Tender For Structural Repair Of Station Buildings, Piers, Viaducts And Other Structures From Botanical Garden To Krishna Park Metro Stations Including 03 Rss (Kjmd,Rkpm And Palam),Crew Control Buildings, 03 Ancillary Buildings (Kjmd, Nuee, Gkei), Kal
Tender Overview
Project Description
Tender for Structural Repair Of Station Buildings, Piers, Viaducts And Other Structures From Botanical Garden To Krishna Park Metro Stations Including 03 Rss (Kjmd,Rkpm And Palam),Crew Control Buildings, 03 Ancillary Buildings (Kjmd, Nuee, Gkei), Kalindi Kunj Depot And Jasola Stabling Yard Of Line-8 Section.
BOQ
| Sl. No. | Item Description |
| 1 | Total of (Schedule-A + Schedule-B) |
| 2 | Total of Schedule C (Manpower Items) |
| 3 | Total of Schedule-A |
| 4 | Total of Schedule-B |
| 5 | Total of Schedule-C OCM-2355 APPENDIX- 3A PROFORMA FOR STATEMENT OF MINOR DEVIATIONS (Refer Clause C 2.2(d) and C 15.1 of ITT) 1. The following are the particulars of minor deviations from the requirements of the Tender Document: Sr. No Clause Deviations Price reduction for each deviation/s Note : 1. The Tenderer shall indicate price reduction against each deviation in Appendix-3A of BOQ. This price is the price which the tenderer shall reduce from this tender price if deviation(s) is/are accepted by the Employer. 2. Where there is no deviation, the statement should be returned duly signed with an endorsement indicating ‘No Deviations’. In case, Performa of deviations is not submitted or submitted as blank, it will be construed that the tenderer has not proposed any deviations from tender documents. 3. It shall be noted that in case Nil/Zero/NA Price quoted by Tenderer in Appendix-3A then it shall mean that contractor has quoted same price for deviation and undeviation bid. 4. If the tenderer proposes deviations in tender documents, and/or any other terms and conditions of the tender, other than in this Appendix, it will have no effect. Signature of authorized signatory On behalf of Tenderer OCM-2355 Preamble |
| 6 | The Bill of Quantities shall be read in conjunction with Notice Inviting Tenders, Instructions to Tenderers, General and Special Conditions of Contract, Employer's Requirement and Technical Specification and other relevant documents. |
| 7 | BoQ1 consists of Schedule A (DSR Civil-2023 Items), Schedule B (NDSR Items) and Schedule C (NDSR Items- Manpower). |
| 8 | The rates and prices to be tendered in the unit Priced Bill of Quantities of Schedule A (DSR-2023 Items), Schedule B (NDSR Items) and Schedule C (NDSR Items- Manpower) are for completed and finished items of works and complete in all respect. |
| 9 | Tenderers shall quote their offer in Indian Rupees (INR) only. Tenderers are required to be quoted percentage (%) Excess/Less for Schedule A (DSR-2023 Items) and Schedule B (NDSR Items) in figures in the appropriate highlighted cells in the BoQ1 sheet. Tenderers are required to be quoted percentage (%) Excess for Schedule C (NDSR Items-Manpower) in figures in the appropriate highlighted cells in the BoQ1 sheet. All the quoted rates will be deemed to include Duties, Taxes, Octroi, Royalty etc., cost of all plants, labour, supervision, materials, scaffolding for masonry work & any work etc., G.I. binding wire, all lead & lifts, transport, all temporary works, erection, maintenance, utility identification, contractor’s profit and establishment/ overheads, together with preparation of design and drawings, all general risks, insurance liabilities, compliance of labour laws and obligations set out or implied in the contracts. For taxes and duties refer clause C2.5 of ITT & clause 10 of SCC. |
| 10 | The price offer in the BOQ shall be given without considering any deviation mentioned in Appendix-3 of FOT i.e. price in the box shall be quoted as per tender conditions without any deviation. |
| 11 | If the tenderer fails to quote rates against any item, the tender may be treated as incomplete and non- responsive and shall be rejected. |
| 12 | Errors will be corrected by the employer for any arithmetical errors in computation or summation as per contract conditions. |
| 13 | The Financial Proposal (as per BOQ) shall be uploaded online on the website http://etenders.gov.in/eprocure/app. The rates shall be quoted in the excel file provided in the bid documents. The tenderer shall download the excel file and quote the rates against each highlighted cells in BoQ1. After quoting their rates the excel file shall be uploaded accordingly. The rates shall not be offered/quoted elsewhere in the technical submission/ tender submission. |
| 14 | The actual work executed against all the BOQ as detailed in tender document would be paid on measurement basis. |
| 15 | The contractor may raise their “On Account” payments on monthly/ quarterly basis as per the status of work on the last day of the respective month as per GCC clause 11.3. |
| 16 | In case of any discrepancy in DSR items covered under Schedule 'A' the relevant items as mentioned in DSR published by CPWD shall prevail. Please Enable Macros to View BoQ information Delhi Metro Rail Corporation Ltd. BOQ Contract: OCM-2355: “Structural Repair of Station buildings, Piers, Viaducts and other structures from Botanical Garden to Krishna Park metro stations including 03 RSS (KJMD,RKPM and PALAM),Crew control buildings, 03 Ancillary buildings (KJMD, NUEE, GKEI), Kalindi Kunj Depot and Jasola Stabling Yard of Line-8 section”. Sr.No. Item code Description of item Unit Qty. Rate (Rs.) Including GST Amount (Rs.) Excluding GST GST Amount (Rs.) Amount (Rs.) Including GST SCHEDULE-A (DSR Civil-2023 Items) |
| 17 | 5.9 5.9.3 Suspended floors, roofs, landings, balconies and access platform sqm 150.0 927.25 117870.763 21216.737 139087.5 5.9.5 Lintels, beams, plinth beams, girders, bressumers and cantilevers sqm 150.0 736.4 93610.17 16849.83 110460.0 |
| 18 | 5.9.6 |
| 19 | 5.9.18 |
| 20 | 13.47 13.47.1 New work (Two or more coats applied @ 1.43 ltr/10 sqm over and including priming coat of exterior primer applied @ 0.90 litre/10 sqm) sqm 2000.0 171.1 290000.0 52200.0 342200.0 |
| 21 | 14.72 16.81 Providing and erecting 2.00 metre high temporary barricading at site; each panel of size 2.50 m x2.00 m made of 40x40x6 mm angle iron or 50x50x3mm hollow MS tube posts/horizontal members/bracings covered with 1.63 mm thick MS sheet. The sheet shall be fixed with 30x5 mm MS flat by suitable welding/riveting. The panels shall be made so that gap of 50cm above the ground is available making overall height as 2.5 m. MS channel ISLC 75 @ 5.70 kg/m, 50 cm long shall be provided at the bottom having oval shaped holes of size 50x25 mm at both ends with 50 cm long MSangle 40x40x6 mm bracing. Suitable arrangement shall be made to fix the barricading to avoid from overturning by providing 250 mm long expansion fasteners at both ends. The work shall be executed as per drawing/direction of Engineer-in-Charge which includes writing and painting, arrangement for traffic diversion such as traffic signals during construction at site for day and night, glow lamps, reflective signs, marking, flags, caution tape as directed by the Engineer-in-Charge. The barricading provided shall be retained in position at site continuously including shifting of barricading from one location to another location as many times as required during the execution of the entire work till its completion. Rate include its maintenance for damages, painting, all incidentals, labour materials, equipments and works required to execute the job. The barricading shall not be removed without prior approval of Engineer-in-Charge. (Note :- One time payment shall be made for providing barricading from start of work till completion of work including shifting. The barricading provided shall remain to be the property of the contractor on completion of the work). Metre 500.0 3439.5 1457415.25 262334.75 1719750.0 |
| 22 | 26.28 26.28.2 50mm average thickness sqm 600.0 256.35 130347.46 23462.54 153810.0 |
| 23 | 26.28.3 |
| 24 | 26.29 26.29.1 Bars upto 12 mm diameter metre 1500.0 8.25 10487.29 1887.71 12375.0 |
| 25 | 26.29.2 |
| 26 | 26.31 26.31.1 SBR Polymer (@10% of cement weight) modified cementitious bond coat @ 2.2 kg cement per sqm of surface area mixed with specified proportion of approved polymer sqm 400.0 141.2 47864.41 8615.59 56480.0 |
| 27 | 26.31.2 |
| 28 | 26.34 26.34.1 50mm thick in Grade M 25 with cement content not less than 330 kg per cum sqm 150.0 569.15 72349.58 13022.92 85372.5 |
| 29 | 26.34.2 |
| 30 | 26.34.3 |
| 31 | 26.37 |
| 32 | Total of Schedule-A (DSR Civil-2023) 6844938.99 1232088.99 8077028.0 Total amount of Schedule-A (DSR Civil-2023) considering Correction factor of 0.973 6660125.64 1198822.59 7858948.24 Total Amount of Schedule-A (DSR Civil-2023)(Excluding GST @ 18%) 6660125.64 GST @ 18% 1198822.62 Total Amount of Schedule-A (DSR Civil-2023)(Including GST @ 18%) 7858948.26 SCHEDULE-B (NDSR items) |
| 33 | NDSR-1 |
| 34 | NDSR-2 |
| 35 | NDSR-3 NDSR-3a Powerthrow (Inhibiting Caplets) Nos. 300.0 116.16 29532.2 5315.8 34848.0 |
| 36 | NDSR-3b |
| 37 | NDSR-4 |
| 38 | NDSR-5 |
| 39 | NDSR-6 |
| 40 | NDSR-7 |
| 41 | NDSR-8 |
| 42 | NDSR-9 |
| 43 | NDSR-10 |
| 44 | NDSR-11 |
| 45 | NDSR-12 |
| 46 | NDSR-13 |
| 47 | NDSR-14 |
| 48 | NDSR-15 NDSR-15(a) 75 mm dia upto 200 mm Each 10.0 2300.67 19497.2 3509.5 23006.7 |
| 49 | NDSR-15(b) |
| 50 | NDSR-15(c ) |
| 51 | NDSR-16 |
| 52 | NDSR-17 |
| 53 | NDSR-18 |
| 54 | NDSR-19 |
| 55 | NDSR-20 |
| 56 | NDSR-21 |
| 57 | NDSR-22 |
| 58 | NDSR - 23 NDSR-23.1 25mm thickness Sqm 1400.0 4080.68 4841484.75 871467.26 5712952.0 |
| 59 | NDSR-23.2 |
| 60 | NDSR-24 |
| 61 | NDSR-25 |
| 62 | NDSR-26 a 200 mm diameter Mtr 250.0 1774.9267 376043.79 67687.88 443731.67 |
| 63 | NDSR-27 a 200 mm x 100 mm Dia, Reducer Tee Each 50.0 1937.0233 82077.26 14773.91 96851.17 |
| 64 | NDSR-28 |
| 65 | NDSR-29 NDSR-29.1 12 mm thickness Sqm 100.0 2110.17 178827.97 32189.03 211017.0 |
| 66 | NDSR-30 |
| 67 | NDSR-31 |
| 68 | NDSR-32 Total amount of Schedule-B (NDSR items) 32110525.81 5779894.68 37890420.45 Total Amount of Schedule-B (NDSR Items)(Excluding GST @ 18%) 32110525.81 GST @ 18% 5779894.65 Total Amount of Schedule-B (NDSR Items)(Including GST @ 18%) 37890420.46 SCHEDULE-C (Manpower Items) |
| 69 | NDSR-33 |
| 70 | NDSR-34 |
| 71 | NDSR-35 Total of Schedule-C (Manpower Items) 1458757.63 262576.37 1721334.0 Total Amount of Schedule-C (Manpower Items)(Excluding GST @ 18%) 1458757.63 GST @ 18% 262576.37 Total Amount of Schedule-C (Manpower Items)(Excluding GST @ 18%) 1721334.0 Grand Total Amount of Schedule-A (DSR Civil-2023 items) + Schedule-B (NDSR items) + Schedule-C (Manpower Items) (Including GST @ 18%) 47470702.72 |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 13 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 16 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender