Mobile App Development From Design To Development Of Either Native Or Browser Or Hybrid Applications Including Concept Development, Information Design & Architecture, Prototyping, Ui & Ux Design, Features & Functionalities, Nomenclature Of Links, Content Development In English / Hindi, Design Of Splash Page And All Guis ( Front-End Pages ) Using Coding As Per Sdk Guidelines ( Frameworks, C, C++, Java Programming, Back-End Development And Integration ) Content Management System & Database Integration, Debugging ( Excluding Developer Account Setup And App Registration Cost ) 347 Designing Of App Screens ( Rate Per Screen ) 348 Adaptation Of Designs In Multiple Screen Sizes ( Rate Per Device & Orientation ) 349 Application Development ( Rate Per Man-Hour ) 350 Integrating Static Links ( Rate Per Man-Hour ) 351 Integrating Pop Up Ads ( Rate Per Man-Hour ) 352 Updation In Existing App ( Rate Per Man-Hour ) 353 Preparation For App Store Submission & Uploading App In App Store ( Rate Per App Store ) 354 Conversion Of App From One Platform To The Another ( Rate Per Man-Hour ) 355 Section V : Web-Site Updation 356 Addition Of New Link To Existing Web-Site Including Design Of New Pages ( Per Page ) 357 Integration Of New Link Within Existing Link Structure ( Per Page ) 358 Addition Of New Links To Existing Web-Site Leading To Another Url / Pdf / Etc. ( Per Link ) 359 Addition Of New Links To Existing Web-Site Leading To Pop-Up / Slider ( Per Link ) 360 Removal Of Links / Pages From Existing Web-Site ( Affecting The Existing Structure ) ( Per Page Removed ) 361 Updation In Existing Web-Site In Text, Images, Etc. Without Affecting The Basic Design Or Structure ( Rate Per Revised Link ) 362 Insertion Of Video-Clip In Web-Site ( Rate Per Video Clip ) , Excluding Video Conversion, Editing, Compression Charges 363 Design Of Static Web-Banner With Image / Text / Graphics For Promotion ( Per Banner ) 364 Design Of A Landing Page With Image / Text / Graphics For Promotion ( Per Page ) 365 Design Of A Landing Page Including Form With Db Using Image / Text / Graphics For Promotion ( Per Page ) 366 Annual Website Maintenance ( Per Website Per Month ) ( Content For Updation Will Be Provided By The Department ) Excluding: 367 ·           Redesign Of Site 368 ·           Design Of New Pages 369 ·           Script / Application - Adding, Editing, Removing Or Installing Any Scripts, Application Or Software To The Existing Website 370 Design Of Website Home Page Only, Including Need Assessment, Planning Of Structure & Quick-Links, Features & Functionalities, Nomenclature Of Links And Content In English / Hindi ( Delivered In Jpeg / Psd Format ) 371 Design Of Home Page Only, Including Need Assessment, Planning Of Structure & Quick-Links, Features & Functionalities, Nomenclature Of Links And Content In English / Hindi ( Delivered In Html / Aspx / Php Format ) 372 Gui Design Of Front-End Web Pages ( Per Page ) 373 ( Delivered In Jpeg / Psd Format ) 374 Gui Design Of Front-End Web Pages ( Per Page ) 375 ( Delivered In Html / Aspx / Php Format ) 376 Third Party Costs Like Domain Name Registration, Server Space For Hosting And Server Administration, Payment Gateways, Buying Of Pre-Developed / Off-The-Shelf, External Modules, Extensions, Plug-Ins, Components, Etc. Will Be Paid At Actual. Agency Management Fee ( For Coordination Of These Will Be Paid Over And Above The Suppliers Bill ) ( % Fee )
Contract Date: Mar 11, 2020 Contract Value : 95.74 Lakh
Government Departments No of Bidders 3
42.
Educational and Research Institute #3563795 AOC
Tender For Training Setup For Collaborative Robot In Department Of Manufacturing Engg And Industrial Management , Training Setup For Collaborative Robot ( Cobot ) , Specifications: 1. Collaborative Robot ( Cobot ) 6 Axis, 2. Payload 5Kg ( Minimum ) . 3. Reach 500 Mm To 1000 Mm Radius ( This Is A Preferable Range ) 4. Position Repeatability + / -0.1 ( Minimum ) . 6. High Speed Operation Mode 600 Mm / Sec ( Minimum ) , Collaborative Operation Mode ( Standardoperation ) 100 Mm / Sec ( Minimum ) And Collaborative Operation Mode ( Low Speed Operation ) 20 Mm / Sec ( Minimum ) 7. Teach Pendentwith 7M ( Minimum ) Cable Length. 8. Safety Equipment Indicator: Multicolour Led Display Robot Status. 10. Cobot Can Be Directly Interface With Electric Gripper / Force Sensor / Vision ( Plug And Play ) . 11. Air Piping, Pneumatic Tubing For Gripper Actuation. 12. Built-In Solenoid Valve Set For Gripper Actuation ( Pneumatic ) . 13. Standard Dis And Dos And Safety Dis / Dos. 14. Ethernet Compatibility. 16. Appropriate Safety Certification ( Third Party Certification ) 17. Inbuilt Dual Channel Safety Interface Like Emergency, Safety Door And Mode Selection. 18. Compact Controller With Interface Card. 19. Appropriate Memory Capacityfor Controller. 20. Programming Software - User-Friendly Software And The Versatility Needed To Accelerate Teaching, Learning And Robotics Research - Installed In Tab / Laptop Just Drag And Drop Ofinstructions-Ros Compatible In Addition To Open Api, Simulation Software For Pc For Programming, Simulation, Modelling, And Layout / Navigational Examinations. 21. In-House Training -Supplier Shall Provide Foc Training To Coep Team. 22. Installation Environment :- 00 To 450 23. Suitable Table For Mounting A Cobot 24. Suitable Stabilizer 25. Electric Gripper - Suitablegripper Interfaced With Cobot With Required Accessories. 26. Pneumatic Gripper - Pneumatic Parallel Grippers Having Min. 2 Fingers On One Gripper Provided Withregulator & Pressure Switch, Required Pneumatic Tubing, Fittings, Accessories And Suitable Compressor. 27. Vision Interface System For Pick And Place Application - Vision System With Min 2Mp Camera, Lens, Light And Required Accessories For Pickand Place Application.
Contract Date: Jul 30, 2021 Contract Value : 25.00 Lakh
Boards / Undertakings / PSU No of Bidders 7
Maharashtra View Result →
43.
Home Affairs #2917511 AOC
Manufacture And Supply Of Marine Duty Electrical Equipment For Roro Vessel For Wbtc Ltd. Manufacture And Supply Of Marine Duty Electrical Equipment For Roro Vessel Of Wbtc Ltd. As Per Technical Specification, Mentioned On Section - C Of Niet. , Main Switch Board Quantity – 01 ( One ) Set ( Sld Drg. Swl-Roro-E-02, Rev.00 Sheet No. 8 To 14 Off 24 Enclosed ) The Board Should Comprise Of 415V, 3 Ph, 50 Hz As Well As 230V, 3 / 2 Ph, 50 Hz Section For Control And Distribution Of The System On Board. Non-Conducting Hand Rails In Front, Construction Shall Be Such That The Board Will Be Of Ip44 Protection ( As Applicable For In-Land Operation ) . Main Cabling And Maintenance Work Including Removal / Replacement Of Components Would Be Performed From Front Side And Suitable For Marine Application. The Panel Board Will Consist Of 2 ( Two ) Separate Compartments For 2 ( Two ) Sets Of D.G’S As Well As Shore Supply Also To Incorporate Into The Panel. All Internal Cables To Be Used For Lfh Type Standard Of Suitable Rated / Graded. Cable Entry From The Bottom Of The Panel Accordingly The Gland Plate ( Detachable ) To Be Provided. All Meters To Be Analogue ( 96 X 96 ) M Size, Reputed Make. Single Line Diagram In Respect To Short Circuit Calculation ( Sheet No. 8 ) And Circuits ( Sheet 9 To 14 ) Are Enclosed For Ready References. , Transformer Bank: Quantity – 01 ( One ) Set ( Sld Drg. Swl-Roro-E-02, Rev.00 Sheet No. 20 ) The Enclosure Of Transformer Bank In Sheet Metal With Ip-22 / 44 ( As Applicable For Inland Operation ) , Drip Proof Type With Louvers On Sides To Facilitate The Air Circulation. The 4 ( Four ) In Nos. Transformer Units Of 2.4 Kva, 415V / 230V, 50 Hz Including Spare Units To Be Installed In A Complete Enclosure Keeping Adequate Distance With Separation In Between Each Other. The Transformer Core Should Of Crgo Steel, Copper Conductor, Insulation Class-B, Vector Group: Delta-Delta-Zero. A Separate Fuse Link Box To Incorporate In Primary And Secondary Terminals To Facilitate The Use Of Spare Units With Changing The Fuse Links Only. ( As Per Enclosed Sheet No. 20 ) , Battery Charger Cum 24V Dc Db For Em Lights & Others: Quantity – 01 ( One ) Set ( Sld Drg. Swl-Roro-E-02, Rev.00 Sheet No. 21, 22 ) The Board Shall Be Of Dead Front Type, Suitable For Wall Mounting Type In Sheet Metal Enclosure With Ip-22, Drip Proof Type, Louvers On Sides, Earthing Studs On Both Sides With Proper Talley Plates. All Metes Are To Be Analogue Type, I.L., Earth Fault I.L, Reverse Power Protection On 24V Dc Battery Lines. Incoming / Outgoing To Be Protected With Rated M.C.B. As Per Enclosed Sheet No. 21 & 22. , Shore Connection Box: Quantity – 01 ( One ) Set 50A, 415V, 50Hz, 3 Ph With W.T. Enclosure, Ip-56 / 65, Suitable For Exposed Area Installation, Wall Mounting Type Sheet Metal Panel. Cable Entry Pipes For Incoming / Outgoing To Be Provided In Detachable Gland Plate In Bottom And Earthing Stud In Both Sides. The Top To Be Provided With Water Guard Tray ( Detachable ) . Suitable Rated Voltmeter ( Analogue ) , I.L. For Phase Sequence With Test P.B. Etc. As Per Marine Standard. , Lighting Distribution Boards: The Boards Shall Be Of Dead Front Type, Suitable For Wall Mounting In Sheet Metal Enclosure With Ip-44 ( Suitable For Inland Operation ) , Drip Proof Type, Minimize The Ingress Of Dust, Vermin And Water. Earthing Studs With Proper Talley Plates To Be Provided As Required. Internal Wiring With Lfh Multistrand Wires Of Adequate Rated / Graded. , Lighting + Misc. Nav. W.H.D.B.: Quantity – 01 ( One ) Set 230V, 3 Ph, 50 Hz ( As Per Enclosed Sld Drg. From Sheet No. 15 To 18 ) , Navigational Light Panel: Quantity – 01 ( One ) Set 230V, 1 Ph, 50 Hz ( As Per Enclosed Sld Drg. Sheet No. 19 ) , Navigational Light Panel: Quantity – 01 ( One ) Set 24V, Dc ( As Per Enclosed Sld Drg. Sheet No. 23 )
Contract Date: Aug 25, 2023 Contract Value : 4.78 Lakh
Government Departments No of Bidders 3
West Bengal View Result →
44.
Home Affairs #2275357 AOC
Installation, Fitting / Fixing / Testing, Commissioning Of Electrical And Electronic Equipment / Systems As Well As Associated Work On Board Yard 786 For Indian Navy As Per Detailed In Section ‘B’ And ‘C’ At Swl Premises As Per The Drawings Of Various Electrical Systems Provided By Swl Incompliance To Niet Clauses- 1 Part – I : Cable Tray & Carrier Workgi Cable Tray 2 400 Mm 3 300 Mm 4 225 Mm 5 150 Mm 6 100 Mm 7 75 Mm 8 Gi Conduit 9 80 Nb 10 65 Nb 11 40Nb 12 25 Nb 13 W / T Multiple Dk Gland Ms 14 V3 ( 145 X 80 Opening X 205Ht ) 15 V5 ( 265 X 100 Opening X 205Ht ) 16 V6 ( 335 X 100 Opening X 205Ht ) 17 W / T Multiple Bhd Gland Ms 18 H2 ( 100 X 60 Opening X 230Lg ) 19 H3 ( 145 X 80 Opening X 230Lg ) 20 H5 ( 340 X 80 Opening X 230Lg ) 21 W / T Dk Tube ( Ms Galvanised With Brass Nuts ) 22 10 Mm 23 15 Mm 24 20 Mm 25 60 Mm 26 W / Tbhd Tube ( Ms Galvanised With Brass Nuts ) 27 10 Mm 28 15 Mm 29 Part – Ii : Cable Length For Laying And Terminationepr, Lhf Insulated Annealed Tinned Copper Conductor Cables [ Core X Size ( Approx. ) ( Sq. Mm ) ] 30 3 X 50 31 3 X 35 32 3 X 16 33 3 X 10 34 3 X 6 35 3 X 4 36 3 X 2.5 37 3 X 1.5 38 2 X 4 39 2 X 2.5 40 2 X 1.5 41 1 X 1.5 42 7 X 1 43 14 X 2.5 44 24 X 1 45 Other Assorted System Cables 46 Co-Axial 47 Others 48 Control Cables 49 Part – Iii : Panels, Dbs, Starter, Etc. Equipment For Installation, Termination And Commissioning Including Testing / Trials. 50 Main Engine ( P&S ) Accessories With Panel For W.H. & E.R. 51 Gear Box ( P&S ) Accessories For W.H. & E.R. 52 Propulsion Control System With Accessories For W.H. & E.R. 53 Alternator C. Panel With Accessories Including D.G. Sets 54 Steering Gear ( P&S ) For Local , W.H. & E.R. With Accessories 55 Main Switch Board 56 Shore Connection Box 57 Trans Rectifier Cum Battery Charger 58 Battery Charger 59 Battery 180Ah, 24V 60 Transformer 61 Panels 62 Anchor Windlass Panel With Accessories 63 Winch Control Panel With Accessories 64 Air Whistle Panel With Accessories 65 Boat Davit Panel ( P&S ) 66 Air Compressor Panel With Accessories 67 Navigationallighting C. Panel 68 Starter 69 Group Starter Panel 70 Star / Delta Starter 71 Star / Delta Starter Panel 72 Power Db 73 Lighting Db ( 1 To 5 ) 74 Navigational Aids / Communication Equipment 75 Marine Radar With Accessories 76 Magnetic Compass With Accessories 77 Gyro Compass With Accessories 78 Gps With Accessories 79 W.S.D.Iwith Accessories 80 Aiswith Accessories 81 Vhf With Accessories 82 Echo Sounder With Accessories 83 E / M Log With Accessories 84 Galley Equipment 85 Cooking Range+ Hot Plate+ Oven 86 Water Boiler 87 Refrigerator 88 Deep Fridge 89 Water Cooler 90 Pump-Motor 91 Sewage Treatment Plant 92 Oily Water Separator 93 Lub Oil / Fuel Oil Purifier 94 Sound Power Telephone With Accessories 95 Engine Orders Telegraph W / H & E.R.With Accessories 96 Shaft Rpm Indication System ( P & S ) For E.R. & W.H. 97 Tank Content Gauge ( Local & Remote ) Withaccessories 98 Bilge Level Alarm Cum Over Flow Alarm System With Accessories 99 Call Up Bell 100 Emergency-Stop System ( Local & W.H. ) 101 Public Address Systemwith Accessories 102 Changeover Switches 103 Ships Name Board 104 C.C. Tv Installation, Termination And Commissioning. 105 Part – Iv : Light Fittings, Fans, Plugs, Sockets Etc. For Installation And Termination. 106 Starter For Air Condition System 107 Mcb Fitted Box For Air Condition System 108 Local Start-Stop 109 Navigation Lights 110 Anchor Light 111 Nuc Light 112 Manoeuvring Light 113 Mast Head Light 114 Constrain Draught Light 115 Morse Light 116 Stern Light 117 Side Light ( P&S ) 118 Sockets For Portable Pumps 119 Assorted Fittings 120 Non Water Tight Type Decorative Lt Ftg With Cfl / Fl Lampfor Cabins / Messes Including Bunk Lt, Mirror Lt, Table Lt Etc. 121 Water Tight Type Lt Ftg. With Cfl / Fl Lamp ( Bc ) And With / Withoutgrilled Guard / Weather Dk. Lt With Incandescent Lamp 122 Wt Switch, Socket & Plug Al-Die Cast Body 123 Nwt Switch, Socket & Plug. 124 Cabin Fan ( 300 / 400Mm Sweep ) Oscillating Type With Built In Regulator And 2M Long Cable & Plug.230V Ac Operated. 125 Console ( W.H. & E.R. ) With Accessories 126 Flood Light 127 Boat Embarkation Light 128 Search Light ( Swelling & Adjustable Type ) With 1X1000w, 230V 129 Wiper ( P&S ) & Cvs 130 Wt Emergency Incandescent Lt With 15-20W, 24V Bc Lamp. Al-Die Cast Body 131 4 Way Wt Junction Box Al-Die Cast Body24v / 230V 132 24V Dc Bell Gen / Fire Alarm 133 Arrangement And Operation For Load Testing Of 2 Nos. Generators, To Complete As Per Irs Requirement
Contract Date: May 27, 2022 Contract Value : 22.90 Lakh
Government Departments No of Bidders 1
West Bengal View Result →
TenderDetail
Loading tenders