Chemicals and Fertilizers Boards / Undertakings / PSU Closing in 17 days TDR #58774826

Bids Are invited for Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Industry Unit; Electrical System Or Installation, Biennial Rate Contract For Repair And Maintenance Of Electrical System In Hwbf At Rashtriya Chemic

Issued by Boards / Undertakings / PSU · Mumbai Suburban, Maharashtra
Tender Value
Ref. Documents
Estimated cost
Bid Submission
17 Dec 2026
17 days left
EMD
75000
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Gem

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Mumbai Suburban → Maharashtra
EMD Exemption
Not Available
Quantity
1

Project Description

Bids Are invited for Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Industry Unit; Electrical System Or Installation, Biennial Rate Contract For Repair And Maintenance Of Electrical System In Hwbf At Rashtriya Chemicals And Fertilizers L.. - Motors Upto 9.3 Kw Rating , Motor Maintenance: Removing The Power Cable And Earthing Cable Connections,Shifting Of Motor From The Motor Bed To The Maintenance Bay/Workshop, Motor Body Cleaning, Ir Value Checking, Resistance Checking, Checking The Fan Cover, Tapping The Screw Threads. Performing The No-Load Test, Recording The Current. , Motor Bearing Replacement: Dismantling Of The Motor, Checking The Stator, Rotor, Bearing And Removal Of Bearing From The Shaft, Replacement Of Bearing By New Bearing And Assembling After Checking The Bearing Housing Clearances. , Motor Painting As Per The Standard Practice With Primer And Double Coat Of Paint , Connection Of Power Cable At Motor End: Shifting Of Motor From Maintenance Bay/Workshop To Operating Area. Glanding And Termination Of Cable In Terminal Box And Applying Of Silicon Compound. , Motors Of 9.3 Kw To 18.5 Kw Rating , Motor Maintenance: Removing The Power Cable And Earthing Cable Connections,Shifting Of Motor From The Motor Bed To The Maintenance Bay/Workshop, Motor Body Cleaning, Ir Value Checking, Resistance Checking, Checking The Fan Cover, Tapping The Screw Threads. Performing The No-Load Test, Recording The Current. , Motor Bearing Replacement: Dismantling Of The Motor, Checking The Stator, Rotor, Bearing And Removal Of Bearing From The Shaft, Replacement Of Bearing By New Bearing And Assembling After Checking The Bearing Housing Clearances. , Motor Painting As Per The Standard Practice With Primer And Double Coat Of Paint , Connection Of Power Cable At Motor End: Shifting Of Motor From Maintenance Bay/Workshop To Operating Area. Glanding And Termination Of Cable In Terminal Box And Applying Of Silicon Compound. , Mcc & Vfd Panel Feeder , Maintenance Of Mcc Feeder And Vfd Panels: Cleaning And Checking Of The Panels, Cleaning And Tightness Of The Power And The Control Terminals, Checking Healthiness Of The Components, Checking Healthiness Of The Cables, Control Circuit And Power Circuit. Replacement Of Any Defective Component (If Any) Is Also Part Of This Item, Component Shall Be Supplied By The Department. , Trobleshooting And Rectification Of The Motor Feeders: Checking Of The Control Circuit Of The Mcc Feeders And Vfds And The Power Circuit And Other Problem Related To Non Starting Of Motors, Tripping Of The Circuit, Fault Etc , Local Push Button Station , Opening Of The Lpbs And Checking The Healthiness Of The Start And Stop Push Buttons, Replacement Of The Push Buttons And Tightening Of The Terminals And Fixing The Lpbs. , Replacement Of The Lpbs Component Like Start And Stop Push Button. , Rewinding Of 3 Phase Motor Stator ( Rpm 1500) , Upto & Including 5 Hp , Above 5 Hp, Upto & Including 10 Hp , Rewinding Of 3 Phase Motor Stator ( Rpm 3000) , Upto & Including 5 Hp , Above 5 Hp, Upto & Including 10 Hp , 1 Phase Motors , Ceiling Fan Rewinding + Parts(Including Supply Of Bearings) , Pedestal Fan (Rewinding, Supply Of Bearings, Overhauling & Assembling) , Exhaust Fan Rewinding Along Wih Parts(Bearing), Assembling & Overhauling , Exhaust Fan Upto 12 Inch , Exhaust Fan Upto 18 Inch , Earthing , Cleaning, Painting & Identification Of Earth Pit Plates With Resistane Value. , Measurement Of Earth Pit Resistance Value And Recording It & Maintain Healthiness With Salt & Charcoal Filling. , Supply And Installation Of Earthing Pit With Maintenance Free Earth Electrode(Model No Fe 80 Of Fast Electrode Make Or Equivalent) 76 Mm Outer Dia & 3 Meter Length. Gi Hardware, Watering Tube, Gi Hinged Covers With 3 Mtrs Digging, Dewatering If Required, Back Filling With Civil Work. Pit To Be Elevated 6 Inch Above The Ground. The Bidder Shall Check Earth Resistance. , Cable Laying: Shifting Of The Cable Drum, Measuring The Cable Length And Cutting The Cable From The Cable Drum As Per The Standared Practices. Laying Of Pvc/Frls Power/Control/Lighting Cable/Earthing Wire Through The Cable Trays With Proper Routing, Physical Dressing, Clamping, Glanding And Cable Termination Along With Declamping & Deglanding. , 4 Core Power Cable Upto 6 Sqmm , 4 Core Power Cable From 6 Sqmm-35 Sqmm , 7 Core Cable Upto 4 Sqmm , 12 Core Cable 2.5 Sqmm , Laying Of Earthing Wire. , 3 Core Single Phase Lighting/Power Supply Cable , Declamping/Deglanding & Removal Of Lt Pvc/Xlpe Power/Contro/Lighting Cable Of Cu/Al Armoured Cable From Tray/Wall Of Following Sizes , 4 Core Power Cable Upto 6 Sqmm , 4 Core Power Cable From 6 Sqmm-35 Sqmm , 7 Core Cable Upto 4 Sqmm , 12 Core Cable 2.5 Sqmm , Laying Of Earthing Wire. , 3 Core Single Phase Lighting/Power Supply Cable , Preventive Maintenance Of The Transformer , Opening Of The Ht And Lt Cable Terminals Covers Of The Transformer, Discharge With Earth Rod, Cleaning Of The Transformer Body, Cleaning Of The Terminals And Retorquing Of The Connections & Taking Ir Value. , Preventive Maintenance Of Ht Panel , Opening Of The Ht Panel, Discharge With Earth Rod, Cleaning Of The Terminals And Retorquing Of The Connections & Taking The Ir Value. , Checking Of Electrical Auxilliaries Like Pdb, Welding Sockets, Ldb And Other Distribution Boards , Opening Of The Distribution Boxes And Welding Sockets, Checking The Healthiness Of The Mcbs, Rccbs And Cables. Replacement Of The Fault Parts Like Terminal Strips, Mcbs, Rccbs. , Providing Electrical Services , Replacement Of 3 Phase Plug Points In Field (Flameproof/Weatherproof) , Replacement Of 1 Phase Plug Points In Field (Flameproof/Weatherproof) , Preparation & Providing Of Temporary Lighting Materials Like Flood Light/ Handlamp/ Single Phase Board Etc , Providing Temporary Single Phase Power Supply To Different Equipments ( Job Includes Providing Temporary Supply And Disconnect It After Job Completion) , Providing Temporary Three Phase Power Supply To Different Equipments ( Job Includes Providing Temporary Supply And Disconnect It After Job Completion) , Providing 24V Power Supply For Lighting Purpose. , Replacement Of Dc Emergency Lights , Replacement Of Faulty Switch, Socket And Plugs In Office Area , Replacement Of Damaged Junction Box Used For Motor And Lighting Purpose. , Assembly/Replacement Of Led Fittings, Halogen Fittings, Ceiling Fan & Exhaust Fan On Structure/Wall/False Ceiling. , Replacement Of Led Fixtures & Testings Above 30 W Upto 100 W. , Assembl, Testing & Connection Of Ceiling Fan Of Size From 48 To 56 , Assembly, Testing & Connection Of Exhaust Fan Of Size Upto 450 Mm And Testing , Rectification Of Lighting Circuit/Junction Box Checking/Minor Repairs , Involving Only One Light Fitting , Involving Two-Four Light Fitting Circuit , Involving Four-Eight Light Fitting Circuit , Shifting Of Material , Shifting Of Material Like Light Fittings, Fans, Switch Board, Tools & Tackles, Spare Parts Etc From One Location To Another & Material Shifting From Main Store To Plant (Upto 25 Kg). , Polyethene Sheet, Canopy , Covering Of Polyethene Sheet For Motor Terminal Box, Light Junction Box During Rainy Season. , Monitoring And Logging Of Electrical Parameters , Surveillance Check Of Dc Emeregency Lights. , Illumination Check & Recording Lux Level Of Lights. , Filling Up Electrolyte Solution & Recording Of Parameters In 235 Cells Of Class-I & Class-Ii Battery Banks. ( 2 Battery Bank). , Filling Up Electrolyte Solution, Check Specific Gravity & Record Voltage In Battery Operated Vehicle And Maintain Healthiness. , Filling Up Electrolyte Solution, Check Specific Gravity & Record Voltage In Fire Water Diesel Battery And Maintain Healthiness. , Shifting Of Electrical Panel. , Disconnection, Removal & Shifting Of Electrical Panel From Plant Site To Different Location If Required. , Installation Of Electrical Panel At Plant Site With Grouting Of Frame Including Required Hardware If Required. , Point Wiring For Light/Fan/Exhaust Fan Points With 3*1 Core 1.5 Sq Mm Solid Cu Conductor, Pvc Insulated Wire With Suitable Size Casing/Caping & Supply Of Wire,Switch, Ceiling Rose & Hardware. , Short (0-3 Mtrs) , Medium (3-6 Mtrs) , Long ( 6-9 Mtrs) , Supply & Wiring For 3 Pin 5 A Plug Point With 3*1 Core 1.5 Sq Mm Solid Cu Conductor, Pvc Insulated Wire With Suitable Size Casing/Caping And Earth Wire. The Scope Includes Supply Of Wire,Switch, Socket & Hardware. , Short (0-3 Mtrs) , Medium (3-6 Mtrs) , Long ( 6-9 Mtrs) , Supply & Wiring For 3 Pin 15 A Plug Point With 3*1 Core 2.5/4 Sq Mm Solid Cu Conductor, Pvc Insulated Wire With Suitable Size Casing/Caping And Earth Wire. The Scope Includes Supply Of Wire,Switch, Socket & Hardware. , Short (0-3 Mtrs) , Medium (3-6 Mtrs) , Long ( 6-9 Mtrs) , House Keeping , Cleaning Of Led Lights: Cleaned Led Light Fixtures Of Different Structures, Designs, And Wattage Ratings By Removing Dust, Dirt, And Debris To Maintain Proper Illumination And Extend Service Life. , Cleaning Of Ceiling Fans, Pedestal Fans:Cleaned Ceiling Fans By Removing Accumulated Dust From Blades, Motor Housing, And Other Accessible Parts To Ensure Efficient Operation And Improve Air Circulation. , Cleaning Of Exhaust Fans: Cleaned Exhaust Fans Of Various Sizes And Capacities By Removing Dust, Grease, And Dirt From Blades, Grills, And Housings To Maintain Proper Ventilation And Performance.

BOQ

Sl. No. Item TitleItem Description
1Motors upto 9.3 KW RatingMotors upto 9.3 KW Rating
2Motor Maintenance: Removing the Power cable and earthing cable connections,shifting of motor from the motor bed to the maintenance bay/workshop, motor body cleaning, IR value checking, resistance checking, checking the fan cover, tapping the screw threads. Performing the No-Load Test, recording the current.Motor Maintenance: Removing the Power cable and earthing cable connections,shifting of motor from the motor bed to the maintenance bay/workshop, motor body cleaning, IR value checking, resistance checking, checking the fan cover, tapping the screw threads. Performing the No-Load Test, recording the current.
3Motor Bearing Replacement: Dismantling of the motor, checking the stator, rotor, bearing and removal of bearing from the shaft, replacement of bearing by new bearing and assembling after checking the bearing housing clearances.Motor Bearing Replacement: Dismantling of the motor, checking the stator, rotor, bearing and removal of bearing from the shaft, replacement of bearing by new bearing and assembling after checking the bearing housing clearances.
4Motor Painting as per the standard practice with primer and double coat of paintMotor Painting as per the standard practice with primer and double coat of paint
5Connection of Power Cable at Motor end: shifting of motor from maintenance bay/workshop to operating area. Glanding and termination of cable in terminal box and applying of silicon compound.Connection of Power Cable at Motor end: shifting of motor from maintenance bay/workshop to operating area. Glanding and termination of cable in terminal box and applying of silicon compound.
6Motors of 9.3 KW to 18.5 KW RatingMotors of 9.3 KW to 18.5 KW Rating
7Motor Maintenance: Removing the Power cable and earthing cable connections,shifting of motor from the motor bed to the maintenance bay/workshop, motor body cleaning, IR value checking, resistance checking, checking the fan cover, tapping the screw threads. Performing the No-Load Test, recording the current.Motor Maintenance: Removing the Power cable and earthing cable connections,shifting of motor from the motor bed to the maintenance bay/workshop, motor body cleaning, IR value checking, resistance checking, checking the fan cover, tapping the screw threads. Performing the No-Load Test, recording the current.
8Motor Bearing Replacement: Dismantling of the motor, checking the stator, rotor, bearing and removal of bearing from the shaft, replacement of bearing by new bearing and assembling after checking the bearing housing clearances.Motor Bearing Replacement: Dismantling of the motor, checking the stator, rotor, bearing and removal of bearing from the shaft, replacement of bearing by new bearing and assembling after checking the bearing housing clearances.
9Motor Painting as per the standard practice with primer and double coat of paintMotor Painting as per the standard practice with primer and double coat of paint
10Connection of Power Cable at Motor end: shifting of motor from maintenance bay/workshop to operating area. Glanding and termination of cable in terminal box and applying of silicon compound.Connection of Power Cable at Motor end: shifting of motor from maintenance bay/workshop to operating area. Glanding and termination of cable in terminal box and applying of silicon compound.
11MCC & VFD Panel FeederMCC & VFD Panel Feeder
12Maintenance of MCC feeder and VFD panels: Cleaning and checking of the Panels, cleaning and tightness of the power and the control terminals, checking healthiness of the components, checking healthiness of the cables, control circuit and power circuit. Replacement of any defective component (if any) is also part of this item, component shall be supplied by the department.Maintenance of MCC feeder and VFD panels: Cleaning and checking of the Panels, cleaning and tightness of the power and the control terminals, checking healthiness of the components, checking healthiness of the cables, control circuit and power circuit. Replacement of any defective component (if any) is also part of this item, component shall be supplied by the department.
13Trobleshooting and rectification of the motor feeders: Checking of the control circuit of the MCC feeders and VFDs and the power circuit and other problem related to non starting of motors, tripping of the circuit, fault etcTrobleshooting and rectification of the motor feeders: Checking of the control circuit of the MCC feeders and VFDs and the power circuit and other problem related to non starting of motors, tripping of the circuit, fault etc
