Hydro Power sector projects by Astha Green Energy Ventures India Private Limited in Kadapa

Project Information

9523
Astha Green Energy Ventures India Private Limited
The Veeraballi Pumped Storage Project (PSP) Envisaged As Off-Stream Closed Loop Project Of 2720 MW / 28560 MWH Storage Capacity, Located Near Vongimalla Village, Veeraballi Taluk Of Kadapa District, Andhra Pradesh. The Veeraballi PSP (Off-Stream Closed Loop Project) Will Comprise Of Two Reservoirs Which Are To Be Constructed Newly. The Upper Reservoir Is Proposed To Be Located On Natural Depression Which Is Suitable For Creating The Desired Gross Storage Capacity Of 1.36 TMC. Out Of 1.36 TMC, The Live Storage Capacity Is 1.17 TMC And The Dead Storage Capacity Is 0.19 TMC By Keeping FRL & MDDL At EL 689.00m & EL 660.00m Respectively. For Creating This Storage, It Is Proposed To Construct Rockfill Embankment For The Average Height Of Around 27 M (With Maximum Height Of 52m) For The Length Of 2307m. Similarly, The Lower Reservoir Is Proposed To Be Located In The Flat / Gradually Sloping Land Which Is Suitable For Creating The Desired Gross Storage Capacity Of 1.23 TMC In Which The Live Storage Capacity Is 1.16 TMC And Dead Storage Capacity Is 0.07 TMC By Keeping FRL And MDDL At EL 324.00m & EL 291.00m Respectively
Project Value
INR 12787.91 Crore /-
Planning
Kadapa
Andhra Pradesh
India
Hydro Power
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail