

224 Railway Construction tenders are published by various Tendering Authorities & Private companies. 224 live Tender for Railway Construction are available in Railway Construction Tender section You can further filter Railway Construction tenders by Tender Value, Tender Submission Date or Project Location.
tender for railway electrification of 25kv ohe works including sps/ ssps, general electrification, civil engineering works, including tower wagon shed, service buildings, staff quarters, track works and signaling and telecommunication works on existing track of single line section of mavi, bari sadri section of ajmer division
a) kalyan passenger yard- scattered yard -scattered replacement of sleeper in connection with elimination of special layouts. b) kalyan passenger yard removal of special layouts by providing of 11 nos. 1 in 12 turnout sleeper along with ohe work towards mumbai end. c) kalyan passenger yard provision of 8 nos 1 in 12 turn outs sleepers and 3 nos 1 in 8.5 turn out sleepers toward igatpuri end.
virudunagar - vanchimaniyachchi section : through formation treatment from km:- 593.300 to 604.800 for a total length of 11.500 kms in between stations kovilpatti & kadambur in tuticorin permanent way section.
welding of rail joints by pre-heat (skv) welding and automatic thimble technique including supply of all required materials and equipment including thermic portion in connection with sanctioned estimate nos: (08/engg/ap-ii of 2020-21), (06/engg/ap-ii of 2020-21), (12/engg/ap-i of 2020-21, 13/engg/ap-i of 2020-21), (21/engg/ap-i of 2020-21), (26/engg/ap-i of 2020-21), (15/engg/ap-i of 2020-21), (14/engg/ap-i of 2020-21), (23/engg/ap-i of 2020-21), (16/engg/ap-i of 2020-21), (25/engg/ap-i of 2020...
through rail renewal(s)-6.446 km.(loop lines), deep screening work of points & crossings and balance p.way works between moribera(incl.) to rani(excl.) & guriya to marwar jn. doubling section between haripur-palanpur section.
guna-gwalior section - provision of lhs in lieu of manned lc no. 58 (non-interlocked) at km. 1193/7-8 between kolaras-shivpuri section (cut cover by using rh girder) size of rcc box 1/5.00 m x 4.00 m.
guna-gwalior section - provision of lhs in lieu of manned lc no. 115 (non-interlocked) at km. 1292/2-3 between panihar-ghatigaon stations (cut and cover method)
secunderabd division kazipet -balharshah section 3rd line with electrification -hiring of three (3) pick-up vans for supervisors under dy.ce/c/kzj unit for official movement of (i) sse/p- way/c/kzj@bza (ii) sse/p-way/c/kzj@pdpl & sse/w/c/rdm &(iii) sse/w/c/kzj to look after 3rd line works between kzj-rgpm, kzj-wl & ki-bza and anywhere in the jurisdiction of s.c.railway for a period of 21 months.
deep- screening by bcm and manual on khandwa-itarsi, itarsi-bhopal, itarsi-jabalpur and itarsi-nagpur section on specified locations, total 24.35 kms. under sr. den/s/bhopal.
annual contract for track maintenance of mgr for section-iv, ntpckahalgaon.
p.way works including transportation of p.way materials, earthwork in formation, blanketing, extension of bridge etc. in rewa yard in connection with satna-rewa doubling project.
associate signalling works in connection with through ballast renewal (tbr) between km 118/0-146/0 including kwm, jmk, jgjn & hji yard of lumding division.
(a) at mlg :- special repairs to opd block, cc wards, administrative block of central hospital, maligaon & miscellaneous repairs to kamakhya railway junction (b) at mlg :- special repairs to cpo office, accounts office, pce office, cmm office of h.q. complex including miscellaneous repairs of rang bhawan & nfrsa stadium.
guntakal division: tbtr: renewal of steel channel sleepers with h-beam sleepers for 2 bridges in sse/br/north jurisdiction (br.no. 80 and 111 of gy-dmm section).
guntakal division: tbtr: renewal of steel channel sleepers with h-beam sleepers for 3 bridges in sse/br/south jurisdiction (br.no. 118dn of gdr-ru section, br.nos. 550dn, 602up of ru-gy section).
