View Bid Results For Gearbox Overhauling Tenders

We found 195 Bid Results related to gearbox overhauling tenders. You can find Contractor details who won gearbox overhauling tenders along with contract details in Bid awards announcements section.

Filters
Stage
141
41
13
Tender Publishing Platform
63
132
State / UT
23
75
21
15
15
11
11
8
6
6
4
4
4
3
3
1
1
1
1
1
1
1
1
1
Contract Value
84
51
45
15
Publish Date
0
0
0
0
0
Sector
15
99
41
13
8
8
6
5
4
3
2
2
1
1
1
1
Ownership
5
104
44
36
10
1
Within keyword
Active filters:
Showing 1–4 of 195 tenders matching your filters
1.
Road Transport and Highways #11284214 Technical Bid
Tender For Supply Of Gaskets & Hino Bond , A)Gasket (Critical) Ohg / Dcg Kits & Cyl.Head Gaskets For Tata, Leyland & Eicher Vehicles , Gskt. (Non-Retorque) Cyl. Head 697 Tcic(728 Dsx) , Gskt. Cyl .Head Tata Cummin , Upper Engine Gasket Kit Tata Cummins , Engine Overhaul Repair Kit Full - Tata Bsii (Fs728Dsxtccs) , Lower Engine Gasket Kit Tata Cummins Bs Iii , Gasket Cyl. Head Cover (9915Dsx) , Gasket Cyl. Head ( Multilayer) 697 Tcic (Mls728)& Tata 1613 Bs Vi Cng , Gasket Cyl. Head 697 Turbo (728Dsxtc) , Cyl. Head Cover Gasket Caf/Hel 3.00Mm , Upper Engine Gasket Kit For Tata 1512 Bs Iii , Lower Engine Gasket Kit For Tata 1512 Bs Iii , Gasket Cylinder Head For Tata 1512 Bs Iii , Gasket Cylinder Head For Tata 1515 Bs Iv , Gasket Kit Upper For Tata 1515 Bs Iv. , Gasket Kit Lower Fortata1515Bsiv. , Gasket, Cylinder Head (Connection Air Intake) For Tata 1515 Bs Iv&1618 Bs Vi 11 Mtr. , Gasket Kit (Full Engine) For Tata 1623 Bs Iv. , Gasket Kit (Upper) For Tata 1623 Bs Iv. , Kit, Upper Engine Gasket For Tata 1618 Bs Vi 11 & 12 Mtr. , Kit, Lower Engine Gasket For Tata 1618 Bs Vi 11 & 12 Mtr. , Gasket, Cylinder Head For Tata 1618 Bs Vi 11 & 12 Mtr. , Gasket,Oil Suc Connection For Tata 1618 Bs Vi 11 & 12 Mtr. , Gasket, Integrated Wiring For Tata 1618 Bs Vi 11 Mtr. , Gasket (Tgh Cover) For Tata 1613 Cng Bs Vi. , Gasket (Tgh To Block) For Tata 1613 Cng Bs Vi. , Gasket - Rocker Arm Cover For Tata 1613 Cng Bs Vi. , Gasket Push Rod For Tata 1613 Cng Bs Vi. , Gasket. Cylinder Head Cover (Hino Engine) & Leyland Bs Iii &Leyland Bsvi. , Mls Cylinder Head Gasket For Leyland Bs Ii And Cng(Mls3088) , Non Mls Cylinder Head Gasket I.E. Cylinder Head Gasket With Dcemjo Material , Gasket Overhauling Kit For Complete Leyland 12 Mtr. Bs Ii And Bs Iii(Fs3088Ds) , Decarbunizing Gasket Kit For Cylinder Block For Leyland 12 Mtr. Bs Ii And Bs Iii (Fs3088Dswoc) , Cylinder Head Gasket For Leyland 1611, 1812 & 2312 Bs Iv And Leyland Bsvi. , Ohg Kit - Without Ch Gasket For Ley 1611, 1812, 2312 & 4/251 Bs Iv. , Ohg Kit - With Ch Gasket For Ley 1611, 1812 & 2312 Bs Iv. , Dcg Kit - Without Ch Gasket For Ley 1611, 1812, 2312 & 4/251 Bs Iv. , Dcg Kit - With Ch Gasket For Ley 1611, 1812 & 2312 Bs Iv. , Cylinder Head Gasket For Leyland 4/251 Bs Iv , Ohg Kit - Without Ch Gasketfor Leyland 4/251 Bs Iv , Dcg Kit - Without Ch Gasketfor Leyland 4/251 Bs Iv , Overhaul Kit Full Engine For Cummins Is Be 5.9L, 180 Hp 24 V Lmro Bs Iv Engine Fitted On Tata 1618 Bs Iv , Kit Gasket Upper For Cummins Is Be 5.9 L, 180 Hp 24V Lmro Bs Iv Engine Fitted To Tata 1618 Bs Iv. , Kit Gasket Lower For Cummins Is Be 5.9L, 180 Hp 24 V Lmro Bs Iv Engine Fitted On Tata 1618 Bs Iv , Integrated Wiring Gasket For Tata 1618 Bs Iv And 1618 Bs Vi 12 Mtr. , Cylinder Head Gasket For Tata 1618 , Engine Overhaul Gasket Kit For Eicher 20.15 , Cylendar Head Gasket (E683) For Eicher 20.15 , Cylendar Head Gasket (E694) For Eicher 20.15 , Front Cover Gasket For Cylender Block For Eicher 20.15 , Hino Bond Liquid Solution Tubes For Leyland Vehicles Anabond Tubes.(Tube Size 350 Gms) , Hino Bond Liquid Solution Tubes For Leyland Vehicles Anabond Tubes. (Tube Size 85 Gms) , Gasket Cylinder Block For Leyland Bsvi. , Gasket-Cylinder Head For H6 Chg With Fkm O-Ring For Leyland Bsvi. , B) Gasket (Other Than Critical) For Tata, Leyland & Eicher Vehicles , Gasket (Cover To Hub) Rear Axle For Tata 1512 Bs Iii / 1512 Bs Ii (25999) , Gskt.Kit For Gbs -40 Paper (Ts16820P) , Gskt. Valve Cover Tata Cummins , Gskt. Differential Caf , Gskt.Wp Flexoid Tata , Syncromesh Gear Box Gskt.(Top Cover Tata , Syncromesh Gear Box Gskt. (Frt.Upper Tata , Gskt Top Cover Upper , Air Completion Cyl. Head Gskt. Kit , Gskt. Fip Flexoid , A14X18 A / Washer Tata Din 7603 , A 14X20 Al Washer Tata Din 7603 , A 8X12 Cu Sealing Washer , Gasket F.I.P. To Support , Gasket Lub. Filter Head , Gasket Lug. Cooler , Gasket Valve Cover 1512 Bs Iii , Gasket (Housing Front And Rear Gear Box ) For Tata 1512 Bs Iii / 1612 Bs Iiand 1618 Bs6 11 Mtr & 12 Mtr , Gasket Support For Tata 709 Bs Ii / 712 Bs Iii , Gasket Water Pump For Tata 709 , Gasket (Hub) Rear Axle For Tata 1612 Bs Ii& 1618 Bs Vi 12 Mtr , Gasket (Front Cover- Upper) For Tata 1515 Bs Iv. , Gasket (Front Cover- Lower) For Tata 1515 Bs Iv. , Gasket Rear Cover For Tata 1515 Bs Iv. , Gasket Rear Cover Lower (Integral) For Tata 1515 Bs Iv. , Gasket Integral Rear Cover Adapter G750 For Tata 1618 Bs Iv. , Gasket Gear Housing (Front Gear Cover ) For Tata 1515, 1618 & 1623 Bs Iv. , Gasket Integral Rear Cover G750 For Tata 1623 Bs Iv. , Gasket (R.I Cover) For Tata 1515, 1618 & 1623 Bs Ivand 1618 Bs6 11 Mtr & 12 Mtr , Gasket Ring (Front Axle) For Tata 1515, 1618, 1623 Bs Iv &1618 Bs Vi 11 Mtr. , Side Cover Gasket For Tata 1515 & 1618 Bs Iv. , Gasket 4X2 (Steering) For Tata 1623 Bs Iv. , Gasket , Push Rod Cover (Cam Follower) For Tata 1515, 1618 & 1623 Bs Iv , Gasket For Exhaust For Tata 1515 Bs Iv , Gasket Exh Gas Rcn Valve (Recirculation Exhaust) For Tata 1515 Bs Iv , Gasket, Exhaust Manifold (Recirculation Exhaust) For Tata 1515 Bs Ivand 1618 Bs6 11 Mtr & 12 Mtr , Gasket, Irrg (Air Filter) For Tata 1515 Bs Iv , Gasket Connection (Air Intake Heater) For Tata 1623 Bs Iv , Gasketconnection (Air Intake) For Tata 1623 Bs Iv, Gasketconnection For Tata 1618 , Gasket (U Seal) Air Compressor For Tata 1618 & 1623 Bs Iv. , Gasket (Water Separator) For Tata 1515 Bs Iv And 1618 Bs6 11 Mtr & 12 Mtr , Gasket (Between Egp & Decomp Pipe) For Tata 1618 Bs Iv. , Gasket Connection For Tata 1618 , Gasket Cover Plate For Tata 1618And 1618 Bs6 11 Mtr & 12 Mtr , Gasket Exhaust Manifold For Tata 1618 , Gasket Starter For Tata 1618And 1618 Bs6 11 Mtr & 12 Mtr , Gasket Filter Head , Gasket ( Front Cover Upper) For Tata 1618And 1618 Bs6 11 Mtr & 12 Mtr , Gasket Oil Drain For Tata 1618 , Gasket ( Integral Rear Cover Adaptor G750) For Tata 1618And 1618 Bs6 11 Mtr & 12 Mtr , Gasket Upper Half Gear Case Cover For Tata 1618 , Gasket Rear Axle Carrier For Tata 1618 Bs Iv , Gasket Exhaust Pipe For Tata 1618 And 1618 Bs6 12 Mtr & 1613 Bs6 Cng , Gasket (Oil Pan) For Tata 1515 & 1623 Bs Iv , Gasket (Oil Pan) For Tata 1618 Bs Iv , Overall Kit For Air Compressor For Tata 1515 Bs Iv. , Gasket & Sealing Ring Kit (Air Compressor) For Tata 1515,1618 &1623 Bs Iv , Gasket Acc Drive Cover (Air Compressor) For Tata 1618 Bs Iv And 1618 Bs Vi 12 Mtr , Gskt. Gear Box Jt.For Driving Tran. Kit , Gasket Common Rail System For Ley 1611 & 1812 Bs Iv , Gasket Common Rail System For Ley 2312 Bs Iv , Gasket Rear Axle Shaft , Gasket Hub Cap , Gasket Oil Filter , Gasket Turbocharger For Tata 1618 Bs Iv And 1618 Bs Vi 11 Mtr & 12 Mtr , Gasket Turbocharger For Eicher 20.15 , Gasket, Gear Housing For Tata 1618 Bs Vi 11 & 12 Mtr. , Gasket, Oil Pan For Tata 1618 Bs Vi 11 & 12 Mtr. , Gasket, Rear Cover For Tata 1618 Bs Vi 11 & 12 Mtr. , Gasket, Connection For Tata 1618 Bs Vi 11 & 12 Mtr. , Gasket, Oil Drain For Tata 1618 Bs Vi 11 & 12 Mtr. , Gasket, Int Manifold Cover For Tata 1618 Bs Vi 11& 12 Mtr. , Gasket, Oil Cooler Core For Tata 1618 Bs Vi 11 & 12 Mtr. , Gasket, Filter Head For Tata 1618 Bs Vi 11 & 12 Mtr. , Gasket (Side Cover) For Tata 1618 Bs Vi 11 & 12 Mtr. , Gasket Side Cover For Tata 1618 Bs Vi 11, 12Mtr& 1613 Cng Bs Vi. , Gasket (Top Cvr) For Tata 1618 Bs Vi 11 & 12 Mtr. , Gasket Rear Cover (Table) For Tata 1618 Bs Vi 11 & 12 Mtr. , Gasketfor Tata 1618 Bs Vi 11 & 12 Mtr. , Gasketfor Tata 1618 Bs Vi 11 & 12 Mtr. , Hub Cap Gasket For Tata 1618 Bs Vi 11 Mtr & 1613 Cng Bs Vi. , Gasket Exhaust System Bs6 For Tata 1618 Bs Vi 11 & 12 Mtr. , Assy Gasket Oil Sump To Cyl Block For Tata 1613 Cng Bs Vi. , Gasket-Oil Pan For Tata 1613 Cng Bs Vi. , Gasket- Throttle Body To Int. Manifold For Tata 1613 Cng Bs Vi. , Assy.Gasket (Intake Manifold) For Tata 1613 Cng Bs Vi. , Gasket Exhaust Pipe Flange For Tata 1613 Cng Bs Vi. , Gasket Assy; Exh Manifold For Tata 1613 Cng Bs Vi. , Gasket Assy; Exhaust Manifold For Tata 1613 Cng Bs Vi. , Gasket For Tata 1613 Cng Bs Vi. , Gasket (Oil Filter To Cyl Block):Bs-Iii For Tata 1613 Cng Bs Vi. , Gasket Oil Cooler For Tata 1613 Cng Bs Vi. , Gasket For Tata 1613 Cng Bs Vi. , W/P Gasket With Silicone Beading For Tata 1613 Cng Bs Vi. , Gasket (Upper Cooling Water Line) For Tata 1613 Cng Bs Vi. , Gasket (Air Compressor) For Tata 1613 Cng Bs Vi. , Gasket (Inspection Window) For Tata 1613 Cng Bs Vi. , Gasket (Cover Front Lower) For Tata 1613 Cng Bs Vi. , Gasket (Cover Front Top To Hsg) For Tata 1613 Cng Bs Vi. , Gasket (Gear Case Cover Rear To Housing) For Tata 1613 Cng Bs Vi. , Gasket For Upper Cover To Gb Housing For Tata 1613 Cng Bs Vi. , Kit-Gasket Gear Box G40 5/7.51 Bs1/2/3/4 For Tata 1613 Cng Bs Vi. , Gasket Rear Hub (Bigger Hub) For Tata 1618 Bs Vi 11 & 12 Mtr And Tata 1613 Cng Bs Vi. , Gasket Assy For Tata 1613 Cng Bs Vi. , Gasket For Tata 1618 Bs Vi 11 & 12 Mtr And Tata 1613 Cng Bs Vi. , Gasket Assy For Tata 1613 Cng Bs Vi. , Turbo Dp Gasket For Leyland 4/251 Bs Iv , Gasket Gear Box For Leyland 4/251 Bs Iv & Leyland Bsvi. , Gskt. Exh.Manifold (Hino Engine) , Gskt .Exh.Pipe ( Hino Engine) , Head Flexoid Rubcork , Gskt. Nozzle Holder , Gskt. Axle Shaft To Hub Flexoid Ley 0.80 Mm (16627Flex) , Jt. Hub Cap Flexoid Ley. 350 & Coml , Gskt Improvement Casing To Thermostat Hsg. /Leyland , Gasket Oil Cooler , Special Gasket For Exhaust Manifold, Cylinder Head For Leyland 12 Mtr. Bs Ii. , Gasket Turbo Outlet To Exhaust Pipe For Leyland 12 Mtr. Bs Ii And Bs Iii , Gasket Oil Drain From T/C For Leyland 12 Mtr. Bs Ii And Bs Iii , Turbo Gasket Box , Gasket- Reverse Idler Cover For Leyland 1611, 1812,2312 & 4/251 Bs Iv And Leyland Bsvi. , Gasket Detent Plunger For Leyland 1611,1812 &4/251 Bs Iv And Leyland Bsvi. , Gasket End Cover For Leyland 1611, 1812, 2312 & 4/251 Bs Iv And Leyland Bsvi. , Gasket - Gear Casing For Leyland 1611, 1812,2312 & 4/251 Bs Iv And Leyland Bsvi. , Gasket Ips Cover (I/P Shaft) For Leyland 1611, 2312 & 4/251 Bs Iv And Leyland Bsvi. , Gasket- Selector Housing For Leyland 1611, 1812, 2312 & 4/251 Bs Iv. , Gasket - Selector Housing End For Leyland 1611, 1812, 2312 & 4/251 Bs Iv. , Gasket (Hub & Brake) 0.5 Mm Thick For Leyland 1611 Bs Iv & Leyland Bsvi. , Gasket (Hub & Brake) 0.5 Mm Thick For Ley 1812 Bs Iv. , Gasket For Rear Axle Hub End With 0.5 Mm Thk For Leyland 2312 & 4/251 Bs Iv. , Gasket Chamb. Bracket (Rear) For Leyland 1611, 1812 & 4/251 Bs Iv. Gasket Chamb. Bracket (Front) For Leyland 1611, 1812, 2312 & 4/251 Bs Iv. , Gasket (Front Brake) For Leyland 1611, 1812, 2312 & 4/251 Bs Iv. , Gasket Side Cover For Ley 1611 Bs Iv. , Gasket (Steering Gear) For Leyland 1611, 1812, 2312 & 4/251 Bs Iv. , Gasket (Steering Gear) For Leyland 1812, 2312 & 4/251 Bs Iv. , Gasket (Steering Gear) For Leyland 1812, 2312 & 4/251 Bs Iv. , Gasket (Steering Gear) For Leyland 1812, 2312 & 4/251 Bs Iv. , Gasket (Steering Gear) For Leyland 1812,2312 & 4/251 Bs Iv.. , Gasket (Steering Gear) For Leyland 1611, 1812, 2312 & 4/251 Bs Iv. , Gasket- Front End Structure For Ley 1611 Bs Iv. , Gasket- Front End Structure For Ley 1611 Bs Iv. , S/A Of Gasket- Front End Structure For Leyland 1812 Bs Iv. , Gasket (Switch Board) For Leyland 1611, 1812 & 4/251 Bs Iv. , Gasket Camshaft Plate For Leyland 1611, 1812, 2312 & 4/251 Bs Iv , Gasket Timing Back Plate For Leyland 1611, 1812, 2312 & 4/251 Bs Iv And Leyland Bsvi. , Gasket Oil Pump Cover For Leyland 1611, 1812 , 2312 & 4/251 Bs Iv And Leyland Bsvi. , Gasket Air Intake Pipe For Leyland 1611, 1812, 2312 & 4/251 Bs Iv And Leyland Bsvi. , Gasket Imf For Leyland 1611, 1812, 2312 & 4/251 Bs Iv. , Gasket (Exhaust Manifold) For Leyland 1611, 1812, 2312 & 4/251 Bs Iv And Leyland Bsvi. , Gasket, Thermostat Housing Gasket Rtug For Leyland 1611 & 2312 Bs Iv And Leyland Bsvi. , Gasket (Water Pump) For Leyland 1611, 1812, 2312 & 4/251 Bs Iv And Leyland Bsvi. , Gasket (Starter) For Leyland 1611, 1812, 2312 & 4/251 Bs Iv And Leyland Bsvi. , Gasket- T/C To Exhaust Manifold For Leyland 1611, 1812, 2312 & 4/251 Bs Iv And Leyland Bsvi. , Gasket- Turbo Outlet To Exhaust Pipe For Leyland 1611, 1812, 2312 & 4/251 Bs Iv , Gasket, Egr Valve Elbow For Leyland 1611, 1812 &2312 Bs Iv And Leyland Bsvi. , Gasket, Egr Outlet Pipe For Leyland 1611, 1812 & 2312 Bs Iv And Leyland Bsvi. , Gasket Inlet Manifold For Eicher 20.15 , Gasket Exhaust Manifold For Eicher 20.15 , Gasket-Exhaust Manifold For H-Series Engines For Leyland Bsvi. , Gasket-Engine Air Intake Manifold For 2V For Leyland Bsvi. , Gasket-Engine Air Intake Pipe For 68Dia - Intake Throttle Valve For Leyland Bsvi. , Gasket-Engine Air Intake Pipe Imf To Aip For Leyland Bsvi. , Gasket Rtug For Coc Outer Profile For Leyland Bsvi. , Gasket Oil Cooler Rtug For Leyland Bsvi. , Gasket For Exhaust Brake To Hc Dozer Assembly Engine Super Charger Assembly For Leyland Bsvi. , Gasket For H Series All Engines Engine Super Charger Assembly For Leyland Bsvi. , Gasket H6 Bs6 Engine Super Charger Assembly For Leyland Bsvi. , Sealing Unit (Gasket) For Leyland Bsvi. , Gasket Fuel Piping O Ring For Leyland Bsvi. , Gearbox Gasket Kit For Leyland Bsvi. , Gasket Selector Tower For Leyland Bsvi. , Gasket -Detent Cover For Leyland Bsvi. , Gasket -Shifter Tower Side Cover For Leyland Bsvi. , Gasket - Selector Tower For Leyland Bsvi. , Gasket Gear Box Selector Tower - Top Cover For Leyland Bsvi. , Gasket 4 Inch Gasket For Leyland Bsvi. , Gasket-Exhaust For Injector Nozzle For Leyland Bsvi. , Gasket-Exhaust Metal Bead Seal For Dpf For Leyland Bsvi.
Contract Date: Ref. Documents Contract Value : Ref. Document
Government Departments No of Bidders 3
Maharashtra View Result →
Contract Date: Jun 10, 2026 Contract Value : 59,769
Boards / Undertakings / PSU No of Bidders 3
Contract Date: Ref. Documents Contract Value : 18,320
Statutory Bodies & Commissions/Committees No of Bidders 3
5.
Power #11206883 AOC
Overhauling Of Esp Of Unit #5 Under Ahp(E/M) Department, Btps.- 1 ESP Water Washing: 2 ESP Water Washing 3 ESP Inspection & Rectification Job: 4 ESP Inspection and rectification jobInspection of the following:1. CERM Assemblies (hammer, bearing, shaft), EERM assemblies (hammer, bearing, shaft, gear assemblies), collecting listed above etc.2. Support Insulator, Torque Insulator, Antisway Insulator, Transformer HV bushing3. Support insulator heater, Purge air heater, hopper heater (resistance checking from Junction Box), Checking of thermostatsfor all the heaters, Hopper Vibrator 4. Replacement and rectification of the following :a) Replacement &rectification of CERM Hammer assembliesb) Replacement &rectification of CERM Bearing assembliesc) Replacement &rectification of CERM Shaft Assemblies.d) Replacement &rectification of EERM Hammer assembliese) Replacement &rectification of EERM Worm Gear Assembliesf) Replacement &rectification of EERM Shaft Assemblies.(Insulation along with cladding need to be removed &restored byVendor with material supply if required).g) Replacement &rectification of EERM Bearing assembliesh) Replacement &rectification of Support Insulatori) Replacement &rectification of Torque Insulatorj) Replacement &rectification of Antisway Insulatork) Replacement &rectification of Hopper heater.(Insulation need to be removed &restored by Vendor with materialsupply).l) Replacement &rectification of Hopper Vibrator.m) Gearbox overhauling of all 52 nos of gearboxes.n) Asbestos Rope change of doors of ESP, insulator box.o) Alignment checking and rectification of ESP internal ifrequired.p) Alignment/Air tightness checking and rectification of All ESPdoors, insulator box doors (If required). [#No air ingress# need to be confirmed afterbox up of all doors at the time of AIRLOAD test (with both ID & fd running).} q) Painting of different areas. 5 GD Screen Replacement: 6 GD Screen ReplacmentGD screen (perforated screen 2&3) replacement of all 4 (four)inlet ducts need to be done. This includes all required fabrication job. (Material will be supplied by WBPDCL). 7 Painting: 8 Painting of different areas1. ALL MOTOR ALONG WITH CANOPY FOR CERM, EERM& GDRM (52 Nos)2. ALL GEAR BOX FOR CERM, EERM & GDRM (52 Nos)3. ALL SHAFT & SUPPORT INSULATOR HOUSING (96 nos)4. ALL INSPECTION DOORS (52 nos)5. ALL ESP TRANSFORMERS (24 Nos)6. RAILINGS OF ROOF (Total railing of ESP roof)7. STAIRCASE OF ESP (Staircase of middle & other 2 sides ofESP)Consumables Materials like Paint/Red-oxide/Asbestos rope, Hylomer, Adhesive (dendrite, hole tight etc.), Petrol, Kerosene,Thinner, Gaskets for Support Insulator Housings & Dis-connecting Switch Box etc. under the scope of contractor. 9 GD test (optional): 10 GD TEST
Contract Date: Jun 02, 2026 Contract Value : 25.41 Lakh
Government Departments No of Bidders 2
West Bengal View Result →
6.
Housing Urban and Rular Development #11150955 Technical Bid
Tender for Item Rate Boq Boq_Ver3.0 Item Rate Normal Inr Only Inr Select, Excess (+), Less (-) Less (-) Tender Inviting Authority: Executive Engineer, Mechanical & Hospital Division Gmch Jammu. Repair And Servicing Of Ambulence Trax (Force Motors ) Bearing Regestration No. Jk02dj-0133. Mhdj/E-Nit 06 Of 2026-27 Dated: 13.04.2026 Due : 23.04.2026 Bidder Name : Price Schedule (This Boq Template Must Not Be Modified/Replaced By The Bidder And The Same Should Be Uploaded After Filling The Relevent Columns, Else The Bidder Is Liable To Be Rejected For This Tender. Bidders Are Allowed To Enter The Bidder Name And Values Only ) Number # Text # Text # Number # Text # Number Number Text Text # Number # Text# Text # Number # Number Number Number Number Text Text Number Number Number Number Text Text Number Number Number Number Text Text Number Number Number Number Text Text Number Number Number Number Text Text Number Number Number # Number # Text Text Number # Number # Date Number # Number # Text # Sl. No. Item Code / Make Quantity Units Estimated Rate Addition / Deduction Rate Including Gst To Be Quoted By The Bidder Rs. P Currency Convertion Against Each Item Quoted Currency In Inr / Other Currency Rebate On Old Parts In Percentage (%) If Any Excise Duty Vat Freight Charges ( Unloading & Stacking) Any Other Taxes/Duties/Levies Other Taxes 2 Iiird Party I.E Dgs&D / Rites Etc Inspection Charges @0.34%+Service Tax Less For Cenvat Credit,If Any Respect Of Supplies Under Full Excise Duty Category Net Cost Of Item Rs. P Total Amount Total Amount With Taxes Total Amount In Words , Repair Of Ambulance Trax Force Motor By Way Of Top Overhauling Of Engine And Repair Of Air Conditionong Sysytem .The Job Includes Dismantling The Cylinder Head And All Top-End Components Such As The Head Gasket, Valves, Valve Seats, Valve Springs, Rocker Arms, Push Rods, And Injectors. The Job Includes Complete Decarbonization Of The Cylinder Head, Pistons, And Intake/Exhaust Passages, Along With Machining Tasks Like Head Facing And Valve Seat Cutting Or Grinding As Required. Worn Parts Such As The Head Gasket, Valve Stem Seals, Manifold Gaskets, Injector Washers, And Other Consumables Are Replaced. The Cylinder Head Is Then Reassembled Using Proper Torque Settings, Valve Clearances Are Adjusted, And All Fuel And Coolant Connections Are Restored. After Reassembly, The Engine Is Tested For Smooth Starting, Proper Compression, Reduced Smoke, And Leakage-Free Operation, Ensuring Improved Performance, Better Mileage, And Reliable Running Of The Vehicle.The Job Also Includes Air-Conditioning Repair Involves Checking The Compressor, Condenser, Evaporator, And Refrigerant Lines For Faults Or Leaks, Replacing Damaged Parts, Vacuuming And Recharging The System With Gas, Cleaning Filters And Coils, And Finally Testing The Cooling Performance To Ensure Smooth And Efficient Ac Operation.The Complete Job Includes Cost Of Labour , Tool And Tackles Charges, Material Charges And All Kind Of Taxes. , Repair To Ambulance Trax Force Motors By Way Of Replacemnet Of Radiator The Job Includes Draining The Old Coolant From The System, Disconnecting The Upper And Lower Radiator Hoses, Coolant Reservoir Pipe, Fan Shroud, And Any Attached Sensors Or Transmission Cooling Lines . The Old Radiator Is Then Unbolted And Carefully Removed, And The Mounting Area Is Cleaned To Remove Dirt And Rust. Before Installing The New Radiator, All Hoses, Clamps, And The Thermostat Are Replaced . The New Radiator Is Fitted Securely With Proper Alignment, And All Connections Are Restored, Ensuring There Are No Loose Fittings. Fresh Coolant Is Added In The Correct Mixture, And The System Is Vacuumised To Remove Trapped Air. After Reassembly, The Engine Is Started And Brought To Operating Temperature To Check For Coolant Circulation, Proper Fan Operation, Stable Temperature Reading, And Absence Of Leaks. The Process Ensures The Cooling System Functions Efficiently And Prevents Engine Over Heating.The Complete Job Includes Cost Of Labour, Tool And Tackles Charges, Material Charges And All Kind Of Taxes. , Repair To Ambulance Force Trax By Way Of Replacement Of Clutch Plate Pressure Plate And Clutch Bearing . The Job Includes Removing The Gearbox To Access The Clutch Assembly And Restoring Smooth Power Transmission Between The Engine And Drivetrain. The Job Includes Disconnecting The Battery, Removing The Propeller Shaft , Detaching Sensors, Linkages, The Clutch Cable Or Hydraulic Line, And Unbolting The Gearbox From The Engine. Once The Gearbox Is Lowered The Old Clutch Assembly Is Removed From The Flywheel, And The Flywheel Surface Is Checked For Heat Spots Or Uneven Wear; It Is Resurfaced . A New Clutch Plate, Pressure Plate, And Clutch Bearing/Release Bearings Are Installed With Proper Alignment Using A Clutch Alignment Tool. The Gearbox Is Then Refitted, All Connections And Mountings Are Restored, And The Clutch Pedal Hydraulic System Is Adjusted For Proper Operation. Finally, The Vehicle Is Test-Driven To Ensure Smooth Gear Shifting, Proper Clutch Engagement, And Vibration-Free Performance.The Complete Job Includes Cost Of Labour, Tool And Tackles Charges, Material Charges And All Kind Of Taxes. , Complete Servicing Of Ambulence (Force Mototrs ) Bearing Regestration No. Jk02dj-0133 By Way Of Draining The Old Engine Oil And Filling Fresh The Engine Oil -6.5 Litres, Replacing The Oil Filter-1 No., Fuel Filter -01 No. Air Filter-01 No., Gear Oil -3 Ltr, Diffrential Oil-2 Ltrs , Power Streering Oil -1 Ltrs, Diesel Exhuast Fluid-20 Ltrs, Brake Fluid-200 Ml .The Job Also Includes Wheel Alignment. The Job Includes Cheking Charging Sysytem , Battery Life , Coolant Hoses, Suspension Components, Check Steering Component Innner/Outer Tie Rods, Grease And Lubricant Components,Check For Proper Operation Of All Lights, Check Radiator Fan Belt.The Job Includes Complete Cleaning And Washing Of Vehicle.The Complete Job Includes Complete Testing Of Engine After Sevicing. The Complete Job Includes Cost Of Labour For Complete Servicing , Tool And Tackles Charges, Material Charges And All Kind Of Taxes. Total In Figures 23 23 0.0 23 Inr Zero Only Quoted Rate In Figures Select 0.0 0.0 Zero Only Quoted Rate In Words Inr Zero Only
Contract Date: Ref. Documents Contract Value : Ref. Document
Government Departments No of Bidders 3
Jammu And Kashmir View Result →
Contract Date: Nov 05, 2024 Contract Value : 2.10 Lakh
Boards / Undertakings / PSU No of Bidders 2
Contract Date: Ref. Documents Contract Value : 87,000
Government Departments No of Bidders 5
Andaman And Nicobar Islands View Result →
11.
