Distribution and Conditioning, Heating Equipment, APH, Valves, Valve, Boilers, Boiler Work, Electronic Products and Appliances, Domestic Appliance, Ceiling Fan
Tender Overview
Project Description
Overhauling Of Air Preheaters & Rectifioat1o11 Of Flue Gas Ducts From Eco Outlet To Aph Inlet Of Units 1 To-4 Boilers ForTheyear2014-15. (Oh-1).Overhauling Of Id Fans. Fd Fans, Pa Fans, Scanner Air Fans & Hot Well Make Up Pumps Of Units 1 To 4 Boilers 1Or The Year2014-15 (Oh-2).Overhauling And Servicing Of High Pressure Valves Of Units 1 To4 Boners For The Year2014-15 (Oh-3).Overhauling Of Electrostatic Precipitators & Flue Gas Ducts From Aph Inlet To Chimney Of Units 1 To 4 Bolters For The Year 2014-15. (Oh-4).Overhauling Of Coat And Oil Firing Equipment Of 4X21 0 Mw Units 1, 2. 3-& 4 Boilers For The Year20i4-15. (Oh-5) .Work Of D Meter Survey Of Boiler Tubes/Bends And Replacement Of Eroded Tubes/Bends In First Pass Of 4X210Mwunits-1, 2, 3 &4 Boilers Tortheyear2014-15. (Oh-6)Work Of 0 Meter Survey Of Boiler Tubes/Bends AndReplacement O1 Eroded Tubes/Bends Ln Second Pass And Inspection (Rectiflcation /Replacement Of Shrouding/Cassette Baffles Of Tubes/Bends Of 4X21 0 Mw Units 1, 2. 3 & 4 Bolters For The Year 2014-15. (Oh-7).Work Of Repairs To Refractory, Replacement Of Damaged Insulation Of Bo1ler Area O1 4X21 0 Mw Units 1: 2, 3 & Boilersfortheyear2014·15. (Oh-8).Erection, Shifting, Operation & Dlsmantllhg Of Stty Climbers. Fumac9 Cleaning Of B.Oilers, Hydraulic Test And Cleaning/Removing Of Dust And Ash From Of 4X2-10Mwunlts 1. 2, 3 & 4 Boilers Fortheyear2014-15. (Oh·9).Rectification Of Afr Ducts And Serviclng/Repalrlng Of Guilloune Gates, Hot Ajr Shut Off Gates, Cold Air Shut Off Gates & Manual Operated Guillotine Type Of Gates, Hot & Cold Air Dampers And Repairs/Replacements Of Ss Wire Mesh At The Bottom O1 The Furnace (Inside The Bottom Ash Hopper) Of 4X21 0 Mw Units 1. 2. 3 & 4 Boilers For The Year 2014·15.{Oh-10).Overhaul Wot1<S At Safety Valves, Boller Drum And Tanks.Wall Deslaggers And Cold Setting Of Hangers Of 4X21 0 Mw Units 1 To 4 Boilers For The Year2o• 4-15. (Oh-11 ).Work O1 Erection & Dismantling Of Cuplok Scaffolding System Of 4X21 0 Mw U-L To 4 Boilers For The Year 2.014-15.
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender