Hydro sector projects by Sikkim Engineering Private Limited in North Sikkim

Project Information

8923
Sikkim Engineering Private Limited
The Proposed Rahi Kyoung HEP Is A Run-Of-The-River Project With Installed Capacity Of 25 MW. The Project Is Proposed On Rahi Chhu A Small Natural Drainage Channel Contributing Flow To The Tolung Chhu Which In Turn Is A Right Bank Tributary Of The Teesta River. Total Catchment Area Of The Project Upstream Of The Weir Site Is 53.50 Km2 . The Length Of The Rahi Chhu River Up To The Proposed Diversion Structure Is Estimated As 14 Km With Very Steep Gradient. Rahi Kyoung Hydro Electric Project Would Involve Construction Of A 3.5 M Wide And 21 M Long Trench Weir Across The Rahi Chhu River. A Feeder Channel Of Length 31 M Will Carry The Water From The Intake To The Surface Desilting Basin. The Head Race Tunnel (HRT) Would Be D-Shaped Of Finished Size 2.6 M (W) × 3.05 M (H) And Would Be About 2.462 Km Long. The Installed Capacity Of The Project Would Be 25 MW Comprising Three Generating Units, Each Of 8.33 MW Capacity
Project Value
INR 215 Crore /-
Planning
North Sikkim
Sikkim
India
Hydro
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail