Bids Are invited for Facility Management Services - Lumpsum Based - As Per Atc; Laying Chain Link Fencing At Banalopa Magazine Building At Msb; Consumables To Be Provided By Service Provider (Inclusive In Contract Cost) - Earth Work In Excavation For
Tender Overview
Project Description
Bids Are invited for Facility Management Services - Lumpsum Based - As Per Atc; Laying Chain Link Fencing At Banalopa Magazine Building At Msb; Consumables To Be Provided By Service Provider (Inclusive In Contract Cost) - Earth Work In Excavation For Foundations Of Buildings, Equipments, Trenches, Drains, Culverts, Manholes, Etc., In All Types Of Soils Including Earth Mixed With Slag/Slag/Soft Rock/Is Integrated Rock, In Both Dry And Wet Conditions, , Centering And Shuttering Including Strutting, Propping Etc. And Removal Of Form For : Suspended Floors, Roofs, Landings, Balconies And Access Platform. , Reinforcement For R.C.C. Work Including Straightening, Cutting, Bending, Placing In Position And Binding All Complete. Cold Twisted Bars , Providing And Laying Pcc 1 : 2:4 Etc. Complete As Per Direction Of Engineer Incharge. , Providing And Laying In Position Specified Grade Of Reinforced Cement Concrete Excluding The Cost Of Centering,Shuttering, Finish & Reinforce - All Work Up To Plinth Level:1:1.5:3(1Cem:1.5 Cor Sand:3 Graded Stone Agg 20 Mm Nominal Size) , Finishing Walls With Water Proofing Cement Paint Of Required Shade :Old Work (One Or More Coats Applied @ 2.20 Kg/10 Sqm) Over Priming Coat Of Primer Applied @ 0.80 Litrs/10 Sqm Complete Including Cost Of Priming Coat. , Structural Steel Work Riveted, Bolted Or Welded In Built Up Sections, Trusses And Framed Work, Including Cutting, Hoisting, Fixing In Position And Applying A Priming Coat Of Approved Steel Primer All Complete: , 15 Mm Cement Plaster On The Rough Side Of Single Or Half Brick Wall Of Mix :1:4 (1 Cement: 4 Fine Sand) , Painting With Synthetic Enamel Paint Of Approved Brand And Manufacture Of Required Colour To Give An Even Shade :One Or More Coats On Old Work. , Providing And Fixing G.I. Chain Link Fabric Fencing Of Required Width In Mesh Size 50X50 Mm Including Strengthening With 2 Mm Dia Wire Or Nuts, Bolts And Washers
BOQ
| Sl. No. | Item Title | Item Description |
| 1 | Earth work in excavation for Foundations of buildings, equipments, trenches, drains, culverts, manholes, etc., in all types of soils including earth mixed with slag/slag/soft rock/is integrated rock, in both Dry and Wet conditions, | Earth work in excavation for Foundations of buildings, equipments, trenches, drains, culverts, manholes, etc., in all types of soils including earth mixed with slag/slag/soft rock/is integrated rock, in both Dry and Wet conditions, |
| 2 | Centering and shuttering including strutting, propping etc. and removal of form for : Suspended floors, roofs, landings, balconies and access platform. | Centering and shuttering including strutting, propping etc. and removal of form for : Suspended floors, roofs, landings, balconies and access platform. |
| 3 | Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete. Cold twisted bars | Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete. Cold twisted bars |
| 4 | Providing and laying PCC 1 : 2:4 etc. complete as per direction of Engineer Incharge. | Providing and laying PCC 1 : 2:4 etc. complete as per direction of Engineer Incharge. |
| 5 | Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centering,shuttering, finish & reinforce - All work up to plinth level:1:1.5:3(1cem:1.5 cor sand:3 graded stone agg 20 mm nominal size) | Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centering,shuttering, finish & reinforce - All work up to plinth level:1:1.5:3(1cem:1.5 cor sand:3 graded stone agg 20 mm nominal size) |
| 6 | Finishing walls with water proofing cement paint of required shade :Old work (one or more coats applied @ 2.20 kg/10 sqm) over priming coat of primer applied @ 0.80 litrs/10 sqm complete including cost of Priming coat. | Finishing walls with water proofing cement paint of required shade :Old work (one or more coats applied @ 2.20 kg/10 sqm) over priming coat of primer applied @ 0.80 litrs/10 sqm complete including cost of Priming coat. |
| 7 | Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete: | Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete: |
| 8 | 15 mm cement plaster on the rough side of single or half brick wall of mix :1:4 (1 cement: 4 fine sand) | 15 mm cement plaster on the rough side of single or half brick wall of mix :1:4 (1 cement: 4 fine sand) |
| 9 | Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade :One or more coats on old work. | Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade :One or more coats on old work. |
| 10 | PROVIDING AND FIXING G.I. CHAIN LINK FABRIC FENCING OF REQUIRED WIDTH IN MESH SIZE 50X50 MM INCLUDING STRENGTHENING WITH 2 MM DIA WIRE OR NUTS, BOLTS AND WASHERS | PROVIDING AND FIXING G.I. CHAIN LINK FABRIC FENCING OF REQUIRED WIDTH IN MESH SIZE 50X50 MM INCLUDING STRENGTHENING WITH 2 MM DIA WIRE OR NUTS, BOLTS AND WASHERS |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 17 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 18 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender