Survey, Soil Testing, Design, Supply, Installation, Construction, Laying, Testing And Commissioning Of Following Works Complete In All Respect (I) Providing Necessary Refurbishment Of Existing Civil Structrure Of Screen Chamber, Grit Chamber And Pump House At Sps No.L And Providing, Supplying, Erecting And Commissioning All Additionally Required Electrical And Mechanical Equipment, Tools And Plants (Including Pumping Machinery, Piping & Valves, Gates, Dg Set & Accessories, Etc.) Designed For Pumping 23.50 Mld Sewage Collected At Sps No. 1 (Ii) Providing, Designing, Supplying And Laying Psc Rising Main From Narayan Bagh To Stp At Hazaribagh As Extension Of Existing Rising And With Allied Infrastructure. (500 M Length) (Iii) Providing, Designing, Supplying, Erecting And Commissioning Of All Necessary Infrastructures Required To Divert The Wastewater Flow Collected Near Om Shanti Nagar To Sps No. 2 Designed For Total Flow Of 0.4 Mld. (Iv) (A) Providing Necessary Refurbishment Of Existing Civil Structure Of Screen Chamber, Grit Chamber And Pump House At Sps No. 2 (Near Bhutnath Temple) And Providing, Supplying, Erecting And Commissioning All Additionally Required Electrical And Machanical Equipment, Tools And Plants (Including Pumping Machinery, Piping & Valves, Gates, Dg Set & Accessories Etc. Designed For Pumping Of 4.32 Mid Sewage Collected At Sps No. 2. (B) Providing, Designing,Constructing Compound Wall And Gate At Sps No. 2 (V) Providing, Supplying & Laying Psc Rising Main From Sps No.2 To Stp At Hazaribagh With Allied Infrastructure. (1100 M Length). (Vi) (A) Providing, Designing,Supplying And Erecting / Constructing All Necessary Infrastructure, Tools And Plants For 26 Mld Stp (Based On Sbr Technology) On D/S Of Lake At Hazaribagh Area To Achieve Desired Quality Of Treated Wastewater. (B) Providing, Designing, Supplying And Constructing Various Types Of Building Works For The Staff Quarters And Storage Godown (Vii) Providing, Designing, Supplying & Laying Of Psc Pipe Linefor Disposal Of 4 Mid. Treated Sewage In To Laxmi Tal. From Stp (300 M Length). (Viii) Providing And Constructing A Masonry Channel To Carry Treated Wastewater From Stp To Narayanbagh (Ix) Providing And Constructing A Masonry Channel To Guide And Confine The Overflow Of Lake Along With Flow Of Treatec Wastewater From Stp Into Narayanbagh. (X) Providing , Supply And Constructing R.C.C. Cover On Existing Channels Carrying Water. (Xi) Providing, Supplying Installation & Constructing Sub Station Along With Distribution Transformers, Ht & Lt Panels Cabling, Etc, For Sps No. 1 And Stp.