Work Of Final Painting Of Bridge ComponentsEtc. At Erected Position At Munger, BiharSite-1. Painting Of Steel Work Of Through TypeTriangulated Girder Bridge Including Footpath,Gang Way, Inspection Ladder, Trolley Refuge, PipeLine Fixing Arrangements, Cable FixingArrangements, Railings Etc. Of Steel With FinalCoat (Finishing Coat) Of Aluminium Paint(Is:2339) After Cleaning The Same With ScrappersAnd/Or Wire Brushes To Remove All Rust And LooseOr Perished Paint To Prepare Perfectly Clean &Dry Surface Free From All Dirt/Foreign Material,Patch/ Touch Up Painting Wherever Required. RateInclude Cost Of Labour, Consumables, Brushes,Misc. Tools And Plants, Ladders, Scaffoldings,Jhoola, Hanging Scaffolding, Staging, Fuel &Power Etc., Patch/ Touch Up Painting WhereverRequired. Work To Be Carried Out As PerSpecification Enclosed And As Per Direction AndInstruction Of Bbj/ Ecr.A) 121.6M Span (C/C Of Bearing) At SouthEnd (Munger End)B) 31.5M Span (C/C Bearing) One Each AtNorth End (Khagaria End) And South End(Munger End)2 Extra Over And Above The Rate For Item No 1 ForCarrying Out Spray Painting With OwnArrangement Of Compressed Air, Painting Gun Etc.In Lieu Of Brush Painting ForA) 121.6M Span (C/C Of Bearing) At SouthEnd (Munger End)B) 31.5M Span (C/C Bearing) One Each AtNorth End (Khagaria End) And South End(Munger End)3 Painting Of Steel Work Of Footpath, InspectionLadder, Trolley Refuge, Pipe Line FixingArrangements, Cable Fixing Arrangements,Railings Etc. Of Steel Through Type Bridge GirdersWith Final Coat (Finishing Coat) Of AluminiumPaint (Is:2339) After Cleaning With ScrappersAnd/ Or Wire Brushes To Remove All Rust And LooseOr Perished Paint To Prepare Perfectly Clean &Dry Surface Free From All Dirt/Foreign Material,Patch/ Touch Up Painting Wherever Required. RateInclude Cost Of Labour, Consumables, Brushes,Misc. Tools And Plants, Ladders, Scaffoldings,Jhoola, Hanging Scaffolding, Staging, Fuel &Power Etc., Patch/ Touch Up3CoNtPainting Wherever Required. Work To BeCarried Out As Per Specification EnclosedAnd As Per Direction And Instruction OfBbj/ Ecr At North End (Khagaria End)4 Extra Rate Over And Above The Rate ForItem No 3 For Carrying Out SprayPainting With Own Arrangement OfCompressed Air, Painting Gun Etc. In LieuOf Brush Painting For In Lieu Of BrushPainting5 Patch / Repair / Touch Up Metallising OfGirder Components Of 121.6M Span (C/COf Bearing) Or 31.5M Span (C/CBearing). Rate Include Cost OfAluminium Wire & Other Materials,Labour, Consumables, Brushes, Misc.Tools And Plants Including CompressorAnd Metallising Gun, Ladders,Scaffoldings, Jhoola, HangingScaffolding, Staging, Fuel & Power Etc.Work To Be Carried Out As PerSpecification Enclosed And As PerDirection And Instruction Of Bbj/ EcrAt North End (Khagaria End) And SouthEnd (Munger End)(A) 121.6 M Span(B) 31.5 M Span