Accelerated Power Development And Reforms Programme (APDARP) eProcurement Tenders

View all Tender Notifications issued by Accelerated Power Development And Reforms Programme. Search live eProcurement business opportunities available in APDARP Tenders section. Accelerated Power Development And Reforms Programme Tenders are further filtered by Bid Submission Date, Tender Value, Project Location & Product Category. Get email alert on Tenders from Accelerated Power Development And Reforms Programme - (APDARP).

1

Accelerated Power Development And Reforms Programme - New

Construction of 45 M wide road Sector -72 -73, Faridabad. Supply and laying of earth work in embankment, Granular Sub Base, Wet Mix Macadam, Dense Bituminous Macadam, Bituminous Concrete M-20 cast in situ Kerb and Channel, Reinforced Cement Concrete

  • 7.39 Crore
  • Haryana
  • Feb 6, 2019
  • 18945452
2

Accelerated Power Development And Reforms Programme - Live

Corrigendum - Tender For The Supply, Installation And Commissioning Of Digital Mobile X-Ray Unit On Rate Contract For Two Years As Mentioned Against Item -1.01 Digital Mobile X-Ray Unit Per Unit Optional Item Rate To Be Freezed For Future Purchase 1.02 Dicom Ready Dry Imager With A Spatial Resolution Of More Than 300 Ppi / Dpi, With Contrast Resolution Of At Least 12 Bits Per Pixel Capable Of Printing 70 Of More Films Per Hour And Having At Least 2 Online Films Size Out Of 8”X10”, 10”X12”, 11”X14” / 10”X14”, 14”X14” And 14”X17” And Should Be Able To Print All These Sizes Of Films And Opg Films. There Should Be No Involvement Of Wet Chemicals And Should Have Dry Direct Printing.

  • 2.10 Crore
  • Haryana
  • Jan 24, 2019
  • 18917780
3

Accelerated Power Development And Reforms Programme - Live

Construction Of Shed In Nandi Shala Bhanbori Road Barwala

  • 9.88 Lakhs
  • Haryana
  • Jan 29, 2019
  • 18916806
4

Accelerated Power Development And Reforms Programme - Live

Construction Of Shed In Shamshan Ghatt At Kharkada Road Barwala,

  • 9.88 Lakhs
  • Haryana
  • Jan 29, 2019
  • 18916789
5

Accelerated Power Development And Reforms Programme - Live

Cleaning and chemical treatment of underground tank at water works Narnaul, A Mtc of W S Scheme in Sector1 Narnaul

  • 1.60 Lakhs
  • Haryana
  • Jan 23, 2019
  • 18915890
6

Accelerated Power Development And Reforms Programme - Live

Cleaning and chemical treatment of underground tank at boosting station in Sector6 PI Dharuhera, A Mtc of W S Scheme in Sector 6 Dharuhera

  • 1.98 Lakhs
  • Haryana
  • Jan 23, 2019
  • 18915887
7

Accelerated Power Development And Reforms Programme - Live

Cleaning and chemical treatment of underground tank at boosting station in Sector4 Rewari, AMtc of W S Scheme in Sector4 Rewari

  • 3.25 Lakhs
  • Haryana
  • Jan 23, 2019
  • 18915884
8

Accelerated Power Development And Reforms Programme - Live

Special repair of balance road in Sector-1 and 4 Hisar. Supply, laying and consolidation of 50mm Bituminous Macadam patch work 25mm thick premix carpet with B-type seal coat with mechanical paver on existing black top surface and new WBM surface and, Job No.112 (Re-invite)

  • 44.85 Lakhs
  • Haryana
  • Jan 24, 2019
  • 18914550
9

Accelerated Power Development And Reforms Programme - Live

Special repair of balance road in Sector-4 P-II Hisar. Supply, laying and consolidation of 50mm Bituminous Macadam patch work 25mm thick premix carpet with B-type seal coat with mechanical paver on existing black top surface and new WBM surface and a, Job No. 113 (Reinvite)

  • 41.10 Lakhs
  • Haryana
  • Jan 24, 2019
  • 18914549
10

Accelerated Power Development And Reforms Programme - Live

Special repair of roads in Sector-3 Hisar. Supply laying and consolidation of 50mm Bituminous Macadam path work and 25mm thick premix carpet with B-type seal coat with mechanical paver and all other works contingent thereto, Job No. 114 (Reinvite)

  • 15.35 Lakhs
  • Haryana
  • Jan 24, 2019
  • 18914548
11

Accelerated Power Development And Reforms Programme - Live

Repair of various street in W N 16

  • 8.87 Lakhs
  • Haryana
  • Jan 28, 2019
  • 18914245
12

Accelerated Power Development And Reforms Programme - Live

P/F IPB in Shamshan Ghat W N 17

  • 9.82 Lakhs
  • Haryana
  • Jan 21, 2019
  • 18914244
13

Accelerated Power Development And Reforms Programme - Live

P/F IPB from Kisan Petrol Pump towards Tohana Road w n 5

  • 9.89 Lakhs
  • Haryana
  • Jan 28, 2019
  • 18914243
14

Accelerated Power Development And Reforms Programme - Live

P/F IPB From Naresh dhanola to h/o Vasu Jain W N 10

  • 31.83 Lakhs
  • Haryana
  • Jan 28, 2019
  • 18914242
15

Accelerated Power Development And Reforms Programme - Live

P/F IPB from house of Jagtar Singh to Raj Kumar W N 14

  • 9.98 Lakhs
  • Haryana
  • Jan 28, 2019
  • 18914241
16

Accelerated Power Development And Reforms Programme - Live

P/F IPB near water works in W N 7

  • 7.26 Lakhs
  • Haryana
  • Jan 28, 2019
  • 18914240
17

Accelerated Power Development And Reforms Programme - Live

P/F IPB in Gali No 9 W N 13 and Gali 9/9 and 9/6 W N 13 and fixing of Old IPB at nandi Shala

  • 28.07 Lakhs
  • Haryana
  • Jan 28, 2019
  • 18914239
18

Accelerated Power Development And Reforms Programme - Live

MISC WORK, MISC WORKS

  • 9.95 Lakhs
  • Haryana
  • Jan 28, 2019
  • 18914238
19

Accelerated Power Development And Reforms Programme - Live

Reconstruction of Gali Kisn Tyre House to Jain Tractor and fixing IPB Mehnga Mistri tu Impreial Gardan

  • 9.89 Lakhs
  • Haryana
  • Jan 28, 2019
  • 18914237
20

Accelerated Power Development And Reforms Programme - Live

Construction of Public Toilet at Palika Bazar Ward No. 13 Barwala (Hisar ), Const. of Public Toilet at Palika Bazar Ward No. 13 Barwala (Hisar )

  • 4.93 Lakhs
  • Haryana
  • Jan 29, 2019
  • 18913806
21

Accelerated Power Development And Reforms Programme - Live

Construction of Public Toilet at Banbhori Road Near Fire Brigade Barwala (Hisar ), Const. of Public Toilet at Banbhori Road Near Fire Brigade Barwala (Hisar )

  • 4.93 Lakhs
  • Haryana
  • Jan 29, 2019
  • 18913805
22

Accelerated Power Development And Reforms Programme - Live

Construction of Public Toilet at Agroha Road, Barwala (Hisar ), Const. of Public Toilet at Agroha Road, Barwala (Hisar )

  • 4.93 Lakhs
  • Haryana
  • Jan 29, 2019
  • 18913804
23

Accelerated Power Development And Reforms Programme - Live

806/ME/MCBGARH/2018 Const. of CC street AC Tractor Agency (Kaccha Beri road) and Shardhanand Master, Parveen Lathar wali gali in ward no 23 Bahadurgarh., 806/ME/MCBGARH/2018

  • 19.75 Lakhs
  • Haryana
  • Jan 21, 2019
  • 18913740
24

Accelerated Power Development And Reforms Programme - Live

Remodeling of Badhana Minor from RD. 0 to RD. 44000 including constructing repair of intervening structures.

  • 3.20 Crore
  • Haryana
  • Jan 22, 2019
  • 18899193
25

Accelerated Power Development And Reforms Programme - Live

Construction Of Community Center at Bawani Khera

  • 99.98 Lakhs
  • Haryana
  • Jan 21, 2019
  • 18898509
26

Accelerated Power Development And Reforms Programme - Live

Construction of Hall in ward 14 Bhuna, Const of Hall in ward 14 Bhuna

  • 17.20 Lakhs
  • Haryana
  • Jan 21, 2019
  • 18898501
27

Accelerated Power Development And Reforms Programme - Live

854/ME/MCBGARH/2019 Supply and Installation of IP based CCTV Cameras in Sector 6 Location in Ward No. 30, 854/ME/MCBGARH/2019

  • 13.96 Lakhs
  • Haryana
  • Jan 28, 2019
  • 18898286
28

Accelerated Power Development And Reforms Programme - Live

853/ME/MCBGARH/2019 Supply and Installation of IP based CCTV Cameras in Sector 6 Location in Ward No. 25, 853/ME/MCBGARH/2019

  • 13.70 Lakhs
  • Haryana
  • Jan 28, 2019
  • 18898285
29

Accelerated Power Development And Reforms Programme - Live

852/ME/MCBGARH/2019 Supply and Installation of IP based CCTV Cameras in Sector 6 Location in Ward No. 24, 852/ME/MCBGARH/2019

  • 13.87 Lakhs
  • Haryana
  • Jan 28, 2019
  • 18898284
30

Accelerated Power Development And Reforms Programme - Live

851/ME/MCBGARH/2019 Supply and Installation of IP based CCTV Cameras in Sector 7 Location in Ward No. 22, 851/ME/MCBGARH/2019

  • 13.96 Lakhs
  • Haryana
  • Jan 28, 2019
  • 18898283
31

Accelerated Power Development And Reforms Programme - Live

850/ME/MCBGARH/2019 Supply and Installation of IP based CCTV Cameras in Various Location in Ward No. 20, 850/ME/MCBGARH/2019

  • 14.05 Lakhs
  • Haryana
  • Jan 28, 2019
  • 18898282
32

Accelerated Power Development And Reforms Programme - Live

849/ME/MCBGARH/2019 Supply and Installation of IP based CCTV Cameras in Various Location in Ward No. 18, 849/ME/MCBGARH/2019

  • 13.96 Lakhs
  • Haryana
  • Jan 28, 2019
  • 18898281
33

Accelerated Power Development And Reforms Programme - Live

Rehabilitation of Munnarehri Minor from RD. 0 to RD. 27300

  • 1.45 Crore
  • Haryana
  • Jan 22, 2019
  • 18898047
34

Accelerated Power Development And Reforms Programme - Live

Lining of watercourse O/L RD 8600/R Garhi Minor (Extension)

  • 30.60 Lakhs
  • Haryana
  • Jan 18, 2019
  • 18894334
35

Accelerated Power Development And Reforms Programme - Live

Lining of watercourse O/L RD 8600/R Garhi Minor (Extension)

  • 26.40 Lakhs
  • Haryana
  • Jan 18, 2019
  • 18894333
36

Accelerated Power Development And Reforms Programme - Live

Lining of watercourse O/L RD 8600/R Garhi Minor (Extension)

  • 16.75 Lakhs
  • Haryana
  • Jan 18, 2019
  • 18894332
37

Accelerated Power Development And Reforms Programme - Live

Lining of watercourse O/L RD 8600/R Garhi Minor (Extension)

  • 15.93 Lakhs
  • Haryana
  • Jan 18, 2019
  • 18894330
38

Accelerated Power Development And Reforms Programme - Live

Lining of watercourse O/L RD 8600/R Garhi Minor (Extension)

  • 15.70 Lakhs
  • Haryana
  • Jan 18, 2019
  • 18894328
39

Accelerated Power Development And Reforms Programme - Live

Lining of watercourse O/L RD 8600/R Garhi Minor (Extension)

  • 12.06 Lakhs
  • Haryana
  • Jan 18, 2019
  • 18894323
40

Accelerated Power Development And Reforms Programme - Live

Shifting Of 11 K.V Dhani Roop Nager Feeder And Other 11 Kv Passing Over The Plot Of Sector-1A At Fatehabad And All Other Works Contingent Thereto ( Including One Year Maintenance And Defect Liability Period Free Of Cost ) ., Job No. 1168

  • 10.45 Lakhs
  • Haryana
  • Jan 23, 2019
  • 18894320
41

Accelerated Power Development And Reforms Programme - Live

Construction Of Community Center At Kailash / Mohan Nagar Palwal In Palwal Distt

  • 4.07 Crore
  • Haryana
  • Jan 30, 2019
  • 18894319
42

Accelerated Power Development And Reforms Programme - Live

Replacement Of Existing Streetlights With Energy Efficient Led Lights In Jhajjar City.

  • 1.97 Crore
  • Haryana
  • Jan 21, 2019
  • 18894318
43

Accelerated Power Development And Reforms Programme - Live

Replacement Of Existing Sodium Light Fitting In Water Works Sector-3And5 At Hisar And All Other Works Contingent Thereto ( Including Three Year Replacement Warrnaty, Maintenance And Defect Liability Period For Free Of Cost ) , Job No.1169

  • 8.35 Lakhs
  • Haryana
  • Jan 23, 2019
  • 18894317
44

Accelerated Power Development And Reforms Programme - Live

Providing And Laying Of Water Supply And Sewerage System Which Are Falling In The Alignment Of Proposed R.O.B. At Level Crossing No. At 89 On Rewari-Hisar Section And Level Crossing No. 60 On Hisar-Jakhal Section On Jindal Chowk To Raipur Road, Hisar, Job No. 2 / 2019

  • 3.40 Lakhs
  • Haryana
  • Jan 28, 2019
  • 18894307
45

Accelerated Power Development And Reforms Programme - Live

Construction Of Footpath Of Park In Hanuman Mandir W. No. 16, E / 23 / 2018 Both

  • 4.54 Lakhs
  • Haryana
  • Jan 21, 2019
  • 18894305
46

Accelerated Power Development And Reforms Programme - Live

Compeletion Of Tile Work In Hermilap Dharmshala W. No. 14, E / 23 / 2018 Both

  • 2 Lakhs
  • Haryana
  • Jan 21, 2019
  • 18894301
47

Accelerated Power Development And Reforms Programme - Live

Providing And Fixing Of S.S Gate And Other Mise. Work In Government. Sen. Sec. School W. No. 12 At Nh-1, E/23/2018 Both

  • 4.58 Lakhs
  • Haryana
  • Jan 21, 2019
  • 18894299
48

Accelerated Power Development And Reforms Programme - Live

Lining Of Watercourse O / L Rd 8600 / R Garhi Minor ( Extension )

  • 37.75 Lakhs
  • Haryana
  • Jan 18, 2019
  • 18894298
49

Accelerated Power Development And Reforms Programme - Live

Development of L / S Work In Poly Clinic Building Sector-16 Karnal. ( Supply And Planting Of Various Type Of Plants And All Other Works Contingent Thereto ) .

  • 98000
  • Haryana
  • Jan 19, 2019
  • 18894297
50

Accelerated Power Development And Reforms Programme - Live

Lining of watercourse O/L RD 8600/R Garhi Minor (Extension)

  • 11.32 Lakhs
  • Haryana
  • Jan 18, 2019
  • 18894294
51

Accelerated Power Development And Reforms Programme - Live

Providing 9 Mtr. Long Octagonal Pole In Water Works In Sector-20P-I At Sirsa And All Other Works Contingent Thereto ( Including Three Year Replacement Warranty, Mtc. / Defect Liability Free Of Cost ) ., Job No. 1162 R

  • 1.55 Lakhs
  • Haryana
  • Jan 23, 2019
  • 18894293
52

Accelerated Power Development And Reforms Programme - Live

annual maintenance Of L / S Work In Nallah Area Sector-3 And 3 Hbc Kurukshetra. ( Mtc. Of Grassy Lawn In Nallah Area And Water Works And All Other Works Contingent Thereto ) .

  • 4.93 Lakhs
  • Haryana
  • Jan 19, 2019
  • 18894292
53

Accelerated Power Development And Reforms Programme - Live

Replacement Of Existing Sodium Ligth Fitting In Sewerage Treatment Plant Villeage Dabra, Tosham Road At Hisar And All Other Works Contingent Thereto ( Including Three Year Replacement Warrnaty, Maintenance And Defect Liability Period For Free Of Cost ) , Job No. 1170

  • 7.50 Lakhs
  • Haryana
  • Jan 23, 2019
  • 18894291
54

Accelerated Power Development And Reforms Programme - Live

annual maintenance Of L / S Work In Nallah Area Sector-3 And 3 Hbc Kurukshetra. ( Mtc. Of Fruit Plants Providing Mali Cum Chowkidar For Watch And Ward And All Other Works Contingent Thereto ) .

  • 2.59 Lakhs
  • Haryana
  • Jan 19, 2019
  • 18894285
55

Accelerated Power Development And Reforms Programme - Live

Lining of watercourse O/L RD 8600/R Garhi Minor (Extension)

  • 4.33 Lakhs
  • Haryana
  • Jan 18, 2019
  • 18894283
56

Accelerated Power Development And Reforms Programme - Live

Laying Under Ground Pipe Line of watercourse at O/L RD 10500/L Surbara Link Channel

  • 11.85 Lakhs
  • Haryana
  • Jan 18, 2019
  • 18894279
57

Accelerated Power Development And Reforms Programme - Live

Laying Under Ground Pipe Line of watercourse at O/L RD 10500/L Surbara Link Channel

  • 12.49 Lakhs
  • Haryana
  • Jan 18, 2019
  • 18894276
58

Accelerated Power Development And Reforms Programme - Live

Laying Under Ground Pipe Line of watercourse at O/L RD 10500/L Surbara Link Channel

  • 61.18 Lakhs
  • Haryana
  • Jan 18, 2019
  • 18894271
59

Accelerated Power Development And Reforms Programme - Live

Laying Under Ground Pipe Line of watercourse at O/L RD 10500/L Surbara Link Channel

  • 51.09 Lakhs
  • Haryana
  • Jan 18, 2019
  • 18894270
60

Accelerated Power Development And Reforms Programme - Live

Providing And Laying Of Pvc Pipe From H / O Dr. Amrit Lal To H / O Ram Kumar And H / O Darshan Lal To Yash Pal W. No. 14, E / 23 / 2018 Both

  • 4.03 Lakhs
  • Haryana
  • Jan 21, 2019
  • 18894269
61

Accelerated Power Development And Reforms Programme - Live

Laying Under Ground Pipe Line of watercourse at O/L RD 10500/L Surbara Link Channel

  • 49.72 Lakhs
  • Haryana
  • Jan 18, 2019
  • 18894268
62

Accelerated Power Development And Reforms Programme - Live

Laying Under Ground Pipe Line Of Watercourse At O / L Rd 10500 / L Surbara Link Channel

  • 67.67 Lakhs
  • Haryana
  • Jan 18, 2019
  • 18894267
63

Accelerated Power Development And Reforms Programme - Live

Laying Under Ground Pipe Line of watercourse at O/L RD 10500/L Surbara Link Channel

  • 48.28 Lakhs
  • Haryana
  • Jan 18, 2019
  • 18894208
64

Accelerated Power Development And Reforms Programme - Live

Laying Under Ground Pipe Line of watercourse at O/L RD 10500/L Surbara Link Channel

  • 35.71 Lakhs
  • Haryana
  • Jan 18, 2019
  • 18894206
65

Accelerated Power Development And Reforms Programme - Live

Construction Of Pavement Block In Markedheshwar Gaushala, E / 23 / 2018 Both

  • 30000
  • Haryana
  • Jan 21, 2019
  • 18894205
66

Accelerated Power Development And Reforms Programme - Live

Laying Under Ground Pipe Line of watercourse at O/L RD 10500/L Surbara Link Channel

  • 9.65 Lakhs
  • Haryana
  • Jan 18, 2019
  • 18894203
67

Accelerated Power Development And Reforms Programme - Live

Laying Under Ground Pipe Line Of Watercourse At O / L Rd 10500 / L Surbara Link Channel

  • 9.37 Lakhs
  • Haryana
  • Jan 18, 2019
  • 18894201
68

Accelerated Power Development And Reforms Programme - Live

Laying Under Ground Pipe Line Of Watercourse At O / L Rd 108830 / L Rana Disty. ( Extension )

  • 21 Lakhs
  • Haryana
  • Jan 18, 2019
  • 18894191
69

Accelerated Power Development And Reforms Programme - Live

Lining of watercourse O/L RD 15267/TL Raipur Minor

  • 24.60 Lakhs
  • Haryana
  • Jan 18, 2019
  • 18894171
70

Accelerated Power Development And Reforms Programme - Live

Lining of watercourse O/L RD 60248/L Masudpur Panihari Link Channel (Extension)

  • 10.19 Lakhs
  • Haryana
  • Jan 18, 2019
  • 18894166
71

Accelerated Power Development And Reforms Programme - Live

Construction Of Tile Terracing In Ambedkar Bhawan At Valmiki Basti W. No. 7, E / 23 / 2018 Both

  • 1.50 Lakhs
  • Haryana
  • Jan 21, 2019
  • 18894149
72

Accelerated Power Development And Reforms Programme - Live

Providing And Fixing Of Ipb 80 Mm From House Ishwar Chamar To House Ramchander And From House Mahender Nai To House Poppa Ward 14 Bhuna

  • 10 Lakhs
  • Haryana
  • Jan 21, 2019
  • 18894147
73

Accelerated Power Development And Reforms Programme - Live

Replacement Of Old Cfl Sodium Light To New Led Light In Ward No 12, 844 / Me / Mcbgarh / 2019

  • 17.30 Lakhs
  • Haryana
  • Jan 26, 2019
  • 18894146
74

Accelerated Power Development And Reforms Programme - Live

A / Maintenance Of L / S Work In Green Belt Sector-14 Karnal. ( Repair And Painting Of Paint On Wall, Snowcem Of Boundary Wall Of Green Belt With One Year Maintenance And Defect Liability Period Free Of Cost ) ., A / Maintenance Of L / S Work In Green Belt Sector-14 Karnal. ( Repair And Painting Of Paint On Wall, Snowcem Of Boundary Wall Of Green Belt With One Year Maintenance And Defect Liability Period Free Of Cost ) .

  • 1.88 Lakhs
  • Haryana
  • Jan 19, 2019
  • 18894145
75

Accelerated Power Development And Reforms Programme - Live

Replacement Of Main Roads Existing Road Lights With Energy Efficient Led Lights In Jhajjar City.

  • 1.87 Crore
  • Haryana
  • Jan 21, 2019
  • 18894144
76

Accelerated Power Development And Reforms Programme - Live

Completion Of Shed In Shamshan Ghat W. No. -Civil Works

  • 1 Lakhs
  • Haryana
  • Jan 21, 2019
  • 18894140
77

Accelerated Power Development And Reforms Programme - Live

Construction Of Vishavkarma Chopal W. No. 7, E / 23 / 2018 Both

  • 5 Lakhs
  • Haryana
  • Jan 21, 2019
  • 18894139
78

Accelerated Power Development And Reforms Programme - Live

Construction Of Ipb With Drain From House Jai Bhagwan To House Tara Sardar From House Kundan Mistri To House Jaibhagwan And Adj. Street In Ward 10 Bhuna, Construction Of Of Ipb With Drain From House Jai Bhagwan To House Tara Sardar From House Kundan Mistri To House Jaibhagwan And Adj. Street In Ward 10 Bhuna

  • 9.50 Lakhs
  • Haryana
  • Jan 21, 2019
  • 18894137
79

Accelerated Power Development And Reforms Programme - Live

Annual Maintenance Of Roads In Various Sector Mandi Township District Sirsa. Providing And Laying Of 25Mm Thick Premix Carpet With Seal Coat In Residential Area No. Iii Across Railway Line In M.T Kalanwali And All Other Works Contingent Thereto, Job No 102 ( Re-Invite )

  • 1 Lakhs
  • Haryana
  • Jan 28, 2019
  • 18894134
80

Accelerated Power Development And Reforms Programme - Live

Supply Of High Resolution Field Emission Scanning Eletron Microscope With Eds

  • 1.80 Crore
  • Haryana
  • Jan 29, 2019
  • 18894133
81

Accelerated Power Development And Reforms Programme - Live

Construction Of Yoga Shed In Love-Kush Park Fatehabad Road Bhuna, Construction Of Yoga Shed In Love-Kush Park Fatehabad Road Bhuna

  • 3.75 Lakhs
  • Haryana
  • Jan 21, 2019
  • 18894129
82

Accelerated Power Development And Reforms Programme - Live

Improvement Of Green Belt In Sec-5 Karnal.(Removed Of Old Barbed Wire Fencing,Dismantling Of Brick Work C.C. Block. Providing And Fixing Of M.S. Fancy Tree Guard,Supply And Laying Of Hydrant Material With 3 Years Maintenance N Defect Liability Period Free Of Cost)

  • 99000
  • Haryana
  • Jan 19, 2019
  • 18894124
83

Accelerated Power Development And Reforms Programme - Live

Completion Of Khatik Samaj Dharmshala - Civil Works

  • 4.92 Lakhs
  • Haryana
  • Jan 21, 2019
  • 18894116
84

Accelerated Power Development And Reforms Programme - Live

Providing Fixing Of Ipb 80 Mm From House Puran Tank To House Ram Vilash Ward 14 Bhuna

  • 9.80 Lakhs
  • Haryana
  • Jan 21, 2019
  • 18894106
85

Accelerated Power Development And Reforms Programme - Live

Providing Fixing Of Ipb 80 Mm From House Anil To House Shyam Lal Ward 14 Bhuna

  • 10 Lakhs
  • Haryana
  • Jan 21, 2019
  • 18894103
86

Accelerated Power Development And Reforms Programme - Live

annual maintenance Of Ephs In Sec 4 5 Ue Karnal - Civil Works

  • 1.99 Lakhs
  • Haryana
  • Jan 18, 2019
  • 18894102
87

Accelerated Power Development And Reforms Programme - Live

development of L / S Work In Between Housing Board Colony Transport Nagar Sector-4 Karnal. ( Supply And Filing Of Good Earth In Deep Area With Three Years Maintenance Defect Liability Period Free Of Cost ) .,

  • 97000
  • Haryana
  • Jan 19, 2019
  • 18894089
88

Accelerated Power Development And Reforms Programme - Live

Annual maintenance Of L / S Work In Green Belt Sector-6 P-Ii Karnal. ( Mtc. Of Grassy Lawn Along With Providing Mali Cum Chowkidar For Watch And Ward And All Other Works Contingent Thereto ) .

  • 5.62 Lakhs
  • Haryana
  • Jan 19, 2019
  • 18894087
89

Accelerated Power Development And Reforms Programme - Live

Construction Of Ipb With Drain From House Pal Dahiya To House Pawan Pawda And From House Guru Much To House Pala Nayak In Ward 12 Bhuna, Construction Of Of Ipb With Drain From House Pal Dahiya To House Pawan Pawda And From House Guru Much To House Pala Nayak In Ward 12 Bhuna

  • 10 Lakhs
  • Haryana
  • Jan 21, 2019
  • 18894082
90

Accelerated Power Development And Reforms Programme - Live

A / Maintenance Of L / S Work In Bougainvillea Garden In Sector-26 Panchkula. ( Providing And Fixing Of 1 No. Rain Shelter With Three Year Maintenance And Defect Liability Period Free Of Cost ) ., A / Maintenance Of L / S Work In Bougainvillea Garden In Sector-26 Panchkula. ( Providing And Fixing Of 1 No. Rain Shelter With Three Year Maintenance And Defect Liability Period Free Of Cost ) .

  • 1.36 Lakhs
  • Haryana
  • Jan 19, 2019
  • 18894078
91

Accelerated Power Development And Reforms Programme - Live

Construction Of Ipb With Drain From House Bittu To House Balbir And From House Ramdhari To House Vinod Single In Ward 12 Bhuna, Construction Of Of Ipb With Drain From House Bittu To House Balbir And From House Ramdhari To House Vinod Single In Ward 12 Bhuna

  • 10 Lakhs
  • Haryana
  • Jan 21, 2019
  • 18894077
92

Accelerated Power Development And Reforms Programme - Live

annual maintenance Of L / S Work In Sector-7 Panchkula. ( Mtc. Of Grassy Lawn, Plants Of Green Belt And All Other Works Contingent Thereto ) .

  • 1.03 Lakhs
  • Haryana
  • Jan 19, 2019
  • 18894071
93

Accelerated Power Development And Reforms Programme - Live

annual maintenance Of Roads In Sec 16 Ue Karnal

  • 1.99 Lakhs
  • Haryana
  • Jan 18, 2019
  • 18894070
94

Accelerated Power Development And Reforms Programme - Live

Annual / Maintenance Of L / S Work In Water Body Park Sector-12 Part-I Karnal. ( Painting Of Paint On Wall Snowcem M.S. Gate And Repair Of Grill Complete In All Other Works Contingent Thereto With Three Years Maintenance And Defect Liability Period Free Of Cost )

  • 95000
  • Haryana
  • Jan 19, 2019
  • 18894067
95

Accelerated Power Development And Reforms Programme - Live

development of Park / Open Space In Sector-31 Panchkula. ( Hiring Of Jcb For Levelling Of Site And All Other Works Contingent Thereto ) .

  • 19000
  • Haryana
  • Jan 19, 2019
  • 18894062
96

Accelerated Power Development And Reforms Programme - Live

Development Of Road In Sec 1 Taroari

  • 1.97 Lakhs
  • Haryana
  • Jan 18, 2019
  • 18894058
97

Accelerated Power Development And Reforms Programme - Live

847/ME/MCBGARH/2019 Replacement of old CFL Sodium Light to New LED Light in Ward No 17, 847/ME/MCBGARH/2019

  • 17.04 Lakhs
  • Haryana
  • Jan 26, 2019
  • 18890347
98

Accelerated Power Development And Reforms Programme - Live

848/ME/MCBGARH/2019 Replacement of old CFL Sodium Light to New LED Light in Ward No 31, 848/ME/MCBGARH/2019

  • 11.39 Lakhs
  • Haryana
  • Jan 26, 2019
  • 18890346
99

Accelerated Power Development And Reforms Programme - Live

Tender For It Equipment :-1 Computer I5 7Th Gen. ( Hp ) 2 Computer I5 7Th Gen. ( Lenovo ) 3 Computer I5 7Th Gen. ( Dell ) 4 Computer I5 7Th Gen. ( Acer ) 5 Computer I3 6Th Gen. ( Hp ) 6 Computer I3 6Th Gen. ( Lenovo ) 7 Computer I3 6Th Gen. ( Dell ) 8 Computer I3 6Th Gen. ( Acer ) 9 Tablet ( Lenovo Tab-2 ) 10 Printer Lazer ( Canon, Hp ) 11 Ups ( Apc, I-Ball ) 12 Projector 13 Photocopier Machine 14 Finger Scanner 15 Intercom 16 Laptop I5 7Th Gen. ( Hp ) 17 Laptop I5 7Th Gen. ( Lenovo ) 18 Laptop I5 7Th Gen. ( Dell ) 19 Laptop I5 7Th Gen. ( Acer ) 20 Laptop I3 6Th Gen. ( Hp ) 21 Laptop I3 6Th Gen. ( Lenovo ) 22 Laptop I3 6Th Gen. ( Dell ) 23 Laptop I3 6Th Gen. ( Acer ) 24 Led Tv 32" ( Samsung ) 25 Led Tv 32" ( Sony ) 26 Led Tv 32" ( Lg ) 27 Led Tv 43" ( Samsung ) 28 Led Tv 43" ( Sony ) 29 Led Tv 43" ( Lg ) 30 Led Tv 48" ( Samsung ) 31 Led Tv 48" ( Sony ) 32 Led Tv 48" ( Lg ) 33 Led Tv 52" ( Samsung ) 34 Led Tv 52" ( Sony ) 35 Led Tv 52" ( Lg ) 36 Video Confrence System 37 Finger Print Scanner 38 Gps Tracker 39 Qr Code Reader 40 Colour Printer 41 Web Camera 42 Iris Scanner 43 Bubble C Pap 44 Window Ac 1 Ton ( Hitachi ) 45 Window Ac 1 Ton ( Samsung ) 46 Window Ac 1 Ton ( Voltas ) 47 Window Ac 1.5 Ton ( Voltas ) 48 Window Ac 1.5 Ton ( Hitachi ) 49 Window Ac 1.5 Ton ( Samsung ) 50 Window Ac 2 Ton ( Voltas ) 51 Window Ac 2 Ton ( Hitachi ) 52 Window Ac 2 Ton ( Samsung ) 53 Split Ac 1 Ton ( Hitachi ) 54 Split Ac 1 Ton ( Samsung ) 55 Split Ac 1 Ton ( Voltas ) 56 Split Ac 1.5 Ton ( Voltas ) 57 Split Ac 1.5 Ton ( Hitachi ) 58 Split Ac 1.5 Ton ( Samsung ) 59 Split Ac 2 Ton ( Voltas ) 60 Split Ac 2 Ton ( Hitachi ) 61 Split Ac 2 Ton ( Samsung ) 62 Printer Cartrage ( Canon All Model ) 63 Laser Colour Printer Cartrage ( Brother All Model ) 64 Printer Cartrage ( Brother All Model ) 65 Printer Cartrage ( Hp All Model )

  • 10000
  • Haryana
  • Jan 28, 2019
  • 18889797
100

Accelerated Power Development And Reforms Programme - Live

845/ME/MCBGARH/2019 Replacement of old CFL Sodium Light to New LED Light in Ward No 13, 845/ME/MCBGARH/2019

  • 24.09 Lakhs
  • Haryana
  • Jan 26, 2019
  • 18887176
Top

Copyright © 2019 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail