Balance Works Of Shed In Ward No-37-1 Brick Work In Superstructure Up To Third Storey Cement Mortoe 1:6 ( 1 Cement : 6 Coarse Sand ) 2 Half Brick Masonry In Foundation & Plinth Using Bricks Of Designation 75 Cement Mortar 1:6 ( 1 Cement : 6 Coarse Sand ) Add Extra Over Item No 5.8 For Half Brick Masonry In Superstructure Up To Third Storey Including Cost Of Nominal Hoopreinforcement ( 2 Nos. 6 Mm Dia M.S. Bar At Every Forth Course ) 3 6 Mm Cement Plaster To Ceiling Of Mix 1:3 ( 1 Cement : 3 Fine 4 Plaster On New Surface On Walls In Cement Mortar 1: 6 Including Racking Of Joints Etc. Complete Fine Finish. ( A ) 20 Mm. Thick 5 Polished Blue Kota Stone Flooring Skirting, Laid Over 20Mm Thick Base Of Cm 1:4 And Jointed With Grey Cement Slurry To Match The Shade Of The Slab Including Rubbing And Polishing Complete For Area Of Earth Slab From 2001 To 5000 Sq. Cm. 25 Mm Thick Slab. 6 Providing &Fixing Steel Gate Grating And Grills Made Of Angles, Tees, Square Bars Or Other Flats Black Pipe With Hold Fasts And Fittings Complete As Per Design And Drawing Including Cutting Welding And Fabrication With Priming Coat Of Red Oxide. 7 Providing And Fixing Welded Mesh / Expanded Metal Mesh In Frame Work, Flat Iron Beading 20X3 Mm Including Top Cross Laps Inside And Out Sides Welding, Iron Bolts, Screws, Clips Etc. Complete ( Fxcluding Frame Work ) Of Size. Welded Mesh 25X25mmx16 Gauge. 8 Applying Birla / Jk White Cement Based Putty Over Cement Plaster Surface For Making Even Surface 9 Two Or More Coats On New Work Including Prepration Of Base With Primer Putty Lippy Complete In All Respect. 10 Centering And Shuttering With Plywood Or Steel Sheets Including Strutting, Propping Bracing Both Ways And Removal Of Formworks For Foundation In Basement Rafts, Footings, Straps Beams, Bases Of Columns Etc. Up To Plinth Level. Suspended Floors, Roofs, Landings Staircases, Balconies, Girders, Cantilevers, Bands, Coping Bed Plates, Anchor Blockes Sills, Chhajjas, Lintel, Beams Etc. 11 Centering And Shuttering With Plywood Or Steel Sheets Including Strutting, Propping Bracing Both Ways And Removal Of Formworks For Foundation In Basement Rafts, Footings, Straps Beams, Bases Of Columns Etc. Up To Plinth Level. Columns, Pillars Posts And Struts Etc. 12 Providing And Fabricating Reinforcement For Rcc Work Including Straightening, Cutting, Bending, Placing In Position In Binding ( Including Cost Of Binding Wire ) All Complete Up To Floor Three Level Hot Rolled Deformed Bars ( Is: 1139 ) 13 Providing And Layiny In Position Specified Grade Of Cement Concrete For Rcc Structure Elements Upto Floor Three Level Including Curing, Compaction, Finishing With Rendering In Cement Sand Mortar 1:3 ( 1 Cement ; 3 Coarse Sand ) And Making Good The Joints Excluding The Cost Of Centering Shuttering And Reinforcement For Beams, Suspended Floors, Roofs, Griders Having Slopes Up To 15° , Landings, Balconies , Shelves , Chajjas, Lintels, Bands , Plain Window, Sills , Staircases And Spiral Staircases M 20 Grade Nominal Mix ( With Graded Stone Aggregate 20Mm Nominal Size )