14Local Push Button StationLocal Push Button Station
15Opening of the LPBS and checking the healthiness of the Start and Stop Push buttons, replacement of the push buttons and tightening of the terminals and fixing the LPBS.Opening of the LPBS and checking the healthiness of the Start and Stop Push buttons, replacement of the push buttons and tightening of the terminals and fixing the LPBS.
16Replacement of the LPBS component like Start and Stop push button.Replacement of the LPBS component like Start and Stop push button.
17Rewinding of 3 phase motor stator ( RPM 1500)Rewinding of 3 phase motor stator ( RPM 1500)
18Upto & including 5 hpUpto & including 5 hp
19Above 5 hp, Upto & including 10 hpAbove 5 hp, Upto & including 10 hp
20Rewinding of 3 phase motor stator ( RPM 3000)Rewinding of 3 phase motor stator ( RPM 3000)
21Upto & including 5 hpUpto & including 5 hp
22Above 5 hp, Upto & including 10 hpAbove 5 hp, Upto & including 10 hp
231 Phase Motors1 Phase Motors
24Ceiling Fan rewinding + Parts(including supply of Bearings)Ceiling Fan rewinding + Parts(including supply of Bearings)
25Pedestal Fan (rewinding, supply of bearings, overhauling & assembling)Pedestal Fan (rewinding, supply of bearings, overhauling & assembling)
26Exhaust Fan Rewinding along wih Parts(Bearing), Assembling & OverhaulingExhaust Fan Rewinding along wih Parts(Bearing), Assembling & Overhauling
27Exhaust Fan upto 12 inchExhaust Fan upto 12 inch
28Exhaust Fan upto 18 inchExhaust Fan upto 18 inch
29EarthingEarthing
30Cleaning, Painting & Identification of Earth Pit plates with resistane value.Cleaning, Painting & Identification of Earth Pit plates with resistane value.
31Measurement of Earth Pit resistance value and recording it & maintain healthiness with salt & charcoal filling.Measurement of Earth Pit resistance value and recording it & maintain healthiness with salt & charcoal filling.
32Supply and installation of earthing pit with Maintenance free earth electrode(model no FE 80 of fast electrode make or equivalent) 76 mm outer dia & 3 meter length. GI hardware, watering tube, GI hinged covers with 3 mtrs digging, dewatering if required, back filling with civil work. Pit to be elevated 6 inch above the ground. the bidder shall check earth resistance.Supply and installation of earthing pit with Maintenance free earth electrode(model no FE 80 of fast electrode make or equivalent) 76 mm outer dia & 3 meter length. GI hardware, watering tube, GI hinged covers with 3 mtrs digging, dewatering if required, back filling with civil work. Pit to be elevated 6 inch above the ground. the bidder shall check earth resistance.
33Cable Laying: Shifting of the cable drum, measuring the cable length and cutting the cable from the cable drum as per the standared practices. Laying of PVC/FRLS Power/control/lighting cable/Earthing Wire through the cable trays with proper routing, physical dressing, clamping, glanding and Cable Termination along with declamping & deglanding.Cable Laying: Shifting of the cable drum, measuring the cable length and cutting the cable from the cable drum as per the standared practices. Laying of PVC/FRLS Power/control/lighting cable/Earthing Wire through the cable trays with proper routing, physical dressing, clamping, glanding and Cable Termination along with declamping & deglanding.
344 Core Power Cable Upto 6 Sqmm4 Core Power Cable Upto 6 Sqmm
354 Core Power Cable from 6 Sqmm-35 Sqmm4 Core Power Cable from 6 Sqmm-35 Sqmm
367 Core Cable upto 4 Sqmm7 Core Cable upto 4 Sqmm
3712 Core Cable 2.5 Sqmm12 Core Cable 2.5 Sqmm
38Laying of Earthing wire.Laying of Earthing wire.
393 Core Single Phase Lighting/Power supply cable3 Core Single Phase Lighting/Power supply cable
40Declamping/Deglanding & removal of LT PVC/XLPE Power/Contro/Lighting cable of Cu/Al armoured cable from tray/wall of following sizesDeclamping/Deglanding & removal of LT PVC/XLPE Power/Contro/Lighting cable of Cu/Al armoured cable from tray/wall of following sizes
414 Core Power Cable Upto 6 Sqmm4 Core Power Cable Upto 6 Sqmm
424 Core Power Cable from 6 Sqmm-35 Sqmm4 Core Power Cable from 6 Sqmm-35 Sqmm
437 Core Cable upto 4 Sqmm7 Core Cable upto 4 Sqmm
4412 Core Cable 2.5 Sqmm12 Core Cable 2.5 Sqmm
45Laying of Earthing wire.Laying of Earthing wire.
463 Core Single Phase Lighting/Power supply cable3 Core Single Phase Lighting/Power supply cable
47Preventive Maintenance of the TransformerPreventive Maintenance of the Transformer
48Opening of the HT and LT Cable Terminals Covers of the Transformer, discharge with earth rod, cleaning of the Transformer body, cleaning of the terminals and retorquing of the connections & taking IR value.Opening of the HT and LT Cable Terminals Covers of the Transformer, discharge with earth rod, cleaning of the Transformer body, cleaning of the terminals and retorquing of the connections & taking IR value.
49Preventive maintenance of HT PanelPreventive maintenance of HT Panel
50Opening of the HT Panel, discharge with earth rod, cleaning of the terminals and retorquing of the connections & taking the IR value.Opening of the HT Panel, discharge with earth rod, cleaning of the terminals and retorquing of the connections & taking the IR value.
51Checking of Electrical Auxilliaries like PDB, Welding Sockets, LDB and other distribution boardsChecking of Electrical Auxilliaries like PDB, Welding Sockets, LDB and other distribution boards
52Opening of the distribution boxes and Welding sockets, checking the healthiness of the MCBs, RCCBs and cables. Replacement of the fault parts like terminal strips, MCBs, RCCBs.Opening of the distribution boxes and Welding sockets, checking the healthiness of the MCBs, RCCBs and cables. Replacement of the fault parts like terminal strips, MCBs, RCCBs.
53Providing Electrical ServicesProviding Electrical Services
54Replacement of 3 phase plug points in field (Flameproof/Weatherproof)Replacement of 3 phase plug points in field (Flameproof/Weatherproof)
55Replacement of 1 phase plug points in field (Flameproof/Weatherproof)Replacement of 1 phase plug points in field (Flameproof/Weatherproof)
56Preparation & providing of temporary lighting materials like flood light/ handlamp/ single phase board etcPreparation & providing of temporary lighting materials like flood light/ handlamp/ single phase board etc
57Providing temporary single phase power supply to different equipments ( Job includes providing temporary supply and disconnect it after job completion)Providing temporary single phase power supply to different equipments ( Job includes providing temporary supply and disconnect it after job completion)
58Providing temporary three phase power supply to different equipments ( Job includes providing temporary supply and disconnect it after job completion)Providing temporary three phase power supply to different equipments ( Job includes providing temporary supply and disconnect it after job completion)
59Providing 24V power supply for lighting purpose.Providing 24V power supply for lighting purpose.
60Replacement of dc emergency lightsReplacement of dc emergency lights
61Replacement of faulty switch, socket and plugs in office areaReplacement of faulty switch, socket and plugs in office area
62Replacement of damaged junction box used for motor and lighting purpose.Replacement of damaged junction box used for motor and lighting purpose.
63Assembly/replacement of LED Fittings, Halogen Fittings, Ceiling Fan & Exhaust fan on structure/wall/false ceiling.Assembly/replacement of LED Fittings, Halogen Fittings, Ceiling Fan & Exhaust fan on structure/wall/false ceiling.
64Replacement of LED fixtures & testings above 30 W upto 100 W.Replacement of LED fixtures & testings above 30 W upto 100 W.
65Assembl, Testing & Connection of ceiling fan of size from 48 to 56\\"Assembl, Testing & Connection of ceiling fan of size from 48 to 56\\"
66Assembly, Testing & Connection of exhaust fan of size upto 450 mm and testingAssembly, Testing & Connection of exhaust fan of size upto 450 mm and testing
67Rectification of Lighting Circuit/Junction Box Checking/minor repairsRectification of Lighting Circuit/Junction Box Checking/minor repairs
68Involving only one light fittingInvolving only one light fitting
69Involving Two-Four light fitting circuitInvolving Two-Four light fitting circuit
70Involving Four-Eight light fitting circuitInvolving Four-Eight light fitting circuit
71Shifting of MaterialShifting of Material
72Shifting of material like light fittings, Fans, switch board, tools & tackles, spare parts etc from one location to another & Material shifting from main store to plant (Upto 25 kg).Shifting of material like light fittings, Fans, switch board, tools & tackles, spare parts etc from one location to another & Material shifting from main store to plant (Upto 25 kg).
73Polyethene Sheet, CanopyPolyethene Sheet, Canopy
74Covering of Polyethene sheet for Motor terminal Box, Light junction box during rainy season.Covering of Polyethene sheet for Motor terminal Box, Light junction box during rainy season.
75Monitoring and Logging of Electrical ParametersMonitoring and Logging of Electrical Parameters
76Surveillance check of dc emeregency lights.Surveillance check of dc emeregency lights.
77Illumination check & recording lux level of lights.Illumination check & recording lux level of lights.
78Filling up Electrolyte solution & recording of parameters in 235 cells of Class-I & Class-II Battery banks. ( 2 Battery bank).Filling up Electrolyte solution & recording of parameters in 235 cells of Class-I & Class-II Battery banks. ( 2 Battery bank).
79Filling up electrolyte solution, check specific gravity & record voltage in Battery operated vehicle and maintain healthiness.Filling up electrolyte solution, check specific gravity & record voltage in Battery operated vehicle and maintain healthiness.
80Filling up electrolyte solution, check specific gravity & record voltage in Fire water Diesel Battery and maintain healthiness.Filling up electrolyte solution, check specific gravity & record voltage in Fire water Diesel Battery and maintain healthiness.
81Shifting of Electrical panel.Shifting of Electrical panel.
82Disconnection, removal & shifting of Electrical panel from plant site to different location if required.Disconnection, removal & shifting of Electrical panel from plant site to different location if required.
83Installation of Electrical panel at plant site with grouting of frame including required hardware if required.Installation of Electrical panel at plant site with grouting of frame including required hardware if required.
84Point wiring for Light/fan/exhaust fan points with 3*1 Core 1.5 sq mm solid Cu conductor, PVC insulated wire with suitable size casing/caping & supply of wire,switch, ceiling rose & hardware.Point wiring for Light/fan/exhaust fan points with 3*1 Core 1.5 sq mm solid Cu conductor, PVC insulated wire with suitable size casing/caping & supply of wire,switch, ceiling rose & hardware.
85Short (0-3 Mtrs)Short (0-3 Mtrs)
86Medium (3-6 Mtrs)Medium (3-6 Mtrs)
87Long ( 6-9 Mtrs)Long ( 6-9 Mtrs)
88Supply & Wiring for 3 pin 5 A plug point with 3*1 Core 1.5 sq mm solid Cu conductor, PVC insulated wire with suitable size casing/caping and earth wire. The scope includes supply of wire,switch, socket & hardware.Supply & Wiring for 3 pin 5 A plug point with 3*1 Core 1.5 sq mm solid Cu conductor, PVC insulated wire with suitable size casing/caping and earth wire. The scope includes supply of wire,switch, socket & hardware.
89Short (0-3 Mtrs)Short (0-3 Mtrs)
90Medium (3-6 Mtrs)Medium (3-6 Mtrs)
91Long ( 6-9 Mtrs)Long ( 6-9 Mtrs)
92Supply & Wiring for 3 pin 15 A plug point with 3*1 Core 2.5/4 sq mm solid Cu conductor, PVC insulated wire with suitable size casing/caping and earth wire. The scope includes supply of wire,switch, socket & hardware.Supply & Wiring for 3 pin 15 A plug point with 3*1 Core 2.5/4 sq mm solid Cu conductor, PVC insulated wire with suitable size casing/caping and earth wire. The scope includes supply of wire,switch, socket & hardware.
93Short (0-3 Mtrs)Short (0-3 Mtrs)
94Medium (3-6 Mtrs)Medium (3-6 Mtrs)
95Long ( 6-9 Mtrs)Long ( 6-9 Mtrs)
96House KeepingHouse Keeping
97Cleaning of LED Lights: Cleaned LED light fixtures of different structures, designs, and wattage ratings by removing dust, dirt, and debris to maintain proper illumination and extend service life.Cleaning of LED Lights: Cleaned LED light fixtures of different structures, designs, and wattage ratings by removing dust, dirt, and debris to maintain proper illumination and extend service life.
98Cleaning of Ceiling Fans, Pedestal Fans:Cleaned ceiling fans by removing accumulated dust from blades, motor housing, and other accessible parts to ensure efficient operation and improve air circulation.Cleaning of Ceiling Fans, Pedestal Fans:Cleaned ceiling fans by removing accumulated dust from blades, motor housing, and other accessible parts to ensure efficient operation and improve air circulation.
99Cleaning of Exhaust Fans: Cleaned exhaust fans of various sizes and capacities by removing dust, grease, and dirt from blades, grills, and housings to maintain proper ventilation and performance.Cleaning of Exhaust Fans: Cleaned exhaust fans of various sizes and capacities by removing dust, grease, and dirt from blades, grills, and housings to maintain proper ventilation and performance.

AI Tender Summary

OUR REF NO 58774826
AUTHORITY Boards / Undertakings / PSU
TENDER VALUE Ref. Documents
LAST DATE 17-12-2026
Authority
Authority Name Rashtriya Chemicals And Fertilizers Limited
Work Description Bids Are invited for Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Industry Unit; Electrical System Or Installation, Biennial Rate Contract For Repair And Maintenance Of Electrical System In Hwbf At Rashtriya Chemicals And Fertilizers L.. - Motors Upto 9.3 Kw Rating , Motor Maintenance: Removing The Power Cable And Earthing Cable Connections,Shifting Of Motor From The Motor Bed To The Maintenance Bay/Workshop, Motor Body Cleaning, Ir Value Checking, Resistance Checking, Checking The Fan Cover, Tapping The Screw Threads. Performing The No-Load Test, Recording The Current. , Motor Bearing Replacement: Dismantling Of The Motor, Checking The Stator, Rotor, Bearing And Removal Of Bearing From The Shaft, Replacement Of Bearing By New Bearing And Assembling After Checking The Bearing Housing Clearances. , Motor Painting As Per The Standard Practice With Primer And Double Coat Of Paint , Connection Of Power Cable At Motor End: Shifting Of Motor From Maintenance Bay/Workshop To Operating Area. Glanding And Termination Of Cable In Terminal Box And Applying Of Silicon Compound. , Motors Of 9.3 Kw To 18.5 Kw Rating , Motor Maintenance: Removing The Power Cable And Earthing Cable Connections,Shifting Of Motor From The Motor Bed To The Maintenance Bay/Workshop, Motor Body Cleaning, Ir Value Checking, Resistance Checking, Checking The Fan Cover, Tapping The Screw Threads. Performing The No-Load Test, Recording The Current. , Motor Bearing Replacement: Dismantling Of The Motor, Checking The Stator, Rotor, Bearing And Removal Of Bearing From The Shaft, Replacement Of Bearing By New Bearing And Assembling After Checking The Bearing Housing Clearances. , Motor Painting As Per The Standard Practice With Primer And Double Coat Of Paint , Connection Of Power Cable At Motor End: Shifting Of Motor From Maintenance Bay/Workshop To Operating Area. Glanding And Termination Of Cable In Terminal Box And Applying Of Silicon Compound. , Mcc & Vfd Panel Feeder , Maintenance Of Mcc Feeder And Vfd Panels: Cleaning And Checking Of The Panels, Cleaning And Tightness Of The Power And The Control Terminals, Checking Healthiness Of The Components, Checking Healthiness Of The Cables, Control Circuit And Power Circuit. Replacement Of Any Defective Component (If Any) Is Also Part Of This Item, Component Shall Be Supplied By The Department. , Trobleshooting And Rectification Of The Motor Feeders: Checking Of The Control Circuit Of The Mcc Feeders And Vfds And The Power Circuit And Other Problem Related To Non Starting Of Motors, Tripping Of The Circuit, Fault Etc , Local Push Button Station , Opening Of The Lpbs And Checking The Healthiness Of The Start And Stop Push Buttons, Replacement Of The Push Buttons And Tightening Of The Terminals And Fixing The Lpbs. , Replacement Of The Lpbs Component Like Start And Stop Push Button. , Rewinding Of 3 Phase Motor Stator ( Rpm 1500) , Upto & Including 5 Hp , Above 5 Hp, Upto & Including 10 Hp , Rewinding Of 3 Phase Motor Stator ( Rpm 3000) , Upto & Including 5 Hp , Above 5 Hp, Upto & Including 10 Hp , 1 Phase Motors , Ceiling Fan Rewinding + Parts(Including Supply Of Bearings) , Pedestal Fan (Rewinding, Supply Of Bearings, Overhauling & Assembling) , Exhaust Fan Rewinding Along Wih Parts(Bearing), Assembling & Overhauling , Exhaust Fan Upto 12 Inch , Exhaust Fan Upto 18 Inch , Earthing , Cleaning, Painting & Identification Of Earth Pit Plates With Resistane Value. , Measurement Of Earth Pit Resistance Value And Recording It & Maintain Healthiness With Salt & Charcoal Filling. , Supply And Installation Of Earthing Pit With Maintenance Free Earth Electrode(Model No Fe 80 Of Fast Electrode Make Or Equivalent) 76 Mm Outer Dia & 3 Meter Length. Gi Hardware, Watering Tube, Gi Hinged Covers With 3 Mtrs Digging, Dewatering If Required, Back Filling With Civil Work. Pit To Be Elevated 6 Inch Above The Ground. The Bidder Shall Check Earth Resistance. , Cable Laying: Shifting Of The Cable Drum, Measuring The Cable Length And Cutting The Cable From The Cable Drum As Per The Standared Practices. Laying Of Pvc/Frls Power/Control/Lighting Cable/Earthing Wire Through The Cable Trays With Proper Routing, Physical Dressing, Clamping, Glanding And Cable Termination Along With Declamping & Deglanding. , 4 Core Power Cable Upto 6 Sqmm , 4 Core Power Cable From 6 Sqmm-35 Sqmm , 7 Core Cable Upto 4 Sqmm , 12 Core Cable 2.5 Sqmm , Laying Of Earthing Wire. , 3 Core Single Phase Lighting/Power Supply Cable , Declamping/Deglanding & Removal Of Lt Pvc/Xlpe Power/Contro/Lighting Cable Of Cu/Al Armoured Cable From Tray/Wall Of Following Sizes , 4 Core Power Cable Upto 6 Sqmm , 4 Core Power Cable From 6 Sqmm-35 Sqmm , 7 Core Cable Upto 4 Sqmm , 12 Core Cable 2.5 Sqmm , Laying Of Earthing Wire. , 3 Core Single Phase Lighting/Power Supply Cable , Preventive Maintenance Of The Transformer , Opening Of The Ht And Lt Cable Terminals Covers Of The Transformer, Discharge With Earth Rod, Cleaning Of The Transformer Body, Cleaning Of The Terminals And Retorquing Of The Connections & Taking Ir Value. , Preventive Maintenance Of Ht Panel , Opening Of The Ht Panel, Discharge With Earth Rod, Cleaning Of The Terminals And Retorquing Of The Connections & Taking The Ir Value. , Checking Of Electrical Auxilliaries Like Pdb, Welding Sockets, Ldb And Other Distribution Boards , Opening Of The Distribution Boxes And Welding Sockets, Checking The Healthiness Of The Mcbs, Rccbs And Cables. Replacement Of The Fault Parts Like Terminal Strips, Mcbs, Rccbs. , Providing Electrical Services , Replacement Of 3 Phase Plug Points In Field (Flameproof/Weatherproof) , Replacement Of 1 Phase Plug Points In Field (Flameproof/Weatherproof) , Preparation & Providing Of Temporary Lighting Materials Like Flood Light/ Handlamp/ Single Phase Board Etc , Providing Temporary Single Phase Power Supply To Different Equipments ( Job Includes Providing Temporary Supply And Disconnect It After Job Completion) , Providing Temporary Three Phase Power Supply To Different Equipments ( Job Includes Providing Temporary Supply And Disconnect It After Job Completion) , Providing 24V Power Supply For Lighting Purpose. , Replacement Of Dc Emergency Lights , Replacement Of Faulty Switch, Socket And Plugs In Office Area , Replacement Of Damaged Junction Box Used For Motor And Lighting Purpose. , Assembly/Replacement Of Led Fittings, Halogen Fittings, Ceiling Fan & Exhaust Fan On Structure/Wall/False Ceiling. , Replacement Of Led Fixtures & Testings Above 30 W Upto 100 W. , Assembl, Testing & Connection Of Ceiling Fan Of Size From 48 To 56 , Assembly, Testing & Connection Of Exhaust Fan Of Size Upto 450 Mm And Testing , Rectification Of Lighting Circuit/Junction Box Checking/Minor Repairs , Involving Only One Light Fitting , Involving Two-Four Light Fitting Circuit , Involving Four-Eight Light Fitting Circuit , Shifting Of Material , Shifting Of Material Like Light Fittings, Fans, Switch Board, Tools & Tackles, Spare Parts Etc From One Location To Another & Material Shifting From Main Store To Plant (Upto 25 Kg). , Polyethene Sheet, Canopy , Covering Of Polyethene Sheet For Motor Terminal Box, Light Junction Box During Rainy Season. , Monitoring And Logging Of Electrical Parameters , Surveillance Check Of Dc Emeregency Lights. , Illumination Check & Recording Lux Level Of Lights. , Filling Up Electrolyte Solution & Recording Of Parameters In 235 Cells Of Class-I & Class-Ii Battery Banks. ( 2 Battery Bank). , Filling Up Electrolyte Solution, Check Specific Gravity & Record Voltage In Battery Operated Vehicle And Maintain Healthiness. , Filling Up Electrolyte Solution, Check Specific Gravity & Record Voltage In Fire Water Diesel Battery And Maintain Healthiness. , Shifting Of Electrical Panel. , Disconnection, Removal & Shifting Of Electrical Panel From Plant Site To Different Location If Required. , Installation Of Electrical Panel At Plant Site With Grouting Of Frame Including Required Hardware If Required. , Point Wiring For Light/Fan/Exhaust Fan Points With 3*1 Core 1.5 Sq Mm Solid Cu Conductor, Pvc Insulated Wire With Suitable Size Casing/Caping & Supply Of Wire,Switch, Ceiling Rose & Hardware. , Short (0-3 Mtrs) , Medium (3-6 Mtrs) , Long ( 6-9 Mtrs) , Supply & Wiring For 3 Pin 5 A Plug Point With 3*1 Core 1.5 Sq Mm Solid Cu Conductor, Pvc Insulated Wire With Suitable Size Casing/Caping And Earth Wire. The Scope Includes Supply Of Wire,Switch, Socket & Hardware. , Short (0-3 Mtrs) , Medium (3-6 Mtrs) , Long ( 6-9 Mtrs) , Supply & Wiring For 3 Pin 15 A Plug Point With 3*1 Core 2.5/4 Sq Mm Solid Cu Conductor, Pvc Insulated Wire With Suitable Size Casing/Caping And Earth Wire. The Scope Includes Supply Of Wire,Switch, Socket & Hardware. , Short (0-3 Mtrs) , Medium (3-6 Mtrs) , Long ( 6-9 Mtrs) , House Keeping , Cleaning Of Led Lights: Cleaned Led Light Fixtures Of Different Structures, Designs, And Wattage Ratings By Removing Dust, Dirt, And Debris To Maintain Proper Illumination And Extend Service Life. , Cleaning Of Ceiling Fans, Pedestal Fans:Cleaned Ceiling Fans By Removing Accumulated Dust From Blades, Motor Housing, And Other Accessible Parts To Ensure Efficient Operation And Improve Air Circulation. , Cleaning Of Exhaust Fans: Cleaned Exhaust Fans Of Various Sizes And Capacities By Removing Dust, Grease, And Dirt From Blades, Grills, And Housings To Maintain Proper Ventilation And Performance.
Basic Detail
Tender No GEM/2026/B/8317884
Bidding Type Tender
Location
City Mumbai Suburban
State Maharashtra
Key Dates
Publish Date 26 Nov 2026
Submission Date 17 Dec 2026
Open Date 18 Dec 2026
Finance
Tender Value Ref. Documents
Tender Fee Ref. Documents
EMD 75000
Exemption Not Available
Document List
ec07c74c-9008-4332-86d0-0863c0bf3fba.pdf
1795674637.xlsx
1795674862.pdf
1795674874.pdf
NIT_merge_d790ae99-54c0-4990-a5f41795675039724_RCF_TR_UREA244.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Nov 26, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Dec 17, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 17 days
Dec 18, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 18 days

Tender Documents

Download All (ZIP) ↓
pdf

ec07c74c-9008-4332-86d0-0863c0bf3fba.pdf

xlsx

1795674637.xlsx

pdf

1795674862.pdf

pdf

1795674874.pdf

pdf

NIT_merge_d790ae99-54c0-4990-a5f41795675039724_RCF_TR_UREA244.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender