Subway Tenders from India

33 Subway tenders are published by various Tendering Authorities & Private companies. 33 live Tender for Subway are available in Subway Tender section You can further filter Subway tenders by Tender Value, Tender Submission Date or Project Location.

1

construction of pedestrian underpass (pup), box culvert (bc), minor bridge (mnb) and other road works between km.34+510 to km.35+100 near vellora chawk on nh-60 (balasore-kharagpur section) in the state of odisha onengineering, procurement & construction (epc) mode

  • 13.55 Crore
  • Orissa
  • Mar 3, 2021
  • 26647099
2

construction of rub/lhs, height gauge, road, r.c.c drain, and other miscellaneous work from 17.00 km to 20.50 km in connection with dimapur (dhansiri)-kohima (zubza) new line project.

  • 3.75 Crore
  • Nagaland
  • Feb 19, 2021
  • 26632200
3

remaining construction of rub at rly chainage 154/8-9 sidhmukh-narwasi .

  • Ref. Document
  • Rajasthan
  • Feb 3, 2021
  • 26620329
4

remaining construction of rub at rly chainage 153/3-4 sidhmukh-narwasi . ( new railway chainage-153/5-6 )

  • Ref. Document
  • Rajasthan
  • Feb 3, 2021
  • 26620320
5

remaining construction of rub at railway chainage 157 / 8-9 sidhmukh-narwasi .

  • Ref. Document
  • Rajasthan
  • Feb 3, 2021
  • 26620300
6

construction of pedestrian underpass box culvert minor bridge and other road works between km 34 . 510 to km 35 . 100 near vellora chawk on nh 60 balasore kharagpur section in the state of odisha

  • 13.55 Crore
  • Orissa
  • Mar 3, 2021
  • 26603674
7

geotechnical investigation work’ for provision of additional services like service road, truck lay bye, pup, vup, fob etc. for augmenting road safety features for package i: dankuni – chandannagar section and package ii : chandannagar – mogra section of sh-13 in phase i: part b: detailed design of underpasses ( vup, lvup ) , pedestrian underpasses ( pup ) / foot over bridges ( fobs ) . , total amount of boq -2 , amount after unconditional rebate

  • Ref. Document
  • West Bengal
  • Jan 27, 2021
  • 26603174
8

remaining construction of rub at rly chainage 153/3-4 sidhmukh narwasi (new railway chainage 153/5-6

  • 49.88 Lakhs
  • Rajasthan
  • Feb 3, 2021
  • 26562546
9

remaining construction of rub at rly chainage 154/8-9 sidhmukh narwasi

  • 1.11 Crore
  • Rajasthan
  • Feb 3, 2021
  • 26562545
10

remaining construction of rub at rly chainage 156/5-6 sidhmukh narwasi

  • 1.07 Crore
  • Rajasthan
  • Feb 3, 2021
  • 26562544
11

remaining construction of rub at rly chainage 157/8-9 sidhmukh narwasi

  • 1.12 Crore
  • Rajasthan
  • Feb 3, 2021
  • 26562541
12

1) s&t work in connection with track renewal in kte-bina section of jabalpur division. 2) s&t work in connection with proposed construction of limited height subway (lhs) in lieu of l-xing no. 60 (spl class) in between dmo-kyx station in bin-kte section.

  • 21.45 Lakhs
  • Madhya Pradesh
  • Feb 5, 2021
  • 26558163
13

secunderabad division-new bg line between jaggayyapeta-janpahad stations - proposed construction of rub @km 48/9-10 as 1x11.0mx5.0m rcc box (cast-in-situ) using rh girder of 26.80m length including balance work of road approaches in lieu of lc no.33 under traffic conditions between revuru ramapuram and mellacheruvu stations.

  • 7.01 Crore
  • Telangana
  • Feb 2, 2021
  • 26514117
14

elimination of 01 nos manned level crossings (lc no.134) by construction of rub between asanboni - saljajori section under aden/i/tata.

  • 9.52 Crore
  • Jharkhand
  • Jan 27, 2021
  • 26501367
15

elimination of 01 nos manned level crossings (lc no.139) by construction of rub between saljajori - tatanagar section under aden/i/tata.

  • 11.59 Crore
  • Jharkhand
  • Jan 27, 2021
  • 26501362
16

tumakuru-arsikere section:-construction of rub in lieu of lc no.101 at km 167/900- 168/000 and lc no.102 at km.170/200-300, lc no.103 at km.171/700-800 and lc no.105 at km.174/800-900.

  • 8.53 Crore
  • Karnataka
  • Jan 27, 2021
  • 26501219
17

tumakuru-arsikere section: construction of rub in lieu of lc no.72 at km.122/500-600, lc no.77 at km.131/500-600, lc no.78 at km.133/100-200 and lc 79 at km.134/100-200.

  • 7.66 Crore
  • Karnataka
  • Jan 27, 2021
  • 26501215
18

elimination of 01 nos manned level crossings (lc no.140) by construction of rub between saljajori - tatanagar section under aden/i/tata.

  • 13.64 Crore
  • Jharkhand
  • Feb 10, 2021
  • 26500806
19

construction of two underpasses at ima , dehradun ( spl wk ) under deposit work

  • Ref. Document
  • Uttaranchal
  • Feb 8, 2021
  • 26500802
20

ratlam division :-providing subway(rub) to eliminate manned level crossings nos. 144(km:280/09-10),145(km:281/14-15), & 146(km:283/12-13) in cna-rtm section by inserting relieving girder and laying the box(es) by pushing the box below the relieving girder.

  • 8.12 Crore
  • Madhya Pradesh
  • Jan 27, 2021
  • 26490021
21

bhusawal division- proposed elimination of level crossing by providing subway by box pushing method in lieu of level crossing nos- a(1)lc no. 39 @ kms 586/21-23 (ak-yad) (rcc box of sizes 5.0x4.5m) b(2)lc no. 41 @ kms 591/20-22 (yad-bgn)(rcc box of sizes 5.0x4.5m) c(3)lc no. 54 @ kms 627/03-05(mzr-mana) (rcc box of sizes 5.0x4.5m) d(4) lc no. 56 @ kms 636/17-19(mana-kurum)(rcc box of sizes 5.0x4.5m ) e(5) lc no. 57 @ kms 639//27-29(mana-kurum)(rcc box of sizes 5.0x4.5m ) f(6) lc no. 58 @ kms 64...

  • 18.63 Crore
  • Maharashtra
  • Jan 29, 2021
  • 26490018
22

signalling arrangement in connection with proposed construction of rubs in lieu of 1.lc.no:58 at km.250@ 47"45@ 36 between mci - mmz stations 2. lc.no:63 between bpa - rech 3. lc.no:66 at km.229/27-29 between rech-rlw 4. lc.no:67 between rech - rlw 5. lc.no:73 between asaf - rlt 6. lc.no:76 at km.204/0-2 between rlt- skzr 7. lc.no:78 at km.200/30-32 between vem-skzr 8. lc.no:79 between vem - skzr 9. lc.no:95 at km.140/32 between magh-bpq stations.

  • 1.23 Crore
  • Telangana
  • Jan 27, 2021
  • 26489981
23

s&t works for limited height subway at lc gate no. 170a and 175 between barabambo- lotaphar.

  • 25.11 Lakhs
  • Jharkhand
  • Jan 22, 2021
  • 26457606
24

1) provision of limited height subway of size 6.0mx4.5m of 22m barrel length by rh girder with cut and cover method for elimination of manned lc no. 12 at km 246/9-247/0 on pa- dd section.2)provision of limited height subway of size 6.0mx4.5m of 22m barrel length by rh girder with cut and cover method for elimination of manned lc no. 13 at km 250/7-8 on pa-dd section.3)provision of limited height subway of size 6.0mx4.5m of 22m barrel length by rh girder with cut and cover method for eliminatio...

  • 7.92 Crore
  • Maharashtra
  • Jan 25, 2021
  • 26457604
25

bhopal division - bina-guna section - construction of limited height subway in lieu of lc no. 14 at km. 1002/8-9 (non-interlocked engg. gate) as 5.00 x 4.50 m rcc box (cut and cover)

  • 2.12 Crore
  • Madhya Pradesh
  • Jan 25, 2021
  • 26440614
26

execution of works for construction of limited height subway no. 233 for casting and pushing of pre-cast rcc box and cast in situ rcc box along with other misc. work for 3rd line in between rourkela - jharsuguda section under chakradharpur division s. e. railway. chargeable estimate no. 1773w/2018.

  • 5.97 Crore
  • Orissa
  • Jan 21, 2021
  • 26440587
27

subway: pumping out of rain water, seepage water, de- silting and removal of bushes/debris in aden/atu portion for a period of one year.

  • 72.60 Lakhs
  • Tamil Nadu
  • Jan 29, 2021
  • 26429625
28

provision of limited height subway of size 6.0mx4.5m of 22m barrel length by rh girder with cut and cover method for elimination of manned lc no. 17 at km 262/6-7 on pa-dd section.

  • 2.51 Crore
  • Maharashtra
  • Jan 25, 2021
  • 26412362
29

implementation of improvement of chhatrapati shivaji maharaj international airport junction (t2) by construction of vehicular underpasses between km 6+140 to km 6+950 of western express highway in mumbai

  • 1.11 Crore
  • Maharashtra
  • Feb 8, 2021
  • 26409390
30

khairar-bhimsen section:- provision of limited height sub way in lieu of level crossings no.s-74 at km 1409/8-9.

  • 3.01 Crore
  • Uttar Pradesh
  • Jan 29, 2021
  • 26396302
31

howrah division - construction of limited height subway in lieu of level crossing no 11a/1 in between station ambika kalna -dhatrigram, level crossing no. 20/1 & 20/2 in between station dhatrigram-katwa, level crossing no.6/3 in between station balagarh-somra bazar at bandel - katwa section.

  • 8.77 Crore
  • West Bengal
  • Jan 25, 2021
  • 26396261
32

implementation of improvement of chhatrapatishivajimaharaj international airport junction (t2) by construction of vehicular underpasses between km 6+140 to km 6+950 of western express highway in mumbai.

  • 111.94 Crore
  • Maharashtra
  • Feb 8, 2021
  • 26394083
33

construction o-m of public toilet units refreshment kiosk water atm ( mini nest ) along with maintenance and operation of fobs with ramps-subway on dbfot mode from km 14 . 050-km 26 . 900 of delhi-gurgaon section of nh-48 in the state of delhi and haryana

  • Ref. Document
  • Delhi
  • Jan 28, 2021
  • 26226225
Tell us about your Product / Services,
We will Find Tenders for you
Top

Copyright © 2021 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail