Tender For Revamping Of Network & It Infra With Soc And Noc.
Tender Overview
Project Description
Tender for Revamping Of Network & It Infra With Soc And Noc. , Part-A: Sdwan , Sd-Wan Central Controller Appliance , Sd-Wan Edge Devices With Ngfw Features , Advanced Persistent Threat (Apt) Solution With Sandboxing , Central Management & Orchestration Software , Sdwan Licenses (Complete Proposed Solution) , Part-B: Active Lan , Core L3 Switch 24 Ports (Non Poe) , Access/ Distribution L2 Switches (Poe) 48 Ports , Access/ Distribution L2 Switches (Poe) 24 Ports , Server Farm Switch 48 Ports , Smart Racks 42U Having Patch Panels And Cable Managers , Smart Racks 24U Having Patch Panels And Cable Managers , Sfp Transceivers 1G (Lc, Single Mode) , Sfp+ Transceivers - 10G (Lc, Single Mode) , Part-C: Uat Setup , Console Kvm Switch , Kvm For Mouse And Keyboard , Development Workstations , Sip Phones , Sd-Wan Controller (Basic) , Sd-Wan Edge Device With Ngfw, Advanced Persistent Threat (Apt) Solution And Sandboxing. (Basic For Uat) , L3 Switch - Min 8 Ports , L2 Switch - Min 8 Ports , Siem, Soar & Ueba (Basic License For Uat) , Nms License (Basic For Uat) , Server Hardware With Os And Virtualization To Host Uat Environment. , Part-D: Noc Setup , Video Wall Display System 4.5M X 1.7M , Video Wall Controller , Noc Operator Consoles , Nms Solution , Helpdesk Ticketing Software , Compute & Storage Including Os, Virtualization For Nms And Helpdesk Ticketing Software. , Cctv Cameras 4 Mp , Nvr With 2 Tb Storage , Cctv Monitoring Station , Cctv Management Software For Backup, Restore, Encryption, Archival, Retrieval Viewing Etc. (Archival Shall Be Maintained On Tape Library) , Passive Cabling For Nvr Connectivity To Cctv Monitoring Console , Cisco Nac Ise Licenses For 5 Years , Part-E: Soc , Siem, Soar & Ueba Solution With Necessary Compute & Storage Including Os, Virtualization , Log Collector , Tls Certificate (Wildcard) - 5 Years , Part-F:Storage And Backup , Backup Solution -20 Tb (With Necessary Hardware & Software) , Nas - 12Tb Usable With Raid 10 , Tape Library (18Tb Native) With Management Software , Rack Rails And Accessories For Tape Library , Cleaning Cartridge , Part-G: Miscellaneous , Barcode Labels , Barcode Label Printer , Bar Code Scanner , Part-H:Passive Networking (Note: The Quantities Specified For Passive Networking Are Indicative Only; Final Quantities Shall Be Determined By The Successful Bidder Based On Comprehensive Site Surveys At Each Location After The Award Of Contract) , Liu (24 Port) With Sc/Lc Adapters & Pigtails , Liu (12 Port) With Sc/Lc Adapters & Pigtails , 6 Core Ofc (Single Mode, Armoured) , Cat6a Utp Cable , Cat6 Patch Cords - 1 Meter , Cat6 Patch Cords - 2 Meter , Earthing Solution , Cable Laying With Required Cable Tray, Conduit, Pipes, Etc. As Required. , Face Plate. Back Plate And Any Other Accessories Required For Establishment Of Lan , Part-I: Training & Other Documentation , Sdwan Training , Training - 2 Weeks For Overall Solutions , Knowledge Transfer Deployed Solution , Training Material , Sop For Noc Operations , Sop For Incident Management And Reporting , Sop For Branch Network Maintenance , Sop For Sdwan Central Management , High Level Network Design (Location-Wise) , Low Level Network Design Document (Location-Wise) , Rack Elevation Diagrams With Labeled Patch Panels And Cable Managers (Location-Wise) , Otdr Test Reports (Location-Wise) , Fluke Test Reports (Location-Wise) , Test Scenarios , Civil Drawings Network Cable Layouts (Location-Wise) , Earthing Layouts (Location-Wise) , Part- J: Third Party Security Audit By Cert-In Empanelled Agency , Network Security Audit (Before Go Live) , Part- K: Manpower , Noc - 3 People (1 Shift) For 5 Years , Soc - 3 People Each Shift (2 Shifts) For 5 Years , L1 Resource (Per City As Per Appendix-P) , Part- L: Installation And Commissioning , One Time Installation Of Proposed Solution At Customer Location , Any Other Hw/ Sw/ Accessories Required For Solution To Function As Per Specifications And Rfp
BOQ
| Sl. No. | Item Description |
| 1 | PART-A: SDWAN |
| 2 | SD-WAN Central Controller Appliance |
| 3 | SD-WAN Edge Devices with NGFW Features |
| 4 | Advanced Persistent Threat (APT) Solution with Sandboxing |
| 5 | Central Management & Orchestration Software |
| 6 | SDWAN Licenses (Complete proposed solution) |
| 7 | PART-B: Active LAN |
| 8 | Core L3 Switch 24 ports (non PoE) |
| 9 | Access/ Distribution L2 Switches (PoE) 48 ports |
| 10 | Access/ Distribution L2 Switches (PoE) 24 ports |
| 11 | Server Farm Switch 48 Ports |
| 12 | Smart Racks 42U having Patch Panels and Cable Managers |
| 13 | Smart Racks 24U having Patch Panels and Cable Managers |
| 14 | SFP Transceivers 1G (LC, Single Mode) |
| 15 | SFP+ Transceivers — 10G (LC, Single Mode) |
| 16 | PART-C: UAT Setup |
| 17 | Console KVM Switch |
| 18 | KVM for mouse and Keyboard |
| 19 | Development Workstations |
| 20 | SIP Phones |
| 21 | SD-WAN Controller (Basic) |
| 22 | SD-WAN Edge device with NGFW, Advanced Persistent Threat (APT) Solution and Sandboxing. (Basic for UAT) |
| 23 | L3 Switch – Min 8 ports |
| 24 | L2 Switch – Min 8 ports |
| 25 | SIEM, SOAR & UEBA (Basic license for UAT) |
| 26 | NMS License (Basic for UAT) |
| 27 | Server hardware with OS and Virtualization to host UAT environment. |
| 28 | PART-D: NOC Setup |
| 29 | Video Wall Display System 4.5m x 1.7m |
| 30 | Video Wall Controller |
| 31 | NOC Operator Consoles |
| 32 | NMS Solution |
| 33 | Helpdesk Ticketing Software |
| 34 | Compute & Storage including OS, Virtualization for NMS and Helpdesk Ticketing Software. |
| 35 | CCTV cameras 4 MP |
| 36 | NVR with 2 TB Storage |
| 37 | CCTV Monitoring Station |
| 38 | CCTV Management Software for Backup, Restore, Encryption, Archival, Retrieval Viewing etc. (Archival shall be maintained on Tape Library) |
| 39 | Passive Cabling for NVR Connectivity to CCTV Monitoring Console |
| 40 | CISCO NAC ISE Licenses for 5 years |
| 41 | PART-E: SOC |
| 42 | SIEM, SOAR & UEBA Solution with necessary Compute & Storage including OS, Virtualization |
| 43 | Log collector |
| 44 | TLS Certificate (Wildcard) – 5 years |
| 45 | PART-F:Storage and Backup |
| 46 | Backup Solution -20 TB (with necessary Hardware & Software) |
| 47 | NAS – 12TB usable with RAID 10 |
| 48 | Tape Library (18TB native) with Management Software |
| 49 | Rack rails and accessories for Tape Library |
| 50 | Cleaning Cartridge |
| 51 | PART-G: Miscellaneous |
| 52 | Barcode Labels |
| 53 | Barcode Label Printer |
| 54 | Bar Code Scanner |
| 55 | PART-H:Passive Networking(Note: The quantities specified for passive networking are indicative only; final quantities shall be determined by the successful bidder based on comprehensive site surveys at each location after the award of contract) |
| 56 | LIU (24 Port) with SC/LC Adapters & Pigtails |
| 57 | LIU (12 Port) with SC/LC Adapters & Pigtails |
| 58 | 6 Core OFC (Single Mode, Armoured) |
| 59 | CAT6A UTP Cable |
| 60 | Cat6 Patch Cords - 1 meter |
| 61 | Cat6 Patch Cords - 2 meter |
| 62 | Earthing Solution |
| 63 | Cable Laying with required cable tray, conduit, pipes, etc. as required. |
| 64 | Face plate. Back plate and any other accessories required for establishment of LAN |
| 65 | PART-I: Training & Other Documentation |
| 66 | SDWAN Training |
| 67 | Training – 2 weeks for overall solutions |
| 68 | Knowledge Transfer Deployed Solution |
| 69 | Training Material |
| 70 | SOP for NOC Operations |
| 71 | SOP for Incident Management and Reporting |
| 72 | SOP for Branch Network Maintenance |
| 73 | SOP for SDWAN Central Management |
| 74 | High Level Network Design (Location-wise) |
| 75 | Low Level Network Design Document (Location-wise) |
| 76 | Rack elevation diagrams with labeled patch panels and cable managers (Location-wise) |
| 77 | OTDR Test Reports (Location-wise) |
| 78 | Fluke Test Reports (Location-wise) |
| 79 | Test Scenarios |
| 80 | Civil Drawings Network Cable Layouts (Location-wise) |
| 81 | Earthing Layouts (Location-wise) |
| 82 | PART- J: Third Party Security Audit by CERT-In Empanelled Agency |
| 83 | Network Security Audit (Before Go live) |
| 84 | PART- K: Manpower |
| 85 | NOC – 3 People (1 shift) for 5 years |
| 86 | SOC – 3 People each shift (2 shifts) for 5 years |
| 87 | L1 Resource (Per City as per Appendix-P) |
| 88 | PART- L: Installation and Commissioning |
| 89 | One time installation of proposed solution at customer location |
| 90 | Any other HW/ SW/ Accessories required for solution to function as per specifications and RFP Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 17 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 18 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender