Tender For New Construction Of Temple North Entrance And Re-Construction Of Existing Dismantling Compound Wall At North Side Temple Compound Wall (Except Supply Of Stone) Belonging To Arulmigu Bramapureeswarar Temple, Thirupattur, Manachanallur Taluk
Tender Overview
Project Description
Tender for New Construction Of Temple North Entrance And Re-Construction Of Existing Dismantling Compound Wall At North Side Temple Compound Wall (Except Supply Of Stone) Belonging To Arulmigu Bramapureeswarar Temple, Thirupattur, Manachanallur Taluk, Trichy District.
BOQ
| Sl. No. | Item Description |
| 1 | Earth work excavation for foundation by manual means for RR/Brick and Other step type footings for Load bearing structures in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 10 mts and initial lift of 2.00mts. and clearing and levelling the site, etc., complete complying with standard specification and as directed by the departmental officers. |
| 2 | Supplying and filling in foundation, basement, etc with filling crushed stone sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. |
| 3 | Cement concrete 1:4:8 (One Cement, Four crushed stone sand and Eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and including curing etc. complete complying with standard specification and as directed by the departmental officers. -Mixing by manual means |
| 4 | R.R.Masonry in Cement mortar 1 : 5 for Foundation and Basement (New stone) including simultaneously pointing above ground level with the same mortar, Cost of Mortar Plasticizer used etc.,complete complying with standard specification and as directed by the Departmental Officers |
| 5 | Basement Level |
| 6 | Ground Floor |
| 7 | Supplying and erecting steel centering including necessary supports for plane surfaces for Reinforced Cement Concrete works such as column footings, column pedestals, plinth beams, grade beams, staircase steps, Sill slabs etc. which require only nominal strutting using mild steel sheets of size 90cm x 60cm and 10 BG stiffened with welded mild steel angles of size 25mm x 25mm x 3 mm for boarding, laid with silver oak joists of size 10cm x 5cm & 7.5cm x 5cm as support runner , vertical stiffener , side support and Top Horizontal stiffener spaced at about 60cm to 90cm centre to centre or at suitable intervals etc. complete in all floors complying with standard specifcation. (Payment for centering shall be given after the concrete is laid). |
| 8 | Providing and laying in position, Standardised Concrete Mix M-25 Grade by insitu machine mix concrete adopting weighing batch method in accordance with IS:456-2000 using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement content of 350 kglm3 and maximum water cement ratio of 0.50, including admixture (plasticiser / superplasticiser) in recommended proportions as per IS:9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability with about (5.0 cu.m.) 7730 kg. of 20mm machine crushed stone jelly and with about (3.3 cu.m.) 5156 kg. of 10-12mm machine crushed stone jelly and with about (4.79 cu.m') 7670 kg. of crushed stone sand, but excluding cost of reinforcement grill and fabricating charges, centering and shuttering and also including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor/ roof slabs wherever necessary without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers. The coarse and fine aggregates to be used should comply with the requirements of IS Standards. (No separate payment will be made by the Department for the excess usage of materials). |
| 9 | Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire) |
| 10 | Labour charges for stone Fixing work excluding cost and conveyance of stone from quarry but including all labour charges for tools and plants for dressing charcoal scaffolding charges handling charges hoisting and fixing in position etc complete., |
| 11 | Chitravanam |
| 12 | Ubabedam- Ubanam Vari |
| 13 | Ubabedam- Kandam vari |
| 14 | Ubabedam- Kapothaga Vari |
| 15 | Athistanam - Jagathi Vari |
| 16 | Athistanam - Kumuthaga Vari |
| 17 | Athistanam - KandaPattiyal Vari |
| 18 | Sthamabam -Kalvari |
| 19 | Sthamabam -Kudampalai Vari |
| 20 | Sthamabam -Pothigai Vari |
| 21 | Prastharam -Kabothagam Vari |
| 22 | Prastharam -Viyala Vari |
| 23 | Ulvari |
| 24 | Nilaikal |
| 25 | Thani Pothiyal |
| 26 | Thani Uthiram |
| 27 | Ulvari Vari |
| 28 | Weathering course in brick jelly lime concrete using broken brick jelly of size 20mm uniform gauge in pure slaked lime (no sand to be used) to the proportion of brick jelly to lime being 32:12.5 by volume and laid over the RCC roof slab in a single layer of required slope and finished by beating the concrete with wooden beaters of approved pattern, keeping the surface constantly wet by sprinkling lime jaggery water, etc., complete as per standard specification and as directed by the deparmental officers. |
| 29 | Brick masonry Lime Mortar 1:2 using Stock bricks including all varivargams, moulds, sthambams, mukapathrams, koodu, nasi and all ornamental brick work complete, all pancharams, agarais, karnakoodus, etc., forming core walls of Rajagopuram/ Vimanams complete including cost and conveyance of all materials including cement, all the labour charges including marking pathies shaping of the bricks, lifting of all the materials to required heights, curing and all extra for working in heights etc., complete 100 cft for vimanam / gopuram |
| 30 | Providing Vargapoochu over the corewalls of Vimanams / Gopurams, with Lime Mortor1:2 complete including shaping the mukhapathram, mahanasi, Koodu all ornamentals works to proper shape by embedding broken bricks of shaped/chiseled bricks, rough-plastering with Lime Mortor1:1.5 and finishing with final ornamental plastering and nayam theervani including cost and conveyance of all materials, labour therefore, lifting of materials, all working in heights, curing with water etc, complete including all extra for folding and including clearing from the vimanams/gopurams 100sft superficial area. for kalkaram The lime used should be sourced from Pollachi which is highly iron fortified and suitable for structural and masonry works. |
| 31 | Painting with (Panchavarnam) Water based exterior emulsion paint complete for the Vinamans/Gopurams, inculding cost and conveyence of all materials, lobour charges inculdinf Artist painter, working in heights, lifting of material, cost of brushes etc, completewhich including all extra for foldings-100sft, superficial area. |
| 32 | Brick work in following Lime Mortor 1:2 using best quality of country bricks of size 8-3/4\\" x 4-1/4\\" x 2 3/4\\"\\" for foundation and basement including curing, etc., complete complying with standard specifiction. |
| 33 | Plastering with Lime Mortar 1:1.5, 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers. |
| 34 | Painting two coat with approved Emulsion over the Lime plastered wall surface, ceiling and other new surface including clearing preparing the surface curing in all floors including brushes etc., complete as per specification. -10 m 2 |
| 35 | Sub Total |
| 36 | GST @ 18% Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 5 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 6 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender