Bids Are invited for Supply Installation Testing And Commissioning Of Hybrid Roof Top Solar Power Plant
Tender Overview
Project Description
Bids Are invited for Hybrid Roof Top Solar Power Plant - Supply Installation Testing And Commissioning Of Hybrid Roof Top Solar Power Plant As Per Ts And Scope Of Works , Supply Installation Testing And Commissioning Including Cable Termination Of Junction Panel Junction Box With Suitable Rating - Supply Installation Testing And Commissioning Including Cable Termination Of Junction Panel-Junction Box With Suitable Rating Mccb 4Pole 36Ka Tm Based Release Speder Link, Input And Output Busbar Set 30X10 Copper Rybn- Powder Coated Siemens Gray 7032 Panel Indication Lamp On Off Trip And Ryb Control Mcb Wire Accessories And Panel Acessories As Per Direction Of Eic , Supply Installation Testing And Commissioning Including Cable Termination Of Ats Change Over Panel - Supply Installation Testing And Commissioning Including Cable Termination Of Ats Change Over Panel- 200A Ats Motorized Change Over Switch 4 Pole 240V Ac With Asr Controlller With Interlock Logic Auto/Manual Operation 1 Input 1 Output Shall Take Status Only Of Supply Of Solar Source And Should On/Off In Auto Mode Outgoing Mccb 1Nos 250A 4Pole 36Ka Mccb With Speder Link Source 1 And Source 2 30X10 Copper Busbar Set Onn Off Trip Ryb Indication Lamp Control Mcb Panel Accessories And Wire Accessories Powder Coated Panel 7032 Siemens Grey As Per Direction Of Eic , Dismantling And Shifting Of Existing Solar Water Heater Supply - Dismantling And Shifting Of Existing Solar Water Heater Supply And Laying Of Ac Armoured Cables Providing Proper Ventilation For Battery Inverter Etc To Be Kept In Acdb Room Supply And Installation Of Battery Racks And Carrying Out All Other Miscellaneous Works Necessary For Completion Of The Project Scope Ensuring Satisfactory Performance Of The System And Compliance With The Instructions Of The Engineerincharge , Non Comprehensive Amc For 1St Year As Per Ts , Non Comprehensive Amc For 2Nd Year As Per Ts , Non Comprehensive Amc For 3Rd Year As Per Ts , Non Comprehensive Amc For 4Th Year As Per Ts , Non Comprehensive Amc For 5Th Year As Per Ts
BOQ
| Sl. No. | Item Title | Item Description |
| 1 | Hybrid Roof top Solar power plant | Supply Installation testing and commissioning of Hybrid Roof top Solar power plant as per TS and Scope of works |
| 2 | Supply Installation testing and commissioning including cable termination of Junction Panel Junction Box With suitable rating | Supply Installation testing and commissioning including cable termination of Junction Panel-Junction Box With suitable rating Mccb 4Pole 36Ka Tm Based Release Speder Link, Input And Output Busbar Set 30X10 Copper Rybn- Powder Coated Siemens Gray 7032 Panel Indication Lamp On Off Trip and Ryb Control Mcb Wire Accessories and Panel Acessories as per Direction of EIC |
| 3 | Supply Installation testing and commissioning including cable termination of ATS Change Over Panel | Supply Installation testing and commissioning including cable termination of ATS Change Over Panel- 200A ATS Motorized Change Over Switch 4 Pole 240V Ac With ASR Controlller With Interlock Logic Auto/Manual Operation 1 Input 1 Output Shall take status only of supply of Solar Source and Should ON/Off in Auto mode Outgoing Mccb 1Nos 250A 4Pole 36Ka Mccb With Speder Link Source 1 and Source 2 30X10 Copper Busbar Set Onn Off Trip Ryb Indication Lamp Control Mcb Panel Accessories and Wire Accessories Powder Coated Panel 7032 Siemens Grey as per Direction of EIC |
| 4 | Dismantling and shifting of existing solar water heater supply | Dismantling and shifting of existing solar water heater supply and laying of AC armoured cables providing proper ventilation for Battery inverter etc to be kept in ACDB room Supply and installation of battery racks and carrying out all other miscellaneous works necessary for completion of the project scope ensuring satisfactory performance of the system and compliance with the instructions of the EngineerinCharge |
| 5 | Non Comprehensive AMC for 1st year as per TS | Non Comprehensive AMC for 1st year as per TS |
| 6 | Non Comprehensive AMC for 2nd year as per TS | Non Comprehensive AMC for 2nd year as per TS |
| 7 | Non Comprehensive AMC for 3rd year as per TS | Non Comprehensive AMC for 3rd year as per TS |
| 8 | Non Comprehensive AMC for 4th year as per TS | Non Comprehensive AMC for 4th year as per TS |
| 9 | Non Comprehensive AMC for 5th year as per TS | Non Comprehensive AMC for 5th year as per TS |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 28 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 29 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender