River Valley Project sector projects by Greenko Energies Private Limited in Tapi

Project Information

9415
Greenko Energies Private Limited
The Ukai Standalone Pumped Storage Project (PSP) Of 2400 MW / 16800 MWH Storage Capacity, Located At Tapi District, Gujarat. The Ukai Standalone PSP Will Comprise Of Two Reservoirs Which Are To Be Constructed Newly. The Upper Reservoir Is Proposed To Be Located On Flat / Gradually Sloping Land Which Is Suitable For Creating The Desired Gross Storage Capacity Of 2.23 TMC. Out Of 2.23 TMC, The Live Storage Capacity Is 1.39 TMC And The Dead Storage Capacity Is 0.84 TMC By Keeping FRL & MDDL At EL 352.00m & EL 334.50m Respectively. For Creating This Storage, It Is Proposed To Construct Rockfill Embankment For The Average Height Of Around 40m (With Maximum Height Of 70m) For The Length Of 11468m
Project Value
INR 11500.83 Crore /-
Planning
Tapi
Gujarat
India
River Valley Project
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail