Tender For Repair Of Damage Of Wooden Trangari At Shanderi, Kundal, Gharat, Batwas, Sargoth, Zurbani, Dumari, Kukandran, Doddu & Naddai, Forest Range Paddar Of Kishtwar Forest Division, Under Pdna Scheme For The Year 2026-27.
Tender Overview
Project Description
Tender for Repair Of Damage Of Wooden Trangari At Shanderi, Kundal, Gharat, Batwas, Sargoth, Zurbani, Dumari, Kukandran, Doddu & Naddai, Forest Range Paddar Of Kishtwar Forest Division, Under Pdna Scheme For The Year 2026-27.
BOQ
| Sl. No. | Item Description |
| 1 | (1) Repair of damage of Wooden Trangari at Shanderi: Earth work in excavation by manual means over areas (Exceeding 30 em and upto 1.5 mtr in depth, 1.5 mtr in width as well as 10 sqm. on plan) including disposal of excavated earth upto 1 mtr from cutting edge, disposed earth to be levelled and neatly dressed in All kinds of Soil |
| 2 | Dry random rubble masonry with hard stone in foundation and plinth: With bond stone. Nallah |
| 3 | Extraction , transportation and Labur of Dry Fallen Drift Wood for making Wooden Foot Bridge of Span 35 ft complete job as per directed by the site incharge. Engage 3 Carpenter for 12 days for making Foot Bridge including all leads lift carriage complete job. |
| 4 | Extraction , transportation and Labur of Dry Fallen Drift Wood for making Wooden Foot Bridge of Span 35 ft complete job as per directed by the site incharge. Engage 6 Labour for 12 days for making Foot Bridge including all leads lift carriage complete job. |
| 5 | Providing and fixing of Nails |
| 6 | Carriage of materials from source to site of work :-Stone av. Distance HL 550 Mtr |
| 7 | (2) Repair of damage of Wooden Trangari at Kundal: Earth work in excavation by manual means over areas (Exceeding 30 em and upto 1.5 mtr in depth, 1.5 mtr in width as well as 10 sqm. on plan) including disposal of excavated earth upto 1 mtr from cutting edge, disposed earth to be levelled and neatly dressed in All kinds of Soil |
| 8 | Dry random rubble masonry with hard stone in foundation and plinth: With bond stone. Nallah |
| 9 | Extraction , transportation and Labur of Dry Fallen Drift Wood for making Wooden Foot Bridge of Span 35 ft complete job as per directed by the site incharge. Engage 3 Carpenter for 12 days for making Foot Bridge including all leads lift carriage complete job. |
| 10 | Extraction , transportation and Labur of Dry Fallen Drift Wood for making Wooden Foot Bridge of Span 35 ft complete job as per directed by the site incharge. Engage 6 Labour for 12 days for making Foot Bridge including all leads lift carriage complete job. |
| 11 | Providing and fixing of Nails |
| 12 | Carriage of materials from source to site of work :-Stone av. Distance HL 550 Mtr |
| 13 | (3) Repair of damage of Wooden Trangari at Gharat: Earth work in excavation by manual means over areas (Exceeding 30 em and upto 1.5 mtr in depth, 1.5 mtr in width as well as 10 sqm. on plan) including disposal of excavated earth upto 1 mtr from cutting edge, disposed earth to be levelled and neatly dressed in All kinds of Soil |
| 14 | Dry random rubble masonry with hard stone in foundation and plinth: With bond stone. Nallah |
| 15 | Extraction , transportation and Labur of Dry Fallen Drift Wood for making Wooden Foot Bridge of Span 35 ft complete job as per directed by the site incharge. Engage 3 Carpenter for 12 days for making Foot Bridge including all leads lift carriage complete job. |
| 16 | Extraction , transportation and Labur of Dry Fallen Drift Wood for making Wooden Foot Bridge of Span 35 ft complete job as per directed by the site incharge. Engage 6 Labour for 12 days for making Foot Bridge including all leads lift carriage complete job. |
| 17 | Providing and fixing of Nails |
| 18 | Carriage of materials from source to site of work :-Stone av. Distance HL 550 Mtr |
| 19 | (4) Repair of damage of Wooden Trangari at Batwas: Earth work in excavation by manual means over areas (Exceeding 30 em and upto 1.5 mtr in depth, 1.5 mtr in width as well as 10 sqm. on plan) including disposal of excavated earth upto 1 mtr from cutting edge, disposed earth to be levelled and neatly dressed in All kinds of Soil |
| 20 | Dry random rubble masonry with hard stone in foundation and plinth: With bond stone. Nallah |
| 21 | Extraction , transportation and Labur of Dry Fallen Drift Wood for making Wooden Foot Bridge of Span 35 ft complete job as per directed by the site incharge. Engage 3 Carpenter for 12 days for making Foot Bridge including all leads lift carriage complete job. |
| 22 | Extraction , transportation and Labur of Dry Fallen Drift Wood for making Wooden Foot Bridge of Span 35 ft complete job as per directed by the site incharge. Engage 6 Labour for 12 days for making Foot Bridge including all leads lift carriage complete job. |
| 23 | Providing and fixing of Nails |
| 24 | Carriage of materials from source to site of work :-Stone av. Distance HL 450 Mtr |
| 25 | (5) Repair of damage of Wooden Trangari at Sargoth: Earth work in excavation by manual means over areas (Exceeding 30 em and upto 1.5 mtr in depth, 1.5 mtr in width as well as 10 sqm. on plan) including disposal of excavated earth upto 1 mtr from cutting edge, disposed earth to be levelled and neatly dressed in All kinds of Soil |
| 26 | Dry random rubble masonry with hard stone in foundation and plinth: With bond stone. Nallah |
| 27 | Extraction , transportation and Labur of Dry Fallen Drift Wood for making Wooden Foot Bridge of Span 35 ft complete job as per directed by the site incharge. Engage 3 Carpenter for 12 days for making Foot Bridge including all leads lift carriage complete job. |
| 28 | Extraction , transportation and Labur of Dry Fallen Drift Wood for making Wooden Foot Bridge of Span 35 ft complete job as per directed by the site incharge. Engage 6 Labour for 12 days for making Foot Bridge including all leads lift carriage complete job. |
| 29 | Providing and fixing of Nails |
| 30 | Carriage of materials from source to site of work :-Stone av. Distance HL 500 Mtr |
| 31 | (6) Repair of damage of Wooden Trangari at Zurbani: Earth work in excavation by manual means over areas (Exceeding 30 em and upto 1.5 mtr in depth, 1.5 mtr in width as well as 10 sqm. on plan) including disposal of excavated earth upto 1 mtr from cutting edge, disposed earth to be levelled and neatly dressed in All kinds of Soil |
| 32 | Dry random rubble masonry with hard stone in foundation and plinth: With bond stone. Nallah |
| 33 | Extraction , transportation and Labur of Dry Fallen Drift Wood for making Wooden Foot Bridge of Span 35 ft complete job as per directed by the site incharge. Engage 3 Carpenter for 12 days for making Foot Bridge including all leads lift carriage complete job. |
| 34 | Extraction , transportation and Labur of Dry Fallen Drift Wood for making Wooden Foot Bridge of Span 35 ft complete job as per directed by the site incharge. Engage 6 Labour for 12 days for making Foot Bridge including all leads lift carriage complete job. |
| 35 | Providing and fixing of Nails |
| 36 | Carriage of materials from source to site of work :-Stone av. Distance HL 500 Mtr |
| 37 | (7) Repair of damage of Wooden Trangari at Dumari: Earth work in excavation by manual means over areas (Exceeding 30 em and upto 1.5 mtr in depth, 1.5 mtr in width as well as 10 sqm. on plan) including disposal of excavated earth upto 1 mtr from cutting edge, disposed earth to be levelled and neatly dressed in All kinds of Soil |
| 38 | Dry random rubble masonry with hard stone in foundation and plinth: With bond stone. Nallah |
| 39 | Extraction , transportation and Labur of Dry Fallen Drift Wood for making Wooden Foot Bridge of Span 35 ft complete job as per directed by the site incharge. Engage 3 Carpenter for 12 days for making Foot Bridge including all leads lift carriage complete job. |
| 40 | Extraction , transportation and Labur of Dry Fallen Drift Wood for making Wooden Foot Bridge of Span 35 ft complete job as per directed by the site incharge. Engage 6 Labour for 12 days for making Foot Bridge including all leads lift carriage complete job. |
| 41 | Providing and fixing of Nails |
| 42 | Carriage of materials from source to site of work :-Stone av. Distance HL 550 Mtr |
| 43 | (8) Repair of damage of Wooden Trangari at Kukandram: Earth work in excavation by manual means over areas (Exceeding 30 em and upto 1.5 mtr in depth, 1.5 mtr in width as well as 10 sqm. on plan) including disposal of excavated earth upto 1 mtr from cutting edge, disposed earth to be levelled and neatly dressed in All kinds of Soil |
| 44 | Dry random rubble masonry with hard stone in foundation and plinth: With bond stone. Nallah |
| 45 | Extraction , transportation and Labur of Dry Fallen Drift Wood for making Wooden Foot Bridge of Span 35 ft complete job as per directed by the site incharge. Engage 3 Carpenter for 12 days for making Foot Bridge including all leads lift carriage complete job. |
| 46 | Extraction , transportation and Labur of Dry Fallen Drift Wood for making Wooden Foot Bridge of Span 35 ft complete job as per directed by the site incharge. Engage 6 Labour for 12 days for making Foot Bridge including all leads lift carriage complete job. |
| 47 | Providing and fixing of Nails |
| 48 | Carriage of materials from source to site of work :-Stone av. Distance HL 600 Mtr |
| 49 | (9) Repair of Wooden Trangari at Doddu: Earth work in excavation by manual means over areas (Exceeding 30 em and upto 1.5 mtr in depth, 1.5 mtr in width as well as 10 sqm. on plan) including disposal of excavated earth upto 1 mtr from cutting edge, disposed earth to be levelled and neatly dressed in All kinds of Soil |
| 50 | Dry random rubble masonry with hard stone in foundation and plinth: With bond stone. Nallah |
| 51 | Extraction , transportation and Labur of Dry Fallen Drift Wood for making Wooden Foot Bridge of Span 35 ft complete job as per directed by the site incharge. Engage 3 Carpenter for 12 days for making Foot Bridge including all leads lift carriage complete job. |
| 52 | Extraction , transportation and Labur of Dry Fallen Drift Wood for making Wooden Foot Bridge of Span 35 ft complete job as per directed by the site incharge. Engage 6 Labour for 12 days for making Foot Bridge including all leads lift carriage complete job. |
| 53 | Providing and fixing of Nails |
| 54 | Carriage of materials from source to site of work :-Stone av. Distance HL 500 Mtr |
| 55 | (10) Repair of damage of Wooden Trangari at Naddai: Earth work in excavation by manual means over areas (Exceeding 30 em and upto 1.5 mtr in depth, 1.5 mtr in width as well as 10 sqm. on plan) including disposal of excavated earth upto 1 mtr from cutting edge, disposed earth to be levelled and neatly dressed in All kinds of Soil |
| 56 | Dry random rubble masonry with hard stone in foundation and plinth: With bond stone. Nallah |
| 57 | Extraction , transportation and Labur of Dry Fallen Drift Wood for making Wooden Foot Bridge of Span 35 ft complete job as per directed by the site incharge. Engage 3 Carpenter for 12 days for making Foot Bridge including all leads lift carriage complete job. |
| 58 | Extraction , transportation and Labur of Dry Fallen Drift Wood for making Wooden Foot Bridge of Span 35 ft complete job as per directed by the site incharge. Engage 6 Labour for 12 days for making Foot Bridge including all leads lift carriage complete job. |
| 59 | Providing and fixing of Nails |
| 60 | Carriage of materials from source to site of work :-Stone av. Distance HL 500 Mtr Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 5 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 7 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender