Energy sector projects by Greenko Solar Energy Private Limited in Belgaum

Project Information

8694
Greenko Solar Energy Private Limited
Proposed Standalone Pumped Storage Component Of Saundatti Integrated Renewable Energy Project (IREP) Is Located In Belagavi District Of Karnataka. The Total Land Requirement For Proposed Project Is 228.97 Ha; Out Of Which 167.65 Ha Is Forest Land And Remaining 61.32 Ha Is Non-Forest Area. Out Of Non-Forest Area, 37.34 Ha Is Private Land And 23.98 Ha Is Government Land. The Proposed Project Would Involve Construction Of Project Roads, Power House, Tailrace Channel, Residential And Staff Colonies, Roads, Etc. Proposed Scheme Will Involve Construction Of Embankment Of 96 M Height For Creation Of Standalone Pumped Storage Component Of Saundatti Integrated Renewable Energy Project Reservoir. Water Is Proposed To Be Diverted Through Four Numbers Of Independent Penstocks And One Number Of Independent Penstocks Bifurcated Into Two From Power Block Of Saundatti IREP Reservoir. A Surface Power House Will Be Located On The Downstream Of The Power Block And Shall Be Equipped With Four Turbines And A Pump/Turbine Having Generating/Pumping Capacity Of 252MW And Two Units Of 126MW, Respectively.
Project Value
Refer document
Planning
Belgaum
Karnataka
India
Energy
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail