

82 Foot Over Bridge tenders are published by various Tendering Authorities & Private companies. 82 live Tender for Foot Over Bridge are available in Foot Over Bridge Tender section You can further filter Foot Over Bridge tenders by Tender Value, Tender Submission Date or Project Location.
construction of foot bridge/ protection on largam khul near the house of mohammad iqbal and others branch of sanigloo canal .
improvement to left service bank of bachhipur sub-minor from rd . 1160m to 1620m including 3nos of foot bridge .
tender for three years rate contract for fccu i fresh catalyst -base price on fob basis, rare earth oxide content( wt%) long description:, : efficiency factor 'a' long description, base price on fob basis long description, etc.
2 emergent repair to wooden bridge at baro hanra over hanra khal in g . p . ramkishore , block kulpi , dist . south 24 pgs . under diamond harbour ( i ) sub-division of canals division .
amrut 2017_18_floating intake structure at peechi dam_balance work appendix _1_construction of rcc foot bridge for pipe line work across canal 2 nos_
dismentaling, providing, erecting &necessary strenghening/repairingwork of footbridge chequred plate,dial indicator, anchor box of radialgate of size 9.144 m x 6.09 m ( 30' x20'), 18 nos and foot bridge chequredplate, dial indicator, anchor boxcover, eru rope drum of gate no 3 &7,stair case and diesel engine of radialgate additional spilway of size 12.497m x 8.23 m ( 41' x 27'), 20 nos ofmachchhu - 2 irrigation schemeunder executive engineer, irrigationdivision, morbi.
construction of foot bridge at chakali gedda ( beside apiic road ) in w.no 50 of gajuwaka zone of gvmc.(2nd call)
re- construction of dilapidated wooden bridge having 38 . 50 meter span over kalaberia khal at ashutia near house of bihari maity in gp- kotbar , block- bhagabanpur- i and dist . purba medinipur in c/w paray samadhan campaign
tender for soil investigation work for the proposed steel bridge in place of wooden bridge over churial diversion khal at ch.4620.00m., near ranjitmath at nischintapur gp,block-budge budge- i,within dist.- south 24 parganas,under suburban drainage sub-division no.ii of suburban drainage division" during-2020-2021.
tender for construction and maintenance / repair of wooden bridges in place of existing wooden bridge.
providing m.s grills, foot bridge barricading arrangements to siphon at km 38.20 of ylm canal in reach 1
construction of foot bridge over indus at liktsey .
construction of foot bridge over river kana ajoy at village bejra under bolpur sriniketan ps
fabrication supply transportation , erection of check dam cum sluice cum foot bridge at rd 39835m over ashrunkhal dc near village arilo gokhabandha under drainage division kendrapara
fabrication supply transportation , erection of check dam cum sluice cum foot bridge at rd 28780m over ashrunkhal dc near village nachhipada under drainage division kendrapara
extension of existing fob for improvement of circulating area at bhojipura station in izzatnagar division of ne railway.
construction of head works, foot bridge, providing and laying ms raw water rising main, providing and laying di pipe feeder mains from wtp to service reservoirs, construction of 1no of 10lakh liters capacity rcc oht(shaft type), providing and laying hdpe pipe distribution network and house service connections under wss to afzalpur town with bhima river sonna barrage as source.
construction of pedestrian bridge at vastral junction at s. p. ring road in auda area. (job no.- 20 / 2020 – 21 remaining work )
construction of foot bridge at malikbar/ youljuk umba ( block sankoo ) under sdp
package 1)construction of footbridge to to niduvale gp sealnayi gandi halla 2) kundur gp bhatragadde girijana colony halla 3) kundur gp kanigadde village janavasathi pradesha halla in mudigere taluk.
mla sdf 2020-21 construction of foot bridge at mundakkai in wayanad district
construction of footbridge at mundakkai in wayanad district
geotechnical investigation work’ for provision of additional services like service road, truck lay bye, pup, vup, fob etc. for augmenting road safety features for package i: dankuni – chandannagar section and package ii : chandannagar – mogra section of sh-13 in phase i: part b: detailed design of underpasses ( vup, lvup ) , pedestrian underpasses ( pup ) / foot over bridges ( fobs ) . , total amount of boq -2 , amount after unconditional rebate
construction of wooden bridge with joist support at narayanmore , bishnupur sagar
construction of foot bridge at sarwari kullu sh construction of sub structure and super structure including steps both side streams .
construction of foot bridge to hemaravalli-somavainihalla in chikmagalur taluk
construction of foot bridge from hosahalli colony to avuthi in chikmagalur taluk
construction of foot bridge from ,bygur school gadde to virendrashetty gadde in avuti hobli byguru gramapanchayat in chikmagalur taluk
londa- miraj doubling projects; construction of new hl , platform including earth work in formation, extension of minor bridge no.82, construction of retaining wall, construction of cop, construction of fob including dismantling of existing fob, extension of island platform, construction of central drain, construction of booking office, s&t building, tm rest house, development of circulating area, formation of approach road and other miscellaneous works at londa yard
remaining work of pedestrian bridge, road works.
construction of foot bridge to galliguddae hemaravalli (near malesha house) in shrivasae gp in chikmagalur taluk
construction of foot bridge from kadavanthi sc colony to kandya hobli lake in chikmagalur taluk
construction of foot bridge from koduvalli road to mincheri in chikmagalur taluk and dist
construction of foot bridge form avuthi hobli byguru grama panchayat makkanahalli devaru datuva darigae connecting road in chikmagalur taluk
construction of foot bridge from avuthi nalkooramma temple to rameshwara temple and to school in avuthi g.p in chikmagalur taluk
construction of wooden bridge over adiganga channel at ch 15555 . 00 m near krishnamohan phe building in gp sekhorbali1 block ps baruipur
tender for construction of wooden bridge over adiganga channel
supply, installation & commissioning of kgv for fob at ibp jhamarkotra mines
tender for - improvement to link drains and sub-drains of balipatana to balijori (sarunai) drainage system (balance work - pile foot bridge near village phulpatana & balipatana)
package: 11 1 ) construction of foot bridge for halla near gowrigadde ashrama in asagodu g.p koppa taluk 2 ) construction of foot bridge for halla near nandigodu surendra and m.p. chandrashekar''s house in asagodu g.p koppa taluk, chikmagalur dist
package: 8 1) construction of foot bridge for halla in a.g. katte road near ramanna gowda's house in asagodu g.p koppa taluk 2) construction of foot bridge for thumbari halla at belegadde road in asagodu g.p koppa taluk
guntakal division: schedule(a)-(ru-wd sec)-(sw-i): proposed extension of platforms to hold 24/26/lhb coaches including cc pathway at guntakal station and proposed extension of platforms to hold 24/26/lhb coaches at tadipatri station- proposed electrical arrangements.(sw-ii):proposed construction of foot over bridges at vanganuru railway station .(sw-iii): proposed construction of foot over bridges at matmari railway station. schedule(b)-guntakal division:proposed to facilitate accommodation for...
package:1: 1) construction of foot bridge for halla on bitmakki to kaske road in nemmar g.p. sringeri taluk 2) construction of foot bridge for halla near shivappa and others house and road from makkimane to bilagodu road in begar g.p. gundre grama, sringeri taluk
construction of foot bridge for govt. halla near mandalagaru chavaligadde puttaswami's house in aduvalli g.p. koppa taluk
construction of foot bridge for halla near sampekolalu prabhakara house for childrens reach school from kikre and kunthuru village in menase g.p. sringeri taluk
package 13: 1) construction of foot bridge for halla on sarne grama mavinakodige addalatti halla in honnekudige g.p n.r.pura taluk 2) construction of foot bridge for halla near muluvalli bachikoppa in bale g.p n.r.pura taluk
construction of foot bridge for halla road from bhandihalla to aragodige road in kolale grama, aduvalli g.p. n.r.pura taluk
construction of foot bridge for halla near netravalli grama gopalanaika's house in addagadde g.p. sringeri taluk
construction of foot bridge for halla on choudikatte in jayapura g.p. koppa taluk
construction of foot bridge for halla from anegunda to karivane s.c. colony connecting road in sringeri taluk
package 6: 1) construction of foot bridge for halla at yakkadabailu grama in muthinakoppa g.p n.r.pura taluk 2) construction of foot bridge for halla near gandhigrama to alanduru prakasha, pranesha, and others house in kaduhinabailu g.p n.r.pura taluk 3) construction of foot bridge for halla nar alanduru and others house in kadahinabailu g.p., n.r.pura taluk
package:7 1) construction of foot bridge for halla from agalagadi to durganagara road and gubuugadde road in agalagandi g.p agalagandi gramam, koppa taluk 2) construction of foot bridge for halla near thotadamane ravikeerthi's house in agalagandi g.p , heggar grama, koppa taluk
package: 9 1) construction of foot bridge for halla near edathante keladevara house in asagodu g.p koppa taluk 2) construction of foot bridge for halla on muniyuru in bhandigadi g.p koppa taluk
package 3: 1) construction of foot bridge for halla on handiguli to sindholli schools road in markal g.p. yadadalli grama, sringeri taluk 2) construction of foot bridge for halla near magodu nagaraja's house and mudodu halla in between gandagalli yagnalukodige road in markal g.p. markal grama, sringeri taluk
package:5 1) construction of foot bridge for halla on sasimane narasimhayya heggade connecting road in bellanduru grama sringeri taluk 2) construction of foot bridge for halla from chatnani to magod road near phaniyachar house in markal g.p. sringeri taluk 3) construction of foot bridge for halla for magalabailu sampi halla connecting from magalabailu malavalli to thorehadlu school via sindholli in addagadde g.p. sringeri taluk
package: 4 1) construction of foot bridge for halla on makkimane to devalekoppa school road in asanabalu g.p. sringeri taluk 2) construction of foot bridge for halla on sooragodu to kiggga and meega schools connecting road in begar g.p. meega grama, sringeri taluk 3) construction of foot bridge for halla near rajamma's site and mudigere halla in neelanduru grama, begar g.p sringeri taluk
package:2 1) construction of foot bridge for halla on meguru to hanchikodige road in nemmar g.p. malnad grama, sringeri taluk 2) construction of foot bridge for halla near ramesh bhat and others house in kuthagodu g.p. gundre grama, sringeri taluk
construction of foot bridge for halla near arige govindegowda's house to karimane jeerulli connecting road in aduvalli g.p. n.r.pura taluk
package 10: 1) construction of foot bridge for halla on koge bilagundi road in jayapura g.p. koppa taluk 2) construction of foot bridge for halla near sigase narayana gowda and other's site in hiregadde g.p. koppa taluk
package: 12 1) construction of foot bridge for halla near kabbinamannu narayana and other's site in halasuru grama, bannuru g.p. n.r.pura taluk 2) construction of foot bridge for halla on ethanadigada to nemanahalli connecting road in bannuru g.p. n.r.pura taluk
construction of foot bridge for halla near modaladu to someshwara temple in bintravalli g.p. koppa taluk
construction of foot bridge for halla from dhoddahadlu to nagaragandi road road in haravari grama kanuru g.p. n.r.pura taluk
construction of 03 nos of steel foot over bridge fob along with pedestrian guard rails at ramasandra gate near milk dairy kondrajanahalli ib circle at hoskote locations in the stretch of bengaluru hoskote mulbagal of nh 75 in state of karnataka
supply, installation, testing and commissioning of omni bus data interface compatible with existing communication system of tms control centre, in connection with construction of fob's on churchgate - virar section of western railway.
execution of the work of (i) extension of fob from pf no. 2/3 to west side of the station at nilgiri road, (ii) provision of 2nd landing of new fob towards kharagpur end on pf no. 3/4 at rupsa.
improvement to drainage curn creek system along with construction of fbs, repair to control sluices, sioc protection works of gopabandhu nagar and bideipur gps r of basudevpur block in kansabansa-mantei doab no-xi (link drain outfall to mantel under
earth work in filling in embankment, blanketing, p.way work, extension of bridges, pf wall, extension of fob, boundary wall etc. for the construction of line no.-4 at ghoswar in connection with new bg rail line hjp-sgl project.
ksb :- provision of foot over bridge for interplatform changing at ksb towards st end with lift and other associated civil works.
repair of foot bridge
tender for execution of the work of extension of fob from pf no. 2/3 to west side of the station at nilgiri road, ii) provision of 2nd landing of new fob towards kharagpur end on pf no. 3/4 at rupsa.
chennai division :- provision of new foot over bridge no.23e and fabrication and erection of steel works for provision of escalators. (balance work)
construction o-m of public toilet units refreshment kiosk water atm ( mini nest ) along with maintenance and operation of fobs with ramps-subway on dbfot mode from km 14 . 050-km 26 . 900 of delhi-gurgaon section of nh-48 in the state of delhi and haryana
Copyright © 2021 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail