}

Machinery and Tools, Manufacturing Machinery, Machine Tools, Laboratory Equipment and Supplies, Laboratory Equipments, Laboratory Equipment-Karnataka

Department Of Employment And Training has published Machinery and Tools, Manufacturing Machinery, Machine Tools, Laboratory Equipment and Supplies, Laboratory Equipments, Laboratory Equipment. Submission Date for this Tender is 30-01-2016. Machine Tools Tenders in Karnataka. Bidders can get complete Tender details and download the document.




Tender Notice

8848636
Machinery and Tools, Manufacturing Machinery, Machine Tools, Laboratory Equipment and Supplies, Laboratory Equipments, Laboratory Equipment
Open Tender
Indian
Karnataka
30-01-2016

Tender Details

Supply Of Tools And Equipments And Laboratory Setup For Electrician Trade At Govt Iti Challakere - A. Trainees Tool Kit 1 Steel Tape, 15 M Length 2 Plier Insulated , 150 Mm 3 Plier Side Cutting , 150 Mm 4 Screw Driver , 100Mm 5 Screw Driver , 150 Mm 6 Electrician Connector, Screw Driver Insulated Handle Thin Stem , 100Mm 7 Heavy Duty Screw Driver, 200 Mm 8 Electrician Screw Driver Thin Stem Insulated Handle, 250Mm 9 Punch Centre , 150 Mm X 9 Mm 10 Knife Double Bladed Electrician 11 Neon Tester 12 Steel Rule 300 Mm 13 Hammer Cross Peen With Handle 450Gms 14 Hammer Ball Pean With Handle – 450 Gms 15 Gimlet 6 Mm 16 Bradawl 17 Scriber ( Knurled Centre Position ) 18 Pincer 150 Mm 19 Tool Box B. Shop Tools, Instruments & Machinery 1 C Clamp 200 Mm 1.1 C Clamp 150 Mm 1.2 C Clamp 100 Mm 2 Spanner Adjustable 150 Mm 2.1 Spanner Adjustable 300 Mm 3 Blow Lamp 0.5 Ltr 4 Melting Pot 5 Ladle 6 Chisel Cold Firmer 25 Mm X 200Mm 7 Chisel 25 Mm 7.1 Chisel 6 Mm 8 Hand Drill Machine 9 Portable Electric Drill Machine 6 Mm Capacity • Compatibility & Connectivity Vendor Responsibility • Should Integrate The Item As Per Dget Syllabus Practical • Lab Manual For The Experiment- Vendor’S Responsibility. • Power Connections – Vendor’S Responsibility • Necessary Stand / Table / Support – Vendor’S Responsibility. 10 Pillar Electric Drill Machine 12 Mm Capacity • Compatibility & Connectivity Vendor Responsibility • Should Integrate The Item As Per Dget Syllabus Practical • Lab Manual For The Experiment- Vendor’S Responsibility. • Power Connections – Vendor’S Responsibility • Necessary Stand / Table / Support – Vendor’S Responsibility. 12 Oil Can 0.12 Ltr. 14 Outside Micrometer 15 Motorised Bench Grinder • Compatibility & Connectivity Vendor Responsibility • Should Integrate The Item As Per Dget Syllabus Practical • Lab Manual For The Experiment- Vendor’S Responsibility. • Power Connections – Vendor’S Responsibility • Necessary Stand / Table / Support – Vendor’S Responsibility. 16 Rawl Plug Tool And Bit 17 Pulley Puller 18 Bearing Puller 19 Pipe Vice 20 Thermometer 0 To 100 Deg. Centigrade 21 Scissors Blade 150Mm 22 Crimping Tool 23 Wire Stripper 20 Cm 24 Chisel Cold Flat 12 Mm 25 Mallet Hard Wood 0.50.Kg 26 Hammer Extractor Type 0.40 Kg 27.1 Hacksaw Frame 300 Mm Adjustable 28 Try Square 150 Mm Blade 29 Outside Divider Caliper 29.1 Inside Divider Caliper 30 Pliers Flat Nose 150 Mm 31 Plier Round Nose 100 Mm 33 Snip Straight 150 Mm 33.1 Bent 150 Mm 34 D.E. Metric Spanner 35 Drill Hand Brace 36 Drill S.S. Twist Block 2Mm, 5Mm, 6Mm Set Of 3 37 Plane, Smoothing Cutters 50 Mm 38 Gauge, Wire Imperial 39 File Flat 200 Mm 2Nd Cut 40 File Half Round 200 Mm 2Nd Cut 41 File Round 200 Mm 2Nd Cut 42 File Flat 150 Mm Rough 43 File Flat 250 Mm Bastard 44 File Flat 250 Mm Smooth 45 File Rasp, Half Round 200 Mm Bastard 46 Soldering Iron 25 Watt 46.1 Soldering Iron 65 Watt 46.2 Soldering Iron 125 Watt 47 Copper Bit Soldering Iron 0.25 Kg 48 Desoldering Gun 49 Hand Vice 50 Mm Jaw 50 Table Vice 100 Mm Jaw 51 Pipe Cutter To Cut Pipes Upto 5 Cm Dia. 52 Pipe Cutter To Cut Pipes Above 5 Cm Dia. 53 Stock And Die Set For 20 Mm To 50 Mm G.I Pipe 54 Stock And Dies Conduit 55 Ohm Meter - Series Type 55.1 Ohm Meter- Shunt Type 56 Multimeter ( Analog ) 0 To 1000 M Ohms, 2.5 To 500V • Compatibility & Connectivity Vendor Responsibility • Should Integrate The Item As Per Dget Syllabus Practical • Lab Manual For The Experiment- Vendor’S Responsibility. • Power Connections – Vendor’S Responsibility 57 Digital Multimeter • Compatibility & Connectivity Vendor Responsibility • Should Integrate The Item As Per Dget Syllabus Practical • Lab Manual For The Experiment- Vendor’S Responsibility. • Necessary Stand / Table / Support – Vendor’S Responsibility. 58 A.C Voltmeter M.I. 0 - 500 V A.C 59 Milli Voltmeter Centre Zero 100-0-100 M Volt 60 D.C. Milli Ammeter 0 -500 M A 61 Ammeter Mc 0-5 A 61.1 Ammeter Mc 0-25A 62 A.C .Ammeter M.I. 0-5A 62.1 A.C .Ammeter M.I. 0-25A 63 Kilo Wattmeter 0 - 1 - 3 Kw 64 A.C Energy Meter - Single Phase 5 Amp 64.1 A.C Energy Meter -Three Phase 15 Amp 65 Power Factor Meter 66 Frequency Meter 67 Flux Meter 68 Wheat Stone Bridge With Galvanometer And Battery 69 Laboratory Type Induction Coil 70 Dc Power Supply 0-30 V, 2 Amp 71 Rheostat - 0 - 1 Ohm , 5 Amp 71.1 Rheostat 0 - 10 Ohm , 5 Amp 71.2 Rheostat 0 -25 Ohm , 1 Amp 71.3 Rheostat 0 - 300 Ohm , 1 Amp 72 1 Phase Variable Auto Transformer • Compatibility & Connectivity Vendor Responsibility • Should Integrate The Item As Per Dget Syllabus Practical • Lab Manual For The Experiment- Vendor’S Responsibility. • Power Connections – Vendor’S Responsibility • Necessary Stand / Table / Support – Vendor’S Responsibility. 73 Battery Charger • Compatibility & Connectivity Vendor Responsibility • Should Integrate The Item As Per Dget Syllabus Practical • Lab Manual For The Experiment- Vendor’S Responsibility. • Power Connections – Vendor’S Responsibility • Necessary Stand / Table / Support – Vendor’S Responsibility. 74 Hydrometer 75 Miniature Breaker 16 Amp ( Raw Material ) 76 Working Bench 2.5 M X 1.20 M X 0.75 M • Item Should Be As Per Dget Syllabus ( Practical ) . • If Require Network & Power Connections – Vendor’S Responsibility. • Necessary Furniture – Vendor’S Responsibility. • Installation Of Item As Per Suggested Layout. 77 Fire Extinguisher Co2, 2 Kg ( With Complete Fittings E.G. Hanger, Stand Etc. ) 78 Fire Buckets ( With Complete Fittings E.G. Hanger, Stand Etc. ) 10 Ltrs Second Semester Shop Tools, Instruments & Machinery 1 Tachometer 2 Current Transformer 415 Volt, 50 Hz, Ct Ratio 150 / 5 Amp, 5Va 3 Potential Transformer 415 Volt, 50 Hz, Pt Ratio 11 Kv / 110 V, 10 Va 5 Tong Tester / Clamp Meter 0 -100 Amp. Ac 6 Megger 500 Volts 7 Contractor & Auxiliary Contracts 3 Phase, 440 Volt, 16 Amp ( Raw Material ) 8 Contractor & Auxiliary Contracts 3 Phase, 440 Volt, 32 Amp ( Raw Material ) 9 Limit Switch ( Raw Material ) 10 Rotary Switch 16 A ( Raw Material ) 11 Load Bank 5 Kw ( Lamp / Heater Type ) 12 Break Test Arrangement With Two Spring Balance 0 To 25 Kg Rating 13 Knife Switch Dpdt Fitted With Fuse Terminals 16 Amp ( Raw Material ) 14 Knife Switch Tpdt Fitted With Fuse Terminals 16 Amp ( Raw Material ) 15 Voltage Stabilizer: In Put : 150 - 230 Volt Ac Output: 220 Volt Ac. • Compatibility & Connectivity Vendor Responsibility • Should Integrate The Item As Per Dget Syllabus Practical • Lab Manual For The Experiment- Vendor’S Responsibility. • Power Connections – Vendor’S Responsibility • Necessary Stand / Table / Support – Vendor’S Responsibility. 16 3 - Point D.C. Starter 17 4 - Point D.C. Starter 18 Electrical Machine Trainer: Specifications: Suitable For Demonstrating The Construction And Functioning Of Different Types Of Dc & Ac Machines ( Single And Three Phases ) . Should Be Fitted With Friction Brake Arrangement, Dynamo Meter, Instrument Panel And Power Supply Unit. Supply In Full Set Up With All Accessories Like Meters, Switches Etc., With Panels & Installation, Testing ( Including The Grouting & Wiring ) . Demonstrating The Equipment As Per Dget Revised Electrician Trade Syllabus 2014. • Compatibility & Connectivity Vendor Responsibility • Should Integrate The Item As Per Dget Syllabus Practical • Lab Manual For The Experiment- Vendor’S Responsibility. • Power Connections – Vendor’S Responsibility • Necessary Stand / Table / Support – Vendor’S Responsibility. 19 Motor-Generator ( Ac To Dc ) Consisting Of : Squirrel Cage Induction Motor With Star Delta Starter And Directly Coupled To Dc Shunt Generator And Switch Board Mounted With Regulator, Air Breaker, Ammeter, Voltmeter, Knife Blade Switches And Fuses, Set Complete With Case Iron And Plate, Fixing Bolts, Foundation Bolts And Flexible Coupling. Induction Motor Rating: 7 Hp, 400V, 50 Cycles, 3 Phase Dc Shunt Generator Rating: 5 Kw, 440V. Supply In Full Set Up With All Accessories Like Meters, Switches Etc., With Panels & Installation, Testing ( Including The Grouting & Wiring ) . Demonstrating The Equipment As Per Dget Revised Electrician Trade Syllabus 2014. • Compatibility & Connectivity Vendor Responsibility • Should Integrate The Item As Per Dget Syllabus Practical • Lab Manual For The Experiment- Vendor’S Responsibility. • Power Connections – Vendor’S Responsibility • Necessary Stand / Table / Support – Vendor’S Responsibility. 20 Used D.C. Generators: Specifications: Series, Shunt And Compound Type For Overhauling Practice. Supply In Full Set Up With All Accessories Like Meters, Switches Etc., With Panels & Installation, Testing ( Including The Grouting & Wiring ) . Demonstrating The Equipment As Per Dget Revised Electrician Trade Syllabus 2014. • Compatibility & Connectivity Vendor Responsibility • Should Integrate The Item As Per Dget Syllabus Practical • Lab Manual For The Experiment- Vendor’S Responsibility. • Power Connections – Vendor’S Responsibility • Necessary Stand / Table / Support – Vendor’S Responsibility. 21 D.C. Shunt Generator With Control Panel, 2.5 Kw, 220V. Supply In Full Set Up With All Accessories Like Meters, Switches Etc., With Panels & Installation, Testing ( Including The Grouting & Wiring ) . Demonstrating The Equipment As Per Dget Revised Electrician Trade Syllabus 2014. • Compatibility & Connectivity Vendor Responsibility • Should Integrate The Item As Per Dget Syllabus Practical • Lab Manual For The Experiment- Vendor’S Responsibility. • Power Connections – Vendor’S Responsibility • Necessary Stand / Table / Support – Vendor’S Responsibility. 22 D.C. Compound Generator With Control Panel Including Fitted Rheostat, Voltmeter, Ammeter And Breaker, 2.5 Kw, 220 V. Supply In Full Set Up With All Accessories Like Meters, Switches Etc., With Panels & Installation, Testing ( Including The Grouting & Wiring ) . Demonstrating The Equipment As Per Dget Revised Electrician Trade Syllabus 2014. • Compatibility & Connectivity Vendor Responsibility • Should Integrate The Item As Per Dget Syllabus Practical • Lab Manual For The Experiment- Vendor’S Responsibility. • Power Connections – Vendor’S Responsibility • Necessary Stand / Table / Support – Vendor’S Responsibility. 23 Diesel Generator Set With Changeover Switch, Over Current Breaker And Water Cooled With Armature, Star-Delta Connections Ac 3 Phase, 5 Kva, 240 Volt. Supply In Full Set Up With All Accessories Like Meters, Switches Etc., With Panels & Installation, Testing ( Including The Grouting & Wiring ) . Demonstrating The Equipment As Per Dget Revised Electrician Trade Syllabus 2014. • Compatibility & Connectivity Vendor Responsibility • Should Integrate The Item As Per Dget Syllabus Practical • Lab Manual For The Experiment- Vendor’S Responsibility. • Power Connections – Vendor’S Responsibility • Necessary Stand / Table / Support – Vendor’S Responsibility. 24 Dc Series Motor Coupled With Mechanical Load 0.5 To 2 Kw, 220 Volts. Supply In Full Set Up With All Accessories Like Meters, Switches Etc., With Panels & Installation, Testing ( Including The Grouting & Wiring ) . Demonstrating The Equipment As Per Dget Revised Electrician Trade Syllabus 2014. • Compatibility & Connectivity Vendor Responsibility • Should Integrate The Item As Per Dget Syllabus Practical • Lab Manual For The Experiment- Vendor’S Responsibility. • Power Connections – Vendor’S Responsibility • Necessary Stand / Table / Support – Vendor’S Responsibility. 25 Dc Shunt Motor 2 To 2.5 Kw, 220 Volts Supply In Full Set Up With All Accessories Like Meters, Switches Etc., With Panels & Installation, Testing ( Including The Grouting & Wiring ) . Demonstrating The Equipment As Per Dget Revised Electrician Trade Syllabus 2014. • Compatibility & Connectivity Vendor Responsibility • Should Integrate The Item As Per Dget Syllabus Practical • Lab Manual For The Experiment- Vendor’S Responsibility. • Power Connections – Vendor’S Responsibility • Necessary Stand / Table / Support – Vendor’S Responsibility. 26 Dc Compound Motor With Starter And Switch 2 To 2.5 Kw, 220 Volts • Compatibility & Connectivity Vendor Responsibility • Should Integrate The Item As Per Dget Syllabus Practical • Lab Manual For The Experiment- Vendor’S Responsibility. • Power Connections – Vendor’S Responsibility Necessary Stand / Table / Support – Vendor’S Responsibility. 27 Single Phase Transformer, Core Type, Air Cooled 1 Kva , 240 / 415 V, 50 Hz • Compatibility & Connectivity Vendor Responsibility • Should Integrate The Item As Per Dget Syllabus Practical • Lab Manual For The Experiment- Vendor’S Responsibility. • Power Connections – Vendor’S Responsibility Necessary Stand / Table / Support – Vendor’S Responsibility. 28 Three Phase Transformer, Shell Type Oil Cooled With All Mounting 3 Kva , 415 / 240 V, 50 Hz , ( Delta / Star ) • Compatibility & Connectivity Vendor Responsibility • Should Integrate The Item As Per Dget Syllabus Practical • Lab Manual For The Experiment- Vendor’S Responsibility. • Power Connections – Vendor’S Responsibility Necessary Stand / Table / Support – Vendor’S Responsibility. 29 Oscilloscope Dual Trace-30Mhz. 30Mhz 2 Channel Dual Trace 6” Rectangular With Integral Gratitude 8X10 Div. 2Kv Accelerating Voltage, Illumination Control On Front Panel, Other All Standard Specification 30 Function Generator Input: 230V Ac + / -10% 50 Hz 1 Phase Output Wave Form: Sine, Square, Triangle, Pulse & Ttl Frequency Range: 0.3Hz To 3 Mhz Mode Of Operation: Through Microcontroller Touch Switch Technology Use: Dds Base Display: 16 Character Alpha Numeric Blue Display Frequency & Waveform Select: Through 3Nos Touch Switches & Fine Freq. Variation Through Potentiometer Amplitude: 20V Pp, Impedance: 50 Ohm Protection: O / P Amplifier Protection Against Short Ckt, + / -15V Overload And On Board Fast Blow Fuse Protection For High Voltage Attenuator: 20Db, 40Db, 60Db Output Socket: Bnc Socket 2 Nos ( Ttl Output And Other Waveforms ) 31 Discrete Component Trainer 32 Linear I.C. Trainer 33 Digital I.C. Trainer Input: 230V Ac 50 Hz + / -10% Dc Supply: +5V / 1A, + / -15V / 500Ma Socket: 16 Pin Zif Socket 4Nos ( With Safety Cover ) Logic Input: 10 No’S Logic Input Switches Push Type Logic Output: 10Nos Logic Output Leds ( White Color Led ) Clock: 1Hz To 1 Mhz Clock Output Monopulser: 1 Hi & 1 Lo ( Debonsing Pulse ) Press Switch One Time Hi & Low Pulse Produce Display: 3 Nos 7 Segment Display For Bcda Assembled Glass Epoxy Pcb ( 2Mm Thickness ) 2Mm Socket With Patch Chords & User Manual . 34 Oil Testing Kit Tools And Equipments For Iii Sem 1 Hygrometer 2 A. Cut Out Relays B. Reverse Current C. Over Current D.Under Voltage 3 Starters For 2 To 5 H.P. A.C Motors A. Resistance Type Starter B. Direct On Line Starter C. Star Delta Starter- Manual, Semi-Automatic And Automatic D. Auto Transformer Type 4 Motor Generator ( Dc To Ac ) Set Consisting Of - Shunt Motor With Starting Compensator And Switch Directly Coupled To Ac Generator With Exciter And Switch Board Mounted With Regulator, Breaker, Ammeter, Voltmeter Frequency Meter, Knife Blade Switch And Fuses Etc. Set Complete With Cast Iron Bed Plate, Fixing Bolts, Foundation Bolts And Flexible Coupling. Shunt Motor Rating : 5 Hp, 440V Ac Generator Rating : 3-Phase, 4 Wire, 3.5 Kva, 400 / 230 Volts, 0.8 Pf, 50Cycles 5 Ac Squirrel Cage Motor With Star Delta Starter And Triple Pole Iron Clad Switch Fuse. 2 To 3 Hp, 3-Phase , 400 Volts, 50 Cycles 6 Ac Phase-Wound Slip Ring Motor With Starter And Switch 5 Hp, 400 Volts, 3-Phase, 50 Cycles 7 A.C. Series Type Motor With Mechanical Load ¼ Hp, 230V, 50 Hz 8 Single Phase Capacitor Motor With Starter Switch 1 Hp 230 Volt 50 Cycles 9 Universal Motor With Starter / Switch 230 Volt, 50 Cycles ¼ Hp 10 Stepper Motor With Digital Controller 11 Shaded Pole Motor 12 Bath Impregnating 13 Oven Stove 1 Synchronous Motor 3 Phase, 3 Hp, 415V, 50Hz, 4 Pole, With Accessories. 2 Lux Meter Tools And Equipments For Iv Sem 1 Inverter- 1 Kva With 12 V Battery Input- 12 Volt Dc, Output- 220 Volt Ac 2 Domestic Appliances – A. Electric Hot Plate 1500 Watt A. Electric Hot Plate 1500 Watt B. Electric Kettle, 1500 Watts C. Electric Iron 1500 Watts D. Immersion Heater 1500 Watt E. A.C. Fan F. Geyser ( Storage Type ) 15 Ltr Minimum G. Mixture & Grinder 3 Thyristor / Igbt Controlled D.C. Motor Drive With Tacho-Generator Feedback Arrangement 1 Hp 4 Thyristor / Igbt Controlled A.C. Motor Drive With Vvvf Control 3 Phase, 2 Hp Tools And Equipments Needed Additional To Existing Tool List 3 Washing Machine 7Kg Cap Top Loading 4 Motor Pump Set 1 Hp, 1 Phase, 240 V 5 Pin Type, Shackle Type & Suspension Type Insulators ( Raw Material )

Key Value

Document Fees
INR 550 /-
EMD
INR 60000.0 /-
Tender Value
Refer document
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail