Tender For Design Verification, Detail Engineering, Supply, Installation, Testing & Commissioning Of Electrical And Mechanical System, Dg Sets, Environment Control System, Tunnel Ventilation System And Building Management System For 5 Underground Sta
Tender Overview
Project Description
Tender for Design Verification, Detail Engineering, Supply, Installation, Testing & Commissioning Of Electrical And Mechanical System, Dg Sets, Environment Control System, Tunnel Ventilation System And Building Management System For 5 Underground Stations From Inderlok To Jhandewalan Of Line-8 Extn. Of Phase-Iv(B) Of Delhi Mrts
BOQ
| Sl. No. | Item Description |
| 1 | Total of all Schedules D2E-09 OVERALL SUMMARY Contract Package : D2E-09 : Design Verification, Detail Engineering, Supply, Installation, Testing & Commissioning of Electrical and Mechanical System, DG Sets, Environment Control System, Tunnel Ventilation System and Building Management System for 5 Underground Stations from Inderlok to Jhandewalan of Line-8 Extn. of Phase-IV(B) of Delhi MRTS S. No. BOQ Part Description Only DE09- Escalated Rate (considering 70% rate for Price Variation and 30 % Escalation) Amount LAR Weightage Non Schedule Items weightage taken from DE-09 Market Rate Weightage LAR Weightage Non Schedule Items weightage taken from DE-09 Market Rate Weightage Costing for CAMC for 3 year |
| 2 | Part-A |
| 3 | Part-B |
| 4 | Part-C |
| 5 | Part-D |
| 6 | Part-E |
| 7 | Part-F |
| 8 | Part-G |
| 9 | Part-H |
| 10 | Part-I |
| 11 | Part-J |
| 12 | Part-K |
| 13 | Part-L |
| 14 | Part-M |
| 15 | Part-N |
| 16 | Part-O Total Amount (JICA Portion) 23 2300948066.0 1946670468.0 160499304.0 193778294.0 0.846 0.0698 0.0842 2164282288.0 GST @18% 414170652.0 Grand Total including GST 2715118718.0 2857055743.0 |
| 17 | Part-P CAMC (Non JICA Portion) with 18% GST 167485690.0 Total amount with CAMC (Non JICA Portion) excluding 18% GST 2442885091.0 Total amount with CAMC (Non JICA Portion) including 18% GST 23 2882604408.0 2442885091.0 2882604407.38 Total Pv Value as per Avg rate GST on Total cost without CAMC @12% GST on CAMC @18% LAR Weightage 1946670468.0 Non Schedule Items weightage taken from DE-09 160499304.0 Market Rate Weightage 193778294.0 LAR Weightage 0.846 Non Schedule Items weightage taken from DE-09 0.0698 Market Rate Weightage 0.0842 Total amount exclusive GST and CAMC 2300948066.0 Part A Polyamide strip 3454000.0 Part B Screw Chiller 163329163.0 Part B Scroll Chiller 15035415.0 Part B DPS VFD 3847470.0 Part B Cabinet Type Axial Fan 4856496.0 Part H IG-100 for dry transformer 2840700.0 Total 193363244.0 Market Rate taken Item Percent 8.40363356553915 Annexure-1 Contract Package D2E-09: Design Verification, Detail Engineering, Supply, Installation, Testing & Commissioning of Electrical and Mechanical System, DG Sets, Environment Control System, Tunnel Ventilation System and Building Management System for 5 Underground Stations from Inderlok to Jhandewalan of Line-8 Extn. of Phase-IV(B) of Delhi MRTS Indication of the Foreign Currency Wise Breakup of the total Quoted Price Name of Bidder S. No. Percentage Component of Foreign Currencies* (in percentage ‘%’) USD EURO JPY |
| 18 | Note: - 1. Bidder are required to quote Numeric values in percentage (%) only against Respective Foreign currency, in which payment is desired to be made. Allowable foreign currencies for payment are USD, EURO, and JPY only. 2. The above format of currency wise breakup would not affect the comparison and evaluation of financial bids, which will be governed in accordance with clause ITB 37.1. This format is to be used for release of payment to contractor (successful bidder) during execution of work. 3. Selling rate of Exchange at the cost of business of State bank Of India on the Thirty (30) days before the latest date of tender submittal (SBI’s Bill Selling Rate) shall be taken for conversion of INR to foreign currency (e.g., if latest date of tender submittal is 31.03.2023 then selling rate of Exchange shall be applicable for 01.03.2023). 4. The payment in Foreign currency will be made only on submission of documentary evidences of items being imported and billed in foreign currency, as per the respective percentage quoted against Foreign currency. 5. The payment in Foreign Currency shall be restricted to the invoice value of imported items or percentage of foreign currency quoted by the bidder, whichever is less. 6. In case any % component of foreign currency is not claimed, the payment shall be released in INR. LETTER OF PRICE BID Date: Loan Agreement No.: ID-P329 IFB No.: Contract D2E-09 To: Delhi Metro Rail Corporation Limited, 5th floor, A-Wing, Metro Bhawan Fire Brigade Lane, Barakhamba Road New Delhi - 110 001 India We, the undersigned, declare that: (a) We have examined and have no reservations to the Bidding Documents, including Addenda issued in accordance with Instructions to Bidders (ITB 8): [insert the number and issuing date of each Addendum]; Addendum No. Date (b) We offer to Design and Construct, in conformity with the Bidding Documents and Technical Bid, the following Works: Contract Package D2E-09: Design Verification, Detail Engineering, Supply, Installation, Testing & Commissioning of Electrical and Mechanical System, DG Sets, Environment Control System, Tunnel Ventilation System and Building Management System for 5 Underground Stations from Inderlok to Jhandewalan of Line-8 Extn. of Phase-IV(B) of Delhi MRTS (c) The total price of our Bid, is: INR 2715118718.0 INR Two Hundred Seventy One Crore Fifty One Lakh Eighteen Thousand Seven Hundred & Eighteen Only Foreign currency 0.0 USD Zero Only (d) Our Bid shall be valid for a period of 120 days from the date fixed for the Bid submission deadline in accordance with the Bidding Documents, and it shall remain binding upon us and may be accepted at any time before the expiration of that period; (e) If our Bid is accepted, we commit to obtain a Performance Security in accordance with the Bidding Documents; (f) We understand that this Bid, together with your written acceptance thereof included in your Letter of Acceptance, shall constitute a binding Contract between us, until a formal Contract is prepared and executed; and (g) We understand that you are not bound to accept the lowest evaluated Bid or any other Bid that you may receive. Name of the Bidder* Name of the person duly authorized to sign and submit the Bid online on behalf of the Bidder to whom Power of Attorney have been given** Title of the person signing and submitting the Online Bid Date Notes: *: In the case of the Bid submitted by a Joint Venture specify the name of the Joint Venture as Bidder. **: Person signing the Bid shall have the power of attorney given by the Bidder to be attached with the Bid. Name of Work :Contract Package D2E-09: Design Verification, Detail Engineering, Supply, Installation, Testing & Commissioning of Electrical and Mechanical System, DG Sets, Environment Control System, Tunnel Ventilation System and Building Management System for 5 Underground Stations from Inderlok to Jhandewalan of Line-8 Extn. of Phase-IV(B) of Delhi MRTS FORM PB-DEVPROFORMA FOR COST OF EACH OF MINOR DEVIATIONS / NONMATERIAL NONCONFORMITY(Refer ITB 34) Name of Bidder: The following are the particulars of minor deviations / nonmaterial nonconformity from the requirements of the Bidding Documents: Sr. No Clause Deviations Price adjustment for each deviation/s Note:1. The Bidder shall indicate price adjustment against each minor deviation/ nonmaterial nonconformity in Form PB-Dev of Price Bid. This price is the price which the bidder shall reduce from their Bid Price if deviation(s) is/are accepted by the Employer.2. Where there is no deviation, please indicate ‘No Deviations’. In case, Performa of deviations is left as blank, it will be construed that the bidder has not proposed any deviations from the Bidding Documents.3. If the bidder proposes deviations in Bidding Documents, and/or any other terms and conditions of the Bid, other than in this Form, it will have no effect.4. All deviations have been listed and priced in the Price Bid and deviations not priced will be treated as null and void and stand withdrawn. Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 48 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 49 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender