Drinking Water Supply and Sanitation Government Departments Closing in 8 days TDR #58689581

Tender For Lighting Arrangement At Different Station Including Restrengthening Of Plain Cement Concrete Poles And Drawing Of Acsr Conductor In Lt Distribution Oh Line At Lot No. 8 In Connection With Ganga Sagar Mela - 2027

Issued by Government Departments · Kolkata, West Bengal
Tender Value
Ref. Documents
Estimated cost
Bid Submission
03 Dec 2026
8 days left
EMD
1.55 Lakhs
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Kolkata → West Bengal
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Tender for Lighting Arrangement At Different Station Including Restrengthening Of Plain Cement Concrete Poles And Drawing Of Acsr Conductor In Lt Distribution Oh Line At Lot No. 8 In Connection With Ganga Sagar Mela - 2027

BOQ

Name of Work:- Lighting arrangement at different station including restrengthening of PCC poles and drawing of ACSR Conductor in LT Distribution OH line at LOT No. 8 in connection with Ganga Sagar Mela – 2027
Sl. No. Item Description
1Supply of hire basis 4.88 mtr long and 0.10 mtr. dia (Av.) bottom and 50 mm. dia. top salbollah post and erecting the same at Bus Stand and other different places as per direction of E.I.C. (av. distance between the two poles is 20 mtrs.)
2Supply on hire basis 4.88 mtr. long and 0.10 mtr. dia (av) bamboo post & erecting the same at bus stand other different places as per direction of the E.I.C.
3Supply on hire basis 400 watt sodium vapour fixture, lamp ballast and other materials required to complete the work with effect from 01.01.2027 to 17.01.2027 = 16 points x 17 days.
4Drawing of LT feeder and distribution line from medium pressure voltage by 3 Ph. 4 wire system as per IE rules and ISS rules by 50 sq. mm. to 16 sq. mm. PVC single core wire on hire basis on salbollah post & on PCC pole incl. supply of wire installation of binding wire etc. as directed before 02.01.2027
5Constructions of tower by steel tubular pole with cross arms for both sides the tower should be 9.14 mtr. long x 1.5 mtr. bottom by supplying reqd. quantity steel pipe cross arms horizontal support etc. to complete the tower on the basis incl. fitting fixing of twin type of 400 watt sodium vapour flood light fixture and lamp (1 set in front and other in the back, if necessary) on hire basis as per direction of EIC incl. drawing off elec. Connection with all protection to avoid all kind of accident and all the tower should be properly earth as per IE rules with effect from 04-01-2027 to17-01-2027 = 14 days
6Making lighting arrangement by one no steel tubular pole 9.14mtr long x 1.5 mtr [5ft] bottom for proper illumination of bus stand including supply of necessary materials required to complete the tower on hire basis including fitting fixing of twin type of 400 watt of sodium vapour flood light fixture and lamp on iron frame and other in the back if necessary as per direction of E.I.C. incl. drawing all elec. Connection an necessary protection complete from 10-01-2027 to 17-01-2027= 8 days
7Drawing tube light points from different distribution and feeder lines on salbollah post and PCC pole at different places with supplying on hire basis 40 watt tube light, choke, starter and all other necessary materials to complete the work from 04.01.2027 to 17.01.2027 = 14 days x 480 pts.
8Drawing street light points from different distribution and feeder lines salbollah posts to different places directed with supply on hire basis 60 watt. bulb, holder bracket and necessary materials required to complete the work
9From 04.01.2027 to 17.01.2027 = 14 days x 150 pts.
10From 18.01.2027 to 22.01.2027 = 5 days x 20 pts.
11Drawing halogen light point on the existing salbollah post from different feeder line as per direction E.I.C. by supplying on hire basis 1000 watt halogen lamp fixture from 02.01.2027 to 17.01.2027 = 16 days x 37 pts.
12Drawing halogen light 1000 watt on PCC pole on hire basis from Kashinagar to Hardwood point from different distribution line to different places as per direction EIC incl. connection of wire and other materials as reqd. to complete the job with effect from 02.01.2027 to 16.01.2027 = 15 days x 24 points.
13Drawing the street light points for bus stand (old & new) from different feeder and distribution line to PCC pole street tubular pole and salballah post to different places as directed with supply on hire basis 250 W sodium fixture lamp ballast and other necessary materials reqd. for the work to complete from 01.01.2027 to 17.01.2027=17days x 106pts
14Drawing of light point for bridge ghat, jetty ghat and other places as directed with supply on hire basis 400 W sodium vapour fixture lamp ballast and other materials reqd. to complete the work from 01.01.2027 to 17.01.2027 = 17 days x 27 pts.
15Drawing of light point of 400 watt twin type flood light fixture and son lamp with control gear complete on hire basis from 01.01.2027 to 17.01.2027 = 17days x 53pts
16Drawing ceiling lights points from different distribution line to different hogla shed as per direction of EIC with supply on hire basis 40 watt bulb holder and other materials required to complete the work from 04.01.2027 to 17.01.2027 = 14 days x 325 pts.
17Drawing ceiling light points from different distribution line to different jetty ghat as per direction of EIC with suppy on hire basis 40 watt bulb holder and other materials required to complete the work from 08.01.2027 to 16.01.2027 = 9 days x 60 pts.
18Drawing of metal flood light points on hire basis on jetty ghat, bus stand from different feeder of 400 watt metal flood fixture, lamp, control gear etc. reqd. to complete the job from 08.01.2027 to 16.01.2027 = 9 days x 22 pts.
19Making jetty ghat signal with color 12 nos. 40 watt x 4 ft. long tube as directed including supply on hire basis ( for 5 nos. jetty) tube choke starter wire etc. for the work complete from 04.01.2027 to 17.01.2027 = 14 days x 15 pts.
20Temporary installation of panel board wooden plank including supply on hire basis salbollah wood plank etc. as per direction of E.I.C.
21Drawing flood light point in new bus stand road PCC pole and tower from different feeder line as directed with fitting fixing of 400 watt twin type SON-T flood light fixture and lamp with control gear bulb etc. as required to complete the work on hire basis for the period from 01.01.2027 to 16.01.2027 = 16 days x 22 pts.
22Temporary installation of controlling station with fittings 63 amps TPN 16 amp TPN main switch on wooden plank and salbollah on hire basis incl. elec. Connection complete as per direction of E.I.C.
23Making electrical connection from WBSEDCL supply main switch board by supplying on hire basis 50 sq. mm x 3.5 core PVC Al. cable as per IE rules as per direction of E.I.C. including supply of all necessary materials reqd. before 01.01.2020 (average Distance from WBSEDCL supply main switch to departmental panel board is 50 mtrs) for four nos. station with proper earthing as per IE rules.
24Replacement of 120 mm size digit 2023 in place of 2021 replacing only digit. Removal of existing letter with supply of red letters as per sample and other materials as directed.
25Fitting fixing of glow sign board /signage board/vernacular board on salballah structures on hire basis at different places as per direction of EIC with all electrical connection including supply of all materials reqd. to Complete the work.
26Maintenance of controlling station by engaging skilled operating staff for operation of controlling switch of different places as per direction of E.I.C.
27Carrying charges of materials such as S.V. fixture, glow sign board, panel board etc. from Akshyanagar store to Kakdwip Lot No. 8 and back to store after completion of mela incl. loading & unloading.
28Painting of control panel board & the electrical accessories by one coat of red oxide paint and two coats of approved & anti corrosive paint as per direction of the E.I.C.
29PROVING BARRIER LIGHTING AT OLD AND NEW BUS STAND Drawing L.T. feeder and distribution line from medium pressure voltage by 3 Ph. 4 wire system as per IE rules and ISS rules by 16 sq mm. PVC single core wires on hire basis on salbollah post including supply of necy. Wire as per direction of E.I.C
30Drawing barrier lighting from different distribution lines to different places on salbollah post with supply of 60 W colour lamp holders etc. on hire basis and other necessary materials required to complete the work from 10.01.2027 to 17.01.2027 = 8 days x 100 pts.
31Repairing of L.T. panel board replacement of fuse grip, indicating lamp 63 amps main switch and fixing of the repaired accessories with all inter connection and testing complete as per direction of the E.I.C.
32Petty repairing of glow sign board with supply of suitable size letter and fixing the same as per existing model including supplying 3 mm thick plastic sheet of reqd. to complete the work and painting complete.
33LIGHTING OF NEW BUS STAND AREA THROUGH MS TUBULAR POLES Supply on hire basis of 9 m long pole and erecting by excavation of earth in any kind if soil at different places of new bus stand and jetty ghat area as per direction of E.I.C for the period from 01.01.2027 to 22.01.2027
34Supply on hire basis of 9 mtrs long steel pole and erecting by excavation of earth in any kind of soul at LCT as per direction of EIC from 01.01.2027 to 22.01.2027
35Drawing of flood light point at LCT jetty ghat with supply of following flood light fixture with lamp on hire basis with all other necessary materials required to complete the work.
36400 watt twin flood light fixture and son lamp with control gear complete from 01.01.2027 to 22.01.2027 = 22 days x 02 pts
37400 watt street light fixture on existing pole and son lamp with control gear complete from 01.01.2027 to 22.01.2027 = 22 days x 04 pts
38250 watt street light fixture on existing pole and son lamp with control gear complete from 01.01.2027 to 22.01.2027 = 22 days x 34 pts
39Drawing barrier signal lighting on LCT jetty ghat with supply of 60 watt color lamp holder etc on hire basis and other necessary materials required to complete the work from 02.01.2027 to 22.01.2027 = 21 days x 180pts
40Making earthing arrangement by supplying 5/8” dia earth spike of 2 mtr long with galvanized bolts nuts sand washer etc including supplying and fitting fixing 8 nos SWG GI wire and restoration of the surface duly rammed as per direction and inter connection earth spike to continuous running earth on the top of the PCC pole
41LIGHTING ARRANGEMENT IN BETWEEN NUTAN RUSTA TO LCT JETTY GHAT Drawing street light point on existing PCC pole by 250Watt SV lamp, ballast, fixture, wire etc and including all other accessories for complete the work on hire basis from 01-01-2027 to 17-01-2027 = 17days x 110 pts
42Supply and delivery at site the special type arm bracket made with 40mm dia GI pipe 2 Mtr long for street light fixture 250 watt SV lamp including MS collar weld at neck of the bracket making 600 bend at the top portion including painting by red oxide paints as per direction of EIC.
43Supply, delivery and fixing of suitable size pole clamp as per direction of EIC.
44Drawing of overhead line in vertical configuration of medium pressure line by ACSR including supplying binding wire for jumper and insulator and safety device etc. in different places as per ISS and IE rules as per direction of EIC (ACSR conductor will be supplied by the Department)
45Fixing of special type arm bracket in PCC pole by supplying necessary fittings all complete
46ILLUMINATION OF EXTENDED PORTION OF MAIN CONCRETE JETTY GHAT NO. 1 Drawing of flood light points for permanent jetty ghat and other place as directed on supply on hire basis 400 watt sodium flood light fixture- 1no, control gear box and SV lamp etc and complete the work from 01-01-2027 to 17-01-2027 =17 days x 12 pts
47Drawing of the flood light point for main entrance of the jetty fixing on MS joist as per direction of EIC. Supply on hire basis 400 watt twin type flood light fixture and 2 nos SON lamp with control gear box complete from 04-01-2027 to 17-01-2027 = 14 days x 4pts
48Drawing of 250watt street light fixture in different place of permanent jetty ghat on hire basis of 250watt S.V. fixture ballast, 250watt S.V. lamp from 04-01-2027 to 17-01-2027 = 14 days x 15pts
49Supply on hire basis of 9mtr long MS pole and erection and fitting fixing on the jetty bridge as per direction of EIC for the period from 04-01-2027 to 17-01-2027
50Supply and delivery at site D type iron clamp set galvanized with necessary GI nuts and washer size 3 ½ “ x 5” dia
51Supply and delivery at site of porcelain shackle insulator size 75mm x 88mm
52Fitting fixing of D type iron clamp, Parceling shackles and pole clamp in the MS pole after completion of the erection work
53Drawing LT feeder and distribution line from medium pressure voltage 3 phase 4-wire system by 25sq.mm. PVC single core aluminum wire on hire basis
54Making earthing arrangement by supplying 5/8” dia earth spike of 2 mtr long with galvanized bolts nuts sand washer etc including supplying and fitting fixing 8 nos SWG GI wire and restoration of the surface duly rammed as per direction and inter connection earth spike to continuous running earth on the top of the PCC pole
55ILLUMINATION OF JETTY GHAT NO 2 Drawing of flood light points for jetty ghat no. 2 and other place as directed on supply on hire basis 400 watt sodium flood light fixture- 1no, control gear box and SV lamp etc to complete the work from 02-01-2025 to 17-01-2025 =16 days x 16 pts
56Drawing of the flood light point for main entrance of the jetty fixing on MS joist as per direction of EIC. Supply on hire basis 400 watt twin type flood light fixture and 2 nos SON lamp with control gear box complete from 01-01-2027 to 17-01-2027 = 17 days x 8pts
57Drawing of 250watt street light fixture in different place of jetty no. 2 on hire basis of 250watt S.V. fixture ballast, 250watt S.V. lamp from 01-01-2027 to 17-01-2027 = 17 days x 30pts
58Supply on hire basis of 9mtr long MS pole and erection and fitting fixing on the jetty bridge as per direction of EIC for the period from 01-01-2027 to 17-01-2027
59Supply and delivery at site D type iron clamp set galvanized with necessary GI nuts and washer size 3 ½ “ x 5” dia
60Supply and delivery at site of porcelain shackle insulator size 75mm x 88mm
61Supply and delivery at site the special type arm bracket made with 40mm dia GI pipe x 2 mtr long for light fixture 250watt SV lamp including MS collar welded at neck of the bracket including painting by red oxide paint as per direction
62Fitting fixing of D type iron clamp, Parceling shackles and pole clamp in the MS pole after completion of the erection work
63Drawing LT feeder and distribution line from medium pressure voltage 3-phase 4-wire system by 25 sq. mm. PVC single core aluminum wire on hire bsis
64Making earthing arrangement by supplying 5/8” dia earth spike of 2 mtr long with galvanized bolts nuts sand washer etc including supplying and fitting fixing 8 nos SWG GI wire and restoration of the surface duly rammed as per direction and inter connection earth spike to continuous running earth on the top of the PCC pole
65ILLUMINATION OF JETTY NO. 3 Drawing flood light points from different place of new jetty Ghat and other places as per direction on supply on hire basis 400 watt sodium fixture, 1no control gear box and S.V. lamp etc complete the work from 01-01-2027 to 17-01-2027 = 17 days x 14 nos
66Drawing flood light points for main entrance of the jetty and approach road as per direction of EIC. Supply on hire basis 400 watt twin type flood light fixture and 2nos SON lamp with control gear box complete from 01-01-2027 to 17-01-2027 = 17 days x 4 pts
67Drawing tube light point from different distribution and feeder line on suitable place at jetty with supply on hire basis 40 watt tube light, choke complete the work from 04-01-2027 to 17-01-2027 = 14 days x 60pts
68Drawing of 250 watt street light in different places of new jetty ghat river bank road and approach road, hardwood point and other place on hire basis of 250 watt SV fixture, ballast, 250wattt SV lamp from 01-01-2027 to 17-01-2027 = 17 days x 40 pts [for Jetty No.3 – 25 Nos and bypass road-15nos]
69Supply on hire basis of 9 mtr long MS pole and erection on the jetty bridge, river bank to hardwood point , approach road as per direction of EIC for the period from 02-01-2027 to 17-01-2027
70Supply and delivery at site D type iron clamp set galvanized coating with necessary GI nuts and washer size 3 ½ “ x 5”
71Supply and delivery at site of porcelain shackle insulator size 75mm x 88mm
72Supply & delivery at site 25 sq. mm. 660/1200 volt grade singe core PVC insulated aluminum cable
73Fitting fixing of D type iron clamp, porcelain shackles and MS clamp in the MS pole after complete erecting work
74Drawing and distribution line from medium pressure voltage 3 Ph 4 wire system by 25 sq.mm PVC single core aluminum cable
75Making earthing arrangement by supplying ⅝” dia earth spike of 2 mtr long with galvanized bolts and nits and washer etc including supplying and fitting riding 8 nos SWG GI wire and restoration of the surface duly rammed as per direction and inter connection earth spike to continuous running earth on the top of the PCC pole
76Making jetty light Ghat signal light with color and LED lamp dimmer and fixing on pole and front side of the jetty to complete the job
77ILLUMINATION OF APPROACH ROAD BETWEEN HARDWOOD POINT TO RIVER BANK Supply on hire basis of 9 mtr long steel tubular pole and erection complete at approach road for Hardwood Point near bus stand
78Drawing of 250 watt street light fixture in different place of approach road on hire basis of 250 watt SV fixture ballast, 250 watt SON-T lamp from 04-01-2027 to 17-01-2027 = 14 days x 23 pts
79Drawing of 250 watt street light fixture in approach road near hardwood point jetty ghat on hire basis of 250 watt SV fixture ballast, 250 watt SON-T lamp from 04-01-2027 to 17-01-2027 = 14 days x 15 pts
80Drawing flood light point of approach road near hardwood point bus stand on hire basis of 400 watt twin type flood light fixture and SON lamp with control gear complete from 04-01-2027 to 17-01-2027 = 14 days x 7 pts
81Making earthing arrangement by supplying 5/8” dia earth spike of 2 mtr long with galvanized bolts nuts sand washer etc including supplying and fitting fixing 8 nos SWG GI wire and restoration of the surface duly rammed as per direction and inter connection earth spike to continuous running earth on the top of the PCC pole
82ILLUMINATION OF JETTY NO.4 AND OTHER ALLIED WORKS Drawing of flood light points from different place of new jetty ghat and other places as per direction on supply on hire basis 400 watt sodium flood fixture 1 no control gear box and SV lamp etc complete the work from 01-01-2027 to 17-01-2027 = 17 days x 20 pts
83Drawing flood light point for main entrance of the jetty and approach roads fixing on MS joint as per direction of EIC. Supply on hire basis 400 watt twin type flood light fixture and 2 nos SON lamp with control gear box complete from 01-01-2027 to 17-01-2027 = 17 days x 16pts
84Drawing of 250 watt street light fixture in different places of new jetty ghat river bank road and approach road, hardwood point and other place on hire basis of 250- watt SV fixture, ballast 250 watt SV lamp from 02-01-2027 to 17-01-2027 = 16 days x55 pts
85Drawing of metal flood light point on different places as per direction of EIC of 400 watt metal fixture, lamp control gear etc to complete the jobs from 01-01-2027 to 17-01-2027 =17 days x 12pts
86Supply on hire basis of 9 mtr long MS pole and erection on the jetty bridge, river bank to hardwood points approach road as per direction of EIC for the period from 01-01-2027 to 17-01-2027
87Supply and delivery at site D type iron clamp set galvanized coating with necessary GI nuts and washer size 3 ½ “ x 5”
88Supply and delivery at site of porcelain shackle insulator size 75mm x 88mm
89Supply and delivery at site 25 sq.mm. 660/1200 volt grade single core PVC insulated aluminum cable
90Fitting fixing of D type iron clamp, porcelain shackles and MS clamp in the MS pole after complete of the erection work
91Drawing and distribution line from medium pressure voltage 3 Ph 4 wire system by 25sq.mm. PVC single core aluminum cable on hire basis
92Making earthing arrangement by supplying 5/8” dia earth spike of 2 mtr long with galvanized bolts nuts sand washer etc including supplying and fitting fixing 8 nos SWG GI wire and restoration of the surface duly rammed as per direction and inter connection earth spike to continuous running earth on the top of the PCC pole
93JETTY NO. 5 WITH SURROUNDING AREAS Drawing of flood light points for jetty Ghat No.5 and other place as directed on supply on hire basis 400 watt sodium flood light fixture-1 No, control gear box and SV lamp etc and complete the work from 01-01-2027 to 17-01-2027= 17 days x 16pts.
94Drawing of the flood light point for main entrance of the jetty fixing on MS joint as per direction of EIC. Supply on hire basis 400 watt twin type flood light fixture and 2 nos SON lamp with control gear box complete from 01-01-2027 to 17-01-2027 =17days x 15 pts.
95Drawing of 250 watt street light fixture in different place of jetty ghat no5 on hire basis of 250 watt S.V fixture ballast,250 watt S.V. lamp from 01-01-2027 to 17-01-2027= 17 days x 45 pts.
96Supply & drawing of distribution line for medium pressure voltage, 3Phase 4 wire system by 25sq.mm single core PVC insulated wire on hire basis including dismantling the same after completion the work.
97Supply on hire basis of 9 mtr. Long MS pole and erection and fitting fixing on the jetty bridge as per direction of EIC for the period from 01-01-2027 to 17-01-2027
98Supply and delivery at site D. type iron clamp set galvanized with necessary GI nuts and washer size 31/2'' x 5'' dia.
99Supply and delivery at site of porcelain shackle insulator size 75mm x 88mm.
100Fitting fixing of D type iron clamp, porcelain shackles and pole clamp in the MS pole after completion of the erection work.
101Making earthing arrangement by supplying 5/8'' dia earth spike of 2 mtr long with galvanized bolts nuts sand washer etc including supplying and fitting fixing 8 nos SWG GI wire and restoration of the surface duly rammed as per direction and inter connection earth spike to continuous running earth on the top of the PCC pole.
102Guarding charge of the whole installation.
103Installation of the departmentally supplied LED board on the top of the jetty No. 5 with proper positioning including supply of 7/20 PVC insulated single core aluminium cable approx. length 20 mtr. Including connection and clamping arrangement complete.
104Fitting fixing of light boxes with three sides open with red and green light for signaling for vessel availability in jetty ghat No. 5.
105GROUP-A Shifting and carrying charges of the above PCC poles at different places by hire basis van and manual labour including loading and unloading complete
106Erection of the above PCC poles by excavation of earth depth up to 2 mtrs from ground level and filling with jhama bricks and excavated soil s per requirement to compete the job
107Drawing of ACSR conductor with illumination arrangement and drawing of overhead line in vertical configuration of medium pressure line by ACSR including supplying binding wire from jumper and insulator and safety device etc in different places as per ISS & IE rules and also as per direction of EIC [ACSR conductor will be supplied by the Department]
108Supply and drawing of continuous wire for earthing from end pole to receive pole by supplying 12 SWG GI wire with all necessary materials and earth clamp complete as per direction of the EIC
109Supply and delivery at site D type iron clamp set galvanized with necessary GI nuts bolts and washer size 3.5” x 5” dia including loading unloading and carrying charges complete as per direction of the EIC
110Supply and delivery of porcelain shackle insulator size 75mm x 88mm
111Supply fitting fixing of hexagonal type safety device by making 12 SWG GI wire for LTOH line as per direction of the EIC
112Fitting fixing of D type iron clamp and pole clamp in the PCC pole after completion and erection as per IE rules
113Making earthing arrangement by supplying 5/8” dia earth spike of 2 mtr long with galvanized bolts nuts sand washer etc including supplying and fitting fixing 8 nos SWG GI wire and restoration of the surface duly rammed as per direction and inter connection earth spike to continuous running earth on the top of the PCC pole
114Making stay arrangement by 7/18 SWG GI stay wire including supply of necessary materials which will be required stone chips, cement, sand, stay rod anchor plate for stay complete as per IE rules & ISS
115Drawing of 250 watt street light fixture in extension road from Hardwood Point Launch Ghat on hire basis of 250 watt SV fixture ballast, 250 watt SON-T lamp from 05-01-2027 to 17-01-2027 = 13 days x 20 pts
116Painting with decorative cement basis paint of approved quality after scraping the above pole surface thoroughly in different area as per direction of the EIC
117Painting with ready mix black Japan paint up to 0.5mtr from ground level as per direction with proper numbering
118Painting of D type iron clamp, arm bracket, pole clamp by two coats complete.
119Dismantling of ACSR conductor and earth wire from end pole after disconnection of al. jointing materials i.e. jumper insulator, safety device, binding from the PCC pole in different places at new bus stand and old bus stand as per direction of EIC after completion of mela works
120Withdrawing the 8 mtrs PCC poles by excavation of the and lifting the poles carefully and stacking the pole at site store
121Supply on hire basis of 15amps plug socket and plug with wooden board and fixing of the different palaces i.e. police line, police barrack, hospital, movement office etc including supply of power cable and connection complete
122GROUP-B RENEWING EARTHING ARRANGEMENT AND MAKING STARY ARRANGEMENT FOR THE EXISTING PCC POLE AT LOT NO.8 NEW BUS STAND Making earthing arrangement by supplying 5/8” dia Earth spike of 2 mtr long with galvanized bolts nuts and washer etc. including supplying and fitting fixing 8 nos SWG GI wire and restoration of the surface duly rammed as per direction and inter connection earth spike to continuous running earth on the top of the PCC pole
123Making the stay arrangement by 7/18 SWG std stay wire including supply of necessary materials which will be required stone chips, cement, sand, stay rod, anchor plate for stay complete as per IE rules
124Carrying charges of fixed type High Mast including control panel, cable, luminaries etc. from Akshaynagar store to site i.e. Harwood point more and near LCT Jetty by hiring of car and all other necessary arrangement as per requirement
125Installation the High Mast pole with fitting fixing of the luminaries (9 Nos.) on the lighting tower and laying of the PVC insulated Aluminium Armoured cable with all interconnection complete with testing of the same as per direction of the EIC.
126Carrying back the fixed type High Mast including control panel, cable, luminaries etc. to PHE store after dismantling the luminaries, accessories, cable etc. at Akshaynagar Store by hiring of car and all other necessary arrangement after completion of Mela
127Guarding arrangement of the whole installation round the clock as per direction of the EIC
128GROUP-CProviding power supply at Lot No.8 guest house [Mohana Bungalow] Guarding of the while installation at LOT No. 8, Kashinagar, Kakdwip Road, Old and new bus stand, Jetty Ghats etc. by engaging labour as per direction from 04-01-2027 to 17-01-2027
129Restrengthening of existing poles in different places after disconnecting the stay etc. at main bus stand (New) and connecting the stay as directed
130Earth filling to the level of existing pole and packing of brickbats by supplying required quantity of bats after earth cutting of the pole base and the PCC pole in original position complete by providing stay wire & other materials as per direction of the E.I.C.
131Replacement of GI bolts nuts & washers D type iron clamp shackle insulator etc. of the above works as per requirement complete of all works as per direction of the E.I.C. including supply of all materials.
132GROUP-D[Drawing of ACSR in LT distribution line at new & old bus stand] Drawing of overhead line in vertical configuration for medium pressure line A.C.S.R including supplying of wire for jumper & insulator and safety device etc. in different places complete as per I.E. Rules (A.C.S.R. conductor shall by supplied by deptt.)
133Supply & drawing of continuous earth wire from end pole to receive pole by supplying 12 S.W.G G.I. wire with all new materials and earth clamp complete as per direction of E.I.C.
134Dismantling of A.C.S.R conductor and earth from end pole after disconnection all jointing materials i.e. jumper including safety device binding from P.C.C. pole in different places of the New Bus Stand as per direction of E.I.C. after completion of Mela – 2027
135Painting with decorative cement base of approved quality after scrapping the pole surface thoroughly in different areas as per direction of E.I.C.
136Painting with ready mix Black Japan paint up to 0.5 mtr. G.L. as per direction with proper numbering.
137Painting of ‘D’ type iron clamps and pole clamp etc. after scrapping the surface with two coats of red oxide paint.
138CarryinCharges of over head materials i.e. A.C.S.R. clamp from Akshyanagar to Lot No. 8 & back to Akshyanagar store after mela including loading and unloading
139Drawing of 25 sq. mm and 50sq.mm. x 3.5 core PVC Ar. Al cable in different distribution of L.T. panel board from the panel board of WBSEDCL [cable will be supplied by the department]
140Drawing of the flood light points at New Bus Stand & Old Bus Stand from different distribution line to P.C.C. pole as directed with supply of following flood light fixture with lamp on hire basis with all other necessary materials reqd. to complete the work for the period from 03.01.2027 to 16.01.2027 = 12 days.
141400-watt twin type flood light fixture and son lamp with control Gear complete 14 days x 94 pts.
142400-watt street light fixtures and son lamp with control gear Complete 14 days x 54 pts.
143GROUP-B ERECTION OF PCC POLES AND DRAWING OF ACSR CONDUCTOR WITH ILLUMINATION ARRANGEMENT AT RIVER BANK AND APPROACH ROAD BEHIND BHARAT SEVASRAM SANGHA Drawing of ACSR conductor with illumination arrangement and Drawing of overhead line in vertical configuration of medium pressure line by ACSR incl. supplying binding wire from jumper and insulator and safety device etc in different places as per ISS and IE rules and also as per direction of EIC (ACSR. conductor will be supplied by the Department)
144Supply and drawing of continuous wire for earthing from end pole to receive pole by supplying 10 SWG GI wire with all necy. Materials and earth clamp complete as per direction of EIC.
145Supply and delivery at site of D type iron clamp set galvanized with necessary GI nuts and bolts washer size 3.5” x 5” dia incl. loading unloading and carrying complete as per direction of EIC
146Supply and delivery of porcelain shackle insulator size 75mm x 88mm including loading unloading and carrying complete as per direction of EIC
147Supply and delivery at site of suitable poles clamp for existing PCC pole with iron angle fitting complete for 3 Ph 4 wire overheads lines as per ISS and IE rules incl. loading and unloading and carrying complete as per direction of EIC i) Size of angle=50mmx50mmx6mm thick. ii) Size of shackle strip=61mmx25mm
148Supply and delivery at site the special Type arm bracket made with 40mm dia pipe x 2 mtr long for street light fixture 400watt SV lamp including MS collar weld at the neck of the bracket 60o bend at the top portion incl. painting by red oxide paints as per direction of EIC.
149Supply and delivery at site of special type MS clamp as per sample by MS patty as required length incl. necy. Nuts, bolts and washer with painting red lead paint of approved make.
150Supply fitting fixing of hexagonal type safety device by making 10 SWG GI wire for LTOH line as per direction of EIC
151Fitting fixing of D type iron clamp and pole clamp in the PCC pole after completion and erection as per IE rules
152Making earthing arrangement by supplying 5/8” dia earth spike of 2 mtr long with galvanized bolts nuts sand washer etc including supplying and fitting fixing 8 nos SWG GI wire and restoration of the surface duly rammed as per direction and inter connection earth spike to continuous running earth on the top of the PCC pole
153Making the stay arrangement by 7/8SWG GI std stay wire incl. supply of necessary materials which will be required stone chips, cement, sand, stay rod anchor plate for stay complete as per IE rules and ISS
154Drawing the flood light points of new bus stand from different distribution line to PCC pole as directed with supply of 250watt street light fixture with lamp on hire basis with all other necessary materials required to complete the work for the period from 05.01.2027 to 17.1.2027 = 13 days x 20 Nos
155Painting with decorative cement basis paint of approved quality after scraping the above pole surface thoroughly in different area as per direction of EIC.
156Painting with ready mix black Japan paint upto 0.5mtr above GL as per direction with proper numbering
157Painting of D type iron clamp and poles etc after scraping the surface with two coats
158Dismantling of ACSR conductor and earth wire from end pole after disconnection all jointing materials i.e. jumper insulator safety device binding from the PCC pole in different places at new bus stand and old bus stand as per direction of EIC after completion of mela works
159Supply on hire basis 4.88 mtr long and 0.10 mtr dia (av.) bottom and 0.50 mtr (av.) top salbollah post and erecting the same as per direction of EIC
160Supply on hire basis of 9 mtr long MS pole and erection and fitting fixing the same as per direction of the EIC for the period from 05-01-2027 to 17-01-2027 = 13 days
161Supply and delivery at site the special type arm bracket made with 40mm dia GI pipe x 2 mtrs long for light fixture 250 watt SV lamp including 600 bend long at the top position including painting by red oxide paint as per direction
162Drawing LT feeder and distribution line from medium pressure voltage 3 Ph 4 wire system by 25 sq.mm PVC single core aluminum wire on hire basis
163Drawing tube light point on the salbollah post with supply on hire basis 40watt tube light choke starter and all other necessary materials to complete the work from 07.01.2027 to 17.01.2027 = 11 days x 60 pts
164Drawing of flood light points for other places as directed on supply on hire basis 400 watt sodium flood light fixture 1no control gear box and SV lamp etc to complete the work from 05-01-2027 to 17-01-2027 = 13 days x 2pts.
165Drawing halogen light point on the PCC pole, salbollah from generating station with supply on hire basis 1000watt halogen lamp fixture from 05.01.2027 to 17.01.2027 = 13 days x 8 pts
166Drawing of 400 watt twin type flood light fixture and SON lamp with control gear complete from 05.01.2027 to 17.01.2027 = 13 days x 10 pts
167Drawing of 250watt street light fixture on hire basis of 250 watt SV fixture ballast 250 watt SV lamp from 05-01-2027 to 17-01-2027 = 13 days x 5pts
168Drawing of the flood light point including supply on hire basis 400 watt twin type flood light fixture and 2 nos SON lamp with control gear box complete from 05-01-2027 to 17-01-2027 = 13 days x 1 pt.
169Temporary installation of controlling station with 16amps TPN main switch on wooden plank and salbollah on hire basis including electrical connection complete as per direction of EIC.
170Fitting fixing of glow sign board on salballah structure on hire basis at different places as per direction of EIC with all electrical connection including supply of all materials required to complete the work (glow sign board will be supplied by the department)
171Guarding the whole installation by engaging experienced labour as per direction of EIC in three shifts from 05.01.2027 to 17.01.2027
172Taking out the whole installation of the above item as per direction of EIC.
173lighting arrangement including supplying and fitting fixing of LED board
174Old Bus Stand (Internal illumination for Police Camps)
175Supply on hire basis of 9 mtr long MS pole and erection on the police camp old Bus Stand area as per direction of EIC.
176For the Period From – 04/01/2026 to 17/01/2026
177Drawing of flood light point at Police camp old bus stand area of the following flood light fixture with lamp on hire basis with all others necessary materials required to complete the work.
178400 Watt street light fixture on existing pole and Son lamp with control gear complete
179from 04/01/2026 to 17/01/2026 = 14 days.
18014 days X 20 Pts.
181Supply and delivery at site 25 sq mm 660/1200 Volt grade single care Pvc insulated aluminum cable.
182Fitting fixing of ‘D’ type iron clamp porcelain shackles and MS clamp in the MS pole after complete of the erection work.
183Drawing and distribution line from medium pressure voltage 3 Ph 4 wire system by 25 sq mm Pvc single core aluminum cable on hire basis.
184Making earting arrangement by supplying 5/8” dia earth spike of 2 mtr long with galvanized bolts nuts washer etc including supply and fitting fixing 8 Nos. SWG GI wire and restoration of the surface duly rammed as per direction and interconnection earth spike to continuous running earth on the top of the PCC pole.
185Bharat Sevashram Sangha Maidan
186Supply on hire basis of 9 mtr long MS pole and erection on the Bharat sevashram sangha area as per direction of EIC.
187For the Period From – 04/01/2026 to 17/01/2026
188Drawing of flood light point at Bharat Sevashram Sangha area of the following flood light fixture with lamp on hire basis with all others necessary materials required to complete the work.
189400 Watt street light fixture on existing pole and Son lamp with control gear complete
190from 04/01/2026 to 17/01/2026 = 14 days.
19114 days X 20 Pts.
192Supply and delivery at site 25 sq mm 660/1200 Volt grade single core Pvc insulated aluminum cable.
193Fitting fixing of ‘D’ type iron clamp porcelain shackles and MS clamp in the MS pole after complete of the erection work.
194Drawing and distribution line from medium pressure voltage 3 Ph 4 wire system by 25 sq mm Pvc single core aluminum cable on hire basis.
195Making earting arrangement by supplying 5/8” dia earth spike of 2 mtr long with galvanized bolts nuts washer etc including supply and fitting fixing 8 Nos. SWG GI wire and restoration of the surface duly rammed as per direction and interconnection earth spike to continuous running earth on the top of the PCC pole
196WBSTC Stand
197Supply on hire basis of 9 mtr long MS pole and erection on the Bhutal PAribhan mat area as per direction of EIC.
198For the Period From – 04/01/2026 to 17/01/2026
199Drawing of flood light point at Bhutal PAribhan mat area of the following flood light fixture with lamp on hire basis with all others necessary materials required to complete the work.
200400 Watt street light fixture on existing pole and Son lamp with control gear complete
201From 04/01/2026 to 17/01/2026 = 14 days.
20214 days X 20 Pts.
203Supply and delivery at site 25 sq mm 660/1200 Volt grade single care Pvc insulated aluminum cable.
204Fitting fixing of ‘D’ type iron clamp porcelain shackles and MS clamp in the MS pole after complete of the erection work.
205Drawing and distribution line from medium pressure voltage 3 Ph 4 wire system by 25 sq mm Pvc single core aluminum cable on hire basis.
206Making earting arrangement by supplying 5/8” dia earth spike of 2 mtr long with galvanized bolts nuts washer etc including supply and fitting fixing 8 Nos. SWG GI wire and restoration of the surface duly rammed as per direction and interconnection earth spike to continuous running earth on the top of the PCC pole.
207WBSTC Stand
208Supply on hire basis of 9 mtr long MS pole and erection on the Bhutal PAribhan mat area as per direction of EIC.
209For the Period From – 04/01/2026 to 17/01/2026
210Drawing of flood light point at Bhutal PAribhan mat area of the following flood light fixture with lamp on hire basis with all others necessary materials required to complete the work.
211400 Watt street light fixture on existing pole and Son lamp with control gear complete
212From 04/01/2026 to 17/01/2026 = 14 days.
21314 days X 20 Pts.
214Supply and delivery at site 25 sq mm 660/1200 Volt grade single care Pvc insulated aluminum cable.
215Fitting fixing of ‘D’ type iron clamp porcelain shackles and MS clamp in the MS pole after complete of the erection work.
216Drawing and distribution line from medium pressure voltage 3 Ph 4 wire system by 25 sq mm Pvc single core aluminum cable on hire basis.
217Making earting arrangement by supplying 5/8” dia earth spike of 2 mtr long with galvanized bolts nuts washer etc including supply and fitting fixing 8 Nos. SWG GI wire and restoration of the surface duly rammed as per direction and interconnection earth spike to continuous running earth on the top of the PCC pole.
218Miscellaneous
219Supply and delivery of different size main switch at different area of Lot No.-8 in connection with Ganga Sagar Mela – 2026.
220Supply and fitting fixing of 100 Amp 415 Volt Rewireable type TPN main switch. Make : Havells / any others approved make (Lot No.8)
221Supply and fitting fixing of 63 Amp 415 Volt Rewireable type TPN main switch. Make : Havells / any others approved make (Lot No.8)
222Supply and fitting fixing of 32 Amp 415 Volt rewireable type TPN main switch. Make : Havells / any others approved make (Lot No.8)
223Supply of 35 sq mm X 3.5 core XLPE insulated 1.1 KV grade PVC insulated Al. Ar. Cable as per latest IS space. Make : Any approved vender of PHED (Location Lot No. 8 & Kakdwip)
224Drawing of the above 35 sq mm X 3 ½ Core Pvc insulated 1.1 Kv grade Al. Ar. Cable for power connection of Battala Panel Board to New Jatri Nibas tents by supplying on hire basis and necessary sal ballah on hire basis including binding wire the same as per direction of EIC.
225Supply and Hire basis of 4 sq mm 1.1 KV single core Pvc insulated and sheathed standed aluminium cable (For CCTV Camera at different point of Lot No.-8).
226100 Amp HRC Fuse type FN-100 (Make – L&T) 15 Nos. Panel X 6 Nos.
227BUS STAND
228Supply & delivery including design and manufacturing with 2.5” x1.5” 1.5 mm aluminum glazing tube for frem acp blue color jali cutting for air passing and selicon pasting by alumenum frem on improted 3mm mail femail acrylic letter inside 1.5 watt led modules
229Fitting. complete letter fitting with acp. 12volt 1.5 watt led modules connect to 700 watt rainproof led power supply.
230BUS STAND BOARD SIZE – 6” X 4’ – 24 sft X 2 Nos.
231LETTER SIZE - 16” HIGHT X 16 Nos.
232BUS SIZE – 48” HIGHT X 2 Nos.
233IN OUT BOARD SIZE – 2’ X 2 – 4 sft X 4 Nos.
234LETTER SIZE - 18” X 10 Nos.
235JETTY GHAT (1-5)
236supply & delivery including design and manufacturing with 2.5”x1.5” 1.5 mm aluminum glazing tube for frem acp blue color jali cutting for air passing and selicon pasting by alumenum frem on improted 3mm mail femail acrylic letter inside 1.5 watt led modules fitting. complete letter fitting with acp. 12volt 1.5 watt led modules connect to 700 watt rainproof led power supply
237BOARD SIZE – 6’ X 4’ – 24 sft X 5 Nos.
238LETTER SIZE - 60” X 5 Nos. – 300 Inch
239JETTY GHAT ENTRY (5 X 2 – 10 PCS)
240Supply & delivery including design and manufacturing with 2.5” x 1.5” 1.5 mm aluminum glazing tube for frem acp blue color jali cutting for air passing and selicon pasting by alumenum frem on improted 3mm mail femail acrylic letter inside 1.5 watt led modules
241Fitting. complete letter fitting with acp. 12volt 1.5 watt led modules connect to 700 watt rainproof led power supply.
242BOARD SIZE – 6’ X 4’ – 24 sft X 10 Nos.
243BIG LETTER - 41” X 10 – 410”
244SHORT - 14” X 50 – 700”
245L.C.T. JETTY
246Supply & delivery including design and manufacturing with 2.5” x 1.5” 1.5 mm aluminum glazing tube for frem acp blue color jali cutting for air passing and selicon pasting by alumenum frem on improted 3mm mail femail acrylic letter inside 1.5 watt led modules fitting. complete letter fitting with acp. 12volt 1.5 watt led modules connect to 700 watt rainproof led power supply.
247BOARD SIZE – 6’ X 4’ – 24 Sft. X 1 Nos.
248LETTER SIZE – 16” X 8 Nos. – 128”
249Dot – 5” X 3 Nos. – 15”
250P.H.E.D. – 10 + 2 =12 PCS
251Supply & delivery including design and manufacturing with 2.5” x1.5” 1.5 mm aluminum glazing tube for frem acp blue color jali cutting for air passing and selicon pasting by alumenum frem on improted 3mm mail femail acrylic letter inside 1.5 watt led modules fitting. complete letter fitting with acp. 12volt 1.5 watt led modules connect to 700 watt rainproof led power supply.
252BOARD SIZE – 6’ X 3’ – 18 Sft. X 10 Nos. (LANDSCAPE)
253BIG LETTER – 12” X 40 Nos. – 480”
254SHORT – 5” X 80 Nos. – 400”
255BOARD SIZE – 6’ X 2’ – 12 Sft. X 2 Nos. (PORTRAIT)
256LETTER – 13” X 8 Nos.
257WELCOME BOARD
258supply & delivery including design and manufacturing with 2.5” x1.5” 1.5 mm aluminum glazing tube for frem acp blue color jali cutting for air passing and selicon pasting by alumenum frem on improted 3mm mail femail acrylic letter inside 1.5 watt led modules
259fitting. complete letter fitting with acp. 12volt 1.5 watt led modules connect to 700 watt rainproof led power supply.
260BOARD SIZE – 8’ X 2’ – 16 Sft. X 2 Nos.
261LETTER SIZE 13” X 14 Nos. – 182”
262Pumping Machinery & allied accessories
263Cora submersible pumping machinery directly coupled with suitable wet winding type submersible motor with 3 mtr. suitable cable having the following specification:-Discharge-70 LPMTotal head-45 MWCOutlet Size-40 mmImpeller - NorylShaft-S.S.Motor - Single Phase 50 Hz ± 5% Standard Voltage of 230 Volt + 10% wet winding type submersible motor, RPM-2850/2900, Mode of Starting -DOL, Motor Rating-1 HPMake-Any approved make.(Manufacturer's test certificate along with curve chart should be submitted at the time of delivery)
264Panel Board with fitting fixing of Ammeter, voltmeter, indicating lamp ON / OFF Push button Switch with Internal wiring complete.
265FASD Starter with Panel having following specifications :-
266Overload relay range - 13.2-20A
267Contactor type - NON
268Contactor rating - 25 Amp
269Protection including phase failure, phase imbalance & phase Reversal, Short circuit protection through MCB.
270Ammeter & voltmeter of suitable rating
271On/Off and Trip Indicator
272Power coated enclosure with PU gasket ensuring excellent finish and reliability.
273Provisiona for connecting dry run preventor.
274[Make-BCH (Cat No-CPSDPYLN) / Equivalent type of any other approved make]
2751.5 sq.mm 3 core 1.1 KV grade flat waterproof copper Submersible Cable (Make-Approved Make).
276Illumination arrangement of cottage Bunglow Muriganga Bunglow, extended portion of Back side of New Bus stand ( Kalabagan), 15 Nos school and repairing of High mast etc. at Lot-8, Kakdwip
277Supply and delivery of the materials at site on hire basis as per requirement to complete temporary illumination work (for Beautification arrangement) of Muriganga Bunglow) at Lot No.8 (From 08-01-2027 to 18-01-2027)
27812 Volt colour flexible type SNTD strip water proof light 52 Nos. strip X 50 ft Long
279SMPS of capacity 10/20 Amp input – 230 Volts, 50Hz output – 12 Volt DC for power supply.
2803 core 2.5 sq mm 1.1 KV grade copper unarmored cable.
281Single core unarmored unsheathed 1.5 sq mm 1.1 KV grade copper cable.
282Supply and delivery of the materials at site on hire basis as per requirement to complete temporary illumination work (For Beautification arrangement) of Cottage Bunglow at Lot No. – 8 (From 08-01-2027 to 18-01-2027)
283Colour flexible type (RGB) water proof strip LED light (2.5 Volt)
28423 Nos. Strip X 30’ ft Long
285Colour flexible type water proof casing LED light (RGB) (2.5 Volt)
28622 Nos. Strip X 30’ ft Long
287SMPS of Capacity 10/20 Amp input – 230 Volts, 50 Hz Output – 12 Volt DC for power supply.
2883 core 2.5 sq mm 1.1 KV grade copper unarmored cable.
289Single core unarmored unsheathed 1.5 sq mm 1.1 KV grade copper cable. (Required Length)
290400 Watt Metal light fixture (2 Nos.)
291Drawing of flood light points for Back Side portion of new bus stand area and others place as directed on supply on hire basis of 400 Watt sodium flood light fixture – 1 No., control gear box and S.r. Lamp etc., and complete the work from 08-01-2027 to 18-01-2027 = 11 days X 15 Pts.
292Drawing of the flood light point as per direction of EIC and supply on hire basis of 400 Watt twin type flood light fixture and 2 Nos. Son T lamp with control gear box complete. From 08-01-2027 to 18-01-2027 = 11 Days. 11 days X 2 Pts.
293Supply on hire basis of 9 mtrs. Long M.S. pole and erection and fitting fixing on the back side portion of new bus stand area as per direction of EIC. From 08-01-2027 to 18-01-2027 = 11 days.
294Supply and delivery at site of ‘D’ type Iron clamp set galvanized with necessary GI nuts and washer size of 3 ½” X 5”.
295Supply and delivery of site of porcelain shackle insulator Size – 70 mm X 88 mm
296Fitting fixing of ‘D’ type Iron clamp parceling shackles and pole clamp in the M.S. pole of the completion of the errection work.
297Drawing of L.T. feeder and distribution line from medium pressure voltage 3 phase – 4 wire system by 25 sq mm PVC single core aluminium wire on hire basis.
298Making Earthing arrangement by supplying 5/8” dia earth spike of 2 mtr. Long with galvanized bolts nuts and washer etc. including supplying and fitting fixing of 8 Nos. SWG GI wire and restoration of the surface duty rammed as per direction and inter connection earth spike to continuous running earth on the top of the PCE pole.
299(SCHOOL LIGHTING) Drawing street light points from different distribution and feeder lines Salbollals post to different places directed with supply on hire basis of 100 watt bulb, holder bracket and necessary materials required to complete the work 08-01-2027 to 17-01-2027 = 10 days. 10 days X 20 Pts. X 15 Nos. School=3000 Pts.
300Drawing of metal flood light points on hire basis for illumination of school compound from different feeder of 400 Watt metal flood fixture, Lamp, control gear etc., required to complete the job from – 08-01-2027 to 17-01-2027 = 10 days X 4 Pts. X 15 Nos. School.
301Supply and fitting fixing of 2 pin 5 Amps plug point for mobile charger & 3 Pin & 15 amps plug point for special purpose on hire basis.
302Drawing of main line of the pump from medium pressure Voltage 3 phase 4 wire system as per IE rules and ISS rules by 50 sq mm to 25 sq mm PVC single core wire on hire basis on Salbollah post including supply of wire installation of binding wire etc. as directed before 08-01-2027 average mm 90 mtr. X 15 Nos. School.
303(DRIVER ROOM) Drawing of light point of 400 Watt sodium type flood light fixture and lamp, Gear complete set on hire basis from 08-01-2027 to 17-01-2027 = 10 days. X 2 Pts. = 20 Pts.
304Drawing light points from different distribution and feeders lines to different places directed with supply on hire basis of 40 watt tube light, chock starter, bulb holder and necessary materials required to complete the work.From 08-01-2027 to 17-01-2027 = 10 days X 8 Pts. = 80 Pts.
305Supply and fitting fixing of 2 Pin 5 Amps plug point for mobile charger & 3 pin & 12 Amps plug point the temporary driver room on hire basis.
306S & F of 63 A 415V TPN main switch ; MaKE: Havells/ any other approved make [ LOT 8]
307S & F of 32 A 415V TPN main switch ; MaKE: Havells/ any other approved make [LOT 8]
308S & F of 32 A 415V DP main switch ; MaKE: Havells/ any other approved make [LOT 8]
309S & F of 100 A 415V TPN main switch ; MaKE: Havells/ any other approved make [ LOT 8]
310Supply and laying of 50 sqmm 3.5 core XLPE insulated 1.1 KV grade Al Armour cable as per latest IS Spec. Make: Any approved vendor of PHED [ Location : LOT 8 , Kakdwip]
311Dismentling of the Item no. 42 to 45 after completion of mela and returned back to store including loading unloading at both ends all complete
312Drawing of the above 70/50/35/10 sq mm 3.5 core Al. Ar. Cable departmental supply for power connection of VIP tents by supplying on hire basis & necessary salbollah on hire basis including binding the same as per direction of EIC.Transformer to different place VIP Tents.
313Drawing of the flood light point as per direction of EIC and supply on hire basis of 400 Watt twin type flood light fixture and 2 Nos. Son T lamp with control gear box complete. From 07-01-2027 to 17-01-2027 = 11 Days.[ 11 days X 15 Pts.] [ Location : Around the area of LOT 8 ]
314Supply and delivery at site the special type arm bracket made with 40mm dia Gl pipe x 2 mtr long for light fixture 250watt SV lamp including MS collar welded at neck of the bracket including painting by red oxide paint as per direction of EIC.
315Making canopy type LED lighting arrangement at mela ground with different coloured (yellow/ Blue/Red) LED light to be fixed by suitable G.I. wire across the road with all interconnection complete for the entire mela period i.e. from 06-01-2027 to 16-01-2027
316Supply of 2 x 4 sq.mm. and 1 x 2.5 sq.mm. PVC insulated single core copper wire for main circuit line on hire basis
317Supply on hire basis and drawing of L.T. distribution line from medium pressure line as per IE rules and ISS by suitable size PVC single core Aluminium wire and supply of binding wire insulation connection etc. as per direction of EIC on or before 06.01.2027
318Providing on hire basis including supplying, laying and transportation charges of 7/20 or 4 sq.mm 1.1 kv grade single core PVC instated and sheathed stranded aluminium wires/cables including dismantling the same after completion of the mela
319Providing on hire basis including fitting fixing of 6 circuit running changer for changing design of the canopy lighting arrangement having output volatage 12 volt DC and input 230 volt, 50 Hz. AC from 06-01-2027 to 16-01-2027
320Providing on hire basis 30 Amps SMPS having input voltage 230 volt 50 Hz AC and out put voltage 12 volt DC for power supply to canopy lighting system
321Dismantling of the entire installataion after completion of mela.
322Supply on Hire basis 8 SWG GI wire
323Supply on hire bases 4.88 M long 100 mm.. Dia. (AV). Bamboo post and erecting the same at different places in pilgrim shed as per IE rules and direction of EIC (AV distance from post to post is 20 M.)
324Providing Guarding arrangement and deputing one no. electrician for the period of 06-01-2027 to 16-01-20207
325Rectification of 5 nos. 12 mtrHigh Mast at Harwood Point, Kakdwip in connection with Ganga Sagar Mela-2027
326Hiring charges of Hydra for upLifting-lowering of middle-top part of high mast and after repairing again lifting from ground with proper positioning of the parts including hiring of all tools-tackles-wire ropes etc all complete as per direction
327Technician charges for repairing the lights , proper allignment of middle-top portion replacement of wire ropes as required length to complete the job as per direction.
328Technician charges for overhauling of winch system , hoist pulleys , terminal box etc and throughly checkup of head frame , lantern carriage , compensator , winc bracket , winch , winch mounting plate , double drum winch ,trailing cable , rest clamp , terminal box , sleeve pipe , hoist & supply cable pulleys ,gusset plate , foundation nut-bolt etc to complete the job as per direction.
329Supply & delivery of the following materials as per sample:-
3306 SWG stranded steel rope
3316 mm SWG wire \\"U\\" clamp
332Superior quality Grease
333Superior quality lubrricating oil
334Technician charges for overhauling of winch system , hoist pulleys , terminal box etc and throughly checkup of head frame , lantern carriage , compensator , winc bracket , winch , winch mounting plate , double drum winch ,trailing cable , rest clamp , terminal box , sleeve pipe , hoist & supply cable pulleys ,gusset plate , foundation nut-bolt etc to complete the job as per direction
335Technician charges for repairing the lights , proper allignment of middle-top portion replacement of wire ropes as required length ( above supplied) to complete the job as per direction.
336Dismantling of the step motor from the unit, heat vernish and connected with the high mast unit.
337Dismantling of the step motor from the unit, rewinding ,heat vernish and connected with the high mast unit.
338Cleaning ,Overhauling , greasing , lubricating of the inner spare of the gearbox unit includig dismantling part by part with reassembling the same all complete
339Dismentling and Fitting-fixing of the gearbox unit to the high mast with proper allignment all complete
340Add GST @ 18%
341Add CESS @ 1% Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 58689581
AUTHORITY Government Departments
TENDER VALUE Ref. Documents
LAST DATE 03-12-2026
Authority
Authority Name Public Health Engineering Department
Work Description Tender for Lighting Arrangement At Different Station Including Restrengthening Of Plain Cement Concrete Poles And Drawing Of Acsr Conductor In Lt Distribution Oh Line At Lot No. 8 In Connection With Ganga Sagar Mela - 2027
Basic Detail
Tender No WBPHE/EE/SMD/NIeT-32 of 2026-27
Bidding Type Tender
Location
City Kolkata
State West Bengal
Key Dates
Publish Date 23 Nov 2026
Submission Date 03 Dec 2026
Open Date 05 Dec 2026
Finance
Tender Value Ref. Documents
Tender Fee Ref. Documents
EMD 1.55 Lakhs
Exemption Not Available
Document List
2d7479c6-3294-4d11-83ff-611c0d84c99f.html
BOQ_5220701.xls
Tendernotice_1.pdf
Tendernotice_2.pdf
Tendernotice_3.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Nov 23, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Dec 03, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 8 days
Dec 05, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 10 days

Tender Documents

Download All (ZIP) ↓
html

2d7479c6-3294-4d11-83ff-611c0d84c99f.html

xls

BOQ_5220701.xls

pdf

Tendernotice_1.pdf

pdf

Tendernotice_2.pdf

pdf

Tendernotice_3.pdf