View Bid Results For Hvds Tenders

We found 207 Bid Results related to hvds tenders. You can find Contractor details who won hvds tenders along with contract details in Bid awards announcements section.

Filters
Stage
92
88
27
Tender Publishing Platform
13
194
State / UT
15
133
27
10
10
8
5
4
2
2
1
1
1
1
1
1
Contract Value
115
49
17
26
Publish Date
0
0
0
0
0
Sector
11
180
10
7
2
2
1
1
1
1
1
1
Ownership
4
154
49
3
1
Within keyword
Active filters:
Showing 1–5 of 207 tenders matching your filters
3.
Power #10765859 Price Bid
Tender For Annual Execution Of Electrical Works) Under (Op) Circle, Uhbvn, Karnal - Erection of independent feeders, system improvement works ie erection and dismantlement/ bifurcation, trifurcation /segregation of 11 KV & LT lines, Pole Mounting Sub Stations, Laying of all types of 11 KV overhead & underground cables, laying of all types of LT overhead and underground cables and other miscellaneous capital revenue works. 2. Release of all categories of new connections and RCO cases involving HT/LT lines and transformers etc. 3. Erection of independent 11 KV feeders and inter-linking feeder from S/Stn. 4. Rehabilitation of 11 KV feeders & LT lines. 5. Deposit works/R-APDRP works etc. 6. Erection & dismantlement of 11 KV lines/LT lines & lying of 11 KV & LT cable. 7. Erection of pole mounting S/Stations. 8. Change the traditional LT distribution system in HVDS. 9. Providing of LT ABC 11 KV ABC cables &1C/4CXLPE armouned/unarmound 10. Providing of LT & 11 KV ABC cables. 11. Replacement of 11 KV bare conductors with 11 KV ABC/HT XLPE Cable. 12. The work connected with release of all types/categories of connections involving erection of HT/LT Lines with conductor/all types of HT/LT cables and distribution transformers. 13. Relocation of all types of existing meters outside the Consumer premises to the main gate/poles etc. 14. Replacement of all types of defective meters. 15. Release of General DS/ NDS connections. 16. Erection / dismantlement/re-orientation of 33 KV Lines. 17. Erection dismantlement/re-orientation of the Sub-Station equipments at 33 KV Sub-Stations. 18. Erection/dismantlement of power transformers at 33 KV Sub-Stations & any other works assigned by the concerned SDO/XEN/SE time to time etc.
Contract Date: Ref. Documents Contract Value : Ref. Document
Government Departments No of Bidders 7
Contract Date: Ref. Documents Contract Value : Ref. Document
Boards / Undertakings / PSU No of Bidders 11
Contract Date: Ref. Documents Contract Value : Ref. Document
Boards / Undertakings / PSU No of Bidders 17
Contract Date: Ref. Documents Contract Value : Ref. Document
Boards / Undertakings / PSU No of Bidders 11
12.
Health and Family Welfare #10625910 Price Bid
Auction Cold Chain Ilr Deep Freezer Iind Call Health Shivpuri , Chc Narwar Ilr Small 140 Lit . Model Mk 144 S . No . 91209294 Dated 08 . 12 . 1999 , Chc Narwar D Freezer Small 140 Lit . Model Mf 144 S . No . 6571403 Dated 06 . 08 . 1997 , Chc Narwar D Freezer Small 140 Lit . Model Mf 144 S . No . 20053203870 , Phc Khatora ( Badarwas ) D Freezer Small140 Lit . Model Mf 142 S . No . 65117213 Dated 08 . 08 . 1997 , Central Store Cmho Office Ilr Small , 140 Lit . Model Mk 140 S . No . 50217164 Dated 22 . 06 . 1991 , Phc Rannod ( Badarwas ) D Freezer Small140 Lit . Model Mf 144 S . No . 91004965 Dated 10 . 12 . 1999 , Phc Manpura ( Picchore ) D Freezer Small140 Lit . Model Mf 144 S . No . 91004861 Dated 07 . 12 . 1999 , Phc Bairad ( Pohari ) D Freezer Small140 Lit . Model Mf 144 S . No . 91004881 Dated 11 . 12 . 1999 , Phc Mangroni ( Narwar ) Ilr Small144 Lit . Model Mk 144 S . No . 91209399 Dated 08 . 12 . 1999 , Chc Badarwas Ilr Small 140 Lit . Model Mk 144 S . No . 65115034 Dated 08 . 09 . 1997 , Phc Bamorkala ( Khaniyadhana ) D Freezer Small140 Lit . Model Sb 142 S . No . 31612059 Dated 06 . 08 . 1992 , Chc Pichhore D Freezer Small140 Lit . Model Mf 144 S . No . 20013702986 Dated 06 . 08 . 1992 , Phc Mangroni ( Narwar ) D Freezer Small144 Lit . Model Hvd S . No . Be04g4e2600b2a8a0152 Dated 04 . 05 . 2011 , Chc Badarwas Ilr Small 140 Lit . Model Mk 144 S . No . 20032300327 Dated 10 . 12 . 1999 , Chc Karera Ilr Small 140 Lit . Model Mk 144 S . No . 91208267 Year 2003 , Phc Bairad ( Pohari ) D Freezer Small144 Lit . Model Hvd 116 S . No . Be04g4e2600b2a7u0199 Dated 11 . 12 . 2010 , Chc Khaniyadhana D Freezer Small 140 Lit . Model Mf 144 S . No . 31600675 Dated 06 . 08 . 1992 , Chc Khaniyadhana Ilr Small 140 Lit . Model Mk 142 S . No . 50213115 Dated 14 . 09 . 1995 , Central Store Cmho Office D Freezer Large , 300 Lit . Model Hvd 286 S . No . Be04f4e2600b2a8k0050 Dated 07 . 10 . 2010 , Chc Pohari D Freezer Small 140 Lit . Model Hvd 116 , S . No . Be04g0e0100b287m0381 Dated 21 . 03 . 2009 , Phc Sirsod ( Karera ) D Freezer Small140 Lit . Model Hvd 116 S . No . Be04g4e2600b2a8h0146 Dated 09 . 03 . 2011 , Chc Narwar Ilr Small 140 Lit . Model Mk 144 S . No . 65115217 Dated 06 . 08 . 1997 , Chc Narwar Ilr Small 140 Lit . Model Mk 144 S . No . 25116493 Dated 26 . 05 . 1995
Contract Date: Ref. Documents Contract Value : Ref. Document
Statutory Bodies & Commissions/Committees No of Bidders 4
Madhya Pradesh View Result →
Contract Date: Ref. Documents Contract Value : Ref. Document
Boards / Undertakings / PSU No of Bidders 9
Contract Date: Ref. Documents Contract Value : Ref. Document
Boards / Undertakings / PSU No of Bidders 14
Contract Date: Ref. Documents Contract Value : Ref. Document
Boards / Undertakings / PSU No of Bidders 8
Contract Date: Ref. Documents Contract Value : Ref. Document
Government Departments No of Bidders 3
Jammu And Kashmir View Result →
Contract Date: Ref. Documents Contract Value : Ref. Document
Government Departments No of Bidders 3
Jammu And Kashmir View Result →
24.
Power #10265688 Price Bid
Tender For The Work Of Feeder Bifurcation Of Labhari Feeder Emanating From 33 / 11 S / S Islamnagar Due To Over Loading Under Edd-Iii ( Bisauli ) , Budaun Against Business Plan-2023-24. ; 1 Cartage Work 2 Safe Carriage Including Loading / Unloading & Proper Stacking Of Following Materials From Store Centre, Nawada, Badaun / Je Store To Site Of Work ( Approx. Distance 0-60 Km. ) 3 S.T. Pole 11 Mtr. Long 4 Pcc Pole 8.5Mtr. Long 5 11 Kv Polymer Disc Insulator 6 11 Kv V-Type X-Arms ( 65X65x6 ) Mm 7 Cross Arms Holding Clamps With Bolt & Nut 8 11 Kv Polymer Pin Insulator 9 F-Bracket For Fitting Top Insulator With Bolts & Nut 10 Ms Channel 125X65x1300 Mm ( Tee-Off ) 11 Holding Clamps With Bolt % Nut For T-Off Channel 12 Acsr Raccon Conductor 13 Barbed Gi Wire 14 Gaurding Cross Arm 1.6 Mtr. Long 15 Holding Clamp For Gaurding Angle 16 Gi Wire 6 Swg And Gi 10 Swg For Guarding, Lacing As Per Cost Schedule ( 21-22 ) ( Hvds 1 / 3 ) 17 Stay Set Complete With Grouting 18 Earthing Complete 19 11 Kv Vcb O / G Ctr 200 / 100 / 5A 20 11 Kv 3X185 Sqmm Xlpe Cable 21 11 Kv 3X185 Sqmm Xlpe Cable Jointing Kit I / D 22 11 Kv 3X185 Sqmm Xlpe Cable Jointing Kit O / D 23 Erection Work 24 Erection Of The Following Support Including Cutting, Making Holes Fixing Of All Types Of Accessories Digging Of Pits Complete In All Respect As Per Resspo Norms. All Types Of Nuts & Bolts, Washer Shall Be Provided By The Contractor For Execution Of Work. 25 Single Support Of St Pole 11 Mtr. Long. 26 Single Support Of Pcc Pole 8.5 Mtr. Long. 27 Pcc Pole 8.5 Mtr Long Double Pole 28 St Pole 11 Mtr Long Double Pole. 29 Grouting Of 8.5 Mtr Long Pcc / St 11 Mtr. Long Poles Including Cost Of Cement / B.B. And Sand Etc. The Work Shall Be Completed As Per Respo Norms. All The Grouting Material Shall Be Provided By The Contractor. 30 The Work Of Driving The Earthing Electrode And Making Connections With Gi Wire As Per Respo Norms As Follows. 31 St Pole 11 Mtr. Long. 32 Pcc Pole 8.5 Mtr. Long. 33 Painting Of St Pole 11 Mtr. Long. Supports With One Coat Of Red Oxide Primer And Two Coats Of Aluminum White Paint Of Isi Mark And Top Danger Portion Of Each Support Must Be Painted By Providing Two Coat Of Post Office Red Paint ( 1.5 Mtr. Upper Portion Of Support ) Paint And Material Shall Be Provided By The Contractor. 34 Erection / Fixing Of Stay Set With Stay Wire And Clamp As Per Resspo Norms Including Binding. Climbing, Clamping, Tightening And Nozzeling Etc. Complete In All Respect Including Its Grouting In Ratio 1:4:8 Of Cement, Sand And Brick Ballast And Sand Etc. As Per Resspo Norms. All The Grouting Material Shall Be Provided By The Contractor 35 Stringing And Sagging Of 11 Kv Overhead Line On Acsr Raccon Conductor Conductor As Per Resspo Norms. 36 Fixing Of Danger Board On Each Location And G.I. Barbed Wire Including Proper Clamping As Per Resspo Norms ( Danger Board With Clamps & Bolts, Nuts Shall Be Provided By The Contractor ) 37 Fixing Of 11 Kv 3X185 Sq.Mm Xlpe Cable Inoutdoor Jointing Kits After Carefully Removing The Insulation Of The Cable Duly Plumbing And Taping Of Cable Providing, Fixing And Crimpling Of Proper Size Good Quality Lugs And Complete Work. 38 Fixing Of 11 Kv 3X185 Sq.Mm Xlpe Cable Outdoor Jointing Kits After Carefully Removing The Insulation Of The Cable Duly Plumbing And Taping Of Cable Providing, Fixing And Crimpling Of Proper Size Good Quality Lugs And Complete Work. 39 Erection / Installation Of Following New 11 Kv Outgoing Panel ( Vcb ) In Control Room And Cable Joint Of The Panel To Pole Including Earthing, Grouting Of Anchor Bolt Of Panel And Making / Repairing Of Pocket For Cable To Insert In Panel From Trench And Fixing, Taping Of Bus Bar With Wiring For Pt. Ac, Dc Connection Including Providing Of Ac & Dc Supply. 40 Note:- Stone Pad 300X300x75mm ( 102 Nos ) , Red Oxide Paint ( 12 Ltr. ) , Aluminum Paint ( 12 Ltr. ) , Eye Bolt For Guard Wire ( 24 Nos. ) Shall Be Provided By The Contractor His Own Cost For Above Work.
Contract Date: Ref. Documents Contract Value : Ref. Document
Boards / Undertakings / PSU No of Bidders 1
Uttar Pradesh View Result →
25.
Power #10078050 Price Bid
Work Contract For Hvds Work In 22 Kv Anaikaraipatty Feeder In East / Bodi Section - 1 Loading Or Unloading Metal Poles All Sizes 2 Unloading Of Dt Upto 100 Kva 3 Other Tree Branch Clearance 4 Alteration Of Stay Clamp 5 Erection Of Dt Upto 25Kva / Metering Set 6 Dismandling Of Cross Arm 7 Cocount Tree Clearance Branch 8 Dismantling Of Dt Upto 100 9 Erection Of Psc Pole Upto 8 M 10 Loadind Of Dt Upto 100 11 Stringing Of Conductor Above 7 / 2.59 Mm 12 Earthing Of Pole Gi 4 Or 6 Swg 13 Loading / Unloading Of Lt Line Material 14 Drillijng Of Holes Up To 3 / 4 15 Excavation Of Pole Upto 8.0M 16 Transporting Of Conductor All Sizes 17 Painting Of Iron Poles Up To 40Ft 18 Dismandling Of Trannsformer Structure Material 19 Loading / Unloading Of Ht Line Material 20 Loading Of Conductor 21 Unloading Of Conductor 22 Fixing Of Aluminium Knob 23 Stay Concreting 24 Fixing Of Shackle 25 Erection Of Stay Set Complete 26 Fixing Of Lt Pin Insulator 27 Levelling Of Ground Using Bul Dozer 28 Erection Of Sp Structure 29 Erection Of Dp Structure 30 Erection Of Double Pole Dt Structure Complete 31 Diamandling Of Metal And Psc Poles 32 Loading / Unloadng Of Psc Pole Upto 8Mtr 33 Transport Of Poles Above 5 Km ( 8Km ) 34 Fixing Of Ht / Lt Fitting 35 Fixing Of V Cross Arm 4.5 Feet 36 Loading / Unloading Of 22 Kv Strain Disc 37 Excavation Of Pit In Hard Soil 38 Erection Of Dt Above 25Kva To 100 Kva 39 Transport Of Dt / Line Material Upto 10 Km 40 Sleeve Concreting 41 Excavation Of Pole Above 8 M 42 Excavation Of Stay Pit 4.5 To 5 43 Dismandling Of Conductor Upto 7 / 3.35 44 Releasing And Reerection Of Conductor 45 Fixing Of Tapping Channel Cross Arm 46 Loading / Unloading Of Psc Pole Above 8 M 47 Alteration Of Back Clamp 48 Fixing Of Ht Pin Insulator 49 Erection Of Psc Pole Above 8 M 50 Provision Of Spike Earthing Arrangement 51 Fixing Of 22 Kv Strain Disc 52 Fixing Of Lt 3 Phase Cross Arm 53 Transport Of Pole For A Lead Upto 5 Km
Contract Date: Ref. Documents Contract Value : Ref. Document
Boards / Undertakings / PSU No of Bidders 1
Contract Date: Ref. Documents Contract Value : Ref. Document
Boards / Undertakings / PSU No of Bidders 1
Contract Date: Ref. Documents Contract Value : Ref. Document
Boards / Undertakings / PSU No of Bidders 1
Contract Date: Ref. Documents Contract Value : Ref. Document
Boards / Undertakings / PSU No of Bidders 1
30.
Power #9958519 AOC
Tender For Extension Works For Capital Dcw Works In Veppadai Subdivision In Pallipalayam Division; 1 Extension works 2 Excavation of pole pit upto 27 (8.0 m) Pole by using JCB 3 Excavation of pole pit for 30 RCC Pole/9.00m PSC Pole by using JCB or manual 4 Excavation of RSJ pole pit above 36 by using JCB or manual 5 Stay pit 4.5 to 5 depth by using JCB or manual 6 Erection of PSC/RCC poles upto 8.0m. (27) by using Crane or manual 7 Erection of PSC/RCC poles upto 9.14m.(30) by using Crane or maual 8 Erection of RSJ poles above 36-0 by using Crane or maual 9 Erection of stay set complete 10 Fixing of HT V cross arms(all types) / channel cross arms/ guarding Cross arms 11 Fixing of LT 3 phase cross arms 12 Fixing of LT Single phase cross arms 13 Fixing of HT/LT TI Fittings 14 Fixing of HT pin Insulators 22 KV 15 Fixing of HT 22 KV strain disc. 16 Fixing of LT pin Insulator 17 Fixing of LT shackle 18 Fixing of Aluminium Knob 19 Paving and Stringing of 7/4.09 mm ACSR 20 Paving and Stringing of 7/3.35 mm ACSR 7/3.0 mm AAAC 21 Paving and stringing of 7/2.59 mm/ ACSR 7/2.11 mm ACSR 22 ERECTION ofDouble Pole TRANSFORMER STRUCTURE COMPLETE inclusive of following works - Excavation of pole pits sizing 2 X 2 X 6, erection of poles, erection of base plate, erection of structure materials , erection of AB switch and HG Fuse, Structure Earthing complete , Pole concreting (2x26) for both base and sleeve including supply of jelly, sand and cement by the contractor , plinth erection with plastering ratio 1:2 including supply of cement and sand , Fixing of Open Type fuse units, HT/LT LAS fixing and LAS earthing through PVC Pipe 0.5 , Provision of bus-bar arrangement, Erection of Stay Set complete, Jumpering, erection of support angles and insulators if any , Alteration of materials in lathe works if any, provision of danger board, 3 Nos Earth pits including erection of cement collar , painting of metal parts, including loading, unloading, transportation of all required materials from stores to site , Road site to pit spot as per the directions by the TANGEDCO Site Engineer (This includes labour for loading, unloading, transporting and rent for crane lorry, all T&P suchas crowbars, siling, DShackle etc., that must be brought 23 ERECTION of HVDS COMPLETE inclusive of following works - Excavation of pole pits sizing 2 X 2 X 6, erection of poles, erection of base plate, erection of structure materials , erection of AB switch and HG Fuse, Structure Earthing complete , Pole concreting (2 x 2 x 6) for both base and sleeve including supply of jelly, sand and cement by the contractor in the ratio of concreting 1:3:6 , plinth erection with plastering ratio 1:2 including supply of cement and sand , Fixing of Open Type fuse units, HT/LT LAS fixing and LAS earthing through PVC Pipe 0.5 , Provision of bus-bar arrangement, Erection of Stay Set complete, Jumpering, erection of support angles and insulators if any , Alteration of materials in lathe works if any, provision of danger board, 3 Nos Earth pits including erection of cement collar , painting of metal parts, including loading, unloading, transportation of all required materials from stores to site , Road site to pit spot as per the directions by the TANGEDCO Site Engineer (This includes labour for loading, unloading, transporting and rent for crane lorry, all T&P suchas crowbars, siling, DShackle etc., that must be brought 24 Erection of New Transformer all capacities (with jumpering) 25 Loading and Unloading of Transformer up to 100 KVA 26 Loading and Unloading of Transformer100 KVA and up to 200KVA 27 Loading of Poles (Up to 8.0 mtr) 28 Loading of Poles (Up to 9.0 mtr) 29 UnLoading of Poles (Up to 8.0 mtr) 30 UnLoading of Poles (Up to 9.0 mtr) 31 Transport of Materials. Below 8 Kms. 32 Above 8 Kms. For additional Km. 33 Transportation of Poles from road side to pole Pit up to1.0 KM 7.5/8.0m (RCC &PSC Poles) 34 Transportation of Poles from road side to pole Pit up to1.0 KM 9.14m & 9.00 Mtr (RCC&PSC Poles) 35 Drilling of hole in channel only 3/4 & 1 per hole 36 Cutting of flat 37 Cutting of channel 38 Cutting of Angle 39 Dismantling of RCC pole 9.14mtr/RSJ pole 40 Dismantling of RCC/PSG pole 8.0mtr/7.5mtr 41 Dismantling of V X arm,channel X arm,guarding X arm (all types) 42 Dismantling of LT 3 phase X arm 43 Dismantling of LT single phase X arm 44 Dismantling of HT/LT TI fitting 45 Dismantling of 11KV strain disc 46 Dismantling of 22KV pin insulator 47 Dismantling of LT shackle 48 Dismantling of LT pin insulator 49 Dismantling of Aluminium knob 50 Erection of street light service 51 Releasing of Single phase service & Refixing 52 Releasing of Three phase service & Refixing 53 Dismantling of stay set 54 Dismantling of ACSR 7/3.35mm conductor 55 Dismantling of ACSR 7/2.59mm/ 7/2.11mm conductor 56 Dismantling of Bus bar arrangements
Contract Date: Apr 04, 2026 Contract Value : 9.70 Lakh
Boards / Undertakings / PSU No of Bidders 1
31.
Power #9958518 AOC
Tender For Extension Works For Capital Dcw Works In Komarapalayam Subdivision In Pallipalayam Division; 1 Extension works 2 Excavation of pole pit upto 27 (8.0 m) Pole by using JCB 3 Excavation of pole pit for 30 RCC Pole/9.00m PSC Pole by using JCB or manual 4 Excavation of RSJ pole pit above 36 by using JCB or manual 5 Stay pit 4.5 to 5 depth by using JCB or manual 6 Erection of PSC/RCC poles upto 8.0m. (27) by using Crane or manual 7 Erection of PSC/RCC poles upto 9.14m.(30) by using Crane or maual 8 Erection of RSJ poles above 36-0 by using Crane or maual 9 Erection of stay set complete 10 Fixing of HT V cross arms(all types) / channel cross arms/ guarding Cross arms 11 Fixing of LT 3 phase cross arms 12 Fixing of LT Single phase cross arms 13 Fixing of HT/LT TI Fittings 14 Fixing of HT pin Insulators 22 KV 15 Fixing of HT 22 KV strain disc. 16 Fixing of LT pin Insulator 17 Fixing of LT shackle 18 Fixing of Aluminium Knob 19 Paving and Stringing of 7/4.09 mm ACSR 20 Paving and Stringing of 7/3.35 mm ACSR 7/3.0 mm AAAC 21 Paving and stringing of 7/2.59 mm/ ACSR 7/2.11 mm ACSR 22 ERECTION ofDouble Pole TRANSFORMER STRUCTURE COMPLETE inclusive of following works - Excavation of pole pits sizing 2 X 2 X 6, erection of poles, erection of base plate, erection of structure materials , erection of AB switch and HG Fuse, Structure Earthing complete , Pole concreting (2x26) for both base and sleeve including supply of jelly, sand and cement by the contractor , plinth erection with plastering ratio 1:2 including supply of cement and sand , Fixing of Open Type fuse units, HT/LT LAS fixing and LAS earthing through PVC Pipe 0.5 , Provision of bus-bar arrangement, Erection of Stay Set complete, Jumpering, erection of support angles and insulators if any , Alteration of materials in lathe works if any, provision of danger board, 3 Nos Earth pits including erection of cement collar , painting of metal parts, including loading, unloading, transportation of all required materials from stores to site , Road site to pit spot as per the directions by the TANGEDCO Site Engineer (This includes labour for loading, unloading, transporting and rent for crane lorry, all T&P suchas crowbars, siling, DShackle etc., that must be brought 23 ERECTION of HVDS COMPLETE inclusive of following works - Excavation of pole pits sizing 2 X 2 X 6, erection of poles, erection of base plate, erection of structure materials , erection of AB switch and HG Fuse, Structure Earthing complete , Pole concreting (2 x 2 x 6) for both base and sleeve including supply of jelly, sand and cement by the contractor in the ratio of concreting 1:3:6 , plinth erection with plastering ratio 1:2 including supply of cement and sand , Fixing of Open Type fuse units, HT/LT LAS fixing and LAS earthing through PVC Pipe 0.5 , Provision of bus-bar arrangement, Erection of Stay Set complete, Jumpering, erection of support angles and insulators if any , Alteration of materials in lathe works if any, provision of danger board, 3 Nos Earth pits including erection of cement collar , painting of metal parts, including loading, unloading, transportation of all required materials from stores to site , Road site to pit spot as per the directions by the TANGEDCO Site Engineer (This includes labour for loading, unloading, transporting and rent for crane lorry, all T&P suchas crowbars, siling, DShackle etc., that must be brought 24 Erection of New Transformer all capacities (with jumpering) 25 Loading and Unloading of Transformer up to 100 KVA 26 Loading and Unloading of Transformer100 KVA and up to 200KVA 27 Loading of Poles (Up to 8.0 mtr) 28 Loading of Poles (Up to 9.0 mtr) 29 UnLoading of Poles (Up to 8.0 mtr) 30 UnLoading of Poles (Up to 9.0 mtr) 31 Transport of Materials. Below 8 Kms. 32 Above 8 Kms. For additional Km. 33 Transportation of Poles from road side to pole Pit up to1.0 KM 7.5/8.0m (RCC &PSC Poles) 34 Transportation of Poles from road side to pole Pit up to1.0 KM 9.14m & 9.00 Mtr (RCC&PSC Poles) 35 Drilling of hole in channel only 3/4 & 1 per hole 36 Cutting of flat 37 Cutting of channel 38 Cutting of Angle 39 Dismantling of RCC pole 9.14mtr/RSJ pole 40 Dismantling of RCC/PSG pole 8.0mtr/7.5mtr 41 Dismantling of V X arm,channel X arm,guarding X arm (all types) 42 Dismantling of LT 3 phase X arm 43 Dismantling of LT single phase X arm 44 Dismantling of HT/LT TI fitting 45 Dismantling of 11KV strain disc 46 Dismantling of 22KV pin insulator 47 Dismantling of LT shackle 48 Dismantling of LT pin insulator 49 Dismantling of Aluminium knob 50 Erection of street light service 51 Releasing of Single phase service & Refixing 52 Releasing of Three phase service & Refixing 53 Dismantling of stay set 54 Dismantling of ACSR 7/3.35mm conductor 55 Dismantling of ACSR 7/2.59mm/ 7/2.11mm conductor 56 Dismantling of Bus bar arrangements
Contract Date: Apr 04, 2026 Contract Value : 9.90 Lakh
Boards / Undertakings / PSU No of Bidders 1
32.
Power #9958517 AOC
Tender For Extension Works For Capital Dcw Works In Komarapalayam Subdivision In Pallipalayam Division; 1 Extension works 2 Excavation of pole pit upto 27 (8.0 m) Pole by using JCB 3 Excavation of pole pit for 30 RCC Pole/9.00m PSC Pole by using JCB or manual 4 Excavation of RSJ pole pit above 36 by using JCB or manual 5 Stay pit 4.5 to 5 depth by using JCB or manual 6 Erection of PSC/RCC poles upto 8.0m. (27) by using Crane or manual 7 Erection of PSC/RCC poles upto 9.14m.(30) by using Crane or maual 8 Erection of RSJ poles above 36-0 by using Crane or maual 9 Erection of stay set complete 10 Fixing of HT V cross arms(all types) / channel cross arms/ guarding Cross arms 11 Fixing of LT 3 phase cross arms 12 Fixing of LT Single phase cross arms 13 Fixing of HT/LT TI Fittings 14 Fixing of HT pin Insulators 22 KV 15 Fixing of HT 22 KV strain disc. 16 Fixing of LT pin Insulator 17 Fixing of LT shackle 18 Fixing of Aluminium Knob 19 Paving and Stringing of 7/4.09 mm ACSR 20 Paving and Stringing of 7/3.35 mm ACSR 7/3.0 mm AAAC 21 Paving and stringing of 7/2.59 mm/ ACSR 7/2.11 mm ACSR 22 ERECTION ofDouble Pole TRANSFORMER STRUCTURE COMPLETE inclusive of following works - Excavation of pole pits sizing 2 X 2 X 6, erection of poles, erection of base plate, erection of structure materials , erection of AB switch and HG Fuse, Structure Earthing complete , Pole concreting (2x26) for both base and sleeve including supply of jelly, sand and cement by the contractor , plinth erection with plastering ratio 1:2 including supply of cement and sand , Fixing of Open Type fuse units, HT/LT LAS fixing and LAS earthing through PVC Pipe 0.5 , Provision of bus-bar arrangement, Erection of Stay Set complete, Jumpering, erection of support angles and insulators if any , Alteration of materials in lathe works if any, provision of danger board, 3 Nos Earth pits including erection of cement collar , painting of metal parts, including loading, unloading, transportation of all required materials from stores to site , Road site to pit spot as per the directions by the TANGEDCO Site Engineer (This includes labour for loading, unloading, transporting and rent for crane lorry, all T&P suchas crowbars, siling, DShackle etc., that must be brought 23 ERECTION of HVDS COMPLETE inclusive of following works - Excavation of pole pits sizing 2 X 2 X 6, erection of poles, erection of base plate, erection of structure materials , erection of AB switch and HG Fuse, Structure Earthing complete , Pole concreting (2 x 2 x 6) for both base and sleeve including supply of jelly, sand and cement by the contractor in the ratio of concreting 1:3:6 , plinth erection with plastering ratio 1:2 including supply of cement and sand , Fixing of Open Type fuse units, HT/LT LAS fixing and LAS earthing through PVC Pipe 0.5 , Provision of bus-bar arrangement, Erection of Stay Set complete, Jumpering, erection of support angles and insulators if any , Alteration of materials in lathe works if any, provision of danger board, 3 Nos Earth pits including erection of cement collar , painting of metal parts, including loading, unloading, transportation of all required materials from stores to site , Road site to pit spot as per the directions by the TANGEDCO Site Engineer (This includes labour for loading, unloading, transporting and rent for crane lorry, all T&P suchas crowbars, siling, DShackle etc., that must be brought 24 Erection of New Transformer all capacities (with jumpering) 25 Loading and Unloading of Transformer up to 100 KVA 26 Loading and Unloading of Transformer100 KVA and up to 200KVA 27 Loading of Poles (Up to 8.0 mtr) 28 Loading of Poles (Up to 9.0 mtr) 29 UnLoading of Poles (Up to 8.0 mtr) 30 UnLoading of Poles (Up to 9.0 mtr) 31 Transport of Materials. Below 8 Kms. 32 Above 8 Kms. For additional Km. 33 Transportation of Poles from road side to pole Pit up to1.0 KM 7.5/8.0m (RCC &PSC Poles) 34 Transportation of Poles from road side to pole Pit up to1.0 KM 9.14m & 9.00 Mtr (RCC&PSC Poles) 35 Drilling of hole in channel only 3/4 & 1 per hole 36 Cutting of flat 37 Cutting of channel 38 Cutting of Angle 39 Dismantling of RCC pole 9.14mtr/RSJ pole 40 Dismantling of RCC/PSG pole 8.0mtr/7.5mtr 41 Dismantling of V X arm,channel X arm,guarding X arm (all types) 42 Dismantling of LT 3 phase X arm 43 Dismantling of LT single phase X arm 44 Dismantling of HT/LT TI fitting 45 Dismantling of 11KV strain disc 46 Dismantling of 22KV pin insulator 47 Dismantling of LT shackle 48 Dismantling of LT pin insulator 49 Dismantling of Aluminium knob 50 Erection of street light service 51 Releasing of Single phase service & Refixing 52 Releasing of Three phase service & Refixing 53 Dismantling of stay set 54 Dismantling of ACSR 7/3.35mm conductor 55 Dismantling of ACSR 7/2.59mm/ 7/2.11mm conductor 56 Dismantling of Bus bar arrangements
Contract Date: Apr 04, 2026 Contract Value : 9.90 Lakh
Boards / Undertakings / PSU No of Bidders 1
Contract Date: Ref. Documents Contract Value : Ref. Document
Boards / Undertakings / PSU No of Bidders 6
39.
Power #9169094 Technical Bid
Supply Of 232 Nos Of Bluetooth Transmitter Device For Automatic Meter Reading Supply Of 232 Nos Of Bluetooth Transmitter Device For Automatic Meter Reading In Pudukkottai Edc , Bluetooth Transmitter For Automatic Meter Reading , 0.6Kva Ups , Bluetooth Transmitter For Automatic Meter Reading , Stay Clamp Suitable For 9.00Mtr Psc Pole , Pole Pit For 9.0M And 9.14 M Psc/Rcc / All Metal Poles (Each Pit) 1.25 X 0.6 X 1.83 Mtr , Loading/ Unloading Of Ht Polymer Insulators , Loading/ Unloading Of Lt Hardwares( Metal Parts) , Loading/ Unloading Of Ht Hardwares , Stay Pit , Loading/ Unloading Of Single Phase Meters , Loading/ Unloading Of Three Phase Meters , Loading/ Unloading Of16 Kva Transformers , Erection Of Poles & Stays (Including Refilling Of Excavated Earth) , Loading/ Unloading Of25 Kva Transformers , Loading/ Unloading Of63 Kva Transformers , Stay Set , Loading/ Unloading Of100 Kva Transformers , Loading/ Unloading Of200/250 Kva Transformers , Loading/ Unloading Of500 Kva Transformers , Uncoiling Of Conductor Drum , Erection Of Line Materials , Loading/ Unloading Of Oil Drums With Oil , Loading/ Unloading Of Oil Drums Without Oil , Loading/ Unloading Of11kv Vacuum Circuit Breaker , Loading/ Unloading Of33kv Vacuum Circuit Breaker , Loading/ Unloading Of110kv Vacuum Circuit Breaker , Loading/ Unloading Of 11Kv Ab Switch , Loading/ Unloading Of 22Kv Ab Switch , Loading/ Unloading Of Double Break Ab Switch , Loading/ Unloading Of 11/22Kv Ct / Pt , Loading/ Unloading Of 11/22Kv Metering Set , Loading/ Unloading Of 33Kv Metering Set , Fixing Of Ht Pin Insulator / Strain Disc , Loading/ Unloading Of Hvds Structure Materials , Loading/ Unloading Of 11/22Kv Las , 22 Kv Pin Insulator With Pin , 22 Kv Strain Disc / Polymer Disc With Hardware , 33 Kv Pin Insulator With Pin , 33 Kv Pinstrain Disc/Polymer Discwith Hardware , Fixing Of Lt Pin Insulator With Pin , Lt Shakle With Hardware , Fixing Of Aluminium Knob , Paving Stringing And Sagging Of Conductor Including Binding Of Pin And Proper Tight [Including Transport Of Condutor From Road Side To Work Spot] Per Run , Upto 7/2.59 Mm Acsr, 7/2.50 Aaac Including Pvc Cable Upto 25 Sqmm , Acsr 7/3.35Mm & 7/ 3.15 Aaac Including Pvc Cable Above 25 Sqmm , Acsr 7/4.09 Mm , Above 7/4.09 Mm Acsr & Dog Conductor , Earthing Wiring And Connection Including Transporting Of Earth Pipe And Excavation Of Pit] , Transformer Structure Earthing 10Ft Depth - 3 Nos Of Pipe Throughtubes , Dp Earthing Including All Works [Double Side Earthing] , Erection Of 4Th Earth Pipe Including Earthing , Earthing Of Poles , Earth Pit Masonary Work 3 Nos Earth Pits Or Using 3 Nos Concrete Tub. , Replacement Of Detoriated Earth Pipe Per Location , Concreting With Mixture 1:3:6 [Including All Materials]. , Mass Concreting For Centre Support For 2 Feet Including All Materials , Mass Concreting For Pole0.6X0.6X1.25M.With Coping , Sleeve Concreting For Pole 0.6 M X 0.6M X 0.3 M With Coping , Sleeve Concreting For Stay Set 0.3 M & 0.75 Long , Erection Of Distribution Transformer Structure Complete , Excavation Of Structure Pole Pits 0.9 X0.9 X 1.83 Mtr , Transporting Of Pole To Pit Location 2 Nos. , Erection Of Poles 2 Nos , Excavation Of Stay Pit 4 Nos , Erection Of Stay Set (4 Sets) , Mass Concreting (Cement:Sand:Jelly Supplied By The Contractor) 2 Nos. , Erection Of 22 Kv Ab Switch , Ttransformer Structure Earthing 10Ft Depth - 3 Nos Of Pipe Through Earth Tubes , Erection Of Top Channel , Bed Channel [2 Nos Channel] Erection , Cross With Stud For Bed Channel Erection , Erection Of Belting Angle / Hg Fuse Angle , Erection Ofhg Fuse Set , Erection Of Ht Las With Jumpering And Earthing , Erection Of Lt Las With Jumbering And Earthing , Erection Of Jumpering [Ht Side] , Transformer Wiring In Lt Side Including Jumpering Bus Bar Etc. , Erection Lt Open Type Fuse Unit Arrangement Single , Erection Lt Open Type Fuse Unit Arrangementdouble , Painting Of Stru. Complete Excluding Dt [Two Coat Of Red Oxide] All Metal Parts(Excluding Cost Of Paint). , Painting Of Stru. Complete Excluding Dt [One Coat Alu Paint, Excluding Cost Of Paint) , Colour Washing Of 2 Numbers Structure Pole [Excluding Cost Of Distember / Snowsem] , Painting Name Of Ss At Seating Channel Including Paint. , Painting Of Dt Alone [Excluding Painting] With Red Oxide And Double Coating Of Aluminium Paint. , Dt Metering Arrangement (Without Materials) , Erection Of Distribution Transformer /Dismantling Of Dt , Upto 100 Kva , Above 100 Kva And Upto 250 Kva , 500 Kva , Colour Washing Of Rcc / Psc Poles , Numbering Of Poles Including Cost Of Paint / Loc [Black Background And Yellow Letters] , Painting Of Sc Details In The Meter Board / Agl Boxes / Hut Scs Including Paint. , Service Connection , Transporting Of Required Materials From Road Side To Work Spot And Erection Of Street Light Fixture Including Wiring Clamping Of Pipe Aerial Board Assembling , Transporting Of Required Materials From Road Side To Work Spot And Erection Of 250 Ws.V. Lamp / Mercury Lamp/Led Yard Light Fittingincluding Wiring, Clamping Of Pipe, Serial Board Assembling Etc. , Fixing Of Street Light Fitting With 2 Cfl/ 4 Cfl , Provision Of St. Lt. Switching Arrangements Including Fixing Meters, Wiring, Service Board Etc. , Erection Of Hut Service Connection Complete With / Without Meter Including Transport Of 5Materials From Section Store To Work Spot , Erection/Dismantling Of Metering Set 11 Kv / 22 Kv/33 Kv , Fabrication Works. , Labour Charges For Alteration Of Back Clamp / Stay Clamp To Suitable For Works. , Providing Of Holes. , All Size Angles / Channel Upto 5/8 , All Size Angles / Channel Above 5/8 , Slot Holes In Flat / Angles / Channel Upto 3/4 , Slot Holes In Flat / Angles / Channel Above 3/4 , Fabrication Of Centre Support Only For Dt Structure , Cutting Of Rs Joist / Angles / Ms Channels , Welding Of Rs Joist / Angles / Ms Channels , General , Set Right The Leaning Pole In Both Ht & Lt[ Pin Point ] Location , Set Right The Leaning Pole In Both Ht & Lt[ Cut Point ] Location , Resagging Of Lines For All Sizes Cut Point Location , Converting Pin Point Into Cut Point Ht Lines , Converting Pin Point Into Cut Point Lt Lines , Clearing Tree Branches Ofcoconut Tree , Clearing Tree Branches Of Neem, Tamarind, Countrytree Etc., , Releasing And Erection 1 Ph Sc Wire [During Conductor Or Support Change] , Releasing And Erection 3 Ph Sc Wire [During Conductor Or Support Change] , Destruction Of Pole Concerting At Site. , Retrieving Grill From Detoriated Pole [Grill Separate From Damaged Pole] , Re Earthing Of Structure Completely Including Earthpipe Changing If Any 3Nos Earth Pipe , Re Examination Of Dt Earthing ( Digging , Inspection And Making Connection In Between Extg. 3Nos Earth Pipe ) , Guarding Arrangement :- , Cradle Guarding Including Earthing And Earth Pit Excavation [Railway & P&T Crossing ] , Flat Guarding With 4 Wire , Split Netural Guarding , Loading And Unloading : , Loading Of 7.5 Mtr / 8.0 Mtr Rcc / Psc/ Metal Pole [Per Pole ] , Loading Of [ 9.14 Mtr ] 9.0 Mtr Poles Rcc /Psc Pole / Metal Pole [ Per Pole ] , Unloading Of Psc / Rcc / Metal Poles , Transporting From Road Side To Workspot , Transport 7.5 Mtrs / 8.00 Mtrs Of Poles Including R.S.Joist And Rail Poles Upto 1.0 Km , Transport 7.5 Mtrs / 8.00 Mtrs Of Poles Including R.S.Joist And Rail Poles Above Additional 1.0 Km Or Part Thereof[ Certified By Aee ] , Transport Of 9.0 Mtr And Above Poles Including R.S. Joist And Rail Poles Upto 1.0 Km , Transport Of 9.0 Mtr And Above Poles Including R.S. Joist And Rail Poles Upto Above Additional 1.0 Km Or Part Thereof , Transport Of Line Materials , Transport Of Line Materials [ Minimum 1 Mt ]From Sub Stores To Section Pocket Store Ornear To Work Spot At Road Side By Using Private Vehicleor Vice Versa Excluding Loading And Unloading Upto 8 Kms , Transport Of Line Materials [ Minimum 1 Mt ]From Sub Stores To Section Pocket Store Ornear To Work Spot At Road Side By Using Private Vehicleor Vice Versa Excluding Loading And Unloading Above 8 Kms And For Every Addl. 1 Km , Transport Of Equipements , Transporting Of Distribution Transformer/Metering Set By Using Private Vehicleload Of One No.Minimumup To 30 Km , .Transporting Of Distribution Transformer/Metering Set By Using Private Vehicleload Of One No.Minimum Above 30 Km For Every Addl .1 Km , Dismantling Works , Dismantling Of 7.5M / 8.0M Poles [Rcc / Psc] , Dismantling Of 9.00M / 9.14M Rcc / Psc/Rail Pole, Tubular Pole And All Metal Poles , Dismantling Stay Set Complete , Dismantling Of Lt 1 Ph X Arm / Lt/Ht Ti Fitting , Dismantling Of Lt/Ht Ti Fitting , Dismantling Of Lt 3 Ph X Arm , Dismantlingof 3[1/2] V` X Arm , Dismantlingof Tapping Channel And Guarding X Arm , Dismantling Of 11 Kv Strain Disc/Polymer Disc With Hardware , Dismantling Of 22 Kv Pin Insulator With Pin , Dismantling Of 22 Kvstrain Disc With Hardware , Dismantling Of 33 Kv Pin Insulator With Pin , Dismantling Of 33 Kvstrain Disc With Hardware , Dismantlingof Lt Pin Insulator With Pin , Dismantlingof Lt Shackle With Hardware , Dismantling Of Aluminium Knob , Dismantling Of Conductor7/2.59 Mm Acsr, 7/2.50 Aaac Including Pvc Cable Upto 25 Sqmm , Dismantling Of Conductoracsr 7/3.35Mm & 7/ 3.15 Aaac Including Pvc Cable Above 25 Sqmm , Dismantling Of Conductoracsr 7/4.09 Mm , Single Phase Meter &3 Phase Meter , Fixing Of Single Phase Meter , Fixing Of 3 Phase Meter , Dismantling Of Single Phase Meter , Dismantling Of 3 Phase Meter
Contract Date: Ref. Documents Contract Value : Ref. Document
Boards / Undertakings / PSU No of Bidders 1
40.
Power #9123601 Technical Bid
Supply Of Various Aluminum Clamps And Bi Metallic Clamps , Supply Of Various Types Of Clamps , 0.6Kva Ups , Bus End Clamp For 2 Bus , Bus End Clamp For 3Bus , Pole Pit For 9.0M And 9.14 M Psc/Rcc / All Metal Poles (Each Pit) 1.25 X 0.6 X 1.83 Mtr , Switch End Clamp For Zebra , T Clamp For Zebra To Zebra , Pg Clamp For Zebra , Stay Pit , Clamp For 11Kv Ct To Kundah , 95Sq.Mm Bi-Metallic Clamp , 120Sq.Mm Bi-Metallic Clamp , Erection Of Poles & Stays (Including Refilling Of Excavated Earth) , Loading/ Unloading Of25 Kva Transformers , Loading/ Unloading Of63 Kva Transformers , Stay Set , Loading/ Unloading Of100 Kva Transformers , Loading/ Unloading Of200/250 Kva Transformers , Loading/ Unloading Of500 Kva Transformers , Uncoiling Of Conductor Drum , Erection Of Line Materials , Loading/ Unloading Of Oil Drums With Oil , Loading/ Unloading Of Oil Drums Without Oil , Loading/ Unloading Of11kv Vacuum Circuit Breaker , Loading/ Unloading Of33kv Vacuum Circuit Breaker , Loading/ Unloading Of110kv Vacuum Circuit Breaker , Loading/ Unloading Of 11Kv Ab Switch , Loading/ Unloading Of 22Kv Ab Switch , Loading/ Unloading Of Double Break Ab Switch , Loading/ Unloading Of 11/22Kv Ct / Pt , Loading/ Unloading Of 11/22Kv Metering Set , Loading/ Unloading Of 33Kv Metering Set , Fixing Of Ht Pin Insulator / Strain Disc , Loading/ Unloading Of Hvds Structure Materials , Loading/ Unloading Of 11/22Kv Las , 22 Kv Pin Insulator With Pin , 22 Kv Strain Disc / Polymer Disc With Hardware , 33 Kv Pin Insulator With Pin , 33 Kv Pinstrain Disc/Polymer Discwith Hardware , Fixing Of Lt Pin Insulator With Pin , Lt Shakle With Hardware , Fixing Of Aluminium Knob , Paving Stringing And Sagging Of Conductor Including Binding Of Pin And Proper Tight [Including Transport Of Condutor From Road Side To Work Spot] Per Run , Upto 7/2.59 Mm Acsr, 7/2.50 Aaac Including Pvc Cable Upto 25 Sqmm , Acsr 7/3.35Mm & 7/ 3.15 Aaac Including Pvc Cable Above 25 Sqmm , Acsr 7/4.09 Mm , Above 7/4.09 Mm Acsr & Dog Conductor , Earthing Wiring And Connection Including Transporting Of Earth Pipe And Excavation Of Pit] , Transformer Structure Earthing 10Ft Depth - 3 Nos Of Pipe Throughtubes , Dp Earthing Including All Works [Double Side Earthing] , Erection Of 4Th Earth Pipe Including Earthing , Earthing Of Poles , Earth Pit Masonary Work 3 Nos Earth Pits Or Using 3 Nos Concrete Tub. , Replacement Of Detoriated Earth Pipe Per Location , Concreting With Mixture 1:3:6 [Including All Materials]. , Mass Concreting For Centre Support For 2 Feet Including All Materials , Mass Concreting For Pole0.6X0.6X1.25M.With Coping , Sleeve Concreting For Pole 0.6 M X 0.6M X 0.3 M With Coping , Sleeve Concreting For Stay Set 0.3 M & 0.75 Long , Erection Of Distribution Transformer Structure Complete , Excavation Of Structure Pole Pits 0.9 X0.9 X 1.83 Mtr , Transporting Of Pole To Pit Location 2 Nos. , Erection Of Poles 2 Nos , Excavation Of Stay Pit 4 Nos , Erection Of Stay Set (4 Sets) , Mass Concreting (Cement:Sand:Jelly Supplied By The Contractor) 2 Nos. , Erection Of 22 Kv Ab Switch , Ttransformer Structure Earthing 10Ft Depth - 3 Nos Of Pipe Through Earth Tubes , Erection Of Top Channel , Bed Channel [2 Nos Channel] Erection , Cross With Stud For Bed Channel Erection , Erection Of Belting Angle / Hg Fuse Angle , Erection Ofhg Fuse Set , Erection Of Ht Las With Jumpering And Earthing , Erection Of Lt Las With Jumbering And Earthing , Erection Of Jumpering [Ht Side] , Transformer Wiring In Lt Side Including Jumpering Bus Bar Etc. , Erection Lt Open Type Fuse Unit Arrangement Single , Erection Lt Open Type Fuse Unit Arrangementdouble , Painting Of Stru. Complete Excluding Dt [Two Coat Of Red Oxide] All Metal Parts(Excluding Cost Of Paint). , Painting Of Stru. Complete Excluding Dt [One Coat Alu Paint, Excluding Cost Of Paint) , Colour Washing Of 2 Numbers Structure Pole [Excluding Cost Of Distember / Snowsem] , Painting Name Of Ss At Seating Channel Including Paint. , Painting Of Dt Alone [Excluding Painting] With Red Oxide And Double Coating Of Aluminium Paint. , Dt Metering Arrangement (Without Materials) , Erection Of Distribution Transformer /Dismantling Of Dt , Upto 100 Kva , Above 100 Kva And Upto 250 Kva , 500 Kva , Colour Washing Of Rcc / Psc Poles , Numbering Of Poles Including Cost Of Paint / Loc [Black Background And Yellow Letters] , Painting Of Sc Details In The Meter Board / Agl Boxes / Hut Scs Including Paint. , Service Connection , Transporting Of Required Materials From Road Side To Work Spot And Erection Of Street Light Fixture Including Wiring Clamping Of Pipe Aerial Board Assembling , Transporting Of Required Materials From Road Side To Work Spot And Erection Of 250 Ws.V. Lamp / Mercury Lamp/Led Yard Light Fittingincluding Wiring, Clamping Of Pipe, Serial Board Assembling Etc. , Fixing Of Street Light Fitting With 2 Cfl/ 4 Cfl , Provision Of St. Lt. Switching Arrangements Including Fixing Meters, Wiring, Service Board Etc. , Erection Of Hut Service Connection Complete With / Without Meter Including Transport Of 5Materials From Section Store To Work Spot , Erection/Dismantling Of Metering Set 11 Kv / 22 Kv/33 Kv , Fabrication Works. , Labour Charges For Alteration Of Back Clamp / Stay Clamp To Suitable For Works. , Providing Of Holes. , All Size Angles / Channel Upto 5/8 , All Size Angles / Channel Above 5/8 , Slot Holes In Flat / Angles / Channel Upto 3/4 , Slot Holes In Flat / Angles / Channel Above 3/4 , Fabrication Of Centre Support Only For Dt Structure , Cutting Of Rs Joist / Angles / Ms Channels , Welding Of Rs Joist / Angles / Ms Channels , General , Set Right The Leaning Pole In Both Ht & Lt[ Pin Point ] Location , Set Right The Leaning Pole In Both Ht & Lt[ Cut Point ] Location , Resagging Of Lines For All Sizes Cut Point Location , Converting Pin Point Into Cut Point Ht Lines , Converting Pin Point Into Cut Point Lt Lines , Clearing Tree Branches Ofcoconut Tree , Clearing Tree Branches Of Neem, Tamarind, Countrytree Etc., , Releasing And Erection 1 Ph Sc Wire [During Conductor Or Support Change] , Releasing And Erection 3 Ph Sc Wire [During Conductor Or Support Change] , Destruction Of Pole Concerting At Site. , Retrieving Grill From Detoriated Pole [Grill Separate From Damaged Pole] , Re Earthing Of Structure Completely Including Earthpipe Changing If Any 3Nos Earth Pipe , Re Examination Of Dt Earthing ( Digging , Inspection And Making Connection In Between Extg. 3Nos Earth Pipe ) , Guarding Arrangement :- , Cradle Guarding Including Earthing And Earth Pit Excavation [Railway & P&T Crossing ] , Flat Guarding With 4 Wire , Split Netural Guarding , Loading And Unloading : , Loading Of 7.5 Mtr / 8.0 Mtr Rcc / Psc/ Metal Pole [Per Pole ] , Loading Of [ 9.14 Mtr ] 9.0 Mtr Poles Rcc /Psc Pole / Metal Pole [ Per Pole ] , Unloading Of Psc / Rcc / Metal Poles , Transporting From Road Side To Workspot , Transport 7.5 Mtrs / 8.00 Mtrs Of Poles Including R.S.Joist And Rail Poles Upto 1.0 Km , Transport 7.5 Mtrs / 8.00 Mtrs Of Poles Including R.S.Joist And Rail Poles Above Additional 1.0 Km Or Part Thereof[ Certified By Aee ] , Transport Of 9.0 Mtr And Above Poles Including R.S. Joist And Rail Poles Upto 1.0 Km , Transport Of 9.0 Mtr And Above Poles Including R.S. Joist And Rail Poles Upto Above Additional 1.0 Km Or Part Thereof , Transport Of Line Materials , Transport Of Line Materials [ Minimum 1 Mt ]From Sub Stores To Section Pocket Store Ornear To Work Spot At Road Side By Using Private Vehicleor Vice Versa Excluding Loading And Unloading Upto 8 Kms , Transport Of Line Materials [ Minimum 1 Mt ]From Sub Stores To Section Pocket Store Ornear To Work Spot At Road Side By Using Private Vehicleor Vice Versa Excluding Loading And Unloading Above 8 Kms And For Every Addl. 1 Km , Transport Of Equipements , Transporting Of Distribution Transformer/Metering Set By Using Private Vehicleload Of One No.Minimumup To 30 Km , .Transporting Of Distribution Transformer/Metering Set By Using Private Vehicleload Of One No.Minimum Above 30 Km For Every Addl .1 Km , Dismantling Works , Dismantling Of 7.5M / 8.0M Poles [Rcc / Psc] , Dismantling Of 9.00M / 9.14M Rcc / Psc/Rail Pole, Tubular Pole And All Metal Poles , Dismantling Stay Set Complete , Dismantling Of Lt 1 Ph X Arm / Lt/Ht Ti Fitting , Dismantling Of Lt/Ht Ti Fitting , Dismantling Of Lt 3 Ph X Arm , Dismantlingof 3[1/2] V` X Arm , Dismantlingof Tapping Channel And Guarding X Arm , Dismantling Of 11 Kv Strain Disc/Polymer Disc With Hardware , Dismantling Of 22 Kv Pin Insulator With Pin , Dismantling Of 22 Kvstrain Disc With Hardware , Dismantling Of 33 Kv Pin Insulator With Pin , Dismantling Of 33 Kvstrain Disc With Hardware , Dismantlingof Lt Pin Insulator With Pin , Dismantlingof Lt Shackle With Hardware , Dismantling Of Aluminium Knob , Dismantling Of Conductor7/2.59 Mm Acsr, 7/2.50 Aaac Including Pvc Cable Upto 25 Sqmm , Dismantling Of Conductoracsr 7/3.35Mm & 7/ 3.15 Aaac Including Pvc Cable Above 25 Sqmm , Dismantling Of Conductoracsr 7/4.09 Mm , Single Phase Meter &3 Phase Meter , Fixing Of Single Phase Meter , Fixing Of 3 Phase Meter , Dismantling Of Single Phase Meter , Dismantling Of 3 Phase Meter
Contract Date: Ref. Documents Contract Value : Ref. Document
Boards / Undertakings / PSU No of Bidders 4
Contract Date: Ref. Documents Contract Value : Ref. Document
Boards / Undertakings / PSU No of Bidders 2
Contract Date: Ref. Documents Contract Value : Ref. Document
Boards / Undertakings / PSU No of Bidders 1
Contract Date: Ref. Documents Contract Value : Ref. Document
Boards / Undertakings / PSU No of Bidders 1
Contract Date: Ref. Documents Contract Value : Ref. Document
Boards / Undertakings / PSU No of Bidders 1
Contract Date: Ref. Documents Contract Value : Ref. Document
Boards / Undertakings / PSU No of Bidders 1
TenderDetail
Loading tenders