51691887 of following materials of pontoon bridge , pile and approach link road including cartage of these material from site of work to degurpurghat site store and alsoincluding loading , unloading, labour, t&p etc placing as per direction of e/i required for
51721267 of following materials of pontoon bridge , pile and approach link road including cartage of these material from site of work to degurpurghat site store and alsoincluding loading , unloading, labour, t&p etc placing as per direction of e/i required for
51661635 Corrigendum : t&p and duly stacked in store at parado ground. 29 dismantalling and carrying railing post fixed in position including opening of 300 x 16 mm nut and bolt,including loading, unloadidng, cartage and duly stacked at store 30 dismantalling and carrying
51734991 (si no. 6 pg.50) 44 dismantling of sal sleeper of pontoon bridge, pile and approach link road including cartage of these material from site of work to kanihar storeand also including loading, unloading stacking properly and also including all taxes
51734279 (si no. 6 pg.50) 44 dismantling of sal sleeper of pontoon bridge, pile and approach link road including cartage of these material from site of work to kanihar storeand also including loading, unloading stacking properly and also including all taxes