Power #10912971 AOC
Bids Are Invited For Preventive Maintenance & Load Testing/ Inspection Of Material Handling Equipments (E.G. Hoists, Eot Cranes, Mobile Cranes & Forklifts Etc.) And Maintenance Of Rolling Shutters.; 1.0 PM of Cranes & Hoists 1.01 Six Monthly preventive maintenance of EOT Crane (capacity 2 ton to 75 ton) / Electric hoist (0.5T to 12.5T) as per the approved checklist 200.0 Nos. 1.02 Annual preventive maintenance of EOT Crane (capacity 2 ton to 75 ton)/Electric hoist (0.5T to 5T) as per the approved checklist 100.0 Nos. 2.0 Load testing of Crane & Hoist, Chain pulley block, mobile crane, forklift, max puller 2.01 Annual load testing of EOT crane (Capacity 2 ton to 20 ton). 40.0 Nos. 2.02 Annual load testing of EOT crane (Capacity 30 ton to 75 ton) 10.0 Nos. 2.03 Annual load testing of Electric hoist (Capacity 0.5 to 12.5 Ton). 50.0 Nos. 2.04 Annual load testing of mobile cranes & DPT of hook (Capacity 55 ton & 12 ton) 2.0 Nos. 2.05 Annual load testing of forklifts (Cap 1 ton to 10 ton) 8.0 Nos. 2.06 Annual PM & load testing of manual hoist ( mono rail with chain pulley block) capacity 0.5 ton to 5 ton 180.0 Nos. 2.07 Annual PM & load testing of Chain Pulley block (SWL0.5 ton to 5 tonn) 185.0 Nos. 2.08 Annual PM & load testing of Hydraullic Pellet Trolley (SWL:upto 3 Tonn) 70.0 Nos. 3.0 Inspection of Specila liftin tool tackles, D-shackle,eyebolt and special lifting tackles 3.01 Dismantling, visual & DPT, boxup of HP turbine rotor lifting beam 2.0 Nos. 3.02 Dismantling, visual & DPT, boxup of LP turbine rotor lifting beam 2.0 Nos. 3.03 Dismantling, visual & DPT, boxup of Turbine easing gear 2.0 Nos. 3.04 Dismantling, visual & DPT, boxup of LP turbine outer casing lifting pin 8.0 Nos. 3.05 Dismantling, visual & DPT, boxup of Turn buckle for lifting HP turbine casing 2.0 Nos. 3.06 Dismantling, visual & DPT, boxup of PCP lifting pin-plate assembly consisting of 4 nos. of plates and 6 nos. of pins. 2.0 Nos. 3.07 Dismantling, visual & DPT, boxup of chlorine toner lifting beam (attached to manual hoist Nos. 0-76230-MH-07 of 2T capacity) consisting of 1 no. of plate and 4 nos. of pins/bolts, 1 No. of D shackles, 3 nos. of hook. 2.0 Nos. 3.08 Annual inspection of slings, D-shackles & eye bolts. 1900.0 Nos. 4.0 Maintenance of rolling shutter 4.01 Six Monthly preventive maintenance of turbine building motor operated rolling shutter (size max. 5mx12m). 20.0 Nos. 4.02 Complete Overhauling of Rolling of shutter (Size Max. L-6 Mtr x H-7Mtr, 5Mx12M) 25.0 Nos. 5.0 Need based maintenance of EOT cranes, hoists and Shutter 5.01 Wire rope replacement of EOT crane/ electric hoists (if required) 2.0 Nos. 5.02 Overhauling of LT gearbox /CT gearbox/ Main hoist gearbox of EOT crane/ electric hoist having SWL up to 75 Ton (if required) 3.0 Nos. 5.03 Maint. / replacement of thruster /electromagnetic brake of crane & hoist (if required ) 15.0 Nos. 5.04 Revamping /redressing of control panels of crane & hoist, if required 8.0 Nos. 5.05 Replacement of pendant/its set of button for EOT Crane/Hoist 8.0 Nos. 5.06 Replacement / maintenance of limit switch/fuse of crane & hoist, cleaning of contacts, moisture etc if required 65.0 Nos. 5.07 Maintenance/ replacement of wheel (each) of crane& hoist 6.0 Nos. 5.08 Laying of power cable having outer dia meter 6 mm to 80 mm in existing cable trays. 300.0 Nos. 5.09 Removal & shifting of manual hoist/CPB from one location and its installation at another location. 22.0 Nos. 5.1 Motor overhauling of motor From 0.18 KW to 3.7 KW, as per applicable procedure . 5.0 Nos. 5.11 Motor overhauling of motor From 5.5 KW to 22.5 KW, as per applicable procedure 4.0 Nos. 5.12 Motor overhauling of motor From 30.0KW to 75.0 KW, as per applicable procedure . 2.0 Nos. 5.13 Decoupling of Motor and Gear Box,allignment correction and coupling. 4.0 Nos. 5.14 Removal and Fixing of coil spring of matching size and shape of shutter. 20.0 Nos. 5.15 Removal and Fixing of lower/upper gear assembly of shutter 10.0 Nos. 5.16 Removal and Fixing of shutter iron strips as per matching size. 50.0 Nos. 5.17 Replacement of shutter rotor cover of matching size. 6.0 Nos. 5.18 Repair of shutter rotor and coil spring 20.0 Nos. 5.19 Rewinding of Electromagnetic (EM) brake coil of crane . 20.0 Nos. 6.0 Maintenance coverage and Crane operation 6.01 Maintenance coverage for attending complaint of crane/hoist upto 8 hrs during normal working day. 130.0 Nos. 6.02 Maintenance coverage for attending complaint of crane/hoist or coverage during lifting of any critical load upto 4 hrs during off hrs or holiday. 200.0 Nos. 6.03 EOT Crane/Electric Hoist operation upto 8 hrs during normal hours on any working day. 600.0 Nos. 6.04 EOT Crane/Electric Hoist operation upto 4 hrs during off hours, Sunday, Holiday 360.0 Nos. 7.0 Supply Items 7.01 Supply of new brake coil of Electro magnetic (EM) brake for different cranes. 12 Nos. 7.02 Supply of strip /spring for shutters (Kg) 150 Kg 7.03 Supply of Electro hydraulic Thrust brake suitable for 300 mm to 400mm drum dia with 18 kg load to work on 3 phase 50C/s,400/440 volts, braking torque 42 Kg.M without drum 7 Nos. 7.04 Supply of Electro hydraulic Thrust brake suitable for 100 mm to 200 mm drum dia with 18 kg load to work on 3 phase 50C/s,400/440 volts,braking torque 42 Kg.M without drum 7 Nos. 7.05 Supply of Chain Pulley Block, SWL-1 Ton, Lift -10 Mtrs 2 Nos. 7.06 Supply of Chain Pulley Block, SWL-2 Ton, Lift -10 Mtrs 2 Nos. 7.07 Supply of Chain Pulley Block, SWL-3 Ton, Lift -10 Mtrs 2 Nos. 7.08 Supply of Chain Pulley Block, SWL-5 Ton, Lift -10 Mtrs 1 Nos. 7.09 Manual Hoist Trolley with Chain Pulley Block each having SWL:5.0 Tonn with length of chain upto 10 Meter 2 Nos.
Contract Date: Ref. Documents Contract Value : 72.35 Lakh
Boards / Undertakings / PSU No of Bidders 6
Uttar Pradesh View Result →
12.
Public Administrative Department #10894424 Price Bid
Tender for Ashok Leyland , Air Cleaner Assembly , Air Compressor , Br. Hose Assy , Brake Hose , Bundy Pipe Sub Assy , Compressor Delivery Pipe , Connecting Rod Assy , Crank Shaft , Cylinder Block , Cylinderhead , Drier And Distributor Valve , Gear Air Compressor Drive (Alt - F1661111) , Hose Assy , Kit-Air Intake System Comp , Low Pressure Indicator Switch , Major Repair Kit , Piston Assy- Std , Piston Repair Kit , Pre-Cleaner (Metal) , Primary Filter , Reed Valve Assy , Secondary Filter , Clutch Back Plate Kit , Clutch Bush Pin Kit , Clutch Disc Facing , Clutch Operating Lever , Clutch Plate Lever , Clutch Repair Kit , Clutch Rocking Shaft , Clutch S/C Major Kit , Clutch Withdrawl Bearing , Clutch Withdrawl Sleeve , Drag Link Assembly , Driving Plate , Lever On Shaft-Outer , Lipe Ceramic Clutch Disc (Alt - B1307001) , Rdc Clutch Cover Sub Assy. , Rdc Spring Kit , Slave Cylinder , 550Mm Ring Fan And Fan Clutch , Cac Inlet Pipe Hose - Engine Side , Cac Outlet Pipe , Cac-Inlet Hose , Cyilicon Hose , Hose - Radiator Inlet Radiator Side , L-Hose , L-Hose - Radiator Piping , Pipe -Turbo Outlet To Cac Inlet , Poly V. Pulley , Radiator Assy , Radiator Inlet Pipe , Ring Fan 550Mm Dia 7 Blade , Side Stay - Radiator Moungting , Tank Assy-Rad.Supp Ly , Turbo Outlet Pipe -Cac , Water Pump , Adjuster Ring , Carrier Mounting Fasterners Kit , Diff Brg , Diff Case & Nest Assy , Diff Spider Kit , Drive Gear & Pinion , Inner Bearing , Oil Seal & Pinion Nut Kit , Oil Seal Assy.-Flange , Outer Bearing , Pilot Bearing , Pinion Cage Assy , Pinion Cage Hardware Kit , Shim Kit-Pinion , Spacer Kit-Drive Pinion , Thrust Screw & Jam Nut Kit , Thrust Washer Kit , 4 Chamber Tail Lamp Rh , 55A Alternator (Lucas) Alt To X7489100 , Armature , Armature Assembly , Battery Cable - Battery +Ve To Isolator Sw , Battery Cable - Battery -Ve To Chasis , Battery Inter Connector , Battery Positive Cable , Bearing Bush Assembling Kit , Bearing Bush Assembling Kit , Brush Assembling Kit , Brush Gear Assembly , Brush Holder , Buzzer , Ce Bracket & Bush Assy. , Commutator End Shield , De Bearing Assembling Kit , Drive Assembly , Excitation Winding , Fasteners Assembling Kit , Field Coil With Thermal Cutout , Fog Lamp Assy , Head Lamp Assy , Horn Assembly , Ignition strengthening Lock , Intermediate Bearing , Isolator Switch Assy , Lead Assembly , Overrunning-Clutch , Plunger Assembly , Pulley , Rear Work Lamp , Rectifier Assembly , Relay Assembly , Rotor Assembly , Sealing Assembling Kit , Solenoid Switch , Solenoid Switch Assembly , Sre Ball Bearing , Starter Motor-Ltvs-24V-Pre-Engaged With , Stator Winding Assembly , Tail Lamp Assy Lh , Turn Signal Indicator , Wiper Arm And Blade Assembly - Driver Side , Wiper Kit Assembly , Wiping System (Kit) , Wiring Harness For Ve Cluster , Adaptor , Oil Fil , Adaptor Bracket , Air Intake Pipe , Ball Bearing, Alt - X0206110 , Bolt Con-Rod , Bolt, Bearing Cap , Breather Hose With Inner Spring , Bushing Con Rod , Camshaft , Camshaft Bush Kit , Composite Valve Kit , Composite Valve Seat Kit , Con Rod Bearing Kit , Con Rod Bearing Kit , Connecting Rod , Crank Shaft Main Bearing Set , Crankshaft, Microalloyed , Damper, , Decarbonising Gasket Kit , Dipstick And Guide , Element Oil Cooler Sub Assy. , 6 Plates , Engine Cylinder Head Assy. , Engine Mounting Bracket , Engine Mounting Bracket , Exhaust Valve , Fly Wheel Bearing Ball , Fly Wheel Ring Gear , Front End Plate Gasket , Gasket Cylinder Head , Gasket Over Hauling Kit- Complete , Gear Crankshaft , Gear, Camshaft Alt To F1661211 , Idler Gear , Intake Manifold , Intake Valve , Liner Cylinder S/S , Manifold, Exhaust , Oil Cooler Gasket , Oil Pump , Oil Strainer Sub Assy. , Piston Ring Set- , Piston Set(With Pin) , Piston,Pin And Ring Set , Plate, Front End Timing Back Plate , Rocker Arm , Rocker Shaft , S/A First Pipe Silencer , Second Pipe Sub Assembly , Series C/S Rear End Plate Oil Seal , Spacer , Special Flanged Bolt , Tail Pipe Assy , Thermostat , Thrust Washer Set - Std , Valve Guide Kit , Valve Intake Seat , Valve Spring Inner , Valve-Exhaust Seat , Brake Drum , Cover Plate For King Pin , Distance Piece- , Front Axle Taper Roller Bearing , Front Hub , Hub Cap , Joint Cover Plate , M20 Bolt For Fa 99 Track Rod Lever Mountg. , Oil Seal - Hub , Ring For Oil Seal , Steering Lever , Track Rod Assembly , Track Rod Lever , 200L Tank Comp Sub Assy , Camshaft , Control Rod , Delivery - Valve Assembly , Delivery - Valve Holder , Flywheel Coupling , Fuel Filter Cum Water Separator , Fuel Hose - Suction Sub Assy , Fuel Sensor Unit , Gear Injection Pump Drive , Hose Assembly-Filter To Fip , Hose Assy - Feed Pump To Fuelfilter Cum W/S , Injector Assy , Overflow Valve , Roller Tappet , Shut Off Solenoid 24V , Strainer Assy , Tapered-Roller Bearing , Timer For Shut Off Solenoid (24V) , Circlip Kit , Const.Mesh Gear On Lay Shaft , Cover-Reverse Idler (Sheet Metal) , Fixed Dog Clutch Reverse , Gasket , Gear Change Finger , Gear On Main Shaft , Input Shaft , Joint , Layshaft(Counter Shaft) , Main Shaft , Needle Roller Bearing , O/D Gear On Layshaft , O/D Gear On Mainshaft , Oil Seal , Rev. Gear On Ms , Reverse Idler Gear , Reverse Idler Pin , Reverse Selector Fork , Roller Bearing ( Alt. Part No. F0259210 ) , Roller Bearing Rear ( Alt .F0259310 ) , Selector Fork , Selector Housing , Selector Shaft , Sliding Pad(Selector Pad) , Sliding Sleeve , Spigot Bearing , Synchro Cone , Synchro Pack , Taper Roller Bearing , Zf Gear Box Gasket Kit , Zf Seal Kit , Bracket - Shock Absorber , Centre Bolt & Nut Kit , Front Shock Absorber , Front Spring , Rear Spring , Shackle Pin , Shock Absorber Mounting , Spring Eye Bush , Spring Shackle , Spring Shackle Sub Assy , U Bolt , Assembly Proximity Mirror , Door Glass , Door Lock Assembly Kit , Filter Element , Fuel Gauge , Housing Cover Assy. R.H. , Oil Tank Assy. , Rpm Meter With Hour Meter , S/A Of Acceleration Bracket And Shaft , Sealing Kit , Sector Shaft Assy. , Shaft And Lever Assembly - Throt , Small Component Kit , Speedo Movement Ratio , Temperature Gauge , Weatherstrip - Door Glass Channel , Windscreen Glass , Windscreen Rubber Beading , Cb Kit Assembly , Companion Flange , Flange Yoke For Drive Shaft , Mid Ship Tube Shaft , Msts Nut , Propeller Shaft Kit , Slip Yoke Assembly , Tube Shaft , Tube Yoke , Uj Kit , Anchor Pin-Brake Shoe , Axle Shaft Long , Axle Shaft -Short , Bracket Mounting Fasteners Kit Comp , Brake Chamber Repair Kit , Brake Drum , Brake Lining Front , Brake Lining Rear , Brake Minor Repair Kit- , Brake Pedal , Brake Spring Kit , Bushing - Cam , Camshaft , Camshaft Repair Kit , Camshaft Washers Kit Comp , Clutch Pedal , Fulcrum Pin , Gasket , Gasket-Bracket & Spider , Hand Brake Valve , Hub Bearing , Kit Lining Set-Std Comp , M.C.Kit , Major Repair Kit- (Rear Brake) , Mc Assembly , Minor Repair Kit , Mtg Bracketbattery Carrier , Oil Seal , Oil Seal Ring-Outer , Rear Hub , Repair Kit For Dual Brake Valve , Repair Kit For Rear Brake Chamber , Return Spring-Brake Shoe , Roller , Front Tyre , Rear Tyre , S/A Of Pedal Bracket , Stud For Axle Shaft , Wheel Bolt , Bonnet Adjustment , Removing And Replacing Of Door Handle , Removing And Replacing Of Door Lock , Removing And Replacing Of Rear Back Light , Replacement Of Channel Set And Bidding Set , Replacement Of Door Bidding Set , Replacement Of Door Canned Set , Replacement Of Door Glass Each , Replacement Of Door Gola , Replacement Of Door Handle Set , Replacement Of Front And Rear Bumper , Replacement Of Front Wind Glass , Replacement Of Roof Upholstery , Replacing Door Hinges Pins Of Each Door , Replacing Door Window Regulator , Exhaust Elbow , Oil Drain Pipe, Flexible - Turbo Charger , Turbo Charger , Turbo Charger With Adaptor Sub Assy , Wheels & Tyres , Bearing , Bearing Lower Teeeth 36 , Dipcase Bearing , Front Hub Bearing , King Pin Bearing T-149 , Main Shaft Bearing , Needle Bearing , Pinion Bearing , Planet Gear Bearing , Rear Wheel Bearing , Reversal Bearing , Transmission Bearing , Accelerator Cable Spring , Black Pad Nylon , Blue Pad Nylon , Boom Clip , Boom Shim , Boom Stablizer Spring , Bucket Ball Joint , Bucket Pin Washer , Bucket Shim , Cabin Mounting , Circlip , Clamp Bolt With Nut , Collapsible Tube , Dipper Shim , Engine Mounting , Externat Circlip , Grease Nipple , Green Pad Nylon , Hub Cover Plate , Hub Plug , Hydra Clamp Nut , Hydraulic Valve Protection Pad , King Pin Shim , King Post Bolt , Kpc Shim , Lower Cab Mounting , Lower Wear Pad Plastic , Oil Drain Plug , Pinion Nut , Protection Pin , Rear Axle Nut , Rear Hub Stud With Nut , Rear Wheel Nut , Red Pad Nylon , Rubber Mounting , Slew Ram Bolt , Stabilizer Wear Pad Nylon Type , Steel Washer , Strap , Throttle Overload Spring , Throttle Pedal Spring , Thrust Pad , Thrust Washer , Turret Seat Thick , Turret Washer Thin , Upper Cab Mounting , Upper Wear Pad Small Plastic , Wear Pad , Yellow Pad , Brake Booster , Brake Disc , Brake Friction Plate , Brake Master Cylinder , Brake Pedal Spring , Brake Piston , Brake Plate , Driven Plate Kit , Friction Plate , Boom Bush , Bucket Pin Bush , Bucket Rod Bush , Cut Bush , Cylinder Bushing Mount Holder , Dipper Rod Bush , Front Axle Bush , King Pin Bush , King Post Bush , Linear Bearing , Loader Arm Bush , Slew Rod Bush , Steel Bush , Steering Axle Bush , Steering Bush , Tie Rod Bush , Tipping Link Bush , Twin Cylinder Bush , Door Handle , Door Latch Assy Rh , Door Lock , Engine Side Panel Rh , Fender , Grill , Leg Rain Cap , Side Window Handle , Steering Wheel , Steering Wheel Knob , Cable , Cable Lever , Gas Strut , Throttle Cable , Throttle Cable With Handle , Alternator , Coil 12V , Diffuser Direction , Front Lamp Assy. , Fuel Level Indicator , Glow Plug , Ignition Switch , Rear Lamp , Rear Lamp , Rear Lamp Assy. , Rear Light , Rear Light Len , Rear Worklight , Refrigerant Fluid Temperature , Solenoid , Solenoid Assy , Solenoid Valve , Starter Motor , Switch Reverse - Forward , Tachometer Hour Meter , Tachometer Revolution Meter , Temperatur Guage , Temperature Sensor , Thermostat Housing , Belt Tensioner , Connecting Rod , Connecting Rod Bush , Crank Shaft Pulley , Crank Shaft Pulley , Diesel Fuel Cap , Dipstick , Elbow Hose , Electrical Valve Gasket , Engine Cooling Fan 21 , Engine Oil Dip Stick , Engine Piston , Engine Valve , Exhaust Elbow , Filter Glaas Bowl , Fly Wheel Ring Gear , Fuel Leak Off Assy. , Fuel Pipe , Fuel Pump , Fuel Sediment Filter Assy , Fuel Tank Cap With Keys (Small) , Gasket Set , High Pressure Pipe 3&4 , Hydraulic Level Guage , Hydraulic Tank Sight Guage , Oil Cooler Gasket , Oil Filler Cap , Oil Pump , Pipe Fuel Filter To Fuel Injection Pump , Preleaner Assy , Preleaner Glass , Pressure Cap , Push Rod , Radiator Hose Bottom , Rocker Cover Gasket , Top Radiator Hose , Valve Collet , Valve Seat , Water Hose Bottom , Water Pump , Watern Hose Bottom , Yellow Cap , Air Filter , Air Filter Assy , Engine Oil Filter , Fluid Reservoir , Fuel Filter , Fuel Filter Assy. , Fuel Filter , Hydraulic Filter , Hydraulic Filter Long Type , Hydraulic Filter , Hydraulic Tank Strainer , Reservoir , Suction Strainer , Transmission Filter , Auxillary Relief Valve , Hyd. Pump Centre Body , Hyd. Pump Drive Gear Shaft Big , Hyd. Pump Flange With Bushes , Hyd. Pump Gear Set , Hyd. Pump Plate Bush , Hyd. Pump Seal Kit , Hyd. Pump Wear Plate , Hydra Clamp Housing , Hydraulic Pump , Hydraulic Pump Key , Hydraulic Pump , Main Relief Valve , Pilot Unloader Valve , Single Pump With Gear 36Cc , Spool Valve , Vaccum Pump With Gear , Centre Pin , Pivot Pin , Pivot Pin Boom Knose , Axle Oil Seal , Brake Piston Ring , Brake Piston Seal , Clutch Seal , Cylinder Seal Kit , Distributor Slider Seal , Dust Seal , Front Axle Crossover Seal , Front Axle Ring , Front Engine Seal , Fuel Injection Seal , Fuel Settler Ring , Gearbox Seal , Hub Oil Seal , Hub Seal , Hydra Clamp Seal , Hydraulic Tank Gasket , Hydraulic Valve Seal , King Pin Seal , O Ring , Oil Seal , Pin Seal , Pinion Cover Slew Gasket , Piston Seal Kit , Rear Engine Seal , Seal Ring , Slew Swing Cylinder Seal Kit , Steering Cyllinder Seal Kit , Transmission Filter Gasket , Transmission Piston Inner , Transmission Pump Ring , Transmission Pump Seal , Transmission Shaft Teflon Ring , Valve Stem Seal , Water Inlet Gasket , Wiper Seal , Orbital Assy. , Pressure Relief Valve Steering , Rack End , Steering Coupling , Tie Rod Assy. , Centre Tooth , Side Cutter , Adaptor Block Assy. , Annulus Carrier , Annulus Ring , Brake Gear , C.W. Stud , Carriage , Clutch Housing With Gear , Clutch Housing With Gear , Cross Universal Joint , Crown Wheel & Pinion Assy. , Crown Wheel & Pinion Set , Differential Case Assy. , Differential Cross , Differential Gear Set O/M , Differential Washer Set , Double Joint Yoke , Drive Shafts , Foot Side Shift Stablizer , Front Axle Crossover Trunion , Front Drive Shaft , Front Hub , Gear Charging Pump , Gear Lever Rubber Boot , Gear Lever Rubber Cap , Gear Shift Lever Tension Spring , Gear Shift Lever , Hydra Clamp Housing O/M , King Post , Kingpost Carriage , Layshaft , Pinion Drive Gear , Pinion Gear , Pinion Shaft , Planetary Gear , Power Steering Pump , Pump Drive Shaft , Pump Shaft Yoke , Rear Axle Drive Shaft , Rear Hub , Steering Pump , Stub Axle Carrier , Sun Gear , Synchroniser Sleeve , Synchronizer Assy. , Terrot Housing O/M , Tipping Lever , Tipping Link , Tippining Liver , Transmission Piston , Trunnion , Yoke Coupling , Yoke Flange , Yoke Flange , Wheels & Tyres , Mahindra Bolero , Gear Fork , Gear Pinion , Air Cleaner Hose Pipe , Air Pressure Horn , Alternator Stator , Alternator Bearing (Roller Type) , Alternator Bushing , Alternator Carbon , Alternator Cashing , Alternator Commulator , Alternator Cutout , Alternator Dunamo Assly , Alternator Rectifire (Positive/Neg.) , Alternator Rotter , Axle Bearing , Back Gear Pinion , Back Light Assly. , Battrey Terminal , Benet Hook With Clip , Benet Monogram , Benet Tana Rod , Black Tap (Big) , Body Mounting , Brake Fexiable Pipe , Brake Lining , Bumper End , Bumper Gutka , Cam Shaft Bush/Bearing , Car Fan , Carbon Holder , Carburator Assly. , Carburator Butter Fly , Carburator Repair Kit (Major) , Chamber Bolt , Chamber Gasket , Clutch Adjusting Rod , Clutch Cable Assly , Clutch Plate Assly. (Plain/W/Facing) , Clutch Release Bearing Hub , Clutch Spring , Condenser , Connecting Bearing , Connector , Counter Gear Assly , Counter Gear Pinion , Counter Shaft Pin , Counter Shaft Roller , Counter Shaft Thrust Washer , Crank Shaft Bearing , Cross Holder , Cross Member , Cross Member , Cross Member Front Assly , Cross Member Rear Assly , Crown & Tail Pinion Assly. , Diesel Filter Assly , Diesel Flexiable Pipe , Differential Crown Pinion Shaft , Differential Gasket , Differential Oil Seal , Digi Rubber , Distributor Assembly , Distributor Cap , Distributor Plate Assly , Door Glass Handle , Door Glass Machine , Door Glass Rubber , Door Glass Channel , Door Half Lock , Door Handle/Lock/Kabja , Door Lock Assambly , Door Regulator Machine , Driving Glass , Dynamo Alternator Pully , Engine Cross Member , Engine Head Bolt , Engine Head Gasket (Full Set) , Engine Head Gasket (Single Pice) , Engine Head Stud F/T , Engine Main Bearing , Engine Mounting , Engine Valve (Inlet & Exhust) , Fan Assly , Fan Belt , Feed Pump Assly , Flang Stand (Double/Single) , Flasher , Fly Wheel Bearing , Fog Light Assly , Fog Light Bulb , Foot Board , Front Shockobsorbar , Front Spring , Front Spring Hanger , Front Spring Main Leaf , Front Spring Shackle Bush , Front Spring Shackle Pin , Fuel Meter , Gear Box Gasket , Gear Box Mounting , Gear Box Oil Seal , Gear Box Seal Kit , Gear Box Thrust Washer , Gear Lever Fork , Grill Assly , H T Wire , Head Light Assly , Head Light Bulb , Head Light Bulb , Head Light Holder , Head Light Seal Beam , Head Light Switch , Heater Plug , Heater Switch , Hood Light Assly , Ignation Switch , Gear Pinion , King Pin Bearing , King Pin , King Pin Oil Seal , L T Wire , Looking Glass (Rear View Mirror) , Main Bearing Coller Oil Seal , Main Shaft Assly , Main Shaft Bearing , Main Shaft Locknut/Oil Seal/Roller/Washer , Manifold Gasket , Master Cylender Assly , Mobile Filter Flexible Pipe , Mounting Buffer , Mudgard Bolt (F/T) , Oil Filter Element , Oil Pressure Switch , Oil Pump Assly , Parking Light Glass , Petrol Tank Assly , Petrol Tank Cap With Key , Petrol Tank Caps Rubber , Petrol Tank Hose Pipe , Petrol Tank Pipe (Steel) , Pisto Ring , Pisto Sleeve , Pisto With Pin , Plastic Tap , Plug Socket , Pressure Plate Assly , Propular Shaft Bolt , Propular Shaft Centre Bearing , Propular Shaft Teeth , Propular Shaft U Bolt , Propular Shaft Youk , Push Pull Switch , Radiator Assly. , Radiator Cap , Radiator Hose Pipe (Uper,Lower) , Radiator Hose Pipe Clamp , Rear Spring Clamp , Rear Spring Leaf , Rear Spring Centre Bolt , Rear Spring Clamp Bolt , Rear Spring Main Leaf , Rear Spring Mounting , Rear Spring Mounting Bolt , Rear Spring Shackle Assly , Rear Spring Shackle Bush Steel , Rear Spring Shacklr Pin , Rear Spring U Bolt , Release Carbon , Rotter , Self Carbon , Self Bushing , Self Housing Plate (Bushing/Brg. Side) , Self Housing Armature 12 Volt , Self Housing Field Post , Self Housing Plate (Carbon Side) , Self Starter Assly , Self Starter Bandix Assly , Self Starter Bushing Cover , Self Starter Solenied Switch , Self Starter Switch , Servo Assly , Shim Washer , Shockobsorber Bolt , Shockobsorber (H/ Duty) , Side Light Assly , Side Light Bulb , Side Light Glass , Side Light Holder , Side Light Switch , Silencer Box (Muffler) , Silencer Clamp , Silencer Gasket ( O) Ring , Sparking Plug , Spedo Meter Cable Assly. , Spedo Meter , Spedo Meter Pinion , Spring Clamp , Spring Clamp Bolt , Spring Show Mounting , Spring U Bolt (Front) , Starting Pully , Steering Box Assly , Steering Collumn , Steering Demper Bush , Steering Rack Assly , Steering Sector Oil Seal , Steering Sector Shaft With Gear , Steering Bolt Joint (Tie-Rod) , Steering Bolt Joint Lock , Steering Combination Switch , Steering Control Rod , Steering Demper Bushing Kit , Steering Horn Bottom Switch , Steering Knockle Kit , Stop Light Switch , Sttring Lever Switch , Sttring Wheel , Sttring Wheel Bush , Sttring Wheel Cover , Suspension Bushing Kit(Major) , Sycronizer Lock Ring , Sycronizer Lock(Maghi Lock) , Sycronizer Spring , Sycronizer Assly , Syncronizer Brass Ring , Tail Pinion Bearing , Tank Float Unit , Tappet Cover Gas Ket , Tie Rod End Drive Set , Tie Rod Pipe , Timing Chain , Top Shaft Assly , Top Shaft Bearing , Top Shaft Oil Seal , Top Shaft Pinion , Top Shaft Roller , Vaccum Horn Pipe , Valve Lock , Valve Oil Seal , Water Pump Gasket , Water Pump Assly , Water Pump Bearing , Water Pump Pully , Wheel Bearing , Wheel Cap , Wheel Cylender Assly. , Wheel Cylender Boot , Wheel Cylender Brucket , Wheel Cylender Kit , Wheel Cylender Pipe , Wheel Cylender Piston , Wheel Drum , Wheel Hub Assly. , Wheel Oil Seal , Wheel Rim , Whel Axle Shaft /Axle Assly. , Wipper Arm & Blade , Wipper Machine Electronic Vaccum Type , Wipper Wheel Box , Wipper/Pennel Switch , Front Tyre , Rear Tyre , Bonnet Adjustment , Removing And Replacing Of Door Handle , Removing And Replacing Of Door Lock , Removing And Replacing Of Rear Back Light , Replacement Of Channel Set And Bidding Set , Replacement Of Door Bidding Set , Replacement Of Door Canned Set , Replacement Of Door Glass Each , Replacement Of Door Gola , Replacement Of Door Handle Set , Replacement Of Front And Rear Bumper , Replacement Of Front Wind Glass , Replacement Of Roof Upholstery , Replacing Door Hinges Pins Of Each Door , Replacing Door Window Regulator , Wheels & Tyres , Tata 407 , Ampere Meter , K.M (Speedo Meter) , K.M Cable , Oil Pressure Assembly , Temperature Meter , Bevel Pinion Set , C. Side Bearing Cap Bolt , Crown & Tail Pinion Assembly , Crown Case Bolt , Crown Side Adjustor , Crown Side Bearing , Diff. Cover Gasket , Diff. Gear Shaft , Differential Spider Cross , Driver Gear , Rear Axle , Spider Washer , Tail Pinion Bearing , Tail Pinion Adjs. Shim , Tail Pinion Coupling , Tail Pinion Nut , Tail Pinion Oil Seal , Bonnet Kapza , Bonnet Lock , Cabin Mounting , Clutch Fork Rod , Clutch Housing Gb. 30 , Clutch Housing Gb. 40 , D. Filter Catching Assembly , Dynamo Armature , Dynamo Bearing Big , Dynamo Bearing Small , Dynamo Carbon , Dynamo Field Coil , Dynamo Plate , Engine Mounting Bolt , Fly Weight Assembly , Handle , Head Bolt With Washer , Jack With Handle , M. Filter Catching Assembly , Oil Cooler Side Plate , Servo Repair Kit , F & R Shackle Bush , F & R Shackle Washer , F&R Shackle Pin , F&R U Bolt , Front & Rear C.Bolt , Front Aux. Leaf A&B , Front Eighth Leaf , Front Fifth Leaf , Front Fourth Leaf , Front Main Leaf , Front Second Leaf , Front Seventh Leaf , Front Sixth Leaf , Front Spring Assembly , Front Third Leaf , Rear Aux. Assembly , Rear Aux. Leaf F&R , Rear Eighth Leaf , Rear Fifth Leaf , Rear Fourth Leaf , Rear Main Leaf , Rear Ninth Leaf , Rear Second Leaf , Rear Seventh Leaf , Rear Sixth Leaf , Rear Third Leaf , A.C. Head , Air Cleaner Pipe , Air Cleaner Rubber , Brake Shoe Return Springs , Brake Shoe Rivits , Double Gear , F & R Hub Assembly , F & R Shock Absorber , F. Brake Shoe Tawa , F. Spindle Choak Nut , F. W.C Repair Kit , F. Wheel Bearing I , F. Wheel Bearing O , F. Wheel Brake Shoe , F. Wheel Cylinder Assembly , F. Wheel Oil Seal , Front Brake Drum , Front Spindle , Front Wheel Rim , Hub Wheel Bolt , King Pin Bearing , King Pin Bush , King Pin Set , King Pin Shim & Lock Kit , Nozzle Pipe Set , R.W.C. Bucket With Boot , Rear Wheel Brake Shoe , Shocker Bolt , Third Arm Bolt , Front Tyre , Rear Tyre , Bonnet Adjustment , Removing And Replacing Of Door Handle , Removing And Replacing Of Door Lock , Removing And Replacing Of Rear Back Light , Replacement Of Channel Set And Bidding Set , Replacement Of Door Bidding Set , Replacement Of Door Canned Set , Replacement Of Door Glass Each , Replacement Of Door Gola , Replacement Of Door Handle Set , Replacement Of Front And Rear Bumper , Replacement Of Front Wind Glass , Replacement Of Roof Upholstery , Replacing Door Hinges Pins Of Each Door , Replacing Door Window Regulator , Chillam , Chillam Oil , Counter Gear , Counter Washer Kit , First Gear , Fourth Gear , Gear Box Coupling , Gear Box Cover Kit , Gear Box Gasket , Gear Box Housing , Gear Box Mounting , Gear Box Oil Seal , Gear Box Top Cover , K.M Pinion , K.M Pinion Back Casing , Main Shaft Assembly , Main Shaft Bearing , Main Shaft Bearing special , Main Shaft Roller , Over Flow Valve , Second Gear , Servo Assembly , Synchronizer Assembly , Synchronizer Brass Ring , Synchronizer Lock Kit , Synchronizer Outer , Third Gear , Top Shaft Pilot Bearing , Top Shaft Ruler Bearing , Top Shaft Assembly , Top Shaft Bearing Outer , Top Shaft Check Nut, , Top Shaft Roller , A.C Cam Cutting , A.C. Block Boaring , A.C. Sleeve Fitting , Block Boaring , Block Bush Fitting , Block Facing , Block Line Boaring , Brake Drum Polishing , Cam Bush Fitting , Cam Polishing , Connecting Boaring , Connecting Bush Fitting , Crank Cutting , Fly Weight Tuning , Fuel Pump & Nozzle Overhauling With Materials , Head Facing , King Pin Overhauling , Oil Seal Brass Welding & Matching , Sleeve Fitting , Valve Guide Fitting , Valve Seat Fitting , Back Light Assembly , Back Light Glass , Brake Flexible Pipe , Brake Sdjuster , Brake Switch , completion Switch , Double Horn , Dynamo Cut Out , F.S Ind. Light Assembly , Flasher Unit , Fog Light Assembly , Fuse Box , H.L. Assembly , Head Light Holder , Headlight Bulb , Horn Cut Out , L.T. Wire - Roll , M.C Repair Kit , M.C.Assembly , Parking Light Bulb , Push Button Switch , Side Mirror , Starting Switch , Wiper Arm , Wiper Blade , Wiper Motor Assembly , Alternator Armature , Alternator Assembly. , Alternator Cut Out , Alternator Roc. Assembly , C, Bearing Without Oil Seal , C. Bearing Bracket , C. Bearing Rubber , Dynamo Rivits , Dynamo Pully , P. Shaft Cross Holder , P. Shaft Flange , P.Shaft Assembly Rear , P.Shaft Half Yoke , P.Shaft Yoke & Teeth , Propeller Shaft Assembly , Propellor Shaft Bolt , U.J. Cross , Self Armature , Self Assembly , Self Bendix , Self Bush , Self Carbon , Self Carbon Plate , Self Casing , Self Clutch Assembly , Self Field Coil , Self Flanger Bolt , Self Housing , Self Pinion , Self Point , Self Solenoid Switch , Steering Bearing , Steering Boot , Steering Box Assembly , Steering Bush , Steering Column Assembly , Steering Cone , Steering Coupling , Steering Cross Assembly , Steering Drug Link Assembly , Steering Gasket , Steering Sector Adj. , Steering Sector Assembly , Steering Sector Oil Seal , Steering Shaft With Bush , Tie Rod Controller Kit , Tie Rod End , Tie Rod End Clamp , A.C. Pump Assembly , A.S. Pump Repair Kit , Oil Pump Assembly , Oil Pump Gear , Oil Pump Repair Kit , Oil Releaf Valve , Radiator Assembly , Water Pump Assembly , Water Pump Bearing , Water Pump Gasket , Water Pump Impeller , Water Pump Repair Kit , Water Pump Seal Kit , Water Pump Shaft , A.C . Ring , A.C Bearing , A.C. Linner , A.C.Kit , A.C.Piston , Air Tank Assembly , Cam Shaft Bush , Champer Gasket , Clutch Plate Gb .30 , Clutch Plate Gb.40 , Clutch Release Bearing , Clutch Repair Kit , Connecting Bearing , Connecting Rod Assembly , Connecting Rod Bolt , Connecting Rod Bush , Crank Shaft P. Assembly , Crank Shaft P. Bearing , Diesel Filter , Diesel Flexible Pipe , Engine Gasket Unit , Engine Mounting , Engine Mounting Rear , Engine Valve (Exhaust) , Engine Valve (Inlot) , Fan Belt , Fly Wheel Bearing , Fly Wheel Ring , Head Gasket , Main Bearing , Main Bearing Colur , Main Bearing Oil Seal , Main Bearing T.Washer , Mobile Filter , Mobile Flexible Pipe , Piston A , Piston Ring , Piston Sleeve , Pressure Plate . Gb. 30 , Pressure Plate. Gb. 40 , Radiator Hose Pipe , Rocker Arm Bush , Rocker Arm Shaft , Silencer Pipe Front , Silencer Gasket , Silencer Muffler , Silencer Pipe Rear , Tappit Cover Gasket , Third Gear Fork , Timing Cover Gasket , Timing Cover Oil Seal , Valve Guide , Wheels & Tyres , Tata Ace , Fitting Of Ac In The Car , Gas Filling , General Servicing Of Ac , Removal Of Ac From The Car , Bonnet Adjustment , Removing And Replacing Of Door Handle , Removing And Replacing Of Door Lock , Removing And Replacing Of Rear Back Light , Replacement Of Channel Set And Bidding Set , Replacement Of Door Bidding Set , Replacement Of Door Canned Set , Replacement Of Door Glass Each , Replacement Of Door Gola , Replacement Of Door Handle Set , Replacement Of Front And Rear Bumper , Replacement Of Front Wind Glass , Replacement Of Roof Upholstery , Replacing Door Hinges Pins Of Each Door , Replacing Door Window Regulator , Adjustment Of Brake Bleeding System , Adjustment Of Foot Brake Shoe , Bearing And Adjustment , Overhauling Of All The Wheel Cylinder , Overhauling Of Complete Brake Dsysterm , Overhauling Of Master Cylinder , Replacement Of Complete Break Linings , Replacement Of Break Drum Front , Replacement Of Break Drum Linings , Replacement Of Break Shoe And Blooding , Replacement Of Front Brake Linings , Replacement Of Front Break Drum , Replacement Of Hand Break Cable , Replacement Of Rear Brake Linings , Replacement Of Wheel Cylinder ( One Side ) , Adjustment Of Free Travel Of Clutch , Clutch Overhauling , Overhauling Of Clutch Plate Assembly , Replacement Of Clutch Adjusting Rods , Replacement Of Clutch And Brakes Pedal Shafts/Bushes , Replacement Of Clutch Plates , Dynamo , Dynamo Assembly Replacement , Fitting Of New Electric Bulb In Parallel , Fitting Of New Search Light , Fitting Of Speedometer Cale Assembly , Head Light Focusing , Oberhauling Of Self Starter , Overhauling Of Horn Ring , Overhauling Of Wiper Moter , Repairing Of Horn , Replacement Of Dynamo Fan , Replacement Of Dynamo Pulley , Replacement Of Horn Ring Starter Place Sleeve , Replacement Of Ignition Switch , Replacement/Check-Up Of Fuel Guage Dashboard , Replacemnt And Check-Up Of Wiper Blade , Replacemnt Of Armature , Replacemnt Of Complete Wiring , Replacemnt Of Dashboard Light Bulb , Replacemnt Of Fuel Guage Tank Unit , Replacemnt Of Head Bulb Each , Replacemnt Of Self Starter Switch , Replacemnt Of Side And Tail Light Bulb , Replacemnt Of Solenoid Switch , Replacemnt Of Voltage Regulator , Replacent Of Wiper Moter , Testing And Recharging Of Battery , Adjustment And Refitting Of Oil Pressure Relief , Adjustment Of Tappet , Change Of Flywheel Ring , Claening And Replacemt Of Spark Plug , Claening Of Carburator , Cleaning Of Distribute , Cleaning Of Distributer Cap , Cylinder Head Overhauling , Engine Timimg Tappet Adjustment, Distributer And G.R.Point, Spark Plugs Cleaning And Adjustment , Overhauling Of Fuel Pump , Overhauling Of Water Pump Assembly , Overhauling Of Water Pump Bearings , Overhouling Of Complete Engine , Refitting Of Connecting Rod Bearing , Refitting Of Oil Pump , Replacement Of Accelerator Wire , Replacement Of Timing Coverplace , Replacement Of Vaulve Guide , Replacemnt Of Fan Belt , Replacemnt Of New Timing Chain , Replacemnt Of Timimng Covers Packing , Replacemt Of Main Bearing , Rocher Shaft And Tappet Replacement , Exhaust , Realigning Exhaust Pipe Assembly , Replacement Of Exhaust Pipe Front , Replacement Of Muffler Assembly, Buffer Plate , Replacement Of New Muffler , Replacement Of Silencer Pipe ( Each ) , Replacement Of Tail Plate , Remove Cleand And Refitt Fuel Tank , Replace Fuel Tank Hose Pipe , Replace Petrol Flexible Pipe Each , Replace Petrol Tank Hard Board Cover , Overhauling Of Gear Box , Overhauling Of Gear Box Assembly , Replacement Of Front Oil Seal , Replacement Of Gear Box Foundation , Replacement Of Gear Lever , Replacement Of Gear Linkage Ball Joint , Replacement Of Side Dash Cover Packing And Seal , Complete Painting After Scrapping Old Paint , Complete Painting Color Change , Complete Painting Double Coat Without Dent , Complete Painting Single Coat Without Dent , Fitting Of New Propeller Shaft , Fitting Of New Propeller Shaft U Point , Overhauling Of Differential,Dismantlingof Rear Axle Fitting With New Charts , Refitting Of Rear Axle Assembly Including Bending And Adjusting Brakes , Replacement Of Back Plate Assembly From The Axle Casing Flange , Replacement Of Differential Packing , Replacement Of Hub Bearing , Replacement Of Hub Oil Seal , Replacement Of Pinion Oil Seal , Replacement Of Rear Axle Shaft , Replacement Of Rear Brake Drum , Adjustment Of Ball Joint , Adjustment Of Damper Pad , Adjustment Of Flang , Adjustment Of Pinion Bearing , Adjustment Of Pinion Thrust , Adjustment Of Tie Rod Ends , Adjustment Of Toe-In And Toe-Out , Overhauling Of Cpmplete Steering , Removal Of Refitting Of Steering Assembly , Replacement Of Ball Joint (Each) , Replacement Of Bottom Melt Of Steering Wheel , Replacement Of Bracket Column Sipport Asssembly , Replacement Of Gear Control Rod , Replacement Of Gear Control Rod Assembly , Replacement Of Gear Control Rod Support Pivot Pin Selector Lever New Making , Replacement Of Gear Pivot Breakings , Replacement Of Steering Column , Replacement Of Steering Wheel , Replacement Of Tie Rod Ends , Replacement Of Top Melt Of Steering Wheel , Setting Of Wheel Castor Chamber And Toe-In-Out , Overhauling Of Complete Suspension , Replacement Of Broken Leaf , Replacement Of Front Bush Suspension , Replacement Of Front Wheel Oil Seal , Replacement Of One Shoch Absorber , Replacement Of Rear Spring Assembly , Replacement Of Rear Spring Bushes , Replacement Of Rubber Bush Kit , Replacement Of Tie Bar Bush (One Side ) , Replacement Of Torsion Bar , Front Tyre , Rear Tyre , Dry Servicing And Lubrication , Engine Tuning , Greasing The Vehicle , Replacing Oil-Filter And Engine-Oil Change , Rubbing And Policing The Vehicle , Servicing And Lubrication, Replacing Oil-Filter Element , Washing , Wheels & Tyres , Tractor , Actuating Lug Assy. , Bracket , Dowel Pin , Fixed Gear , Fork Assy , Propeller Shaft Cover , Sliding Gear , Universal Joint Assy. , Canopy , Dry Air Cleaner Assy. , Filter Cartridge Dry Air Cleaner , Gasket Inlet Cover Assy. , Hose Clamp , Hose Clip , Pipe Inlet , Clutch Housing , Clutch Plate , Copper Washer , Inner Bush , Metalic Bush , Shaft Assy. , Single Cluth Assy. With Clutch Plate , Spring Dowel Sleeve , Control Valve Assy. , Kit Camshaft , Kit Position Lever , Kit Quadrant With Friction , Anti Freeze Coolant , Ctb Clamp , Hose Clip , Hose Pipe , No Loss Tank , Radiator Assy , Radiator Hose , Bushing Cam Shaft , Bushing Knock , Cap Set Bearing , Case Oil Seal , Crankcase Assy , Gasket Oil Seal Case , Gasket Plate Front , Main Bearing Set , Oil Filter , Pin Dowel , Plate Front , Plug Expanision , Rear Plate , Side Seal , Connecting Rod Assy , Crankshaft Gear , Crankshaft Nut , Flywheel Bolt , Piston , Plane Washer , Pulley Engine , Ring Gear Fly Wheel , Ring Sets Piston , Cap Sealing , Cap Valve Stem , Cylinder Head Assy , Gesket Cylinder Head , Guide Exhaust Valve , Hose Clamp , Hose Pipe , Jet Combustion , Plate Connector , Retainer Valve Stem , Seal Valve Stem , Seat Exhaust Valave , Seat Inlet Valve , Spring Valve , Spring Washer , Tappet , Thermostat Housing , Valve Exhaust , Valve Inlet , Valve Lock Spring , B.P. Shaft , Cage Carrier , Pedal Assy. , Sleeve , Battert Cut-Off Switch Mtg Plate , Battery , Beacon Lamp , Beacon Wiring Harness , Combination Switch , Fender Lamp , Flasher Unit Assy. , Hazard Switch , Head Lamp Assy , Holder Rod , Horn Assy (High Tone) , Horn Mounting Bracket , Instrument Cluster , Main Wiring Harness , Oil Pressure Sensor , Relay , Socket Assy. , Starter Switch Assy. , Stop Switch , Alternator Assy , Engine Assy. , Engine Oil , Plate Adjusting , Spacer Alternator , Starter Motor , Gasket Silencer , Manifold Exhaust , Nail Rivet , Round Silencer , Steering Cylinder , Pivot Pin Assy. , Thrust Washer , Bevel Pinion Shaft , Crown Wheel & Tail Pinion , Locking Washer(Crown Wheel) , Washer Bevel Pinion , Tail Pinion Carrier , Assy. Trumpet Housing Front , Gear Oil , Trumpet Housing , Assy Steering Arm , Assy. Front Axle Housing , Bearing , Bevel Gear , Front Axle , Gasket Steering Arm , Steering Arm , Stub Axle , Clip. Hose , Fuel Feed Pump , Fuel Filter Assy. , Fuel Pipe , High Pressure Pipe , Hose Clip , Hose Fuel , Injector Over Flow Pipe , Joint Three Way , Nozzle & Holder Assy. , Strainer Plus Pipe Assy. , Ext. Circlip , Halical Gear , Intermediate Shaft , Lay Shaft , Needle Bush , Oil Seal , Tapper Roller Brg , Conical Spring , Dipstick , Gear Shifter , Lever Assy , ORing , Pin Assy. , Rubber Boot , Spring , Z-Plate , Bolt Governor Case , Bolt. High Speed Set , Case Governor , Cover Torque Set , C-Ring Torque , Gasket Governor Case , Lever Governor , Lever Speed Control , Nut Torque Set , Pin Spring , Screw Assy. Back Set , Shaft Governor , Shaft Sliding Sleeve , Shim. Governor Shaft , Sleeve Sliding , Solenoid Assy. , Spring Governor , Spring Start , Spring Tie Rod , Washer Spring , Weight Assy. Governor , Encl. In Seat Kit , External Circlip , Kit Crank , Kit Cylinder , Kit Piston , Shaft , Hydraulic Lift Assy. , Lever , Kit Relief Valve , Lift Body Assy , Lub Oil Filter , Oil Pump Assy. , Strainer Assy. Oil , Switch Oil Pressure , Valve Assy. Relief , Drain Plug , Brake Pedal , Clutch Pedal Assy. , Hinge Pin , Knob Assy- Parking Brake , Link Pin , Tie Rod Assy , Draft Lever , Knob Assy. - Operating Sector , Knob Lever , Position Lever , Clamp , Gear Pump , Hsu Pipe , Nipple , O-Ring , Reduction Hose , Steering Column Assy. , Suction Pipe , Suction Strainer , Trolly Pipe , Ball Brg , Cover (Pto Shaft) , Pto Gear , Pto Lever Assy. , Pto Shaft , Pto Sliding Gear , Air Valve Assy , Industrial Tyre , Rear Axle , Rim Rear , Spacer , Turf Tyre , Wheel Rim , Wheel Tyre , Front Tyre , Rear Tyre , Axle ( Foot Throttel ) Assy. , Bonnet Assy. , Dashboard Assy. , Fender Assy , Foot Board Assy , Foot Throttle Assy , Fuel Tank , Hand Accelerator Assy , Head Light Frame , Meter Plate , Mounting Strip , Mtg Pin , Push Rod Assy. , Rear View Mirror , Reflex Reflector , Side Cover -Radiator , Spring Cotter , Strap Clamp , Tail Lamp Bkt. Assy , Dome Sticker Round , Front Wheel Rim , Rim Front , Steering Wheel , Tyre (Rear & Front) , Adjustable Ancher Chain , Back Plate Rops (For 1026E) , Bush Plate Assy. , Draw Bar Assy. , Hook Pin , Linch Pin Assy , Lower Link Assy. (Lh&Rh) , Pin-Lift Rod , Pin-Top Link Assy. , Shaft Lower Link Assy. , Bolt Rocker Bracket , Bracket Rocker Shaft , Bush Idler Gear , Camshaft , Cap Oil Filler , External Circlip A-19 , Gasket Cover Assy. , Gear Assy. Idler , Gear Camshaft , Gear Fip , Rocker Assy. , Shaft Assy. Rocker , Spring Rocker , Bearing Hsg. , Gasket , Fan Belt(B-37) , Fan Cooling , Fan Spacer , Gasket Water Pump , Plate Water Pump , Pulley Water Pump , Water Pump Assy. , Actuator Assy. , Brake Lever-Parking Brake , Cover -Brake Housing , Friction Disc , Gasket Brake Housing , Gear Oil Wet Brake , Steel Disc , Swiel Block , Wet Brake , Wheels & Tyres , Tractor Trolly , Wheels & Tyres , Chasis/Frame , Trolley Body , Axle & Hub Assembaly , Hydraulic Jack/Sylinder , Toing Channel/Drawbar , Braking System , Tailgate , Lights , Reflectors , Stablizer Jack , Cuplink , Velding Work , Painting Work , Other Fabrication/Repair Work , Water Tanker Supply , Battery , Charger 51.2V/100Ah , Charging Socket Set , Hydrolic & Compressor Repairing , Controller (1000 Watt) , Convertor , Full Electrical Wiring , Drl Led Head Light , Back Horn , Indicator Bulb Front , Indicator Bulb Back , Key Lock , Motor (1000 Watt) , Paint , Accelerator Mutha , lane road Mutha , Body Repairing/Velding Work , Speedometer , Flasher , Hydraulic Set With Remote , Labour Charges , Water Supply Tanker , Wheels & Tyres , Chasis/Frame , Trolley Body , Axle & Hub Assembaly , Hydraulic Jack/Sylinder , Toing Channel/Drawbar , Braking System , Tailgate , Lights , Reflectors , Stablizer Jack , Cuplink , Velding Work , Painting Work , Other Fabrication/Repair Work
Contract Date: Ref. Documents Contract Value : Ref. Document
Local Bodies No of Bidders 3
Uttar Pradesh View Result →
13.
Power #10782777 Price Bid
Tender for Round the clock Routine, Preventive and Breakdown Maintenance works of Bowl Mills (XRP-903), Raw Coal Feeders & Coal Pipes and round the clock dragging, accumulating, lifting and shifting of Coal Mill Reject (CMR) to specified places within theHTPS and General Cleaning of Mills/Fans areas etc. of Unit #8&9, DTPS, HTPS, Kasimpur for 02 years. - Round the clock routine and preventive maintenance of Bowl mills & RC-feeders of Unit No:-8 (03shift X 730 days =2190) 2 Round the clock routine and preventive maintenance of Bowl mills & RC-feeders of Unit No:-9 (03shift X 730 days =2190) 3 Round the clockoperationPLC Auto/Manual from mill site and compressorsfor coal mill reject system and routine/preventive break-down maintenance of pneumatic coal mill reject handling system & compressor with air receiver tank and air pipe lines etc along with the house keeping of reject system and nearby areaof Unit No:-8 & 9( (03shift X 730 days =2190) 4 Break-down Maintenance works of Bowl mills (XRP- 903)of Unit no-8 or 9 of 2X250 MW, DTPS, HTPS, Kasimpur, Aligarh. 5 Replacement of Roller Journal assembly(One RJ assembly makes one job) ( Time of Job completion = 08 Hrs.) 6 Changing trunnion position of RJ assembly. (One trunnion of one mill makes one Job) ( Time ofJob completion = 04 Hrs.) 7 Replacement of worn out grinding roll with new/healthy one, including servicing of RJ assembly.(Time of Job completion = 24 Hrs.) 8 Overhauling of pressure spring assembly (One spring assembly of any mill shall be considered as one quantity.)( Time of completion = 08 Hrs.) 9 Servicing/ repairing of spring support cover by machining/ tapping etc.(Time of completion = 08 Hrs.) 10 Replacement / Servicing of journal stop bolt..(Time of completion = 04 Hrs.) 11 Attending dust leakage from Journal opening cover. .(Time of completion = 04 Hrs.) 12 Replacement of bull ring segment assembly when replacement of RJ assembly has been given as separate job ( Separate job for removing and fixing of all three RJ assembly shall be given).(Time of completion = 16 Hrs.) 13 Replacement of bull ring segment assembly while at least one RJ assembly is inside the bowl mill.(Time of completion = 24 Hrs.) 14 Refitting of dislocated clamping ring/bull ring segment when replacement of RJ assembly has been given as separate job( Separate job for removing and fixing of all three RJ assembly shall be given).(Time of completion = 16 Hrs.) 15 Refitting of dislocated clamping ring/bull ring segment while at-least one RJ assembly is inside the bowl mill.(Time of completion = 24 Hrs.) 16 Replacement of airport ring assembly, when replacement of RJ assembly has been given as separate Job. Complete one set (one set consist of 06 pieces).(Time of completion = 48 Hrs.) 17 Repairing of airport ring assembly in installed condition when replacement of RJ assembly has been given as separate job (Separate Job for removing and fixing of all three RJ assembly shall be given).(Time of completion = 12 Hrs.) 18 Repairing of airport ring assembly in installed condition while at-least one RJ assembly is inside the bowl mill.(Time of completion = 12 Hrs.) 19 Repairing/Replacement of bowl extension ring segment, when replacement of RJ assembly has been given as a separate Job.(Time of completion = 12 Hrs.) 20 Repairing/Replacement of venturi, while replacement of MPO & MDV are awarded as separate Job.(Time of completion = 12 Hrs.) 21 Repairing/Replacement of venturi, while MPO & MDV are in their installed condition.(Time of completion = 24 Hrs.) 22 Repairing of venturi outlet in installed condition.(Time of completion = 08 Hrs.) 23 Replacement of MPO.(Time of completion = 48 Hrs.) 24 Replacement of MDV.(Time of completion = 24 Hrs.) 25 Replacement of (leaking) Victaulic coupling rubber gasket of MPO/ MDV/ transition piece.(Time of completion = 04 Hrs.) 26 Replacement of classifier inner cone,when replacements of RJ assemblies have been given as separate Jobs.(Time of completion = 48 Hrs.) 27 Fabrication and fixing of air ductvanes.(Time of completion = 08 Hrs.) 28 Repairing ofO collar assembly.(Time of completion = 06 Hrs.) 29 Repairing eroded portion of classifier inner cone.(Time of completion = 04 Hrs.) 30 Replacement/refitting/Servicing of classifier blade.(Time of completion = 04 Hrs.) 31 Adjustment of classifier blade operating linkage mechanism.(Time of completion = 08 Hrs.) 32 Replacement /Repairing of scrapper guard assembly.(Time of completion = 04 Hrs.) 33 Replacement of mill side liner, when replacement of RJ assembly has been given as a separate Job.(Time of completion = 24 Hrs.) 34 Repairing of Mill side liners by patching/welding (MS plate of thickness-10/12 mm for patching may be arranged from scrap).(Time of completion = 04 Hrs.) 35 Repairing/Replacement of mill side bottom liner.(Time of completion = 04 Hrs.) 36 Replacement of bottom insulation cover plate(complete set).(Time of completion = 24 Hrs.) 37 Repairing of bottom insulation cover plate.(Time of completion = 12 Hrs.) 38 Checking and inspection / Replacement of Labyrinth seal inside the mill liner body of mill.(Time of completion = 12 Hrs.) 39 Checking and inspection / Replacement of Labyrinth seal outside the mill liner body of mill.(Time of completion = 12 Hrs.) 40 Refitting/replacement of dislocated lower/upper skirt assembly.(Time of completion = 24 Hrs.) 41 Decoupling, performing alignment of mill-motor complete coupling and final coupling.(Time of completion = 12 Hrs.) 42 Replacement of damaged geared coupling of input shaft and distance piece with new-one (Healthy-one) and perform alignment.(Time of completion = 24 Hrs.) 43 Repairing of separator body, when replacement of RJ assemblies have been given as separate Jobs.(Time of completion = 24 Hrs.) 44 Replacement of bowl hub cover, when replacement of RJ assemblies has been given as separate Job.(Time of completion = 08 Hrs.) 45 Making threaded hole of any diameter on any surface of bowl mill by drilling and tapping.(Time of completion = 12 Hrs.) 46 Servicing of oil coolers of mills in installed condition (one cooler of one mill make one Job).(Time of completion = 24 Hrs.) 47 Replacement/Refitting of braided hose of lube oil pipe line.(Time of completion = 04 Hrs.) 48 Servicing of seal air valve on seal air header of mills.(Time of completion = 06 Hrs.) 49 Hard facing of bowl mill spares by 2 chequering pattern using sequence welding technique in installed condition.(Time of completion = 08 Hrs.) 50 Complete dense hard facing of cap of airport ring assembly & Bowl extension ring with hard facing electrode.(Time of completion = 04 Hrs.) 51 Fabrication and Replacement of RCF Hopper chute to center pipe of mill.(Time of completion =24 Hrs.) 52 Fabrication & Fitting of Guard/covering/shroud of RJ assembly housing by 8/10/ 12mm thick MS/Sailma plate.(Time of completion = 12 Hrs.) 53 Complete Overhauling of RJ assembly.(Time of completion = 16 Hrs.) 54 Servicing of Hot air gate.(Time of completion = 10 Hrs.) 55 Servicing of Hot air damper.(Time of completion = 10 Hrs.) 56 Servicing of Cold air gate.(Time of completion = 08 Hrs.) 57 Servicing of Cold air damper.(Time of completion = 08 Hrs.) 58 Attending coal/coal dust leakage from centre feed pipe/coal pipe {one patch (min size-200X200mm) make one Job)}.(Time of completion = 04 Hrs.) 59 Servicing of lube oil system of mills (one mill make one Job).(Time of completion = 16 Hrs.) 60 Servicing of oil coolers of mill lub. oil system by taking out the cooler from the lube oil system. (One cooler of one mill make one Job).(Time of completion = 48 Hrs.) 61 Servicing of lube oil pump ofBowl mills.(Time of completion = 08 Hrs.) 62 Replacement of lube oil pump of bowl mill with new /overhauled/serviced pump.(Time of completion = 04 Hrs.) 63 Metalizing & hard facing of clamping rings of bull ring segment (All 4 rings make one job). Metalizing welding electrode is in firm scope. Hard facing to be done with L&T 670/700 welding electrode which shall be provided by Nigam.(Time of completion = 24 Hrs.) 64 Repairing / Welding work in Cold air Duct/ Hot air duct.(Time of completion = 06 Hrs.) 65 Changing worn out coal pipe (full length or piece) / bend with new one (One pipe/bend make one Job).(Time of completion = 24 Hrs.) 66 Changing of worn out /damaged centre feed pipe of milling system.(Time of completion = 24 Hrs.) 67 Cleaning, Greasing, Servicing of electrically operated hoist (One job of one unit for fifteen days).(Time of completion = 16 Hrs.) 68 Servicing of all electrically operated hoist of mill site.(one unit make one job of7+ 1 under hung crane + hoist ).(Time of completion = 40 Hrs.) 69 Taking out one no. complete RJ assembly from any bowl mill while taking-out journal openingcover.(Time of completion = 08 Hrs.) 70 Fixing of one no RJ assembly in any bowl mill when Journalopening cover is already opened.(Time of completion = 08 Hrs.) 71 Checking and inspection/Replacement of (If found damaged) bearings with new one ofinput shaft of planetary Gearbox of Bowl Mill.(Time of completion = 48 Hrs.) 72 Replacement of broken bolt ofmill body to separator top and bottom liner.(Time of completion = 24 Hrs.) 73 Shifting of healthy RJ assembly from mill floor (3.5 mtr.) of unit no:- 8 to unit no:- 9 mill floor ( 3.5 mtr.) and vice versa.(Time of completion = 04 Hrs.) 74 Repairing and reconditioning of eroded portion of bowl (erosion due to worn-out of bull ring segment) in installed condition by metalizing, hard facing of bowl surface with bull ring segments erosion size up-to or less than 4 x 4 of 1 Segment.(Time of completion = 48 Hrs.) 75 Repairing and reconditioning of eroded portion of bowl (erosion due to worn-out of bull ring segment) in installed condition by metalizing, hard facing of bowl surface with bull ring segments erosion size more than 4 x 4 of 1 Segment erosion size more than4 x4 and up-to 6 x 5 of 1 Segment.(Time of completion = 72 Hrs.) 76 Repairing and reconditioning of eroded portion of bowl (erosion due to worn-out of bull ring segment) in installed condition by metalizing, hard facing of bowl surface with bull ring segments erosion size more than 4 x 4 of 1 Segment erosion size morethan 6 x 5 of 1 Segment.(Time of completion = 96 Hrs.) 77 Breakdown & Maintenance / Overhauling work of Gravimetric Coal Feeders 250 MW 78 Replacement of COC Gear Box with new/serviced gear box.(Time of completion = 08 Hrs.) 79 Servicing / Rectification of defects of clean out conveyor ofGCF.(Time of completion = 08 Hrs.) 80 Servicing/repairing of span/ weigh span roller.(Time of completion = 04 Hrs.) 81 Repairing of end door.(Time of completion = 04 Hrs.) 82 Servicing/repairing of air operated feeder outlet gate.(Time of completion = 08 Hrs.) 83 Servicing /repairing of manual Feeder inlet gate/bunker outlet gate.(Time of completion = 08 Hrs.) 84 Servicing of seal air valve of GCF.(Time of completion = 08 Hrs.) 85 Servicing of defective COC Drive (Quadruple Helix-worm unit).(Time of completion = 15 Hrs.) 86 Replacement /Repairing of belt scrapper.(Time of completion = 04 Hrs.) 87 Attending dust leakage from GCF body by welding/patching etc.(Time of completion = 04 Hrs.) 88 Servicing/Overhauling of Gravimetric Coal Feeder Main gear box.(Time of completion = 12 Hrs.) 89 Replacement / Servicing of Gravimetric Coal Feeder Head Pulley/power pulley/take-up pulley.(Time of completion = 08 Hrs.) 90 Servicing of Gravimetric Coal Feeder.(Time of completion = 16 Hrs.) 91 Servicing of clutch assembly.(Time of completion = 08 Hrs.) 92 Replacement of damagedfeeder belt with new one of Gravimetric Coal Feeder.(Time of completion = 24 Hrs.) 93 Replacement of Main Gear Box of GC Feeder with new/serviced gear box.(Time of completion = 08 Hrs.) 94 Replacement of clutch assembly of GC Feeder with new/serviced.(Time of completion = 08 Hrs.) 95 Repairing/Replacement of grating of various sizes.(Time of completion =Hrs./m².) 96 Round the clock lifting and shifting of CMR, General Cleaning and removing of of choking from Mills ofUnit# 8& 9, DTPS 97 Round the clock lifting and shifting of coal Mill rejects spelled outfrom Pyrite Hopper and Mills (at ‘0’ Meter) of Unit # 8 & 9, 2X250MW, HTPS, Kasimpur to Coal yard of old Plant / 2X250 MW Plant or other specified places within theHTPS, Plant. 98 Filling and shifting of coal Mill reject from SILO system of Mill reject system of Unit # 8 & 9, 2X250MW, HTPS, Kasimpur to Coal yard of old Plant/2x250 MW Plant or other specified places within theHTPS, Plant. 99 Cleaning of mill floor (‘0’ & ‘3.5’ meter), mill associated auxiliaries, pulverize coal pipes, structure of mill, duct connected to mill at 3.5 meter floor, classifier top, Removing of settled coal/coal dust at Hot air gate/cold air gate and its platform, and ID/FD/ PA/Seal air fan foundation floors of Unit # 8. 100 Cleaning of mill floor (0 & 3.5 meter), mill associated auxiliaries, pulverize coal pipes, structure of mill, duct connected to mill at 3.5 meter floor, classifier top, Removing of settled coal/coal dust at Hot air gate/cold air gate and its platform, and ID/FD/ PA/Seal air fan foundation floors of Unit #9. 101 Cleaning of Feeder floor & associated structure to feeder floor of Unit # 8 . 102 Cleaning of Feeder floor & associated structure to feeder floor of Unit # 9. 103 Removal of major chocking of bowl mill & center pipe of bowl mill (From feeder outlet gate to liner body of mill) of Unit # 8. 104 Removal of major chocking of bowl mill & center pipe of bowl mill (From feeder outlet gate to liner body of mill) of Unit # 9. 105 Removal of major chocking of Coal feeder of Unit # 8. 106 Removal of major chocking of Coal feeder of Unit # 9. 107 Removal of major chocking of Coal feederbelt of Unit # 8. 108 Removal of major chocking of Coal feeder belt of Unit # 9. 109 Cleaning of P.A. duct internally from hot air gate to mill side liner body of Unit # 8. 110 Cleaning of P.A. duct internally from hot air gate to mill side liner body of Unit # 9. 111 Maintenance of Coal Pipes 112 TO ATTEND THE CHOCKING OF COAL PIPE 113 PATCH WORK ON COAL PIPE (DURING SHUT DOWN OF MILL) SIZE- 200MMX200MMM 114 CHANGING OF VICTAULIC COUPLING GASKET 115 REPLACEMENT OF COAL PIPE HANGERS. 116 REPAIRING OF COAL PIPE BENDS AT DIFFERENT ANGLES AT POSITION.
Contract Date: Ref. Documents Contract Value : Ref. Document
Boards / Undertakings / PSU No of Bidders 4
Uttar Pradesh View Result →
14.
Power #10779970 Price Bid
Tender For Overhauling Of 33Kv Circuit Breaker At 220Kv S/S Sultanpur Under Electy. 400Kv S/S Division, Sultanpur. - Overhauling and Servicing of 36 kV Vacuum Circuit Breakers at 220KV S/S, Sultanpur (for various 33 KV feeders):The scope of work includes:• General cleaning and lubrication of the operating mechanism after dismantling.• Checking and tightening of all locking pins, nuts & bolts.• Setting and adjustment of the tripping and closing mechanism.• Checking and adjustment of the connecting pole and main rods, and verifying their operation.• Overhauling of the spring charging motor, including gearbox maintenance.• Replacement of carbon brushes and polishing of the commutator as required.• Checking and replacement of the MCB as needed.• Setting of limit switches after thorough cleaning using CRC/CTC.• Checking tightness and integrity of all electrical connections.• Final checking of auto spring charging functionality.• Checking pole operation, including measurement of individual contact travel distances.• Checking and repairing housing seals as necessary.• Measurement of insulation resistance (megger value) in open condition, including vacuum checking.• Verifying tightness of all electrical connections in auxiliary contact blocks and control terminal blocks.• Checking and adjustment of trip and close levers and coils.• Checking of all alarms and indicators.• Verification of electrical and mechanical operation of the circuit breaker, including local and remote operation.All works shall be carried out with complete provision of manpower, materials, miscellaneous consumables, tools, and plants (T&P) required for the job.
Contract Date: Ref. Documents Contract Value : Ref. Document
Boards / Undertakings / PSU No of Bidders 5
Uttar Pradesh View Result →
Contract Date: Ref. Documents Contract Value : Ref. Document
Boards / Undertakings / PSU No of Bidders 2
Contract Date: Ref. Documents Contract Value : Ref. Document
Boards / Undertakings / PSU No of Bidders 2
Contract Date: Ref. Documents Contract Value : Ref. Document
Boards / Undertakings / PSU No of Bidders 2
Contract Date: Ref. Documents Contract Value : Ref. Document
Boards / Undertakings / PSU No of Bidders 2
Contract Date: Ref. Documents Contract Value : Ref. Document
Boards / Undertakings / PSU No of Bidders 2
Contract Date: Ref. Documents Contract Value : Ref. Document
Boards / Undertakings / PSU No of Bidders 2
Contract Date: Ref. Documents Contract Value : Ref. Document
Boards / Undertakings / PSU No of Bidders 2
Contract Date: Ref. Documents Contract Value : Ref. Document
Boards / Undertakings / PSU No of Bidders 2
Contract Date: Ref. Documents Contract Value : Ref. Document
Boards / Undertakings / PSU No of Bidders 2
Contract Date: Ref. Documents Contract Value : Ref. Document
Boards / Undertakings / PSU No of Bidders 2
Contract Date: Ref. Documents Contract Value : Ref. Document
Boards / Undertakings / PSU No of Bidders 2
Contract Date: Ref. Documents Contract Value : Ref. Document
Boards / Undertakings / PSU No of Bidders 2
35.
Drinking Water Supply and Sanitation #10546067 Price Bid
repairing Of All Gear Box And Its Accessories At Wazirabad Barrage. , Dismantling Of Gearbox By Removing Both End Couplings And Extracting The Complete Shaft Assembly From The Barrage Gates. This Includes Removal Of Thrust And Steel Blocks Using Skilled Labour And Specialized Lifting Equipment. The Gearbox Top Cover (Top Half) Shall Be Removed, Followed By Detachment Of The Bottom Half From The Main Gearbox Body. All Internal Components Parts Gear, Changer Gear Assembly, Bearing, Limit Shift Assembly And Shaft Shall Be Carefully Removed In Sequence, Ensuring Proper Identification And Documentation Of Their Orientation And Order For Accurate Reassembly. , Dismantling Of Drumbox Assemblyby Removing Both End Couplings And Extracting The Complete Shaft,Bearand Gear Assembly From The Drum Box .. All Internal Components Parts Gear, Changer Gear Assembly, Bearing, Limit Shift Assembly And Shaft Shall Be Carefully Removed In Sequence, Ensuring Proper Identification And Documentation Of Their Orientation And Order For Accurate Reassembly. , Thorough Cleaning Of All Components To Remove Debris, Contaminants, And Residual Lubricants Using Appropriate Cleaning Agents And Methods. Detailed Inspection Of Each Component To Assess Condition, Identify Wear, Damage, Or Corrosion, And Document Findings For Further Repair Or Replacement As Required. , Repair Of Limit Switch Assembly Of Gear Box Including The Complete Overhauling /Oiling And Greasing Including Replacement Of Parts As Per Sample . , Replacement Of Normally Open (No) Switch And Contactor With A Relay, Along With The Complete Installation Of Electrical Components For The Gear Box In The Hoisting Mechanism Of The Barrage System , Replacement Of Brake Pad As Per Sample Along With Complete Fitting And Integration In The Gearbox Assembly , Replacement Of Brake Coil As Per Sample Along With Complete Fitting And Integration In The Gearbox Assembly , Replacement Of Bearing No 6315/C4 Djb Approved Makes , Replacement Of Bearing No 6312M/C3 Djb Approved Makes , Replacementbearing No 6308 2Rs1 Djb Approved Makes , Replacementbearing No 6310 2Rs1 Djb Approved Makes , Complete Assembly Of The Gearbox, Including Packing, Greasing, And Installation Of Both End Shafts With Cast Iron (C.I.) Couplings And Bolts. Ensure Proper Alignment And Secure Fastening To Maintain Efficient Power Transmission And Operational Reliability , Complete Overhauling And Lubrication Of All Moving And Critical Components Of The Drum Box Assembly Of The Gearbox, Using Appropriate Tools Such As Grease Guns And Nipples. The Work Shall Be Carried Out By Skilled Labor As Per Site Requirements. Ensure Proper Lubrication With The Specified Grade And Viscosity Of Grease To Maintain Optimal Performance And Prevent Wear And Tear Of Mechanical Parts Including Internal Parts Of Painting , The Work Involves Achieving Precise/Making Alignment Of The Shaft Connecting The Drum Box And Gear Box In The Hoisting Mechanism Of The Barrage. Proper Alignment Is Critical To Prevent Deviation From The Guide Grooves During Operation—Particularly During Lifting—And To Ensure Long-Term Stability And Accuracy Of Sluice Gate Movement.The Job Includes Dismantling The Existing Shaft (Which Transmits Motion Between The Drum Box And Gear Box), Carrying Out Realignment, And Reinstalling The Shaft With High Precision. To Restore The System To Optimal Operating Condition, The Work Shall Also Involve The Replacement Of Associated Hardware Components As Required—Such As Bearings, Couplings, Keys, And Fasteners.This Intervention Is Essential For The Reliable And Efficient Functioning Of The Sluice Gate Lifting System And To Prevent Operational Issues During Gate Actuation. , After Cleaning And Overhauling The Gear And Shaft Of The Gearbox, Refit And Them In Their Original Positions With Making Alignment With All Movement Parts Of Gear Box And Ensure That They Are Functioning Properly. , Conduct Load Testing Of 3Under Sluice And 3Weir Side Gates And Weir Side Gates During Opening And Closing Operations, Using Stop Logs To Isolate Pond Water And Ensure A Free Flow Channel To The Gates. The Activity Shall Be Carried Out With The Assistance Of Skilled Labor And Professional Divers. Post-Testing, Ensure That There Is No Obstruction Or Difficulty In The Smooth Lifting (Operation) Of The Gates
Contract Date: Ref. Documents Contract Value : Ref. Document
Boards / Undertakings / PSU No of Bidders 4
Contract Date: Ref. Documents Contract Value : Ref. Document
Boards / Undertakings / PSU No of Bidders 2
Contract Date: Ref. Documents Contract Value : Ref. Document
Boards / Undertakings / PSU No of Bidders 2
Contract Date: Mar 10, 2025 Contract Value : 10.51 Lakh
Boards / Undertakings / PSU No of Bidders 2
42.
Power #10245403 Price Bid
Tender for De Coupling Of Raw Water Pump, Complete Dismantling The Entire Pump, Cleaning, Examination And Replacement Of Damaged Components, Changing Of Shafts, Bearing Housing, Bearings, Impeller, Impeller Housing & Neck Rings, Reassembling The Pump And Recommissioning Satisfactorily After Aligning The Pump And Motor.(Transporting Vehicle And Rubber Cord Will Be Arranged By Contractor Scope) , Charges For Cleaning And Examination Of Existing Gland Sleeve, Intermediate And Pump Shaft Sleeves, Finostos ‘B Bushes And Neck Rings De & Nde. Transporting Of Existing Shafts With Sleeves, Impeller, Loose Hub Plates With Neck Rings Etc., To Workshop For Checking Shaft Trueness, Machining And Matching Of Sleeves With Finostos ‘B Bushes, Loose Hub Plates With Neck Rings To The Required Dimensions And Also Return Back To Raw Water Pump House. (Transporting Vehicle Will Be Arranged By Contractor Scope.) , Charges For Cutting And Removal Of Existing Worn-Out Gland Sleeve, Intermediate Shaft Sleeves And Pump Shaft Sleeve, Neck Rings And Re Fixing New Machined Sleeves On The Shafts New Neck Rings With Loose Hub Plates After Preheating Of Sleeves If Necessary. , Charges For Renewal Of Worn Out Line Shafts & Dowel Pin And Edge Preparation Of Shaft And Bushes, Drilling And Cutting Process In The Outside Work Shop Etc., If Necessary. , Charges For Aligning The Inter Shaft- Lock Mechanism With Shaft Coupling & Dowel Pin And Bushes After The Machining Process If Necessary. , Charges For Overhauling Of 900Mm Butterfly Valve Includes Complete Overhauling Of Gearbox, Inspection And Scale Cleaning Of Valve Seat And Changing Of Rubber Seal Also Attending The Repairs And Servicing Of The Butterfly Valve Parts And Actuator Parts. , Charges For Lifting The Trash Rack/ Intake Screens From Intake Channel Of Raw Water Pump 1 To 4, Dismantling The Trash Rack/ Intake Screen Cleaning, After Completion Of Work, Lowering The Same And Re Fixing Into Position. , Charges For Reconditioning And Erection Of
Contract Date: Ref. Documents Contract Value : Ref. Document
Boards / Undertakings / PSU No of Bidders 2
Contract Date: Nov 17, 2025 Contract Value : 3.00 Lakh
Boards / Undertakings / PSU No of Bidders 2
Contract Date: May 21, 2025 Contract Value : 8.41 Lakh
Boards / Undertakings / PSU No of Bidders 2
50.
Power #10160193 AOC
Tender for Charges For Overhauling Of Sludge Disposal Pump Includes Dismantling Of Pump Components, Cleaning, Inspection And Renewal Of Worn-Out Parts And Reassembling. , Complete Alignment & Checking The Operation Of Clarifier Sludge Disposal Pump Motor, Sludge Disposal Pump And Its Suction & Delivery Pipe Lines And Its 150 Mm Gate Valves. , Charges For Overhauling Of 150 / 200 Mm Size 100 / 125 Class Gate Valves Of Cold & Hot Water Tunnel Vent In Cooling Water System I Including Dismantling Of Vent Pipe , Complete Dismantling The Valve, Lapping The Valve Disc & Seat Area Renewal Of Spares, Gland Packing And Rubber Gasket And Assembling. , Charges For Cleaning The Algae And Other Foreign Materials On The Outer Surface And Painting With Two Coats Of Enamel Yellow / Black Paint On Handrails And Epoxy Smoke Grey Paint On Ct Id Fan Blades, Gear Boxes, G.B. Foundation. , Charges For Painting With One Coat Of Rust Convertor , One Coat Of Epoxy Red Oxide Primer And One Coat Of Epoxy Coal Thar Black Paint One Over The Other With Proper Intervals For Door Structure In Sun Shield Roof, Safety Grills Inside The Fan Stack Area, Gearbox Oil Level Indicator Pipe Line In Cooling Tower -Ii. , Charges For Draining The Oil In 1 No. Ct Id Fan Gear Box, To Remove The Gear Box Oil Level Indicator Pipe Line From The Gear Box, Cleaning The Pipe Line And Releasing/Removing The Choke In The Pipe Using Air/ Water And Re Fixing The Same In The Gear Box, And Topping Up Of Drained / New Oil In The Gearbox, If Any Pipe Fittings Like Tee, Union, Elbow, Bend Is Damaged It Has To Be Replaced Which Are Under Contractor Scope. , Charges For Cutting And Removal Of Existing Deteriorated Bolts Of Scrappers, Removing Damaged Scrapers, Cutting Of Scrapper Rubber To Required Dimension From Old Conveyor Belt, Marking And Making Holes On Scrapper Rubber And Fixing With New G.I Bolts And Nuts In The Traction & Flocculator Drive In Clarifier Ii. , Cost Of Neoprene Rubber(Black) Gasket , Size,1M X 2 M X5 Mm Th
Contract Date: Dec 12, 2025 Contract Value : 5.92 Lakh
Boards / Undertakings / PSU No of Bidders 2
TenderDetail
Loading tenders