sw-i) bza division - bza - gdr section: trr(p) - 1.364km from km 158.636 to 160.00 on dn line in sse/p.way/nlr section of aden/nlr sub - division.sw-ii) bza division - bza - gdr section: tfr (all fittings) : 7.150kms and tfr (without ercs) : 2.953km at various locations in aden/nlr sub - division.
part supply of signaling material, installation, testing and commissioning in connection with various track circuit and point work in section of ahmedabad - khodiyar - palanpur, mahesana - patan - bhildi, mahesana - viramgam, khodiyar - gandhinagar - kalol, ahmedabad - himmatnagr, mahesana -taranga hill and various other locations of ahmedabad division.
nagda-kota section :- through formation treatment by geogrid & geotextile with bcm from km 698.220 to 725.000 up & dn (46.520kms).
guntakal division: tbtr: renewal of steel channel sleepers with h-beam sleepers for 1 bridge in sse/br/central jurisdiction (br.no. 292dn of gtl-bay section).
new bongaigaon-goalpara town-kamakhaya (sl) -tsr(p) - 8.70 km.
supply of building material at krishi vigyan kendra kerakat , jaunpur . , supply of building material , stone grit 12- 20mm dalla grit , stone ballast 20- 40mm , coarse sand fm 2 . 6 & above ( confirming zone-2 ) , bricks -m150
supply of building material at rajkiya mahavidyalya muftiganj , jaunpur , supply of building material , stone grit 12- 20mm dalla grit , coarse sand fm 2 . 6 & above ( confirming zone-2 ) , stone ballast 20-40 mm size , brick bats , bricks m-15
repairing of track no wmh 5150 of psc(west) colliery.
supply 50mm gauge hard stone machine crushed ballast and loading the same into railway's wagons/hoppers at pakur/bakudih/barharwa/pinargaria depot for kharagpur division (1,74,661 cum).
welding of 60kg /90 uts rails in-situ with single shot crucible fitted in connection with track renewal and maintenance work in kharagpur division. (13,682 joints)
refurbishing of camp coaches for track machines
joravasan - surat sec. ctr(s/p) = 8.290km in connection of sanctioned work ctr(s/p) = 15.524km
material supply.- 1 vetrified tiles 1 * 1.4 ft 2 jcb rental 3 1.5 inch ballast 4 black theft 5 grills 6 cement 7 door 8 vita 9 sand 10 sliding window 11 rubber paint 12 3 / 4 inch black ballast 13 pimples 14 shutter iron
"signal zonal work under the jurisdiction of sse/sig/vzm in waltair division."
at bt-bnj section: construction of rail fencing & ballast wall total 7740m at km 26/5 to 27/5,km-30/13 to 31/15,km-36/19 to 37/7, km-37/18 to 38/6, km@45'47@15 to 40/15 both up & dn track near railway track under senior section engineer/works/bongaon in the jurisdiction of assistant engineer/barasat
at bt-bnj section: construction of rail fencing & ballast wall total 8720m at km-52/20 to 53/14, km-53/21 to 54/5, km-66/33 to 67/25, km-61/23 to 62/13 & km-75/5 to 76/5 both up & dn track near railway track under senior section engineer/works/bongaon in the jurisdiction of assistant engineer/barasat
proposed supplying and stacking of machine crushed ballast from outside quarry as per revised ballast specification of june 2016 and loading the same into the ballast hoppers by mechanical means at kayer depot under sr. den (s) ngp's jurisdiction. (qty. 75261 m3).
proposed repairs of tracks in scattered location under section of sse(p.way) butibori under aden(s)ngp sub-division.
barabanki & malhaur yards : miscellaneous p.way works including dismantling and linking of bg track & turnouts, ballast insertion, leading of p.way material, bni/ni including working of track machines and other allied (p.way) works in connection with "barabanki-malhaur-3rd & 4th line (32.84 km) on lucknow division of northern railway
pnbe - ddu section (1) ctr/p dn line km 556.2 - 560 = 3.8 km, 643.9 - 644.5 = 0.6km, 661 - 662 = 1.0 km, 675 - 678 = 3.0 km, 678.0 - 678.5 = 0.5 km, 679.75 - 680.0 = 0.25 km, up line km 629.0 - 629.5 = 0.5 km, 671 - 672 = 1.0 km, 689.098 - 690.143 = 1.045, 697.66 - 698.246 = 0.586, 711.25 - 712.308 = 1.058, 730.528 - 733.0 = 2.472 km 736.124 - 744.1 = 7.976 & 744.1 - 748.0 = 3.9 km (total 27.687 km) and (2) tsr/p on dn line 568.65 - 568.95 = 0.3 km up line 551.0 - 555.0 = 4.0 km up line 571.095...
1) s&t work in connection with track renewal in kte-bina section of jabalpur division. 2) s&t work in connection with proposed construction of limited height subway (lhs) in lieu of l-xing no. 60 (spl class) in between dmo-kyx station in bin-kte section.
construction of cut & cover tunnel no. 1c ( approx. length - 90m ) at ch. 6.550 km to 6.640 km, c&c no. 2a ( approx. length - 50m ) at ch. 6.550 km to 6.640 km, balance works of c&c no. 1b ( approx. length - 150m-rcc box ) at ch. 6.750 km to 6.90 km, c&c no. a0 ( approx. length - 145m ) at ch. 0.772 km to 0.941 km and balance works of ug tunnel no. 1 ( side drains, trolley refuges excavation & lining ) at ch. 2.051km -3.932km, ug tunnel no. 1a ( ug lining of approx. length 134m ...
open tender for the work of repair and maintenance of track under sse/p-way/dumka
proposed supplying and stacking of machine crushed ballast from outside quarry as per revised ballast specification of june 2016 and loading the same into the ballast hopper by mechanical means at malkhed depot under sr. den (s) ngp's jurisdiction (qty. 76228m3)
"samuktala - kamakhyaguri - tbr - 8.00 km. & alipurduar - samuktala - tbr - 12.60 km."
open tender for strengthening of br. no.679,685,690 etc. in main line, br. no.64,66,117 etc. in jasidih- dumka line with other ancillary work under the jurisdiction of aen/jsme.
construction of cut & cover tunnel no. 1c (approx. length - 90m) at ch. 6.550 km to 6.640 km, c&c no. 2a (approx. length - 50m) at ch. 6.550 km to 6.640 km, balance works of c&c no. 1b (approx. length - 150m-rcc box) at ch. 6.750 km to 6.90 km, c&c no. a0 (approx. length - 145m) at ch. 0.772 km to 0.941 km and balance works of ug tunnel no. 1 (side drains, trolley refuges excavation & lining) at ch. 2.051km -3.932km, ug tunnel no. 1a (ug lining of approx. length 134m) at ch. 4.376 km to 4.510 k...
doubling of railway track between ludhiana and kila raipur ( 17.174 km ) including electrification and signaling telecommunication works on engineering procurement construction ( epc ) mode.
bids are invited for high pressure sodium vapour lamps (hpsv lamps) as per is:9974 (pt.1 and 2 ) , lamp starter (ignitors - starting device) for hpsv lamps, metal halide lamps) as per is:12449 part , lamp ballast for hpsv lamps , led luminaire (for road and street lights) , capacitor total quantity : 108
repairing of existing railway track at icd balasore
tender for 132 / 33 kv rai nagar to 33 / 11 kv balrai turnkey base work under edd iiird saifai etawah-1 supply of 33 kv xlpe insulated al. cable 3 x 300 sq. mm. 2 supply of g.i. pipe 160 mm. dia for u/g laying of 3x300 sq. mm. 33 kv xlpe cable below the railway track (pipe to be laid by h.d.d. method) 3 supply & erection of 33 kv heat shrinkable jointing kit outdoor type for 33 kv, 3x300 sq. mm. xlpe cable 4 supply & erection ofm.s. droper channel 100x50 mm, 3000 mm long with 2 nos clamps- ...
tender for unloading of full rake of fly-ash at cci bokajan railway siding from railway wagons within free time allowed by railway & shifting of the same from cci bokajan railway siding to respective gantry/ yard inside the factory and subsequent cleaning / sweeping of railway track, platform as per railway rules.
laying of 3 core 11kv 185/240 sq mm2.11 kv xlpe electric power cable in side 150 mm dia cast iron pipe of la class under railway track using horizontal auger boring machine along with liaison work with rly authority for bifurcation of 11 kv feeders under bopal division
miscellaneous p.way works such as boxing of ballast, sealing of liner contact area, shallow screening, through packing, jungle cleaning, cleaning of side drains etc. under the jurisdiction of aden (balugaon) of khurda road division.
miscellaneous p.way works such as boxing of ballast, sealing of liner contact area, shallow screening, through packing, jungle cleaning, cleaning of side drains etc. under the jurisdiction of aden (brahmapur) of khurda road division.
ctr(s)-14.850 kms with 60 kg rail and 60 kg prc sleeper @ 1540 with ballast cushion and earth work from inside ammunition depot shed no. 139/148.
bids are invited for high pressure sodium vapour lamps (hpsv lamps) as per is:9974 (pt.1 and 2 ) , lamp ballast for hpsv lamps , lamp starter (ignitors - starting device) for hpsv lamps, metal halide lamps) as per is:12449 part , ballasts for fluorescent lamps , fluorescent lamps (fluorescent tubular lamps) as per is: 2418 (part 1,2,3 and 4) total quantity : 2260
supply of marshalling yard spares ( rail track material ) for rgtpp hisar, dcrtpp yammunanagar and ptps panipat
annual contract for track maintenance of mgr for section-v, ntpckahalgaon
repair and maintenance of railway track for smooth movement of rolling stock in bhel bhopal
shifting of lt line and strengthening of lt line parallel to railway track from anil shahid gate , airforce gate to karampur chaudhary under edd-ii , bareilly ( full deposite scheme )
auction contract for sale of r.b.m., sand, ballast, murum.
supply & spreading of ballast of company’s pvt. rly. line for shärda vihar area to korba exchange yard and inside plant area at dspm-tps, cspgcl, korba east.
mangalore -proposed preparatory works in connection with g m inspection between mangalore- mangalore junction- panambur(other than track works).
senior section engineer permanent way mangalore section: proposed preparatory works in connection with gm inspection for the year 2020-21 (track work)
linking of new bg track with 60kg / 52kg new rails / sh rails and psc sleepers with 1660 nos / per km in main line and m+7 sleeper density in loop lines on newly constructed formation and linking from km 17 / 0 to 44 / 0 including spreading of ballast and loading / unloading, carrying of rail, sleeper, points & crossing and p. way fittings to molvom / pherima station including flash butt welding and other ancillary works related to track linking in connection with dhansiri-zubza ( bg )...
hubballi- chikjajur doubling project:- track linking works between kundagol (ex) and savanur yard (ex)between km: 450/000-423/500 & 420/500-414/000 ( including snh yard & gdi yard) for total : 33.0 km.
conversion of coaches into camp coaches (refurbishment) for 26 coaches at c&w workshop, n.f. railway, new bongaigaon.
miscellaneous p.way work for maintenance of track in krcl pattern under the jurisdiction of sse(p.way)guwarighat under aden/nainpur.
supply, stacking and mechanized loading of 105000 m3 machine crushed track ballast as per railway specification irs-ge-i-june 2016 or latest at khj depot under aden/lalitpur.
supplying and stacking of 65 mm machine crushed ballast at karjat depot.
supply, erection, testing and commissioning of electrical and mechanical equipment with scopeof 03 years of operation and maintenance atparvat sps.- ( 1 ) h.t vcb panel ( 2 ) airbreak switch ( 3 ) lighting arrestor ( 4 ) d.o. fuse assembly with fuse ( 5 ) pin, post insulator ( 6 ) transformer ( 7 ) ht protective relays ( 8 ) l.t power cable ( 9 ) h.t power cable ( 10 ) h.t, lt jointing kits ( 11 ) air circuit breaker ( 12 ) mccb ( 13 ) mcb, elcb, rc...
urgent raising of height of existing rcc drain constructed on bank of cutting saection from mast pole no. 16/35 to mast pole no. 16/19 in railway line at 2x500 mw, abvtps, cspgcl, janjgir-champa.
supply & spreading of ballast of company’s pvt. rly. line for sharda vihar area to korba exchange yard and inside plant area at dspm-tps, cspgcl, korba east
supply of construction repairing material nagar parishad burhar-brick , sand , murum , ballast , dust , iron , primer , brush , paint , fiber door , grill , cement isi , iron gate , paver block , white cement etc
1) repairing of bulldozer, 2) using of boiler coal, 3) cleaning of electrical equipment, 4) supply of hrc contro/ power fuse and high capacity semi conducting fuses, 5) supply of aluminum and f.r.p. staircase, 6) daily civil work of central store department, 7) purchase of ballast fir lighting fixture, 8) supply of c.h.v m.c.b. 9) purchase of wire and i.c.t.p. switch.
mys division: birur-hubballi section:- ancillary work in connection with deep screening by bcm for a length of 39.775km in aden/davangere sub division under sanctioned work of through ballast renewal (tbr) from km 210 to km 380 for a length of 71.23 km at scattered locations between birur-harihar stations. (locations for a length of 39.775km- 211/800-217/200(up), 218/400-220/965(up), 228/000-230/900(up), 248/710-258/577(up), 228/510-230/800(dn), 262/000-278/753(dn))
mysuru division: birur-hubli section:- ancillary work in connection with deep screening by bcm for a length of 31.455 km in aden/dvg sub division under sanctioned work of through ballast renewal (tbr) from km 210 to km 380 for length of 71.23 km at scattered locations between birur - harihar stations. (locations for length of 31.455 km - 279/500- 280/500 (dn), 288/071-289/026 (dn), 339/000-350/000, 361/500-380/000)
zonal work in zone no. 4 for period ending 30.06.2021 jurisdiction: bandariya bagh north eastern railway colony & drm office building.
a)trr(p)-6.47 km and tsr (p)-17.90 km in kalyan-lonavala section. b)deep screening of track 9.07 by bcm process between kms105.33 to kms.114.4 kms=9.07 kms in kjt- khpi(sl) under sr.den(se) juridictionc)deepscreening by bcm between kalyan-lonavala section(kyn-lnl-trr(p)-6.47km &tsr (p)-17.90)
maintenance of railway tracks of rsmy at ytps for a period from april-2021 to march-2022
udhna - jalgaon:tbr plain track, p&c, shoulder & crib ballast, tftr, trr, crr and ttr under aden-amalner inconnection of sanctioned track works for the year 20-21.
bilharghat -sohawal section :- linking of b.g. track & turnouts, provision of glued joint & sejs, dismantling of existing track & turnouts , handling, lifting, loading, unloading and spreading of ballast, leading of p-way materials and others lied works in between bilharghat (excluding) to sohawal (including) & excluding ,darshan nagar & salarpur yard in connection with''proposed doubling of barabanki-akbarpur (161 km)" of lucknow division on northern railway.
secunderabad- dhone sections: ctr (p) for 6.55 kms (for a length of 3.95 kms only).
hyderabad division-tbr-27.36 km: rear works behind bcm in deep screening locations of den/lines/hyb jurisdiction
shallow screening by sbcm machine between kyn-igp & dw-bsr section under sr.den (ne) csmt section.
bhusawal division - ctr/s work at savda up & dn loop, raver up & dn loop, burhanpur up & dn loop, nepanagar dn loop, dongargaon dn loop, khandwa dn 1st & 2nd loop, total 8.551tkms on aden khandwa section under sr. den (north) bhusawal jurisdiction.
conclusion for rate contract for paints for 03 years , paint , traffic , top coat , dark amercoat grey . , epoxy based primer for appication in ballast tank , h . p . anticorrosive paint for use under non-skid coat , h . p . advanced non-skid coating for helo & flight deck , high performance anticorrosive paint for flight deck . , h . p . non-skid coating for flight deck ( with arrestor gear ) , h . p . non-skid coating for flight deck ( w / o arrestor gear ) , paint polyuret...
collection of ballast incl mech loading, boxing etc in hise depot
supplying and stacking of 65 mm machine crushed ballast as per revised specification of june,2016 and loading the same in to wagon/hoppers/boxes, at turbhe depot under aden (t) tna section (qty.60758 m3)
through rail renewal (primary) of existing 60k. rail with new 60kg. 90uts rail for 26.211 tr.km. (i) (km.410.55-412 (joint line) = 1.45 tr.km., km.404.54-412 (up line)= km.7.46 tr.km., km.427-434.05 (up line)= 7.05 tr.km., km.452.3-453.16 (up line)= 0.86 tr.km., 455.45-459.64 (up line) = 4.19 tr.km. between bndm-jsg., (ii)km.497/8-498/22 (dn line)= 1.5 tr.km. between dtv-beh, km.515/4-514/26 (dn line)=0.5 tr.km. (total - 2.0 tr.km.), (iii)km.412-414 (up line) = 2.0 tr.km. between bndm-rou, (iv)...
through sleeper renewal (primary) of existing psc-60kg sleeper (1660nos/km) with new psc-60kg sleeper(1660nos /km , wider base psc sleeper) with elastic fastening including deep screening / raising of ballast cushion to the standard of 35cm, for 8.8km in between section bndm-rou in ckp division under juridication of den(west)/ckp (by pqrs) (2nd call)
bhusawal division - tsr (p)- 20 kms with trt with deep screening by bcm in igatpuri- manmad section under sr. den(south)bhusawal's jurisdiction.
supplying and stacking on railway ground 65mm machine crushed stone ballast as per latest specification of rdso/lko of june-2004 wit latest amendments including royalty and fees etc and loading the same into railway hoppers/wagons etc as directed by aden at site at tkwd depot. (approx. qty. - 25,000m3)
sw-i: proposed cess work in connection with the work of bengaluru-mysore section (24.9 km). sw-ii: sw-ii: proposed cess in connection with the work of bengaluru-mysore section for a length of 19.60 kms. sw-iii: strengthening of bank by providing standard width for a length of 11.05 km in sse/pway/kgi section. sw-iv: strengthening of bank by providing standard width for a length of 8.2 kms in sse/pway/cpt section. sw-v: strengthening of bank by providing standard width for a length of 10.9 kms i...
supplying and stacking on railway ground 65mm machine crushed stone ballast as per latest specification of rdso/lko of june-2004 wit latest amendments including royalty and fees etc and loading the same into railway hoppers/wagons etc as directed by aden at site at dudhani depot. (approx. qty. - 25,000m3)
proposed passing 1850mm dia carrier pipe for water supply under railway track at km 523/3-4 by pushing technique of rcc box of size 2.50mx2.50 on sur- wd section
tftr work at km 519/6-8, 526/4-527/8 & 529/2-530/5= 2.90km under aden/klbg subdivision [re-invitation]
railway siding daily maintenance and preventive maintenance of entire broadgauge railway track line in inside yard and outside yard of mtps upto karumalaikoodal for 120 days.
crossing of express railway line bombay-dehli with regional water supply scheme a-2 existing pipeline netwok(godhavi group) between timba-s.south under deposit work of district ahmedabad
mtps i chp i railway siding daily maintenance and preventive maintenance of entire broad gauge railway track line in inside yard and outside yard of mtps
e-auction sale of mineral stone , khanda , gitti , ballast , boulder , pattiya , red murrum , granite , stone , etc
annual repairing contract of defective pdh/sdh equipment cards (make- tejas, webfil & puncom) installed under the jurisdiction of sr.dste/lmg in lmg division for a period of two years.
eastern railway ctr(p) hwh - bdc ctr(p) work- reverse m/l- ( 38.0 - 38.845 km = 0.845 km) total = 0.845 km by pqrs & reverse m/l 6.0 - 9.15 = 3.15 km), (10.42 - 12.999 = 2.579 km), tkpr engine line + receiving line -(0.918 - 1.961 km = 1.043 km), total = 6.772 km by manual, hwh bdc - total ctr(p) = 7.617 km and other locations with other ancillary works.
eastern railway - primary track renewal namely hwh divn.: trr(p) = hwh- she: dn ml 1.729 - 1.870 = 0.141, dn ml 2.00 - 4.616 =2.616,ml 6.272 - 6.556 = 0.284, dn ml 6.632 - 8.00 = 1.368, dn ml 9.73 - 10.087 = 0.357, dn ml 13.382 -13.720=0.338.dn ml 19.400 - 20.300 = 0.900, up ml 1.325 - 1.337 = 0.022: up ml 4.460 - 6.000 = 1.540 and other locations with other ancillary works.
Copyright © 2021 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail