View Bid Results For Air Classifier System Tenders

We found 8 Bid Results related to air classifier system tenders. You can find Contractor details who won air classifier system tenders along with contract details in Bid awards announcements section.

Filters
Stage
5
2
1
Tender Publishing Platform
8
State / UT
5
3
2
1
1
1
Contract Value
3
1
4
Publish Date
0
0
0
0
0
Sector
4
5
1
1
1
Ownership
2
6
2
Within keyword
Active filters:
Showing 1–1 of 8 tenders matching your filters
1.
Health and Family Welfare #10826364 Price Bid
Supply Of Machine-1 Impact Pulverizer ( G.M.P. Model ) Impact Type, High Speed, Air Swept, Swing Hammer Type, Multi Purpose Grinding Mills Made Of Stainless Steel Complete With Whizzer, Classifier Dust Collector , Stand & Siphon System Electric Moter 25 Hp Three Phase With Starter Grinding Chamber Size 22 Inch, Capacity 100-400 Kg / Hour , With Mesh Size 80-100. With All Accessary. 2 Vibro Shifter ( G.M.P.Model ) Screen Stainless Steel 304 Quality & With Mesh Size 60-80 Screen Diameter 760Mm, Eiectric Motor 1Hp Three Phase Over All Dimensions In Mm 770 ( W ) ?770 ( D ) ?800 ( H ) , Capacity 100-200 Kg / Hour. With All Accessary. 3 Weighing Machine ( Electronic ) For Up To 200 Kg. 4 Edge Runner ( Wet Grinder ) ( G.M.P. Model ) Kharal Size 12X24 Inch. ( Kharal & Musali Made By Emry Stone & Covered Ss 304 Sheet With Gear Box & 2Hp 3 Phase Cromptan Moter ) With All Accessary. 5 Automatic Bottle Washing Machine ( G.M.P. Model ) ( With Jet Flow ) Nwith All Accessary. 6 Mono Block Liquid Pump - 3Hp With 2 Input And Output Pvc ( Food Grade ) Pipe 100 Metre Fitting. With All Accessaries 7 Diesel Furnace ( With All Accessories And Fittings ) Which Is Hold 1000 Liter Kadhahi. With All Accessary 8 Air Blower Electric Moter 1 / 4 Hp. With All Accessary. 9 Weighing Machine ( Electronic ) For Up To 200 Kg. 10 Weighing Machine ( Electronic ) For Up To 100 Kg 11 Hydraulically Operated Pallet Truck ( Mini ) . With All Accessary. 12 Blister Packing Machine Nthe Sealing Width Is 210Mm The Machine Will Be Gmp Model Totally Ss 304 Cladded. Production: 200-240 Packs Per Minute Depend On Zero Capsules, Ds Type, And Paracetamal Type. Nwith The Following Accessories: N150 Vacuum Pump, Bcp Unit Full Automatic, Pressure Sealing Roller, Film Heater, Vibrator, Hopper, Feeding Unit, Panel And All Other Standard Accessories. None Set Of Change Part Free As Per The Given Pack And Machine Tool Box. Nif Requir Extras: N1- Safety Polycarbonate Gurard. N2- 6 Kg Air Compressor Pressure N3- Cooling Water Requirement 55 Ltrs / Hr At 14Oc ( Base Foil Depend ) Nwith All Accessary 13 Washing And Drying Unit Entire Processing Line: N1- Brush Washing Machine - To Remove The Soil With Dry Brushes. N2- Bubble Washing Machine - To Remove The Soil With High Pressure Water Turbulent. N3- De-Watering - To Remove The Surface Excess Water From The Root Vegetables. Nwith All Accessary 14 Automatic Form ( Pouch ) Fill Seal Machine With Complete Accessories For Packing Medicine Powder 03Gm To 10 Gm. With All Accessary. 15 Caro Gated Box Automatic Sealing Machine With All Accessary. 16 Semi Automatic Counting & Filling Machine ( G.M.P. Model ) . With All Accessary. 17 Auger Filling Machine ( G.M.P. Model ) For Packing Medicine Powder 100 Gm To 1Kg. With All Accessary. 18 Juice Machine ( Zinger ) ( G.M.P. Model ) Electric Motor 2Hp Ncapacity: 50Kg / Hr. With All Accessary. N 19 Juice Machine ( Lemon ) ( G.M.P.Model ) N Capacity: 20-30 Lemon / Min Or 60 Kg. / Hour Fruit Diameter 35-55 Mm. With All Accessary. N 20 Wet Grinder ( G.M.P. Model ) Kharal Size 12X36 Inch. ( Kharal & Musali Made By Emry Stone & Covered Ss 304 Sheet With Gear Box & 2 Hp 3 Phase Cromptan Moter ) With All Accessary. 21 Edge Runner ( Wet Grinder ) ( G.M.P. Model ) Kharal Size 12X24 Inch. ( Kharal & Musali Made By Emry Stone & Covered Ss 304 Sheet With Gear Box & 2Hp 3 Phase Cromptan Moter ) With All Accessary. 22 Edge Runner Mill ( G.M.P. Model ) For Bhawana Of Wet Material None Roller Weight 100 Kg. Diamitr 20 Width 5 Pan Dia-40 Height 12 Made From Ss 304 Grade. With All Accessary. N 23 Farmantation Unit- ( Double Wall Glass Wool Insulated ) Autmactic Temperature & Ph Control, Estimation Of Alcohol ( 2000 Ltr. Capacity ) ( G.M.P.Model ) Made From Stainless Steel 304 Grade. Airtight Lid & 12 Inch Hole In Midle Of Lid With Airtight Cover 2 Inch Balv In Bottom For Outlet Of Water And 4 Leg.With All Accessary. 24 Distillation Plant ( G.M.P. Model ) ( 2000 Ltr. Capacity ) Electric Made From Stainless Steel 304 Grade. With All Accessary. 25 Decoction Plant Capacity 2000 Liter ( G.M.P. Model ) Made From Stainless Steel 304 Grade. With All Accessary. 26 Kadhahi 1000 Liter Capacity ( G.M.P.Model ) Made From Stainless Steel. 304 Grade With 4 Handle With Ss Wireness Cover Thickness 5Mm 27 Kadhahi 100 Liter Capacity ( G.M.P.Model ) Made From Stainless Steel.304 Grade With 2 Handle With Ss Wireness Cover Thickness 4Mm 28 Air Tight Drum ( G.M.P. Model ) Made From Food Grade Stainless Steel 304 Grade &18 Gauze ( Capacity: 200 Liter ) 29 Tawa 6 Fit Diameter ( G.M.P. Model ) Made From Stainless Steel 304 Grade Thikness 6 Mm With Two Handed. 30 Tawa 5 Feet Diametre ( G.M.P. Model ) Made From Stainless Steel 304 Grade Thikness 6 Mm With Two Handed. 31 Vessel 100 Liter ( G.M.P. Model ) Made From Stainless Steel 304 Grade &18 Gauze 32 Vessel 200 Liter ( G.M.P. Model ) Made From Stainless Steel 304 Grade &18 Gauze
Contract Date: Ref. Documents Contract Value : Ref. Document
Government Departments No of Bidders 4
Uttar Pradesh View Result →
2.
Power #10782777 Price Bid
Tender for Round the clock Routine, Preventive and Breakdown Maintenance works of Bowl Mills (XRP-903), Raw Coal Feeders & Coal Pipes and round the clock dragging, accumulating, lifting and shifting of Coal Mill Reject (CMR) to specified places within theHTPS and General Cleaning of Mills/Fans areas etc. of Unit #8&9, DTPS, HTPS, Kasimpur for 02 years. - Round the clock routine and preventive maintenance of Bowl mills & RC-feeders of Unit No:-8 (03shift X 730 days =2190) 2 Round the clock routine and preventive maintenance of Bowl mills & RC-feeders of Unit No:-9 (03shift X 730 days =2190) 3 Round the clockoperationPLC Auto/Manual from mill site and compressorsfor coal mill reject system and routine/preventive break-down maintenance of pneumatic coal mill reject handling system & compressor with air receiver tank and air pipe lines etc along with the house keeping of reject system and nearby areaof Unit No:-8 & 9( (03shift X 730 days =2190) 4 Break-down Maintenance works of Bowl mills (XRP- 903)of Unit no-8 or 9 of 2X250 MW, DTPS, HTPS, Kasimpur, Aligarh. 5 Replacement of Roller Journal assembly(One RJ assembly makes one job) ( Time of Job completion = 08 Hrs.) 6 Changing trunnion position of RJ assembly. (One trunnion of one mill makes one Job) ( Time ofJob completion = 04 Hrs.) 7 Replacement of worn out grinding roll with new/healthy one, including servicing of RJ assembly.(Time of Job completion = 24 Hrs.) 8 Overhauling of pressure spring assembly (One spring assembly of any mill shall be considered as one quantity.)( Time of completion = 08 Hrs.) 9 Servicing/ repairing of spring support cover by machining/ tapping etc.(Time of completion = 08 Hrs.) 10 Replacement / Servicing of journal stop bolt..(Time of completion = 04 Hrs.) 11 Attending dust leakage from Journal opening cover. .(Time of completion = 04 Hrs.) 12 Replacement of bull ring segment assembly when replacement of RJ assembly has been given as separate job ( Separate job for removing and fixing of all three RJ assembly shall be given).(Time of completion = 16 Hrs.) 13 Replacement of bull ring segment assembly while at least one RJ assembly is inside the bowl mill.(Time of completion = 24 Hrs.) 14 Refitting of dislocated clamping ring/bull ring segment when replacement of RJ assembly has been given as separate job( Separate job for removing and fixing of all three RJ assembly shall be given).(Time of completion = 16 Hrs.) 15 Refitting of dislocated clamping ring/bull ring segment while at-least one RJ assembly is inside the bowl mill.(Time of completion = 24 Hrs.) 16 Replacement of airport ring assembly, when replacement of RJ assembly has been given as separate Job. Complete one set (one set consist of 06 pieces).(Time of completion = 48 Hrs.) 17 Repairing of airport ring assembly in installed condition when replacement of RJ assembly has been given as separate job (Separate Job for removing and fixing of all three RJ assembly shall be given).(Time of completion = 12 Hrs.) 18 Repairing of airport ring assembly in installed condition while at-least one RJ assembly is inside the bowl mill.(Time of completion = 12 Hrs.) 19 Repairing/Replacement of bowl extension ring segment, when replacement of RJ assembly has been given as a separate Job.(Time of completion = 12 Hrs.) 20 Repairing/Replacement of venturi, while replacement of MPO & MDV are awarded as separate Job.(Time of completion = 12 Hrs.) 21 Repairing/Replacement of venturi, while MPO & MDV are in their installed condition.(Time of completion = 24 Hrs.) 22 Repairing of venturi outlet in installed condition.(Time of completion = 08 Hrs.) 23 Replacement of MPO.(Time of completion = 48 Hrs.) 24 Replacement of MDV.(Time of completion = 24 Hrs.) 25 Replacement of (leaking) Victaulic coupling rubber gasket of MPO/ MDV/ transition piece.(Time of completion = 04 Hrs.) 26 Replacement of classifier inner cone,when replacements of RJ assemblies have been given as separate Jobs.(Time of completion = 48 Hrs.) 27 Fabrication and fixing of air ductvanes.(Time of completion = 08 Hrs.) 28 Repairing ofO collar assembly.(Time of completion = 06 Hrs.) 29 Repairing eroded portion of classifier inner cone.(Time of completion = 04 Hrs.) 30 Replacement/refitting/Servicing of classifier blade.(Time of completion = 04 Hrs.) 31 Adjustment of classifier blade operating linkage mechanism.(Time of completion = 08 Hrs.) 32 Replacement /Repairing of scrapper guard assembly.(Time of completion = 04 Hrs.) 33 Replacement of mill side liner, when replacement of RJ assembly has been given as a separate Job.(Time of completion = 24 Hrs.) 34 Repairing of Mill side liners by patching/welding (MS plate of thickness-10/12 mm for patching may be arranged from scrap).(Time of completion = 04 Hrs.) 35 Repairing/Replacement of mill side bottom liner.(Time of completion = 04 Hrs.) 36 Replacement of bottom insulation cover plate(complete set).(Time of completion = 24 Hrs.) 37 Repairing of bottom insulation cover plate.(Time of completion = 12 Hrs.) 38 Checking and inspection / Replacement of Labyrinth seal inside the mill liner body of mill.(Time of completion = 12 Hrs.) 39 Checking and inspection / Replacement of Labyrinth seal outside the mill liner body of mill.(Time of completion = 12 Hrs.) 40 Refitting/replacement of dislocated lower/upper skirt assembly.(Time of completion = 24 Hrs.) 41 Decoupling, performing alignment of mill-motor complete coupling and final coupling.(Time of completion = 12 Hrs.) 42 Replacement of damaged geared coupling of input shaft and distance piece with new-one (Healthy-one) and perform alignment.(Time of completion = 24 Hrs.) 43 Repairing of separator body, when replacement of RJ assemblies have been given as separate Jobs.(Time of completion = 24 Hrs.) 44 Replacement of bowl hub cover, when replacement of RJ assemblies has been given as separate Job.(Time of completion = 08 Hrs.) 45 Making threaded hole of any diameter on any surface of bowl mill by drilling and tapping.(Time of completion = 12 Hrs.) 46 Servicing of oil coolers of mills in installed condition (one cooler of one mill make one Job).(Time of completion = 24 Hrs.) 47 Replacement/Refitting of braided hose of lube oil pipe line.(Time of completion = 04 Hrs.) 48 Servicing of seal air valve on seal air header of mills.(Time of completion = 06 Hrs.) 49 Hard facing of bowl mill spares by 2 chequering pattern using sequence welding technique in installed condition.(Time of completion = 08 Hrs.) 50 Complete dense hard facing of cap of airport ring assembly & Bowl extension ring with hard facing electrode.(Time of completion = 04 Hrs.) 51 Fabrication and Replacement of RCF Hopper chute to center pipe of mill.(Time of completion =24 Hrs.) 52 Fabrication & Fitting of Guard/covering/shroud of RJ assembly housing by 8/10/ 12mm thick MS/Sailma plate.(Time of completion = 12 Hrs.) 53 Complete Overhauling of RJ assembly.(Time of completion = 16 Hrs.) 54 Servicing of Hot air gate.(Time of completion = 10 Hrs.) 55 Servicing of Hot air damper.(Time of completion = 10 Hrs.) 56 Servicing of Cold air gate.(Time of completion = 08 Hrs.) 57 Servicing of Cold air damper.(Time of completion = 08 Hrs.) 58 Attending coal/coal dust leakage from centre feed pipe/coal pipe {one patch (min size-200X200mm) make one Job)}.(Time of completion = 04 Hrs.) 59 Servicing of lube oil system of mills (one mill make one Job).(Time of completion = 16 Hrs.) 60 Servicing of oil coolers of mill lub. oil system by taking out the cooler from the lube oil system. (One cooler of one mill make one Job).(Time of completion = 48 Hrs.) 61 Servicing of lube oil pump ofBowl mills.(Time of completion = 08 Hrs.) 62 Replacement of lube oil pump of bowl mill with new /overhauled/serviced pump.(Time of completion = 04 Hrs.) 63 Metalizing & hard facing of clamping rings of bull ring segment (All 4 rings make one job). Metalizing welding electrode is in firm scope. Hard facing to be done with L&T 670/700 welding electrode which shall be provided by Nigam.(Time of completion = 24 Hrs.) 64 Repairing / Welding work in Cold air Duct/ Hot air duct.(Time of completion = 06 Hrs.) 65 Changing worn out coal pipe (full length or piece) / bend with new one (One pipe/bend make one Job).(Time of completion = 24 Hrs.) 66 Changing of worn out /damaged centre feed pipe of milling system.(Time of completion = 24 Hrs.) 67 Cleaning, Greasing, Servicing of electrically operated hoist (One job of one unit for fifteen days).(Time of completion = 16 Hrs.) 68 Servicing of all electrically operated hoist of mill site.(one unit make one job of7+ 1 under hung crane + hoist ).(Time of completion = 40 Hrs.) 69 Taking out one no. complete RJ assembly from any bowl mill while taking-out journal openingcover.(Time of completion = 08 Hrs.) 70 Fixing of one no RJ assembly in any bowl mill when Journalopening cover is already opened.(Time of completion = 08 Hrs.) 71 Checking and inspection/Replacement of (If found damaged) bearings with new one ofinput shaft of planetary Gearbox of Bowl Mill.(Time of completion = 48 Hrs.) 72 Replacement of broken bolt ofmill body to separator top and bottom liner.(Time of completion = 24 Hrs.) 73 Shifting of healthy RJ assembly from mill floor (3.5 mtr.) of unit no:- 8 to unit no:- 9 mill floor ( 3.5 mtr.) and vice versa.(Time of completion = 04 Hrs.) 74 Repairing and reconditioning of eroded portion of bowl (erosion due to worn-out of bull ring segment) in installed condition by metalizing, hard facing of bowl surface with bull ring segments erosion size up-to or less than 4 x 4 of 1 Segment.(Time of completion = 48 Hrs.) 75 Repairing and reconditioning of eroded portion of bowl (erosion due to worn-out of bull ring segment) in installed condition by metalizing, hard facing of bowl surface with bull ring segments erosion size more than 4 x 4 of 1 Segment erosion size more than4 x4 and up-to 6 x 5 of 1 Segment.(Time of completion = 72 Hrs.) 76 Repairing and reconditioning of eroded portion of bowl (erosion due to worn-out of bull ring segment) in installed condition by metalizing, hard facing of bowl surface with bull ring segments erosion size more than 4 x 4 of 1 Segment erosion size morethan 6 x 5 of 1 Segment.(Time of completion = 96 Hrs.) 77 Breakdown & Maintenance / Overhauling work of Gravimetric Coal Feeders 250 MW 78 Replacement of COC Gear Box with new/serviced gear box.(Time of completion = 08 Hrs.) 79 Servicing / Rectification of defects of clean out conveyor ofGCF.(Time of completion = 08 Hrs.) 80 Servicing/repairing of span/ weigh span roller.(Time of completion = 04 Hrs.) 81 Repairing of end door.(Time of completion = 04 Hrs.) 82 Servicing/repairing of air operated feeder outlet gate.(Time of completion = 08 Hrs.) 83 Servicing /repairing of manual Feeder inlet gate/bunker outlet gate.(Time of completion = 08 Hrs.) 84 Servicing of seal air valve of GCF.(Time of completion = 08 Hrs.) 85 Servicing of defective COC Drive (Quadruple Helix-worm unit).(Time of completion = 15 Hrs.) 86 Replacement /Repairing of belt scrapper.(Time of completion = 04 Hrs.) 87 Attending dust leakage from GCF body by welding/patching etc.(Time of completion = 04 Hrs.) 88 Servicing/Overhauling of Gravimetric Coal Feeder Main gear box.(Time of completion = 12 Hrs.) 89 Replacement / Servicing of Gravimetric Coal Feeder Head Pulley/power pulley/take-up pulley.(Time of completion = 08 Hrs.) 90 Servicing of Gravimetric Coal Feeder.(Time of completion = 16 Hrs.) 91 Servicing of clutch assembly.(Time of completion = 08 Hrs.) 92 Replacement of damagedfeeder belt with new one of Gravimetric Coal Feeder.(Time of completion = 24 Hrs.) 93 Replacement of Main Gear Box of GC Feeder with new/serviced gear box.(Time of completion = 08 Hrs.) 94 Replacement of clutch assembly of GC Feeder with new/serviced.(Time of completion = 08 Hrs.) 95 Repairing/Replacement of grating of various sizes.(Time of completion =Hrs./m².) 96 Round the clock lifting and shifting of CMR, General Cleaning and removing of of choking from Mills ofUnit# 8& 9, DTPS 97 Round the clock lifting and shifting of coal Mill rejects spelled outfrom Pyrite Hopper and Mills (at ‘0’ Meter) of Unit # 8 & 9, 2X250MW, HTPS, Kasimpur to Coal yard of old Plant / 2X250 MW Plant or other specified places within theHTPS, Plant. 98 Filling and shifting of coal Mill reject from SILO system of Mill reject system of Unit # 8 & 9, 2X250MW, HTPS, Kasimpur to Coal yard of old Plant/2x250 MW Plant or other specified places within theHTPS, Plant. 99 Cleaning of mill floor (‘0’ & ‘3.5’ meter), mill associated auxiliaries, pulverize coal pipes, structure of mill, duct connected to mill at 3.5 meter floor, classifier top, Removing of settled coal/coal dust at Hot air gate/cold air gate and its platform, and ID/FD/ PA/Seal air fan foundation floors of Unit # 8. 100 Cleaning of mill floor (0 & 3.5 meter), mill associated auxiliaries, pulverize coal pipes, structure of mill, duct connected to mill at 3.5 meter floor, classifier top, Removing of settled coal/coal dust at Hot air gate/cold air gate and its platform, and ID/FD/ PA/Seal air fan foundation floors of Unit #9. 101 Cleaning of Feeder floor & associated structure to feeder floor of Unit # 8 . 102 Cleaning of Feeder floor & associated structure to feeder floor of Unit # 9. 103 Removal of major chocking of bowl mill & center pipe of bowl mill (From feeder outlet gate to liner body of mill) of Unit # 8. 104 Removal of major chocking of bowl mill & center pipe of bowl mill (From feeder outlet gate to liner body of mill) of Unit # 9. 105 Removal of major chocking of Coal feeder of Unit # 8. 106 Removal of major chocking of Coal feeder of Unit # 9. 107 Removal of major chocking of Coal feederbelt of Unit # 8. 108 Removal of major chocking of Coal feeder belt of Unit # 9. 109 Cleaning of P.A. duct internally from hot air gate to mill side liner body of Unit # 8. 110 Cleaning of P.A. duct internally from hot air gate to mill side liner body of Unit # 9. 111 Maintenance of Coal Pipes 112 TO ATTEND THE CHOCKING OF COAL PIPE 113 PATCH WORK ON COAL PIPE (DURING SHUT DOWN OF MILL) SIZE- 200MMX200MMM 114 CHANGING OF VICTAULIC COUPLING GASKET 115 REPLACEMENT OF COAL PIPE HANGERS. 116 REPAIRING OF COAL PIPE BENDS AT DIFFERENT ANGLES AT POSITION.
Contract Date: Ref. Documents Contract Value : Ref. Document
Boards / Undertakings / PSU No of Bidders 4
Uttar Pradesh View Result →
3.
Heavy Industries and Public Enterprises #9403384 Technical Bid
Annual Maintenance Contract For The Maintenance And Upkeep Of Equipments; 1 A Material Handling Equipments A1Routine Maintenace Works BUCKET ELEVATOR -120 nos & BUCKET BELT CONVEYOR 1 nos. Plummer blocks: cleaning, Bearings checking / adjustments / greasing; Gear box / geared motor: inspection, oil top up,tightening of bolts; Coupling: checking / tightening / replacement work; Coupling guard: checking / replacement; Tongue plate – inspection / adjustment / replacement; Bucket elevator casing inspection/ any kind of leakage arresting, spillage arresting work / repair; / Discharge pipe leakage arresting.,Bucket belt: checking / alignment / tensioning / shortening if required, Joint inspection / tightening / repair; Buckets:checking / replacement / fixing / tightening; Tensioning stud checking / adjustment /slide plate replacement;Equipment platform & boot area cleaning work. 2 BELT CONVEYORS -90 nos. : Plummer blocks: cleaning, Bearings checking / adjustments / greasing; Gear box / geared motor: inspection, oil topup,tightening of bolts; Coupling/Pulley: checking / tightening / replacement work; Coupling guard / drum guard: checking / replacement; Conveyor Belt: checking / alignment / tensioning / tensioning bolt replacement, Belt joint checking,Carrying idlers / Return idlers / Guide rolls / idler frames: checking / replacement; Skirt board inspection / repair / replacement, Snub drum checking (if required); take-up drumset inspection / maintenance (if required); inspection / adjustment / replacement of scrapper(if required); All kind of leakage arresting work /Discharge pipe checking and corrective action. 3 Screw Conveyors -1nos, Plummer blocks cleaning, bearings checking / adjustments, Bearings greasing, Gearbox checking, Oil top up in gearbox, tightening of foundation bolts of motor & gearbox, Coupling checking / tightening / replacement work, Checking / replacement of coupling guard, Inspection of Screw Flight & casing, Screw & cover plate repair work. 4 Vibrofeeder: Counter Weight adjustment, inspection / repair of tray; 5 Trommel- 1 number Plummer blocks cleaning, bearings checking / adjustments, Bearings greasing, Gearbox checking, Oil top up in gearbox, tightening of foundation bolts of motor & gearbox, Coupling checking / tightening / replacement work, Checking / replacement of coupling guard. Checking the wiremesh. 6 A2 Replacement Works: Material Handling Equipments Head drumset (inclusive of bearing): for elevators 7 Head drum bearing/sleeves/plummer blockreplacement for elevators 8 Bucket belt for elevators / bucket belt conveyors 9 Drive drumset replacement: inclusive of bearings for other equipments 10 Tail drumset / snub drumset / take-up drumset: (inclusive of bearings)for BE and BC wherever applicable 11 Drive drumbearing/sleeves/plummer blockfor belt conveyor 12 Tail drumbearing/sleeves/plummer blockfor BC and BE wherever applicable 13 Idler replacement in belt conveyor 14 Idler frame replacement 15 Buckets replacement in BE or BC 16 Replacement of takeup screw in bucket elevator 17 Bucket Elevator drive modification including fabrication from the old casing-from flat belt to Geared drive 18 Screw flight for screw conveyors 19 Belt conveyor joint preparation 250/350mm per set 20 Belt conveyor joint preparation 600mm per set 21 Conveyor Belt Replacement: Dismantling of old conveyor belt, recoiling and shifting from site to designated area; Shifting of conveyor belt of suitable length from stores/designated area to site, laying of belt of width 250mm / 350mm 22 Conveyor Belt Replacement: Dismantling of old conveyor belt, recoiling and shifting from site to designated area; Shifting of conveyor belt of suitable length from stores/designated area to site, laying of belt of width 600 mm 23 Vulcanizing of conveyor belt of width 250/300 mm per joint (Vulcanising solution shall be supplied by the party) 24 Vulcanizing of conveyor belt of width 600 mm per joint (Vulcanising solution shall be supplied by the party) 25 Spot vulcanizing (Joint repair) (Vulcanising solution shall be supplied by the party) 26 Belt conveyor scraper replacement 27 Trommel Screen mesh preparation and replacement per piece 28 Trommel screen repair/patch up work 29 Replacement of Trommel frame 30 Gearbox oil seal/ pump gland packing replacement 31 Fabrication/Installation/Dismantling of material handling equipment Fabrication of bucket elevator intermediate casing of all size 32 Fabrication of bucket elevator bottom casing of all size 33 Fabrication of bucket elevator top casing of all size 34 Fabrication of belt conveyor frame 250mm/350mm/600mm (includes fixing of idlers/ idler frame) 35 Installation/dismantling of bucket elevator or part 36 Installation/dismantling of belt conveyor or part 37 Replacement of pulleys/couplings of material handling equipment 38 Fabrication and replacement of Feed shutter/inspection door 39 Fabrication of carrying Idler frames of conveyor 40 Fabrication of Blower Impeller 41 B. DRIERS & ACCESSORIES B1Routine Maintenance Works FBD & accessories of MSP – 2 no Dryer Shell , duct line, bag filter: Inspection of dryer shell, bed, duct line, valves, bag filter, Rotary valve checking / maintenance / replacement, checking / replacement of insulators / ropes; opening, inspection and closing of manhole; Blowers Inspection, cleaning and balancing of blowers, Inspection of exhaust blower bearing, pulley, replacement of belts, foundation bolt tightening. Fuel pump system Inspection of oil pump, oil line checking / welding, oil filter cleaning, oil filter gasket replacement, Inspection of valves / replacement. Burner Checking / cleaning / replacement. Air compressor: Inspection of air compressor and accessories, checking air leaks, check drive belts, check/replacement of air filters, drain the condensate,checking of relief valves/replacement. 42 SHAFTDRIER & ACCESSORIES – 5 nos Blower – cleaning, impeller checking & alignment, foundation bolt tightening, pulley checking / replacement, duct line valves checking, lubrication and greasing, oil line filter cleaning, oil line pump foundation bolt tightening, oil line valve inspection, Rope/Cloth replacement, exhaust blower foundation bolt tightening,blower bearing checking, oil pump coupling spider replacement, burner checking / cleaning, manhole – opening for inspection / maintenance and closing/ airlock removal. 43 DIESEL/FURNACE OIL PUMPS – 5 nos Inspection / maintenance / replacement of oil pump, oil filter, valves, oil heater, coupling, spider, foundation bolt, hose pipe 44 B2 Replacement works FBD and Shaft Dryer Replacement of v belt for blowers/pumps/process equipments if carried out separately 45 Replacement of impellers of blower. 46 Replacement of bearing of blowers 1 set. 47 Dismantling & Erection of blowers. 48 Replacement of Heater coils in heater unit of oil pumps up to 6 KW. 49 FBD/Shaft drier burner assembly cleaning and replacement 50 Replacement of fluid couplings 51 B3 Repair & Installation of Structural and Equipment Dismantling, Fabrication and installation of Mild steel Parts including all fabrication related works Dismantling of Damaged Structural work. 52 Fabrication & painting of structural work. 53 Erection of structural work 54 Precision fabrication works including painting 55 Fabrication and Erection of FRP structural 56 FRP handrails 57 Fabrication and installation of FRP platforms 58 Dismantling or Installation of process/other equipments 59 Table feeder Jamming rectification (blockage/wet sand jamming) 60 B4 Refractory works: (Fresh / repair works) Dismantling and relining of refractory as per drawing / as per site requirement excluding supply of materials (which shall be made by IREL at stores) including labour, charges of supervision, moving material from stores, disposal of debris at designated areas, site clearing etc. Inspection of defective / damaged refractory works, assessment and preparation of repair plans in consultation with EIC; Mobilize tools/tackles etc required for refractory works; erection of shuttering, scaffolding & platforms as required; removal of damaged refractory by using pneumatic / electric breakers or manual chipping; erection of temporary supports, shutters and lifting arrangements; fixing of anchors, painting of anchors with black bituminous paints / suitable primers & paint; thorough cleaning of the shell plate by grinding / chipping; Prepare and execute refractory works following prudent quality system – following proper water and refractory mixing ratio, mixing time, pouring, vibrating, curing time as applicable; care must be taken while applying to minimize refractory wastage; carryout the refractory dry out as per the heating curve given by the refractory supplier / OEM.The burner and fuel required will be given by IREL; Removal of shuttering after ensuring the setting of refractory.After completion of work, clear the area by removing all debris, scrap the site and shifting of dismantled refractory material to scrap yard / area assigned. Refractory like fire bricks, insulation brick, insulation block etc 61 Refractory like dense castable, insulation castable etc 62 C1 Routine Maintenance works HIGH TENSION SEPERATORS (HTS) – 10 nos Machine cleaning by blowing out with air, Feed gate cleaning and adjustment, inspection / repair / replacement of feed trash screen, rotor wiping brush inspection / replacement, electrode position checking / adjustment,splitter checking / adjustments, metal hose pipe checking / replacement, V belts / pulleys /springs - checking / adjustment / replacement, rotor bearings checking, greasing of bearings, Metal hose pipe replacement, Rotor and Geared motor Pulley inspection / replacement. 63 ELECTROSTATIC PLATE SEPERATORS (EPS) – 13 nos Machine cleaning byblowing out with air , Plate and electrode cleaning, Feed gate cleaning and adjustment, inspection / repair / replacement of feed screen, electrode position checking / adjustment,splitter checking / adjustments/replacements, feed roller bearing checking / replacement,geared motor checking / oil top up, Feed roller checking/adjustment. 64 INDUCED ROLL MAGNETIC SEPERATORS (IRMS) – 09 nos ( IRMS 5 Nos. and Exolon 4 Nos.) : Machine cleaning byblowing out with air , Feed gate cleaning and adjustment, inspection / repair / replacement of feed screen, rotor wiping brush inspection / replacement, splitter checking / adjustments / replacement, rubberhose pipe checking / replacement, V belts / pulleys / spring -checking / adjustment / replacement, Idler pulley assembly checking / replacement, rotor bearings checking, greasing of bearings, Rotor and Geared motor Pulley replacement, Air gap checking / adjustment. 65 RARE EARTH DRUM MAGNETIC SEPERATORS (REDMS) – 10 nos Machine cleaning byblowing out with air , vibrofeeder feed gate cleaning and adjustment, inspection / repair / replacement of feed screen, splitter checking / adjustments/ replacement, V belts / pulleys / springs - checking / adjustment / replacement, Idler pulley assembly checking / replacement, rotor bearings checking and greasing, Rotor and Geared motor Pulley replacement, inspection/adjustment of fly mass of vibrofeeder, tightening of motor foundation bolts, vibrofeeder bolts and tray bolts, vibratory tray repair / replacement. 66 RARE EARTH ROLL MAGNETIC SEPERATORS (RERMS) – 13 nos Machine cleaning byblowing out with air,Kevlar/PU belt inspection / adjustment / replacement, vibrofeeder feed gate cleaning and adjustment, inspection / repair / replacement of feed screen, splitter checking / adjustments / replacement, rotor bearings checking and greasing, coupling checking / replacement, Rotor and Geared motor Pulley/coupling replacement, inspection / adjustment of fly mass of vibrofeeder, tightening of motor foundation bolts, vibrofeeder bolts and tray bolts. 67 VIBRATING SCREENS – 28 nos : Feed chute box cleaning and adjustment, inspection / repair / replacement of screen mesh, inspection/adjustment of fly mass of vibrofeeder, tightening of motor foundation bolts and vibrofeeder bolts, checking of balls/rope, Repair of screen body / collection trays, replacement of support rod. 68 AIR TABLES – 16 nos : Inspection / adjustment / replacement of cloth by removing top deck, alignment checking, bearings checking / greasing, foundation bolt tightening of motor, blowers and air table structure, deck lifting stud repairing / replacement, drive belt checking / replacement, Drive pulley / Counter weight pulley replacement, blower impeller balancing/ bellows replacement. 69 Auto Samplers- 7 numbers: Inspection/ adjustment/ replacement of plungers, hydraulic powerpacks, hoses, cylinders, solenoid coils, moving arm, motor, replacement/installation of auto samplers 70 C2 Replacement Works Rotor for HTRS / Corona HTS/ IRMS 71 Rotor for Exolon 72 Rotor for REDMS 73 Rotor/Shaft replacement work for RERMS 74 All process equipment splitter replacment 75 ESPS electrode replacement 76 Drive end Bearing of process equipments 77 Non drive endBearing of process equipments 78 Feed Roll of IRMS / ESPS/HTRS 79 Wire electrode HTS 80 Induction Electrode HTS 81 Capacitance Electrode HTS 82 RERMS belt replacement of all sizes 83 Vibrating screen chute replacement 84 Vibrating screen meshes assembling in spare frames of all sizes. 85 Air table Main Shaft replacement with bearing 86 Air table air blower replacement 87 Air table cloth replacement 88 Air table bearing replacement 1 set 89 Reconditioning table top and replacement 90 Air chamber fabrication and replacement 91 fabrication of bottom chamber and replacement 92 Reconditioning offoundation Frame & wooden spring 93 Replacement of Air table wooden spring 94 Reconditioning and replacement ofAir table chute 95 Replacement of pulleys/couplings of process equipments 96 Reconditioning/fabrication of Auto samplers 97 Reconditioning and replacement of brass/coir/fiber brushes in process equipments 98 Magnetic separator pole gap/rotor adjustment/ All process equipment splitter adjustment 99 Trash mesh fabrication and replacement 100 Rotex Gearbox replacement 101 Rotex gear box bearing replacement 102 C3 Reconditioning/Fabrication Works Reconditioning of vibrating screen motors inclusive of bearing replacement and painting 103 HTRS induction electrode fabrication/reconditioning 104 HTRS capacitance electrode fabrication/reconditioning 105 Leak arresting/ fixing or replacement of chutes/pipes/ hoppers 106 Airtable eccentric shaft preparation 107 Airtable blower fabrication /reconditioning 108 Reconditioning of Shaft drier burner assembly 109 RERMS belt/AT cloth/ Screen mesh patch up work/reconditioning work 110 Assissting weigher calibration work/ Load testing of weighers/ inspection of materials 111 Carpentry works for 10 nos for flange gasket/ hammer handle 112 Carpentry works of wooden planks/plywoods/compressed woods 113 DWET CIRCUIT EQUIPMENTS D1Routine Maintenance works PUMPS – 50 Nos Bearing blocks: cleaning, Bearings checking / adjustments / greasing; Pulley: checking / tightening / replacement work / alignment work ; Belt guard: checking / replacement; V belt: checking / alignment / tensioning/ replacement; Tensioning stud: checking / adjustment /slide plate replacement; Pump platform & nearby area cleaning work. Suction & delivery piece / suction components: checking / replacement, bolts tightening. Pump and motor foundation bolts tightening. MDC valve checking, MDC valve checking and pin replacement. CPD tank: Inspection / stilling arrangement checking 114 HYDROSIZER – 3 Nos Water box: inspection / cleaning; spray pipes checking and clearing of spray water holes, NRV’s checking / replacement, check for any leakages in the water box / rectification, cleaning of water filters, check the discharge valve / repair / replacement. 115 WET TABLE – 3 Nos Deck: Inspection / repair, Checking of head motion,Spare parts repair/ replacement like yoke pin, Rocker shaft, Connecting link with bushed Crosshead, Connecting link Pin, Connecting Link stud with nut, Adjusting Block, Adjusting Block Pin, Adjusting Block stud replacement / adjustment, Lube oil top up, Lubrication & Greasing 116 PAN FILTER 3 Nos., SCREW CLASSIFIER & SCREW FEEDER – 2 Nos Cleaning of Pan filter, cleaning of grills,Bearing: Checking / Greasing Gearbox: Checking/ oil topup, Lubrication of drive mechanism Pan filters Gear & Pinion: Inspection/ Greasing. Scroll / Chain / sprocket: adjustment / replacement / lubrication. Vacuum unit: lines / receiver inspection / repair, rubber hose checking / replacement, hose clips checking / replacement, cloth replacement includes preparation. 117 SPIRALS – 108 Sticks Launder discharge cuff bend replacement includes fixing of clamps 118 COMPRESSORS – 5 nos 2 stage reciprocating compressor. Check and replace the air filters,check/replace drive belts, check for leak/damage, check for all valves, Check lube oil, Dain the condensate water from the reservoir, check/replace the safety relief valve 119 D2 Pump reconditioning: Dismantling of pump (warman or other make centrifugal pumps) and its accessories at site, reconditioning, reassembling and fitting the same including suction as well as delivery short pieces as per the standard procedure of OEM or as directed by the EIC. This includes handling / shifting of new / usable, damaged/worn out parts from site to any location inside the plant as per requirement. All consumables, spares, transportation, EME shall be provided by IREL free of cost. If any other grade pump installed by IREL in between the contract which is not included then its nearer value will be given to contractor. Size of the pump upto 3/2 CAH 120 size of the pump upto6/4DAH 121 Vacuum pumps 122 Split casing Water pumps of all sizes 123 Mono block water pumps 124 Submersible pumps 125 Submersibleslurry pump (Toyo) 126 D3 Replacement works Pumps Dismantling of pump and accessories (warman or other make centrifugal pump) from site and replacement of the samewithnew / assembled pump including suction and delivery pieces as per the standard procedure of OEM or as directed by EIC at MSP, HUS and Pump houses, Aramvilai pond. Cost of replacement shall include shifting of equipments (new/assembled) from Central stores / assembly yard or any location within the plant to the required site and shifting of old/damaged equipment from site to designated location for repairing. All spares, EMEshall be provided by IREL free of cost. but size of the pump upto 3/2 CAH 127 but size of the pump upto 6/4 DAH 128 Split casing Water pumps of all sizes 129 Mono block water pumps 130 Vacuum pumps 131 Submersible pumps 132 MDC valce/operating mechanism replacement/repair 133 Suction and deliver short piece/ T piece/suction pipes replacement 134 Bearing assembly of pumps upto 3/2 or equivalent 135 Bearing assembly of pump upto 6/4 or equivalent 136 VALVES Dismantling & Erection of Metallic / Non metallic valves / NRV / foot valves at all elevations as per the scope of work with gasket (If only dismantling or only erection is there, only half the amount will be sanctioned.) Valve Size 15mm - 90mm NB 137 but size 100 mm – 250 mm NB 138 but size above 250 mm – 400 mm NB 139 Hydrosizer Teeter water pipes replacement 140 Feed well replacement along with all supporting pipelines 141 Wet Table Replacement / repair / overhauling of head motion mechanism 142 PAN Filter Filter cloth replacement 143 Size upto 200mm 144 Size above 200mm to 400mm 145 2 stage reciprocating compressor head replacement 146 Hydrocyclone : Apex valve replacement 147 Hydrocyclone : Reconditioningincluding fabrication work 148 Hydrocyclone Replacment 149 Replacement of spiral launder 150 Screw classifier screw replacement work inclusive of bearing 151 D4 PIPE & FITTINGS Fabrication of HDPE fittings: Measuring, marking, cutting and fabrication of HDPE short piece, bend, Tee etc of all sizes using the infrastructure available at MSP for fabrication of HDPE items. All spares, EMEshall be provided by IREL free of cost. Party to provide adequate manpower with HDPE welding infrastructure, required tools & tackles to carry out job. Payment shall be made per joint basis for different sizes of pipes & Fittings. 152 Fabrication of split Collar Clamps for HDPE pipe 153 Fabrication of Metal clamps for cuff bends/ flanges 154 HDPE pipe/collar joining using mirror welding 155 Fabrication of Metal shortpiece/Reducer 156 Fabrication of Short piece with HDPE insert for pump: Measuring, marking, cutting and fabrication of Metal short piece, bend, Tee etc with HDPE pipe inserted of all sizes using the infrastructure . All spares, EMEshall be provided by IREL free of cost. Party to provide adequate manpower with HDPE welding infrastructure, required tools & tackles to carry out job. Payment shall be made per joint basis for different sizes of pipes & Fittings. 157 HDPE PIPE LINE WORKS of all sizes Replacement ofprefabricated HDPE pipes / rubber hosesand fittings including erection by bolts and nuts at all levels including proper supporting system as per drawing or as directed by EIC. If any valves need to be erected during the erection process, as a part of piping system, shall be deemed inclusive. This also includes opening and refitting of pipes for checking/choke cleaning purpose. All spares, EME shall be provided by IREL free of cost. Party to provide adequate manpower with required tools, tackles and consumables to carry out job. Payment shall be made as per linear meter length basis for different sizes of pipes. Fittings and valves shall be calculated on linear meter length basis. If the size pipes are not in the list the nearer size value will be paid to the contractor. Pipe size upto 90mm NB 158 Pipe size above upto 160mm NB 159 Material handling hose size upto 80 mm NB 160 Material handling hose size above upto 200 mm NB 161 E1 Replacement of drive Motor For Pumps, Blowers, Driers/ other equipments-electric motor rating upto 7.5 kW 162 but rating above upto 22 kW. 163 but rating above upto 45 kW 164 but rating above 45 kW 165 For Elevator, rating of motor / geared motor 1.1 kW to 5.5 kW 166 For other material handling equipments / process equipments, rating of geared motor / motor upto5.5 kW 167 but ratingabove 5.5 kW to 15 kW 168 but rating above 15 kW 169 Forvibrating feeder, Vibrating screens & other equipments - Vibromotors upto 0.75 kW 170 Forvibrating feeder, Vibrating screens & other equipments - Vibromotors rating above 0.75KW to 2.92 kW 171 E2 Replacement of Gear Boxes For elevators the type of gear box 3NU/4NU or equivalant 172 For Elevators the type of gear box U 500 or equivalent 173 For belt conveyor the type of gearbox 3NU/4NU or equivalent 174 For belt conveyor the type of gearbox U500/U600/U700/U800/U1000 or equivalent 175 For other equipments-the type of gear box model V600 or equivalent 176 F1 General Works Gas cutting Works (CI / MS / SS); (Cutting gases and Gas cutting set to be arranged by the party). Scrap generated if any is to be shifted to scrap yard. 177 Welding works (CI / MS / SS) (Welding electrode and machines to be arranged by the party). Scrap generated if any is to be shifted to scrap yard. 178 Any size electric hoist - erection / dismantling and shifting to designated places. 179 Any size electric hoist/chain block reconditioning work 180 Pipe line modification and replacement up to 50 mm NB (old or new metal pipes). 181 Pipe line modification and replacement above 50mm up to 150 mm NB (old or new metal pipes). 182 Duct line modification and replacement above 150mm upto600 mm NB (old or new metal pipes) 183 Overhauling of Gear Boxes Overhauling of gear boxes (other than U series) / geared motor of all sizes 184 Overhauling of gear boxes U/V series or Rotex equivalent 185 Overhauling of any size / type of Valves / NRV / Rotary union, Chain. 186 Spares Assembling Slurry pumps bearing unit Assembling and testing of size upto 4/3 187 Slurry pumps bearing unit assembling and testing of size 6/4 188 Bucket belt preparation: Shifting of belt from Stores to designated area, sizing of belt, dismantling of reusable buckets from old belt / new buckets from stores / fixing of buckets using bolts & gaskets, rolling and stacking of bucket belt. 189 Bucket Elevator and Belt conveyor drum setting of all sizes. 190 Slurry pump / water pump and drive motor base frame fabrication and painting. 191 Gear box / geared motor frame/motor frame of all sizes – fabrication and painting. 192 Chutes, feed box, discharge pipes, skirt boards, collection boxes, wiper / scraper, collection tray – fabrication, painting and fixing. 193 Belt guards of all sizes – fabrication, painting and fixing in equipments. 194 Coupling guards of all sizes – fabrication, painting and fixing in equipments. 195 Tail drum guards for belt conveyors of all sizes - fabrication, painting and fixing. 196 G MachiningWorks Repair & machining work of shaft of size up to 50mm 197 but size more than 50 mm to 100 mm 198 Key way machining for shafts of size up to 50mm 199 but for shafts of size more than 50mm to 120mm 200 TL Bush / Coupling / Sprockets – boring of size up to 65mm & keyway machining. 201 Bucket elevator / Belt conveyor / Bucket belt conveyor - drum surface repairing & crowning. 202 Repairing, static and dynamic balancing of blower impellers. 203 MS Sheet / plate bending & rolling works of thickness up to 12mm 204 Thread repair/preparation work 205 Flange preparation all material includes cutting and machining 206 FBD Nozzle holder repair work 207 HTRS/Exolon/IRMS/RERMS shaft replacement and repair work includes welding 208 Scrap cleaning/ material shifting/ Unloading 209 Material management at mechanical Worksop 210 H Shift Maintenance Works Deployment of maintenance personnel per shift at MSP & HUP on as and when required basis to carry out all type shift maintenance works & other continuous shift works in second and third shiftto run the plant smoothly as per instruction of EIC / Shift in charges in A, B & C - Shifts should be Four (04) in which one (01) should be a supervisor, one(1) should be a welder and others capable to execute all type of maintenance works in second and third shifts. Note:Any miscellaneous jobs for the plant operation in A, B & C-shift is to be carried out by the maintenance personnel on as and when required basis as per instruction of EIC / shift in charge. The work which is carried out during 08.00Pm to 06.00Am will be coming under shift maintenance works.
Contract Date: Ref. Documents Contract Value : Ref. Document
Boards / Undertakings / PSU No of Bidders 1
4.
Power #9361578 AOC
Biennial Rate Contract For The Supply Of Spares Of M/S L And T Mhi Power Boilers Pvt Ltd Make Coal Mill(Mvm32f) Installed At Boiler Area Of 2X660mw,Stage-Ii Sstpp,Mppgcl,Dongalia , Lower - Housing , Fitting Plate For Air Seal Assembly (Mark No. 4 Dwg No. C-10-32R-5788) ( 1Set = 1 Mill Qty.) , Complete Hub Skirt Assembly , Middle Housing , Grinding Table Upper Ring(Thk 20 Mm) , Deflector Assembly (Dwg No.10-32R-6724 R1) , Complete Deflector Assembly Duly Installed Tiles Without Liners With Bolt, Nut M16x40 Spot Weldedfor Top Liners And Bottom Hard Chrome Liners , Taper Cup (Part No.N67-700-1181-1 , Mark No. 08) , Ceramic Liner Cover (Part No.N67-700-1181-3 , Mark No. 09) , Washer (Part No.N67-700-1175-1 , Mark No. 32) , Ceramic Liner Cover (Part No.N67-700-1174-2 , Mark No. 31) , Ceramic Liner (Part No.N67-700-1174-1 , Mark No. 30) , Set Screw (Part No.170-255-020-2 , Mark No. 103) , Bolt(Part No.N67-700-1173-2 , Mark No. 28) With Nut (M16) ( 1 Set = 1/3 Mill Qty) , Complete Set Of Tiles For Deflector With Weldable/Taper Plug And Ceramic Cap ( 1 Set = 1/3 Mill Qty.) , Rj Cover (Dwg No. C-10-32F-61306) , Journal Gap Bolt Bushing (Dwg. Mark No 2) , Piston Housing (Dwg Mark No 3) , Bushing Retainer (Dwg Mark No 4) , Lock Plate (Dwg Mark No 8) , Lock Plate (Dwg Mark No 9) , Lock Plate (Dwg Mark No 10) , Roller Lift Gauge (Dwg. Mark No 14) , Roller Lift Gauge Fitting Plate(Dwg. Mark No 15) , Shim(Piston Bush) (Dwg. Mark No18) ( 1 Set = 1/3 Mill Qty) , Dust Seal For Roller Tensioning System (Mark No 13) 1 Set = 1/3 Mill Qty.) , Classifier , Complete Set Oftiles For Center Cone And Center Feed Pipe With Weldable Plug And Ceramic Cap ( 1 Set = 1 Mill Qty) , Outlet Ring ( Classifier) Moc Hardox: 400 (Suitably In 3-4 Segments) , Slide Outlet (Classifier) Moc Hardox 400 (Suitably In 3-4 Segments) , Complete Outlet Ring Drive Assembly , Centre Cone Support Pipe With Flange Duly Installed Tiles.( 3 Nos = 1 Mill Qty.) , Center Feed Pipe Outlet ( Classifier) , End Cup (Thrust) , End Cup ( Free) , End Cup Bush Locking Set Screw (Mhi Dwg No N67-700-6177) (1 Set = 1 Mill Qty) , R J Assembly , Seal Kit Complete Set For Rja ( 1 Set = 1 Rja) , Upper Plate , Stop Plate , Journal Head
Contract Date: May 11, 2026 Contract Value : 13.47 Crore
Government Departments No of Bidders 1
Madhya Pradesh View Result →
5.
Agriculture #8202409 AOC
Supply Installation Commissioning Testing Of Bedana Processing Line Semi Automatic Cleaning Grading Line4 Tph , Supply,Installation,Commissioning &Testing Of Bedana Processing Line (Semi-Automatic Cleaning Grading Line) 4 Tph , Grading Machine • Material:- Contact Part 01 • Other Material Ms Powder Coated. • Capacity:- 4 ?.?.?. • Power Required:- Not More Than 15 Hp. • This Machine Consists Of 1. Destemmerdrum With A Rotor. 2. Suction Blower 2 Nos. With Fan Dia. 600 Mm 3.2800 Rpm Air Discharge Fan For Aspiration. 4.Air Lock System For Auto Discharge Of Collected Reject Material. • Grader With Wire Mesh Sieve For Grading In Two Sizes With Vibro System , Classifier• Material:- Contact Parts Are Food Grade M/S • Other Material Ms Powder Coated. • Capacity:- 4 ?.?.?. • Power Required:- Not More Than 3 Hp. • For Separation Of Light Material. • Fan Size:- Dia. 460 Mm. With 40 Radial Fins , Convear• This Is A Z Type Of Conveyor Belt With Suitable Heights For Transporting The Raisins & Any Material From One Machine To The Next One.Width:-450 Mm To 900 Mm. • Material:- Modular Upb Belt. • Power Required:- 1 Hp To 2Hp. • Length, Height, Width As Per Requirement. • Various Type Of Belts Available As Per Application , Sizerfrem• Material:- Contact Parts Are Food Gradem/S • Other Material Ms Powder Coated. • Capacity:-4 ?.?.?. • Power Requad:- Not More Than 2 Hp. • Vibro Motors For Grading In 3 Sizes. , Hopperms Vibrated Hopper 3 Hp For Greding Machine , Pannal Board , Stabilizer And Wairing,Cabaling Main Panalboard. Ms Powercoated, With Stand In Ms Sq.Pipe 125 Amp. Change Verswitch )No.7.5 Hp. Starter -0.1 No. 5Hp Starter-0.3 Nos 2Hp. -0.2 No.Ship-01 No. With Digital Volt. Amp. Frequency Meter , Air Flow Pipe Fitting , Transportation And Installation Charges
Contract Date: Oct 06, 2025 Contract Value : 35.59 Lakh
Government Departments No of Bidders 3
Maharashtra View Result →
6.
Power #8124787 AOC
Work Contract For Aoh Of Boilers Non-Pressure Parts ( Excluding Raph ) Of Unit # 4 At 2X660mw, Sstpp, Mppgcl, Dongalia ( T-2023_Mppgc_286862 ) 1 Section-A ( General Overhauling Work Of Duct, Gates & Dampers ( Pa, Sa & Fg Ducts ) 2 Cleaning Of Ash From Ducts 3 Repairing Of Ducts By Patching / Welding 4 Repairing Of Ducts By Application Of Ms Plate / Angle / Channel 5 Replacement Of Bracing Pipes / Protective Angles Inside The Ducts 6 Servicing Of Dampers 7 Servicing Of Guillotine Gates ( Including Esp ) 8 Servicing Ofgear Box Of Fd Fan Discharge Gates 9 Repairing / Replacement Of Protection Cover Of Nmej / Mej 10 Cleaning And Inspection Of Mill Hot / Cold Pa Gates 11 Cleaning, Inspection & Seal Replacement Of Mill Ha / Ca Gates 12 Servicing Of Id Fan Suction / Discharge Gates ( 1 Set= 2 Nos ) 13 Repairing Of Expansion Joint Small Sized Upto 3000Mm 14 Repairing Of Expansion Joint Above 3000Mm 15 Hydrojet Cleaning Of Id Fan Outlet Gates ( Size Of Discharge Gates 6912X3456 Mm2 , 1Set = 2 Nos ) 16 Section-B ( General Overhauling Work Of Fans ( Id, Fd, Pa Fan ) 17 Complete Servicing Of Induced Draft Fan 18 Complete Servicing Of Forced Draft Fan 19 Complete Servicing Of Primary Air Fan 20 Servicing Of Lube Oil And Control Oil System Of Id / Fd / Pa Fan 21 Alignment Of Id Fans With Motor 22 Alignment Of Fd Fans With Motor 23 Alignment Of Pa Fans With Motor 24 Cleaning Of Complete Fan Including Blades And Silencers Of Pa, Fd Fans And Inspection Of Main Bearing Assembly. 25 Alignment Of Rotating Oil Seal Of Id, Fd And Pa Fans 26 Removal Of Top Half Of Fancasing And Diffuser, Cleaning Of Complete Fan Including Blades And Silencers Of Pa Fans And Inspection Of Mba. 27 Section-C ( General Overhauling Work Of Coal Circuit ) 28 Replacement Of Complete Coal Burner Assembly 29 Replacement / Servicing Of Oil Gun / Air Tip 30 Alignment Of Burner Tip With Tilt Mechanism Inline With Other Burners From Inside & Outside The Furnace 31 Replacement And Refixing Of Burner Panel And Additional Air Portpanels Air Seal Plate With Fastener 32 Section-D ( Complete Overhauling Work Of Coal Mills ( Make L&T Mhi , Modell No. Mvm32f ) And Rcf ( Make Stock Redler Model Eg3651 ) 33 Complete Overhauling Of Coal Mill ( Including Replacement Of Grinding Parts ) And Raw Coal Feeder 34 Alignment Of Mill Motor With Gear Box. 35 Repairing / Replacement / Servicing Of Mpo, Mdv, Outlet Orifice ( Mill Top ) , Mpo Plate, Servicing Of Classifier Vanes Etc. 36 Servicing, Rectification Of Bunker Outlet / Feeder Inlet / Outletgate , Mdv And Kgv Of Coal Pipe. 37 Complete Servicing Of Raw Coal Feeder Including Replacement Of Head Pulley, Tail Pulley And Coc System 38 Replacement / Repairing Of Rcf Chute ( Below Rcf ) Including Feeder Outlet Gate With Its Alignment 39 Replacement / Repairing Of Center Feed Pipe And Sleeve Coupling 40 Servicing Of Lube Oil System And Hydraulic Oil System 41 Removal, Dismentling, Servicing, Alignment And Reinstallation Of Roller Journal Assembly 42 Painting Of Coal Mill 43 Repairing And Resetting Of Bottom Insulationcover Plate 44 Repairing / Replacement Of Mill Body Side Liner By Providing Patching Of Size 300X300 Mm 45 Repairing / Replacement Of Air Inlet Ring Segment ( Air Port ) Assembly 46 Replacement / Repairing Of Upperskirt, Lower Skirt ( Hub Skirt ) & Scrapper Assembly 47 Replacement / Repairing Of Scrapper Assembly 48 Section-E ( Inspection / Repair / Replacement Andservicingof P.F. Discharge Pipe ) 49 Replacementof P.F. Bends 50 Reversal Of Coal Pipe Bends After Due Repairing 51 Changing Of Coal-Pipe Victualic Coupling Gasket 52 Servicing Ofcoal Pipe Hangers Including Repairing 53 Servicing / Repairing Of Sleeve Coupling Of Coalpipes 54 Replacementof Straight Coal Pipe 55 Rotation Ofof Straight Coal Pipe By 180 Degree 56 Repairing Of P.F. Bend & Straight Pipe By Patch Welding 57 Removal / Inspection Of Orifice In Pf Pipe Lines 58 ( Section-F ) General Overhauling Work Of Coal Mill Seal Air Fans 59 Servicing / Replacement Of Set Of Fan Bearings And Coupling 60 Servicing / Replacement Of Fan Discharge Valve / Damper 61 Replacement / Repairing Of Expansion Joints 62 Cleaning / Replacement Ofdynavane / Fabricfilter 63 Complete Alignment Ofmotor &Fan Along With Coupling 64 ( Section -G ) General Overhauling Work Of Ac / Dc Scanner Cooling Fans 65 Servicing , Balancing And Painting Of Ac And Dc Scanner Air Fans
Contract Date: Oct 17, 2025 Contract Value : 1.74 Crore
Government Departments No of Bidders 3
Madhya Pradesh View Result →
7.
Power #8115258 AOC
Tender For Work Contract For Aoh Of Boilers Non- Pressure Parts ( Excluding Raph ) Of Unit 3 At 2X660 Mw, Sstpp, Mppgcl, Dongalia.- 1 (Section-A) General Overhauling work of Duct, Gates & Dampers (PA, SA & FG Ducts) 2 Cleaning of Ash from ducts 3 Repairing of Ducts by patching/welding 4 Repairing of Ducts by application of MS Plate/Angle/Channel 5 Replacement of Bracing pipes/ Protective angles inside the ducts 6 Servicing of Dampers 7 Servicing of Guillotine Gates (Including ESP) 8 Servicing of Gear Box of FD Fan Discharge gates 9 Repairing / Replacement of protection cover of NMEJ/MEJ 10 Cleaning and Inspection of Mill HOT/COLD PA Gates 11 Cleaning, Inspection & Seal replacement of Mill HA/CA Gates 12 Servicing of ID Fan Suction/Discharge Gates (1 Set= 2 Nos) 13 Repairing of Expansion Joint Small Sized up to 3000mm 14 Repairing of Expansion Joint Above 3000mm 15 Hydro jet Cleaning of ID Fan Outlet Gates (Size of Discharge Gates 6912x3456 mm, 1Set = 2 Nos) 16 SECTION-B (General Overhauling work of Fans (ID, FD, PA Fan) 17 Complete Servicing of Induced Draft Fan 18 Complete Servicing of Forced Draft Fan 19 Complete Servicing of Primary Air Fan 20 Section-C (General Overhauling work of Coal Burner Assembly) 21 Replacement of Complete Coal Burner Assembly 22 Replacement/Servicing of Oil Gun/Air Tip 23 Alignment of Burner tip with tilt mechanism in line with other burners from inside & outside the furnace 24 Replacement and Re-fixing Of Burner Panel and Additional Air Port Panels Air Seal Plate With Fastener 25 Section-D (Complete Overhauling Work of Coal Mills (Make L&T MHI, Model No. MVM32F) and RCF (Make Stock redler model EG3651 ) 26 Complete Overhauling of Coal Mill (Including Replacement of Grinding Parts) And Raw Coal Feeder 27 Alignment of Mill Motor with Gear Box. 28 Repairing/Replacement/Servicing of MPO, MDV, Outlet Orifice (Mill Top), MPO Plate, Servicing of Classifier Vanes Etc. 29 Servicing, Rectification of Bunker Outlet/Feeder Inlet/Outlet Gate, MDV And KGV Of Coal Pipe. 30 Complete Servicing of Raw Coal Feeder Including Replacement of Head Pulley, Tail Pulley and COC System 31 Replacement / Repairing of RCF Chute (Below RCF) Including Feeder Outlet Gate with Its Alignment 32 Replacement/Repairing of Centre Feed Pipe and Sleeve Coupling 33 Servicing of Lube Oil System and Hydraulic Oil System 34 Removal, Dismantling Servicing, Alignment and Reinstallation of Roller Journal Assembly 35 Painting of Coal Mill 36 Repairing and Resetting of Bottom Insulation cover Plate 37 Repairing / Replacement of Mill Body Side Liner by Providing Patching of Size 300x300 Mm 38 Repairing/Replacement of Air Inlet Ring Segment (Air Port) Assembly 39 Replacement /Repairing of Upper skirt, Lower Skirt (Hub Skirt) & Scrapper Assembly 40 Replacement/Repairing of Scrapper Assembly 41 SECTION-E (INSPECTION/REPAIR/REPLACEMENT ANDSERVICINGOF P.F. DISCHARGE PIPE) 42 Replacement of P.F. Bends 43 Changing of Coal-Pipe Victaulic Coupling Gasket 44 Servicing of coal Pipe Hangers Including Repairing 45 Replacement of Straight Coal Pipe 46 Repairing of P.F. Bend & Straight Pipe by Patch Welding 47 Removal/Inspection of Orifice in PF Pipe Lines 48 Primary Distributor Inspection and Repair 49 Inspection and Repair of Dresser Coupling 50 Sleeve Joint inspection (Horizontal and Vertical) and rectification and gasket replacement with scaffolding 51 (SECTION-F) GENERAL OVERHAULING WORK OF Coal Mill Seal Air Fans 52 SERVICING/REPLACEMENT OF SET OF FAN BEARINGS AND COUPLING 53 SERVICING /REPLACEMENT OF FAN DISCHARGE VALVE/DAMPER 54 REPLACEMENT/REPAIRING OF EXPANSION JOINTS 55 CLEANING/REPLACEMENT OFDYNAVANE/FABRICFILTER 56 COMPLETE ALIGNMENT OFMOTOR &FAN ALONG WITH COUPLING 57 (SECTION -G) GENERAL OVERHAULING WORK OF AC/DC SCANNER COOLING FANS 58 SERVICING , BALANCING AND PAINTING OF AC AND DC SCANNER AIR FANS
Contract Date: Oct 15, 2025 Contract Value : 2.27 Crore
Government Departments No of Bidders 4
Madhya Pradesh View Result →
8.
Power #7903693 AOC
Rate Contract For Maintenance Jobs Of Unit#3 Under Bm, Ktps.- 1 Job: Part:A 2 COAL MILL WORK: Insertion of Filling Balls & if required, Damaged Balls are to be removed from the Coal Mill 3 COAL MILL WORK: Insertion of Filling Balls. 4 COAL MILL WORK: Replacement of Stirrup assembly & if required Swivel Balls of Stir-rup Assembly are to be changed 5 COAL MILL WORK: Loading Block of Spider replace-ment & allied work as necessary 6 COAL MILL WORK: Total Set of Grinding Ball re-placement 7 COAL MILL WORK: Measurement of wear of GRINDING ZONE: Ring & Ball 8 COAL MILL WORK: Checking of Coal Mill internals 9 COAL MILL WORK:Replacement of Throat Plate & allied work as necessary 10 COAL MILL WORK: Readjustment of Throat Gap & if required necessary repairing jobs between Mill Housing & Throat Plate are to be done 11 COAL MILL WORK: Classifier Blade adjustment 12 COAL MILL WORK: Replacement of Classifier Blade 13 COAL MILL WORK: Total set of Throat Plate replace-ment & allied work as necessary 14 COAL MILL WORK : Replacement of Loading Unit assembly 15 COAL MILL WORK: Replacement of Loading Cylinder 16 COAL MILL WORK: Repairing of Walker Seal/Loading cylinder servicing 17 COAL MILL WORK: Bolt tightening of Mill Housing 18 COAL MILL WORK: Bolt tightening of Loading Units 19 COAL MILL WORK :Cleaning of Rejection passage 20 COAL MILL WORK: Cleaning of Rejection passage along with Scrapper Plate fitting 21 COAL MILL WORK: Replacement after fabrication of Brush Plough Door 22 COAL MILL WORK: Repairing / replacement of knife Gate assembly including all associated work 23 COAL MILL WORK: Repairing / replacement of pyrite Gate assembly including all associated work /SA fan anti vibration pad replacement with associated job 24 COAL MILL WORK: Thorough repairing & refitting of Gravity Damper assembly 25 COAL MILL WORK: Replacement of Mill Housing Lin-er 26 COAL PIPE WORK: Replacement of “Y” piece 27 COAL PIPE WORK: Replacement of Coal Carrying Pipe (CCP) Bends 28 COAL PIPE WORK: Replacement of Straight CCP 29 COAL PIPE WORK: Replacement of NRV after repairing including Hard Facing at corners 30 COAL PIPE WORK: Fabrication & fitting / replacement of Coal Sampler 31 COAL PIPE WORK: Dismantling & refitting of John-son’s Coupling (JC) & Sealing rings. Rockwell coupling fitting with seal rings. Eroded portion of straight CCP carrying JC is to be replaced by welding fresh part of CCP. 32 COAL PIPE WORK: : Coal dust leakage to be stopped by inserting asbestos rope or by tightening the Johnson’s Coupling 33 COAL PIPE WORK: Coal dust leakageto be stopped by application of Sodium silicate / jute packing with grease on leakage point/Burner cleaning / oil top up 34 COAL CLEANING WORK: Cleaning of choked Coal Carrying Pipe 35 COAL CLEANING WORK: Cleaning of Coal Mill inside 36 COAL CLEANING WORK:Cleaning of Coal Feeder box & if required Coal Bunker is to be iso-lated by operating the gates 37 COAL CLEANING WORK: Cleaning of choked Feeder to Mill drop pipe & chute/Loading unit servicing 38 COAL CLEANING WORK:Cleaning of choked Coal Burner Mouth 39 FOREIGN MATERIAL REMOVAL WORK: Removal of foreign material from inside the Coal Feeder box 40 FOREIGN MATERIAL REMOVAL WORK: Removal of foreign material from Coal Mill after necessary checkingof Mill inside & Ring, Ball measurement to be carried out if required 41 FOREIGN MATERIAL REMOVAL WORK: Removal of foreign material after necessary checkingfrom rotary throt of modified Mill, if required by gas cutting. 42 AIR SEAL SYSTEM WORK: Replacement / readjustment of Air Seal system as a whole (upper & lower outer seal) 43 AIR SEAL SYSTEM WORK: Air Seal pipe cleaning & meas-urement of Bottom Air Seal gap 44 PATCH REPAIRING WORK: Patch repair in position by re-quired portion of MS plate weld-ing 45 PATCH REPAIRING WORK:Welding of leakage joints 46 COAL FEEDER WORK: Through repairing of Coal feeder with all necessary work as per scope of work 47 COAL FEEDER WORK: Complete removal of Drag Link Chain & refitting the same after thorough repairing of the chain 48 COAL FEEDER WORK: Bed Height adjustment & if required partial cleaning of coal feeder 49 COAL FEEDER WORK: Replacement of Scrapper bar & Chain link of Drag link chain of Coal Feeder in situ 50 COAL FEEDER WORK : Replacement of Conical Chute 51 COAL FEEDER WORK : Replacement of Drop pipe including fitting of man holes after fab-rication of the same 52 COAL FEEDER WORK : Feeder chain checking & all pin tacking 53 COAL FEEDER WORK : Feeder bearing greasing (4 nos.) 54 COAL FEEDER WORK : Feeder chain tension checking & tightening 55 COAL FEEDER WORK : Replacement of Duplex chain 56 ALIGNMENT WORK: Alignment of Coal Mill motor with Mill Gear box. Gear box holding down bolts tightness to be done. 57 ALIGNMENT WORK: Alignment of Motor with PA Fan. Tightening of Fan bearings are to be done./PA or FD fan bearing replacement work with associated job. 58 ALIGNMENT WORK: Alignment of Motor with FD Fan. Tightening of Fan bearings are to be done. 59 ALIGNMENT WORK: Realignment of Hydraulic Cou-pling with Motor & ID Fan includ-ing tightening of Fan bearing bolts 60 ALIGNMENT WORK: Alignment of Hydraulic Coupling with Motor & ID Fan & if re-quired Hydraulic Coupling is to be shifted / replaced. Tightening of Fan bearing bolts are to be done/Hydraulic coupling servicing 61 ALIGNMENT WORK: Removal & repositioning of Coal Mill / PA Fan motor 62 ALIGNMENT WORK: Alignment of Seal Air Fan with Motor 63 ALIGNMENT WORK: Seal Air Fan bearing replacement with Motor alignment 64 ALIGNMENT WORK: Mill / PA Fan Coupling replacement with Motor alignment 65 FAN & DAMPER WORK: Servicing of Gas Damper & if re-quired bearing are to be replaced 66 FAN & DAMPER WORK: Servicing of Air Damper & if re-quired bearings are to be re-placed/Feeder radicon gear box servicing 67 FAN & DAMPER WORK: PA / FD Fan RVC adjustment 68 FAN & DAMPER WORK: Repairing & Hard facing of ID Fan runner as per scope of work. Only Hard facing electrodes will be supplied by WBPDCL. 69 FAN & DAMPER WORK: Part repairing & Part hard facing of ID Fan runner. Only hard facing electrode will be supplied by WBPDCL. Scope of work is as per enclosed sheet. 70 FAN & DAMPER WORK: PA Fan Impeller checking 71 FAN & DAMPER WORK: Seal Air Fan / PA Fan balancing 72 FAN & DAMPER WORK: ID Fan runner checking & balancing 73 COAL BURNER WORK: Rotation of PF Impeller regulating rod 74 COAL BURNER WORK: Replacement after repairing of Coal nozzle, Impeller, Impeller regulating rod, Guard plate, PA liner including hard facing in the following areas with ESAB 600B electrode: 75 COAL BURNER WORK: Replacement after repairing of Impeller, Impeller regulating rod, Guard plate, PA liner including hard facing like serial no. E/2/b 76 COAL BURNER WORK: Replacement / rotation of Coal nozzle, Impeller, Impeller regulating rod, PA liner & repairing, hard facing of Guard plate. 75% of the Guard plate is to be hard faced with 3 – 4 mm heights. (Hard facing electrode will be supplied by WBPDCL) 77 COAL BURNER WORK: Hard facing of Coal nozzle - 60” X 8” X 3 - 4 mm at the flange end (Hard facing electrode will be supplied by WBPDCL and hard facing is to be done as per direction of Control Engineer) 78 BURNER WORK: Oil burner barrel replacement & associate work 79 WIND BOX WORK: Part repair of Air Register in situ 80 OTHER WORK: Greasing of PA Fan / Mill Coupling 81 OTHER WORK: Attending PA leakage from flange joint between PA Fan & Mill 82 OTHER WORK: Replacement of Mill Gear box oil after thorough cleaning of Gear box internals & its auxiliaries 83 OTHER WORK: Seal Air Fan bearing greasing & coupling checking 84 OTHER WORK: ID / FD / PA / Mill lub oil strainer cleaning 85 OTHER WORK: Replacement of Radicon Gear box 86 OTHER WORK: Oil replacement of Hydraulic Coupling & working oil cooler of ID Fan 87 OTHER WORK: For cooler leakage testing cooling water line isolation & normalisa-tion. 88 OTHER WORK: Replacement of Air seal & cooling water hose of PA Fan 89 OTHER WORK: Fabrication & repairing of Feeder Conical chute 90 PART: B 91 Minimum Monthly Lumpsum Value including labour charge as per minimum wage rate w.e.f 01.01.2024(09 nos category and 12 nos no category worker), 5 nos supervisor charge, 1 no companys own worker, Safety PPEs, tools, tackles, night allowance, consumables charge, other allowances and benefits as per MOS dtd 04.10.2021 and profit (Part: B is excluded of evaluation of tender)
Contract Date: Sep 04, 2025 Contract Value : 2.50 Crore
Government Departments No of Bidders 3
West Bengal View Result →
TenderDetail
Loading tenders