Tender For Lighting Arrangement At Different Station Including Restrengthening Of Plain Cement Concrete Poles And Drawing Of Acsr Conductor In Lt Distribution Oh Line At Lot No. 8 In Connection With Ganga Sagar Mela - 2027
Tender Overview
Project Description
Tender for Lighting Arrangement At Different Station Including Restrengthening Of Plain Cement Concrete Poles And Drawing Of Acsr Conductor In Lt Distribution Oh Line At Lot No. 8 In Connection With Ganga Sagar Mela - 2027
BOQ
| Sl. No. | Item Description |
| 1 | Supply of hire basis 4.88 mtr long and 0.10 mtr. dia (Av.) bottom and 50 mm. dia. top salbollah post and erecting the same at Bus Stand and other different places as per direction of E.I.C. (av. distance between the two poles is 20 mtrs.) |
| 2 | Supply on hire basis 4.88 mtr. long and 0.10 mtr. dia (av) bamboo post & erecting the same at bus stand other different places as per direction of the E.I.C. |
| 3 | Supply on hire basis 400 watt sodium vapour fixture, lamp ballast and other materials required to complete the work with effect from 01.01.2027 to 17.01.2027 = 16 points x 17 days. |
| 4 | Drawing of LT feeder and distribution line from medium pressure voltage by 3 Ph. 4 wire system as per IE rules and ISS rules by 50 sq. mm. to 16 sq. mm. PVC single core wire on hire basis on salbollah post & on PCC pole incl. supply of wire installation of binding wire etc. as directed before 02.01.2027 |
| 5 | Constructions of tower by steel tubular pole with cross arms for both sides the tower should be 9.14 mtr. long x 1.5 mtr. bottom by supplying reqd. quantity steel pipe cross arms horizontal support etc. to complete the tower on the basis incl. fitting fixing of twin type of 400 watt sodium vapour flood light fixture and lamp (1 set in front and other in the back, if necessary) on hire basis as per direction of EIC incl. drawing off elec. Connection with all protection to avoid all kind of accident and all the tower should be properly earth as per IE rules with effect from 04-01-2027 to17-01-2027 = 14 days |
| 6 | Making lighting arrangement by one no steel tubular pole 9.14mtr long x 1.5 mtr [5ft] bottom for proper illumination of bus stand including supply of necessary materials required to complete the tower on hire basis including fitting fixing of twin type of 400 watt of sodium vapour flood light fixture and lamp on iron frame and other in the back if necessary as per direction of E.I.C. incl. drawing all elec. Connection an necessary protection complete from 10-01-2027 to 17-01-2027= 8 days |
| 7 | Drawing tube light points from different distribution and feeder lines on salbollah post and PCC pole at different places with supplying on hire basis 40 watt tube light, choke, starter and all other necessary materials to complete the work from 04.01.2027 to 17.01.2027 = 14 days x 480 pts. |
| 8 | Drawing street light points from different distribution and feeder lines salbollah posts to different places directed with supply on hire basis 60 watt. bulb, holder bracket and necessary materials required to complete the work |
| 9 | From 04.01.2027 to 17.01.2027 = 14 days x 150 pts. |
| 10 | From 18.01.2027 to 22.01.2027 = 5 days x 20 pts. |
| 11 | Drawing halogen light point on the existing salbollah post from different feeder line as per direction E.I.C. by supplying on hire basis 1000 watt halogen lamp fixture from 02.01.2027 to 17.01.2027 = 16 days x 37 pts. |
| 12 | Drawing halogen light 1000 watt on PCC pole on hire basis from Kashinagar to Hardwood point from different distribution line to different places as per direction EIC incl. connection of wire and other materials as reqd. to complete the job with effect from 02.01.2027 to 16.01.2027 = 15 days x 24 points. |
| 13 | Drawing the street light points for bus stand (old & new) from different feeder and distribution line to PCC pole street tubular pole and salballah post to different places as directed with supply on hire basis 250 W sodium fixture lamp ballast and other necessary materials reqd. for the work to complete from 01.01.2027 to 17.01.2027=17days x 106pts |
| 14 | Drawing of light point for bridge ghat, jetty ghat and other places as directed with supply on hire basis 400 W sodium vapour fixture lamp ballast and other materials reqd. to complete the work from 01.01.2027 to 17.01.2027 = 17 days x 27 pts. |
| 15 | Drawing of light point of 400 watt twin type flood light fixture and son lamp with control gear complete on hire basis from 01.01.2027 to 17.01.2027 = 17days x 53pts |
| 16 | Drawing ceiling lights points from different distribution line to different hogla shed as per direction of EIC with supply on hire basis 40 watt bulb holder and other materials required to complete the work from 04.01.2027 to 17.01.2027 = 14 days x 325 pts. |
| 17 | Drawing ceiling light points from different distribution line to different jetty ghat as per direction of EIC with suppy on hire basis 40 watt bulb holder and other materials required to complete the work from 08.01.2027 to 16.01.2027 = 9 days x 60 pts. |
| 18 | Drawing of metal flood light points on hire basis on jetty ghat, bus stand from different feeder of 400 watt metal flood fixture, lamp, control gear etc. reqd. to complete the job from 08.01.2027 to 16.01.2027 = 9 days x 22 pts. |
| 19 | Making jetty ghat signal with color 12 nos. 40 watt x 4 ft. long tube as directed including supply on hire basis ( for 5 nos. jetty) tube choke starter wire etc. for the work complete from 04.01.2027 to 17.01.2027 = 14 days x 15 pts. |
| 20 | Temporary installation of panel board wooden plank including supply on hire basis salbollah wood plank etc. as per direction of E.I.C. |
| 21 | Drawing flood light point in new bus stand road PCC pole and tower from different feeder line as directed with fitting fixing of 400 watt twin type SON-T flood light fixture and lamp with control gear bulb etc. as required to complete the work on hire basis for the period from 01.01.2027 to 16.01.2027 = 16 days x 22 pts. |
| 22 | Temporary installation of controlling station with fittings 63 amps TPN 16 amp TPN main switch on wooden plank and salbollah on hire basis incl. elec. Connection complete as per direction of E.I.C. |
| 23 | Making electrical connection from WBSEDCL supply main switch board by supplying on hire basis 50 sq. mm x 3.5 core PVC Al. cable as per IE rules as per direction of E.I.C. including supply of all necessary materials reqd. before 01.01.2020 (average Distance from WBSEDCL supply main switch to departmental panel board is 50 mtrs) for four nos. station with proper earthing as per IE rules. |
| 24 | Replacement of 120 mm size digit 2023 in place of 2021 replacing only digit. Removal of existing letter with supply of red letters as per sample and other materials as directed. |
| 25 | Fitting fixing of glow sign board /signage board/vernacular board on salballah structures on hire basis at different places as per direction of EIC with all electrical connection including supply of all materials reqd. to Complete the work. |
| 26 | Maintenance of controlling station by engaging skilled operating staff for operation of controlling switch of different places as per direction of E.I.C. |
| 27 | Carrying charges of materials such as S.V. fixture, glow sign board, panel board etc. from Akshyanagar store to Kakdwip Lot No. 8 and back to store after completion of mela incl. loading & unloading. |
| 28 | Painting of control panel board & the electrical accessories by one coat of red oxide paint and two coats of approved & anti corrosive paint as per direction of the E.I.C. |
| 29 | PROVING BARRIER LIGHTING AT OLD AND NEW BUS STAND Drawing L.T. feeder and distribution line from medium pressure voltage by 3 Ph. 4 wire system as per IE rules and ISS rules by 16 sq mm. PVC single core wires on hire basis on salbollah post including supply of necy. Wire as per direction of E.I.C |
| 30 | Drawing barrier lighting from different distribution lines to different places on salbollah post with supply of 60 W colour lamp holders etc. on hire basis and other necessary materials required to complete the work from 10.01.2027 to 17.01.2027 = 8 days x 100 pts. |
| 31 | Repairing of L.T. panel board replacement of fuse grip, indicating lamp 63 amps main switch and fixing of the repaired accessories with all inter connection and testing complete as per direction of the E.I.C. |
| 32 | Petty repairing of glow sign board with supply of suitable size letter and fixing the same as per existing model including supplying 3 mm thick plastic sheet of reqd. to complete the work and painting complete. |
| 33 | LIGHTING OF NEW BUS STAND AREA THROUGH MS TUBULAR POLES Supply on hire basis of 9 m long pole and erecting by excavation of earth in any kind if soil at different places of new bus stand and jetty ghat area as per direction of E.I.C for the period from 01.01.2027 to 22.01.2027 |
| 34 | Supply on hire basis of 9 mtrs long steel pole and erecting by excavation of earth in any kind of soul at LCT as per direction of EIC from 01.01.2027 to 22.01.2027 |
| 35 | Drawing of flood light point at LCT jetty ghat with supply of following flood light fixture with lamp on hire basis with all other necessary materials required to complete the work. |
| 36 | 400 watt twin flood light fixture and son lamp with control gear complete from 01.01.2027 to 22.01.2027 = 22 days x 02 pts |
| 37 | 400 watt street light fixture on existing pole and son lamp with control gear complete from 01.01.2027 to 22.01.2027 = 22 days x 04 pts |
| 38 | 250 watt street light fixture on existing pole and son lamp with control gear complete from 01.01.2027 to 22.01.2027 = 22 days x 34 pts |
| 39 | Drawing barrier signal lighting on LCT jetty ghat with supply of 60 watt color lamp holder etc on hire basis and other necessary materials required to complete the work from 02.01.2027 to 22.01.2027 = 21 days x 180pts |
| 40 | Making earthing arrangement by supplying 5/8” dia earth spike of 2 mtr long with galvanized bolts nuts sand washer etc including supplying and fitting fixing 8 nos SWG GI wire and restoration of the surface duly rammed as per direction and inter connection earth spike to continuous running earth on the top of the PCC pole |
| 41 | LIGHTING ARRANGEMENT IN BETWEEN NUTAN RUSTA TO LCT JETTY GHAT Drawing street light point on existing PCC pole by 250Watt SV lamp, ballast, fixture, wire etc and including all other accessories for complete the work on hire basis from 01-01-2027 to 17-01-2027 = 17days x 110 pts |
| 42 | Supply and delivery at site the special type arm bracket made with 40mm dia GI pipe 2 Mtr long for street light fixture 250 watt SV lamp including MS collar weld at neck of the bracket making 600 bend at the top portion including painting by red oxide paints as per direction of EIC. |
| 43 | Supply, delivery and fixing of suitable size pole clamp as per direction of EIC. |
| 44 | Drawing of overhead line in vertical configuration of medium pressure line by ACSR including supplying binding wire for jumper and insulator and safety device etc. in different places as per ISS and IE rules as per direction of EIC (ACSR conductor will be supplied by the Department) |
| 45 | Fixing of special type arm bracket in PCC pole by supplying necessary fittings all complete |
| 46 | ILLUMINATION OF EXTENDED PORTION OF MAIN CONCRETE JETTY GHAT NO. 1 Drawing of flood light points for permanent jetty ghat and other place as directed on supply on hire basis 400 watt sodium flood light fixture- 1no, control gear box and SV lamp etc and complete the work from 01-01-2027 to 17-01-2027 =17 days x 12 pts |
| 47 | Drawing of the flood light point for main entrance of the jetty fixing on MS joist as per direction of EIC. Supply on hire basis 400 watt twin type flood light fixture and 2 nos SON lamp with control gear box complete from 04-01-2027 to 17-01-2027 = 14 days x 4pts |
| 48 | Drawing of 250watt street light fixture in different place of permanent jetty ghat on hire basis of 250watt S.V. fixture ballast, 250watt S.V. lamp from 04-01-2027 to 17-01-2027 = 14 days x 15pts |
| 49 | Supply on hire basis of 9mtr long MS pole and erection and fitting fixing on the jetty bridge as per direction of EIC for the period from 04-01-2027 to 17-01-2027 |
| 50 | Supply and delivery at site D type iron clamp set galvanized with necessary GI nuts and washer size 3 ½ “ x 5” dia |
| 51 | Supply and delivery at site of porcelain shackle insulator size 75mm x 88mm |
| 52 | Fitting fixing of D type iron clamp, Parceling shackles and pole clamp in the MS pole after completion of the erection work |
| 53 | Drawing LT feeder and distribution line from medium pressure voltage 3 phase 4-wire system by 25sq.mm. PVC single core aluminum wire on hire basis |
| 54 | Making earthing arrangement by supplying 5/8” dia earth spike of 2 mtr long with galvanized bolts nuts sand washer etc including supplying and fitting fixing 8 nos SWG GI wire and restoration of the surface duly rammed as per direction and inter connection earth spike to continuous running earth on the top of the PCC pole |
| 55 | ILLUMINATION OF JETTY GHAT NO 2 Drawing of flood light points for jetty ghat no. 2 and other place as directed on supply on hire basis 400 watt sodium flood light fixture- 1no, control gear box and SV lamp etc to complete the work from 02-01-2025 to 17-01-2025 =16 days x 16 pts |
| 56 | Drawing of the flood light point for main entrance of the jetty fixing on MS joist as per direction of EIC. Supply on hire basis 400 watt twin type flood light fixture and 2 nos SON lamp with control gear box complete from 01-01-2027 to 17-01-2027 = 17 days x 8pts |
| 57 | Drawing of 250watt street light fixture in different place of jetty no. 2 on hire basis of 250watt S.V. fixture ballast, 250watt S.V. lamp from 01-01-2027 to 17-01-2027 = 17 days x 30pts |
| 58 | Supply on hire basis of 9mtr long MS pole and erection and fitting fixing on the jetty bridge as per direction of EIC for the period from 01-01-2027 to 17-01-2027 |
| 59 | Supply and delivery at site D type iron clamp set galvanized with necessary GI nuts and washer size 3 ½ “ x 5” dia |
| 60 | Supply and delivery at site of porcelain shackle insulator size 75mm x 88mm |
| 61 | Supply and delivery at site the special type arm bracket made with 40mm dia GI pipe x 2 mtr long for light fixture 250watt SV lamp including MS collar welded at neck of the bracket including painting by red oxide paint as per direction |
| 62 | Fitting fixing of D type iron clamp, Parceling shackles and pole clamp in the MS pole after completion of the erection work |
| 63 | Drawing LT feeder and distribution line from medium pressure voltage 3-phase 4-wire system by 25 sq. mm. PVC single core aluminum wire on hire bsis |
| 64 | Making earthing arrangement by supplying 5/8” dia earth spike of 2 mtr long with galvanized bolts nuts sand washer etc including supplying and fitting fixing 8 nos SWG GI wire and restoration of the surface duly rammed as per direction and inter connection earth spike to continuous running earth on the top of the PCC pole |
| 65 | ILLUMINATION OF JETTY NO. 3 Drawing flood light points from different place of new jetty Ghat and other places as per direction on supply on hire basis 400 watt sodium fixture, 1no control gear box and S.V. lamp etc complete the work from 01-01-2027 to 17-01-2027 = 17 days x 14 nos |
| 66 | Drawing flood light points for main entrance of the jetty and approach road as per direction of EIC. Supply on hire basis 400 watt twin type flood light fixture and 2nos SON lamp with control gear box complete from 01-01-2027 to 17-01-2027 = 17 days x 4 pts |
| 67 | Drawing tube light point from different distribution and feeder line on suitable place at jetty with supply on hire basis 40 watt tube light, choke complete the work from 04-01-2027 to 17-01-2027 = 14 days x 60pts |
| 68 | Drawing of 250 watt street light in different places of new jetty ghat river bank road and approach road, hardwood point and other place on hire basis of 250 watt SV fixture, ballast, 250wattt SV lamp from 01-01-2027 to 17-01-2027 = 17 days x 40 pts [for Jetty No.3 – 25 Nos and bypass road-15nos] |
| 69 | Supply on hire basis of 9 mtr long MS pole and erection on the jetty bridge, river bank to hardwood point , approach road as per direction of EIC for the period from 02-01-2027 to 17-01-2027 |
| 70 | Supply and delivery at site D type iron clamp set galvanized coating with necessary GI nuts and washer size 3 ½ “ x 5” |
| 71 | Supply and delivery at site of porcelain shackle insulator size 75mm x 88mm |
| 72 | Supply & delivery at site 25 sq. mm. 660/1200 volt grade singe core PVC insulated aluminum cable |
| 73 | Fitting fixing of D type iron clamp, porcelain shackles and MS clamp in the MS pole after complete erecting work |
| 74 | Drawing and distribution line from medium pressure voltage 3 Ph 4 wire system by 25 sq.mm PVC single core aluminum cable |
| 75 | Making earthing arrangement by supplying ⅝” dia earth spike of 2 mtr long with galvanized bolts and nits and washer etc including supplying and fitting riding 8 nos SWG GI wire and restoration of the surface duly rammed as per direction and inter connection earth spike to continuous running earth on the top of the PCC pole |
| 76 | Making jetty light Ghat signal light with color and LED lamp dimmer and fixing on pole and front side of the jetty to complete the job |
| 77 | ILLUMINATION OF APPROACH ROAD BETWEEN HARDWOOD POINT TO RIVER BANK Supply on hire basis of 9 mtr long steel tubular pole and erection complete at approach road for Hardwood Point near bus stand |
| 78 | Drawing of 250 watt street light fixture in different place of approach road on hire basis of 250 watt SV fixture ballast, 250 watt SON-T lamp from 04-01-2027 to 17-01-2027 = 14 days x 23 pts |
| 79 | Drawing of 250 watt street light fixture in approach road near hardwood point jetty ghat on hire basis of 250 watt SV fixture ballast, 250 watt SON-T lamp from 04-01-2027 to 17-01-2027 = 14 days x 15 pts |
| 80 | Drawing flood light point of approach road near hardwood point bus stand on hire basis of 400 watt twin type flood light fixture and SON lamp with control gear complete from 04-01-2027 to 17-01-2027 = 14 days x 7 pts |
| 81 | Making earthing arrangement by supplying 5/8” dia earth spike of 2 mtr long with galvanized bolts nuts sand washer etc including supplying and fitting fixing 8 nos SWG GI wire and restoration of the surface duly rammed as per direction and inter connection earth spike to continuous running earth on the top of the PCC pole |
| 82 | ILLUMINATION OF JETTY NO.4 AND OTHER ALLIED WORKS Drawing of flood light points from different place of new jetty ghat and other places as per direction on supply on hire basis 400 watt sodium flood fixture 1 no control gear box and SV lamp etc complete the work from 01-01-2027 to 17-01-2027 = 17 days x 20 pts |
| 83 | Drawing flood light point for main entrance of the jetty and approach roads fixing on MS joint as per direction of EIC. Supply on hire basis 400 watt twin type flood light fixture and 2 nos SON lamp with control gear box complete from 01-01-2027 to 17-01-2027 = 17 days x 16pts |
| 84 | Drawing of 250 watt street light fixture in different places of new jetty ghat river bank road and approach road, hardwood point and other place on hire basis of 250- watt SV fixture, ballast 250 watt SV lamp from 02-01-2027 to 17-01-2027 = 16 days x55 pts |
| 85 | Drawing of metal flood light point on different places as per direction of EIC of 400 watt metal fixture, lamp control gear etc to complete the jobs from 01-01-2027 to 17-01-2027 =17 days x 12pts |
| 86 | Supply on hire basis of 9 mtr long MS pole and erection on the jetty bridge, river bank to hardwood points approach road as per direction of EIC for the period from 01-01-2027 to 17-01-2027 |
| 87 | Supply and delivery at site D type iron clamp set galvanized coating with necessary GI nuts and washer size 3 ½ “ x 5” |
| 88 | Supply and delivery at site of porcelain shackle insulator size 75mm x 88mm |
| 89 | Supply and delivery at site 25 sq.mm. 660/1200 volt grade single core PVC insulated aluminum cable |
| 90 | Fitting fixing of D type iron clamp, porcelain shackles and MS clamp in the MS pole after complete of the erection work |
| 91 | Drawing and distribution line from medium pressure voltage 3 Ph 4 wire system by 25sq.mm. PVC single core aluminum cable on hire basis |
| 92 | Making earthing arrangement by supplying 5/8” dia earth spike of 2 mtr long with galvanized bolts nuts sand washer etc including supplying and fitting fixing 8 nos SWG GI wire and restoration of the surface duly rammed as per direction and inter connection earth spike to continuous running earth on the top of the PCC pole |
| 93 | JETTY NO. 5 WITH SURROUNDING AREAS Drawing of flood light points for jetty Ghat No.5 and other place as directed on supply on hire basis 400 watt sodium flood light fixture-1 No, control gear box and SV lamp etc and complete the work from 01-01-2027 to 17-01-2027= 17 days x 16pts. |
| 94 | Drawing of the flood light point for main entrance of the jetty fixing on MS joint as per direction of EIC. Supply on hire basis 400 watt twin type flood light fixture and 2 nos SON lamp with control gear box complete from 01-01-2027 to 17-01-2027 =17days x 15 pts. |
| 95 | Drawing of 250 watt street light fixture in different place of jetty ghat no5 on hire basis of 250 watt S.V fixture ballast,250 watt S.V. lamp from 01-01-2027 to 17-01-2027= 17 days x 45 pts. |
| 96 | Supply & drawing of distribution line for medium pressure voltage, 3Phase 4 wire system by 25sq.mm single core PVC insulated wire on hire basis including dismantling the same after completion the work. |
| 97 | Supply on hire basis of 9 mtr. Long MS pole and erection and fitting fixing on the jetty bridge as per direction of EIC for the period from 01-01-2027 to 17-01-2027 |
| 98 | Supply and delivery at site D. type iron clamp set galvanized with necessary GI nuts and washer size 31/2'' x 5'' dia. |
| 99 | Supply and delivery at site of porcelain shackle insulator size 75mm x 88mm. |
| 100 | Fitting fixing of D type iron clamp, porcelain shackles and pole clamp in the MS pole after completion of the erection work. |
| 101 | Making earthing arrangement by supplying 5/8'' dia earth spike of 2 mtr long with galvanized bolts nuts sand washer etc including supplying and fitting fixing 8 nos SWG GI wire and restoration of the surface duly rammed as per direction and inter connection earth spike to continuous running earth on the top of the PCC pole. |
| 102 | Guarding charge of the whole installation. |
| 103 | Installation of the departmentally supplied LED board on the top of the jetty No. 5 with proper positioning including supply of 7/20 PVC insulated single core aluminium cable approx. length 20 mtr. Including connection and clamping arrangement complete. |
| 104 | Fitting fixing of light boxes with three sides open with red and green light for signaling for vessel availability in jetty ghat No. 5. |
| 105 | GROUP-A Shifting and carrying charges of the above PCC poles at different places by hire basis van and manual labour including loading and unloading complete |
| 106 | Erection of the above PCC poles by excavation of earth depth up to 2 mtrs from ground level and filling with jhama bricks and excavated soil s per requirement to compete the job |
| 107 | Drawing of ACSR conductor with illumination arrangement and drawing of overhead line in vertical configuration of medium pressure line by ACSR including supplying binding wire from jumper and insulator and safety device etc in different places as per ISS & IE rules and also as per direction of EIC [ACSR conductor will be supplied by the Department] |
| 108 | Supply and drawing of continuous wire for earthing from end pole to receive pole by supplying 12 SWG GI wire with all necessary materials and earth clamp complete as per direction of the EIC |
| 109 | Supply and delivery at site D type iron clamp set galvanized with necessary GI nuts bolts and washer size 3.5” x 5” dia including loading unloading and carrying charges complete as per direction of the EIC |
| 110 | Supply and delivery of porcelain shackle insulator size 75mm x 88mm |
| 111 | Supply fitting fixing of hexagonal type safety device by making 12 SWG GI wire for LTOH line as per direction of the EIC |
| 112 | Fitting fixing of D type iron clamp and pole clamp in the PCC pole after completion and erection as per IE rules |
| 113 | Making earthing arrangement by supplying 5/8” dia earth spike of 2 mtr long with galvanized bolts nuts sand washer etc including supplying and fitting fixing 8 nos SWG GI wire and restoration of the surface duly rammed as per direction and inter connection earth spike to continuous running earth on the top of the PCC pole |
| 114 | Making stay arrangement by 7/18 SWG GI stay wire including supply of necessary materials which will be required stone chips, cement, sand, stay rod anchor plate for stay complete as per IE rules & ISS |
| 115 | Drawing of 250 watt street light fixture in extension road from Hardwood Point Launch Ghat on hire basis of 250 watt SV fixture ballast, 250 watt SON-T lamp from 05-01-2027 to 17-01-2027 = 13 days x 20 pts |
| 116 | Painting with decorative cement basis paint of approved quality after scraping the above pole surface thoroughly in different area as per direction of the EIC |
| 117 | Painting with ready mix black Japan paint up to 0.5mtr from ground level as per direction with proper numbering |
| 118 | Painting of D type iron clamp, arm bracket, pole clamp by two coats complete. |
| 119 | Dismantling of ACSR conductor and earth wire from end pole after disconnection of al. jointing materials i.e. jumper insulator, safety device, binding from the PCC pole in different places at new bus stand and old bus stand as per direction of EIC after completion of mela works |
| 120 | Withdrawing the 8 mtrs PCC poles by excavation of the and lifting the poles carefully and stacking the pole at site store |
| 121 | Supply on hire basis of 15amps plug socket and plug with wooden board and fixing of the different palaces i.e. police line, police barrack, hospital, movement office etc including supply of power cable and connection complete |
| 122 | GROUP-B RENEWING EARTHING ARRANGEMENT AND MAKING STARY ARRANGEMENT FOR THE EXISTING PCC POLE AT LOT NO.8 NEW BUS STAND Making earthing arrangement by supplying 5/8” dia Earth spike of 2 mtr long with galvanized bolts nuts and washer etc. including supplying and fitting fixing 8 nos SWG GI wire and restoration of the surface duly rammed as per direction and inter connection earth spike to continuous running earth on the top of the PCC pole |
| 123 | Making the stay arrangement by 7/18 SWG std stay wire including supply of necessary materials which will be required stone chips, cement, sand, stay rod, anchor plate for stay complete as per IE rules |
| 124 | Carrying charges of fixed type High Mast including control panel, cable, luminaries etc. from Akshaynagar store to site i.e. Harwood point more and near LCT Jetty by hiring of car and all other necessary arrangement as per requirement |
| 125 | Installation the High Mast pole with fitting fixing of the luminaries (9 Nos.) on the lighting tower and laying of the PVC insulated Aluminium Armoured cable with all interconnection complete with testing of the same as per direction of the EIC. |
| 126 | Carrying back the fixed type High Mast including control panel, cable, luminaries etc. to PHE store after dismantling the luminaries, accessories, cable etc. at Akshaynagar Store by hiring of car and all other necessary arrangement after completion of Mela |
| 127 | Guarding arrangement of the whole installation round the clock as per direction of the EIC |
| 128 | GROUP-CProviding power supply at Lot No.8 guest house [Mohana Bungalow] Guarding of the while installation at LOT No. 8, Kashinagar, Kakdwip Road, Old and new bus stand, Jetty Ghats etc. by engaging labour as per direction from 04-01-2027 to 17-01-2027 |
| 129 | Restrengthening of existing poles in different places after disconnecting the stay etc. at main bus stand (New) and connecting the stay as directed |
| 130 | Earth filling to the level of existing pole and packing of brickbats by supplying required quantity of bats after earth cutting of the pole base and the PCC pole in original position complete by providing stay wire & other materials as per direction of the E.I.C. |
| 131 | Replacement of GI bolts nuts & washers D type iron clamp shackle insulator etc. of the above works as per requirement complete of all works as per direction of the E.I.C. including supply of all materials. |
| 132 | GROUP-D[Drawing of ACSR in LT distribution line at new & old bus stand] Drawing of overhead line in vertical configuration for medium pressure line A.C.S.R including supplying of wire for jumper & insulator and safety device etc. in different places complete as per I.E. Rules (A.C.S.R. conductor shall by supplied by deptt.) |
| 133 | Supply & drawing of continuous earth wire from end pole to receive pole by supplying 12 S.W.G G.I. wire with all new materials and earth clamp complete as per direction of E.I.C. |
| 134 | Dismantling of A.C.S.R conductor and earth from end pole after disconnection all jointing materials i.e. jumper including safety device binding from P.C.C. pole in different places of the New Bus Stand as per direction of E.I.C. after completion of Mela – 2027 |
| 135 | Painting with decorative cement base of approved quality after scrapping the pole surface thoroughly in different areas as per direction of E.I.C. |
| 136 | Painting with ready mix Black Japan paint up to 0.5 mtr. G.L. as per direction with proper numbering. |
| 137 | Painting of ‘D’ type iron clamps and pole clamp etc. after scrapping the surface with two coats of red oxide paint. |
| 138 | CarryinCharges of over head materials i.e. A.C.S.R. clamp from Akshyanagar to Lot No. 8 & back to Akshyanagar store after mela including loading and unloading |
| 139 | Drawing of 25 sq. mm and 50sq.mm. x 3.5 core PVC Ar. Al cable in different distribution of L.T. panel board from the panel board of WBSEDCL [cable will be supplied by the department] |
| 140 | Drawing of the flood light points at New Bus Stand & Old Bus Stand from different distribution line to P.C.C. pole as directed with supply of following flood light fixture with lamp on hire basis with all other necessary materials reqd. to complete the work for the period from 03.01.2027 to 16.01.2027 = 12 days. |
| 141 | 400-watt twin type flood light fixture and son lamp with control Gear complete 14 days x 94 pts. |
| 142 | 400-watt street light fixtures and son lamp with control gear Complete 14 days x 54 pts. |
| 143 | GROUP-B ERECTION OF PCC POLES AND DRAWING OF ACSR CONDUCTOR WITH ILLUMINATION ARRANGEMENT AT RIVER BANK AND APPROACH ROAD BEHIND BHARAT SEVASRAM SANGHA Drawing of ACSR conductor with illumination arrangement and Drawing of overhead line in vertical configuration of medium pressure line by ACSR incl. supplying binding wire from jumper and insulator and safety device etc in different places as per ISS and IE rules and also as per direction of EIC (ACSR. conductor will be supplied by the Department) |
| 144 | Supply and drawing of continuous wire for earthing from end pole to receive pole by supplying 10 SWG GI wire with all necy. Materials and earth clamp complete as per direction of EIC. |
| 145 | Supply and delivery at site of D type iron clamp set galvanized with necessary GI nuts and bolts washer size 3.5” x 5” dia incl. loading unloading and carrying complete as per direction of EIC |
| 146 | Supply and delivery of porcelain shackle insulator size 75mm x 88mm including loading unloading and carrying complete as per direction of EIC |
| 147 | Supply and delivery at site of suitable poles clamp for existing PCC pole with iron angle fitting complete for 3 Ph 4 wire overheads lines as per ISS and IE rules incl. loading and unloading and carrying complete as per direction of EIC i) Size of angle=50mmx50mmx6mm thick. ii) Size of shackle strip=61mmx25mm |
| 148 | Supply and delivery at site the special Type arm bracket made with 40mm dia pipe x 2 mtr long for street light fixture 400watt SV lamp including MS collar weld at the neck of the bracket 60o bend at the top portion incl. painting by red oxide paints as per direction of EIC. |
| 149 | Supply and delivery at site of special type MS clamp as per sample by MS patty as required length incl. necy. Nuts, bolts and washer with painting red lead paint of approved make. |
| 150 | Supply fitting fixing of hexagonal type safety device by making 10 SWG GI wire for LTOH line as per direction of EIC |
| 151 | Fitting fixing of D type iron clamp and pole clamp in the PCC pole after completion and erection as per IE rules |
| 152 | Making earthing arrangement by supplying 5/8” dia earth spike of 2 mtr long with galvanized bolts nuts sand washer etc including supplying and fitting fixing 8 nos SWG GI wire and restoration of the surface duly rammed as per direction and inter connection earth spike to continuous running earth on the top of the PCC pole |
| 153 | Making the stay arrangement by 7/8SWG GI std stay wire incl. supply of necessary materials which will be required stone chips, cement, sand, stay rod anchor plate for stay complete as per IE rules and ISS |
| 154 | Drawing the flood light points of new bus stand from different distribution line to PCC pole as directed with supply of 250watt street light fixture with lamp on hire basis with all other necessary materials required to complete the work for the period from 05.01.2027 to 17.1.2027 = 13 days x 20 Nos |
| 155 | Painting with decorative cement basis paint of approved quality after scraping the above pole surface thoroughly in different area as per direction of EIC. |
| 156 | Painting with ready mix black Japan paint upto 0.5mtr above GL as per direction with proper numbering |
| 157 | Painting of D type iron clamp and poles etc after scraping the surface with two coats |
| 158 | Dismantling of ACSR conductor and earth wire from end pole after disconnection all jointing materials i.e. jumper insulator safety device binding from the PCC pole in different places at new bus stand and old bus stand as per direction of EIC after completion of mela works |
| 159 | Supply on hire basis 4.88 mtr long and 0.10 mtr dia (av.) bottom and 0.50 mtr (av.) top salbollah post and erecting the same as per direction of EIC |
| 160 | Supply on hire basis of 9 mtr long MS pole and erection and fitting fixing the same as per direction of the EIC for the period from 05-01-2027 to 17-01-2027 = 13 days |
| 161 | Supply and delivery at site the special type arm bracket made with 40mm dia GI pipe x 2 mtrs long for light fixture 250 watt SV lamp including 600 bend long at the top position including painting by red oxide paint as per direction |
| 162 | Drawing LT feeder and distribution line from medium pressure voltage 3 Ph 4 wire system by 25 sq.mm PVC single core aluminum wire on hire basis |
| 163 | Drawing tube light point on the salbollah post with supply on hire basis 40watt tube light choke starter and all other necessary materials to complete the work from 07.01.2027 to 17.01.2027 = 11 days x 60 pts |
| 164 | Drawing of flood light points for other places as directed on supply on hire basis 400 watt sodium flood light fixture 1no control gear box and SV lamp etc to complete the work from 05-01-2027 to 17-01-2027 = 13 days x 2pts. |
| 165 | Drawing halogen light point on the PCC pole, salbollah from generating station with supply on hire basis 1000watt halogen lamp fixture from 05.01.2027 to 17.01.2027 = 13 days x 8 pts |
| 166 | Drawing of 400 watt twin type flood light fixture and SON lamp with control gear complete from 05.01.2027 to 17.01.2027 = 13 days x 10 pts |
| 167 | Drawing of 250watt street light fixture on hire basis of 250 watt SV fixture ballast 250 watt SV lamp from 05-01-2027 to 17-01-2027 = 13 days x 5pts |
| 168 | Drawing of the flood light point including supply on hire basis 400 watt twin type flood light fixture and 2 nos SON lamp with control gear box complete from 05-01-2027 to 17-01-2027 = 13 days x 1 pt. |
| 169 | Temporary installation of controlling station with 16amps TPN main switch on wooden plank and salbollah on hire basis including electrical connection complete as per direction of EIC. |
| 170 | Fitting fixing of glow sign board on salballah structure on hire basis at different places as per direction of EIC with all electrical connection including supply of all materials required to complete the work (glow sign board will be supplied by the department) |
| 171 | Guarding the whole installation by engaging experienced labour as per direction of EIC in three shifts from 05.01.2027 to 17.01.2027 |
| 172 | Taking out the whole installation of the above item as per direction of EIC. |
| 173 | lighting arrangement including supplying and fitting fixing of LED board |
| 174 | Old Bus Stand (Internal illumination for Police Camps) |
| 175 | Supply on hire basis of 9 mtr long MS pole and erection on the police camp old Bus Stand area as per direction of EIC. |
| 176 | For the Period From – 04/01/2026 to 17/01/2026 |
| 177 | Drawing of flood light point at Police camp old bus stand area of the following flood light fixture with lamp on hire basis with all others necessary materials required to complete the work. |
| 178 | 400 Watt street light fixture on existing pole and Son lamp with control gear complete |
| 179 | from 04/01/2026 to 17/01/2026 = 14 days. |
| 180 | 14 days X 20 Pts. |
| 181 | Supply and delivery at site 25 sq mm 660/1200 Volt grade single care Pvc insulated aluminum cable. |
| 182 | Fitting fixing of ‘D’ type iron clamp porcelain shackles and MS clamp in the MS pole after complete of the erection work. |
| 183 | Drawing and distribution line from medium pressure voltage 3 Ph 4 wire system by 25 sq mm Pvc single core aluminum cable on hire basis. |
| 184 | Making earting arrangement by supplying 5/8” dia earth spike of 2 mtr long with galvanized bolts nuts washer etc including supply and fitting fixing 8 Nos. SWG GI wire and restoration of the surface duly rammed as per direction and interconnection earth spike to continuous running earth on the top of the PCC pole. |
| 185 | Bharat Sevashram Sangha Maidan |
| 186 | Supply on hire basis of 9 mtr long MS pole and erection on the Bharat sevashram sangha area as per direction of EIC. |
| 187 | For the Period From – 04/01/2026 to 17/01/2026 |
| 188 | Drawing of flood light point at Bharat Sevashram Sangha area of the following flood light fixture with lamp on hire basis with all others necessary materials required to complete the work. |
| 189 | 400 Watt street light fixture on existing pole and Son lamp with control gear complete |
| 190 | from 04/01/2026 to 17/01/2026 = 14 days. |
| 191 | 14 days X 20 Pts. |
| 192 | Supply and delivery at site 25 sq mm 660/1200 Volt grade single core Pvc insulated aluminum cable. |
| 193 | Fitting fixing of ‘D’ type iron clamp porcelain shackles and MS clamp in the MS pole after complete of the erection work. |
| 194 | Drawing and distribution line from medium pressure voltage 3 Ph 4 wire system by 25 sq mm Pvc single core aluminum cable on hire basis. |
| 195 | Making earting arrangement by supplying 5/8” dia earth spike of 2 mtr long with galvanized bolts nuts washer etc including supply and fitting fixing 8 Nos. SWG GI wire and restoration of the surface duly rammed as per direction and interconnection earth spike to continuous running earth on the top of the PCC pole |
| 196 | WBSTC Stand |
| 197 | Supply on hire basis of 9 mtr long MS pole and erection on the Bhutal PAribhan mat area as per direction of EIC. |
| 198 | For the Period From – 04/01/2026 to 17/01/2026 |
| 199 | Drawing of flood light point at Bhutal PAribhan mat area of the following flood light fixture with lamp on hire basis with all others necessary materials required to complete the work. |
| 200 | 400 Watt street light fixture on existing pole and Son lamp with control gear complete |
| 201 | From 04/01/2026 to 17/01/2026 = 14 days. |
| 202 | 14 days X 20 Pts. |
| 203 | Supply and delivery at site 25 sq mm 660/1200 Volt grade single care Pvc insulated aluminum cable. |
| 204 | Fitting fixing of ‘D’ type iron clamp porcelain shackles and MS clamp in the MS pole after complete of the erection work. |
| 205 | Drawing and distribution line from medium pressure voltage 3 Ph 4 wire system by 25 sq mm Pvc single core aluminum cable on hire basis. |
| 206 | Making earting arrangement by supplying 5/8” dia earth spike of 2 mtr long with galvanized bolts nuts washer etc including supply and fitting fixing 8 Nos. SWG GI wire and restoration of the surface duly rammed as per direction and interconnection earth spike to continuous running earth on the top of the PCC pole. |
| 207 | WBSTC Stand |
| 208 | Supply on hire basis of 9 mtr long MS pole and erection on the Bhutal PAribhan mat area as per direction of EIC. |
| 209 | For the Period From – 04/01/2026 to 17/01/2026 |
| 210 | Drawing of flood light point at Bhutal PAribhan mat area of the following flood light fixture with lamp on hire basis with all others necessary materials required to complete the work. |
| 211 | 400 Watt street light fixture on existing pole and Son lamp with control gear complete |
| 212 | From 04/01/2026 to 17/01/2026 = 14 days. |
| 213 | 14 days X 20 Pts. |
| 214 | Supply and delivery at site 25 sq mm 660/1200 Volt grade single care Pvc insulated aluminum cable. |
| 215 | Fitting fixing of ‘D’ type iron clamp porcelain shackles and MS clamp in the MS pole after complete of the erection work. |
| 216 | Drawing and distribution line from medium pressure voltage 3 Ph 4 wire system by 25 sq mm Pvc single core aluminum cable on hire basis. |
| 217 | Making earting arrangement by supplying 5/8” dia earth spike of 2 mtr long with galvanized bolts nuts washer etc including supply and fitting fixing 8 Nos. SWG GI wire and restoration of the surface duly rammed as per direction and interconnection earth spike to continuous running earth on the top of the PCC pole. |
| 218 | Miscellaneous |
| 219 | Supply and delivery of different size main switch at different area of Lot No.-8 in connection with Ganga Sagar Mela – 2026. |
| 220 | Supply and fitting fixing of 100 Amp 415 Volt Rewireable type TPN main switch. Make : Havells / any others approved make (Lot No.8) |
| 221 | Supply and fitting fixing of 63 Amp 415 Volt Rewireable type TPN main switch. Make : Havells / any others approved make (Lot No.8) |
| 222 | Supply and fitting fixing of 32 Amp 415 Volt rewireable type TPN main switch. Make : Havells / any others approved make (Lot No.8) |
| 223 | Supply of 35 sq mm X 3.5 core XLPE insulated 1.1 KV grade PVC insulated Al. Ar. Cable as per latest IS space. Make : Any approved vender of PHED (Location Lot No. 8 & Kakdwip) |
| 224 | Drawing of the above 35 sq mm X 3 ½ Core Pvc insulated 1.1 Kv grade Al. Ar. Cable for power connection of Battala Panel Board to New Jatri Nibas tents by supplying on hire basis and necessary sal ballah on hire basis including binding wire the same as per direction of EIC. |
| 225 | Supply and Hire basis of 4 sq mm 1.1 KV single core Pvc insulated and sheathed standed aluminium cable (For CCTV Camera at different point of Lot No.-8). |
| 226 | 100 Amp HRC Fuse type FN-100 (Make – L&T) 15 Nos. Panel X 6 Nos. |
| 227 | BUS STAND |
| 228 | Supply & delivery including design and manufacturing with 2.5” x1.5” 1.5 mm aluminum glazing tube for frem acp blue color jali cutting for air passing and selicon pasting by alumenum frem on improted 3mm mail femail acrylic letter inside 1.5 watt led modules |
| 229 | Fitting. complete letter fitting with acp. 12volt 1.5 watt led modules connect to 700 watt rainproof led power supply. |
| 230 | BUS STAND BOARD SIZE – 6” X 4’ – 24 sft X 2 Nos. |
| 231 | LETTER SIZE - 16” HIGHT X 16 Nos. |
| 232 | BUS SIZE – 48” HIGHT X 2 Nos. |
| 233 | IN OUT BOARD SIZE – 2’ X 2 – 4 sft X 4 Nos. |
| 234 | LETTER SIZE - 18” X 10 Nos. |
| 235 | JETTY GHAT (1-5) |
| 236 | supply & delivery including design and manufacturing with 2.5”x1.5” 1.5 mm aluminum glazing tube for frem acp blue color jali cutting for air passing and selicon pasting by alumenum frem on improted 3mm mail femail acrylic letter inside 1.5 watt led modules fitting. complete letter fitting with acp. 12volt 1.5 watt led modules connect to 700 watt rainproof led power supply |
| 237 | BOARD SIZE – 6’ X 4’ – 24 sft X 5 Nos. |
| 238 | LETTER SIZE - 60” X 5 Nos. – 300 Inch |
| 239 | JETTY GHAT ENTRY (5 X 2 – 10 PCS) |
| 240 | Supply & delivery including design and manufacturing with 2.5” x 1.5” 1.5 mm aluminum glazing tube for frem acp blue color jali cutting for air passing and selicon pasting by alumenum frem on improted 3mm mail femail acrylic letter inside 1.5 watt led modules |
| 241 | Fitting. complete letter fitting with acp. 12volt 1.5 watt led modules connect to 700 watt rainproof led power supply. |
| 242 | BOARD SIZE – 6’ X 4’ – 24 sft X 10 Nos. |
| 243 | BIG LETTER - 41” X 10 – 410” |
| 244 | SHORT - 14” X 50 – 700” |
| 245 | L.C.T. JETTY |
| 246 | Supply & delivery including design and manufacturing with 2.5” x 1.5” 1.5 mm aluminum glazing tube for frem acp blue color jali cutting for air passing and selicon pasting by alumenum frem on improted 3mm mail femail acrylic letter inside 1.5 watt led modules fitting. complete letter fitting with acp. 12volt 1.5 watt led modules connect to 700 watt rainproof led power supply. |
| 247 | BOARD SIZE – 6’ X 4’ – 24 Sft. X 1 Nos. |
| 248 | LETTER SIZE – 16” X 8 Nos. – 128” |
| 249 | Dot – 5” X 3 Nos. – 15” |
| 250 | P.H.E.D. – 10 + 2 =12 PCS |
| 251 | Supply & delivery including design and manufacturing with 2.5” x1.5” 1.5 mm aluminum glazing tube for frem acp blue color jali cutting for air passing and selicon pasting by alumenum frem on improted 3mm mail femail acrylic letter inside 1.5 watt led modules fitting. complete letter fitting with acp. 12volt 1.5 watt led modules connect to 700 watt rainproof led power supply. |
| 252 | BOARD SIZE – 6’ X 3’ – 18 Sft. X 10 Nos. (LANDSCAPE) |
| 253 | BIG LETTER – 12” X 40 Nos. – 480” |
| 254 | SHORT – 5” X 80 Nos. – 400” |
| 255 | BOARD SIZE – 6’ X 2’ – 12 Sft. X 2 Nos. (PORTRAIT) |
| 256 | LETTER – 13” X 8 Nos. |
| 257 | WELCOME BOARD |
| 258 | supply & delivery including design and manufacturing with 2.5” x1.5” 1.5 mm aluminum glazing tube for frem acp blue color jali cutting for air passing and selicon pasting by alumenum frem on improted 3mm mail femail acrylic letter inside 1.5 watt led modules |
| 259 | fitting. complete letter fitting with acp. 12volt 1.5 watt led modules connect to 700 watt rainproof led power supply. |
| 260 | BOARD SIZE – 8’ X 2’ – 16 Sft. X 2 Nos. |
| 261 | LETTER SIZE 13” X 14 Nos. – 182” |
| 262 | Pumping Machinery & allied accessories |
| 263 | Cora submersible pumping machinery directly coupled with suitable wet winding type submersible motor with 3 mtr. suitable cable having the following specification:-Discharge-70 LPMTotal head-45 MWCOutlet Size-40 mmImpeller - NorylShaft-S.S.Motor - Single Phase 50 Hz ± 5% Standard Voltage of 230 Volt + 10% wet winding type submersible motor, RPM-2850/2900, Mode of Starting -DOL, Motor Rating-1 HPMake-Any approved make.(Manufacturer's test certificate along with curve chart should be submitted at the time of delivery) |
| 264 | Panel Board with fitting fixing of Ammeter, voltmeter, indicating lamp ON / OFF Push button Switch with Internal wiring complete. |
| 265 | FASD Starter with Panel having following specifications :- |
| 266 | Overload relay range - 13.2-20A |
| 267 | Contactor type - NON |
| 268 | Contactor rating - 25 Amp |
| 269 | Protection including phase failure, phase imbalance & phase Reversal, Short circuit protection through MCB. |
| 270 | Ammeter & voltmeter of suitable rating |
| 271 | On/Off and Trip Indicator |
| 272 | Power coated enclosure with PU gasket ensuring excellent finish and reliability. |
| 273 | Provisiona for connecting dry run preventor. |
| 274 | [Make-BCH (Cat No-CPSDPYLN) / Equivalent type of any other approved make] |
| 275 | 1.5 sq.mm 3 core 1.1 KV grade flat waterproof copper Submersible Cable (Make-Approved Make). |
| 276 | Illumination arrangement of cottage Bunglow Muriganga Bunglow, extended portion of Back side of New Bus stand ( Kalabagan), 15 Nos school and repairing of High mast etc. at Lot-8, Kakdwip |
| 277 | Supply and delivery of the materials at site on hire basis as per requirement to complete temporary illumination work (for Beautification arrangement) of Muriganga Bunglow) at Lot No.8 (From 08-01-2027 to 18-01-2027) |
| 278 | 12 Volt colour flexible type SNTD strip water proof light 52 Nos. strip X 50 ft Long |
| 279 | SMPS of capacity 10/20 Amp input – 230 Volts, 50Hz output – 12 Volt DC for power supply. |
| 280 | 3 core 2.5 sq mm 1.1 KV grade copper unarmored cable. |
| 281 | Single core unarmored unsheathed 1.5 sq mm 1.1 KV grade copper cable. |
| 282 | Supply and delivery of the materials at site on hire basis as per requirement to complete temporary illumination work (For Beautification arrangement) of Cottage Bunglow at Lot No. – 8 (From 08-01-2027 to 18-01-2027) |
| 283 | Colour flexible type (RGB) water proof strip LED light (2.5 Volt) |
| 284 | 23 Nos. Strip X 30’ ft Long |
| 285 | Colour flexible type water proof casing LED light (RGB) (2.5 Volt) |
| 286 | 22 Nos. Strip X 30’ ft Long |
| 287 | SMPS of Capacity 10/20 Amp input – 230 Volts, 50 Hz Output – 12 Volt DC for power supply. |
| 288 | 3 core 2.5 sq mm 1.1 KV grade copper unarmored cable. |
| 289 | Single core unarmored unsheathed 1.5 sq mm 1.1 KV grade copper cable. (Required Length) |
| 290 | 400 Watt Metal light fixture (2 Nos.) |
| 291 | Drawing of flood light points for Back Side portion of new bus stand area and others place as directed on supply on hire basis of 400 Watt sodium flood light fixture – 1 No., control gear box and S.r. Lamp etc., and complete the work from 08-01-2027 to 18-01-2027 = 11 days X 15 Pts. |
| 292 | Drawing of the flood light point as per direction of EIC and supply on hire basis of 400 Watt twin type flood light fixture and 2 Nos. Son T lamp with control gear box complete. From 08-01-2027 to 18-01-2027 = 11 Days. 11 days X 2 Pts. |
| 293 | Supply on hire basis of 9 mtrs. Long M.S. pole and erection and fitting fixing on the back side portion of new bus stand area as per direction of EIC. From 08-01-2027 to 18-01-2027 = 11 days. |
| 294 | Supply and delivery at site of ‘D’ type Iron clamp set galvanized with necessary GI nuts and washer size of 3 ½” X 5”. |
| 295 | Supply and delivery of site of porcelain shackle insulator Size – 70 mm X 88 mm |
| 296 | Fitting fixing of ‘D’ type Iron clamp parceling shackles and pole clamp in the M.S. pole of the completion of the errection work. |
| 297 | Drawing of L.T. feeder and distribution line from medium pressure voltage 3 phase – 4 wire system by 25 sq mm PVC single core aluminium wire on hire basis. |
| 298 | Making Earthing arrangement by supplying 5/8” dia earth spike of 2 mtr. Long with galvanized bolts nuts and washer etc. including supplying and fitting fixing of 8 Nos. SWG GI wire and restoration of the surface duty rammed as per direction and inter connection earth spike to continuous running earth on the top of the PCE pole. |
| 299 | (SCHOOL LIGHTING) Drawing street light points from different distribution and feeder lines Salbollals post to different places directed with supply on hire basis of 100 watt bulb, holder bracket and necessary materials required to complete the work 08-01-2027 to 17-01-2027 = 10 days. 10 days X 20 Pts. X 15 Nos. School=3000 Pts. |
| 300 | Drawing of metal flood light points on hire basis for illumination of school compound from different feeder of 400 Watt metal flood fixture, Lamp, control gear etc., required to complete the job from – 08-01-2027 to 17-01-2027 = 10 days X 4 Pts. X 15 Nos. School. |
| 301 | Supply and fitting fixing of 2 pin 5 Amps plug point for mobile charger & 3 Pin & 15 amps plug point for special purpose on hire basis. |
| 302 | Drawing of main line of the pump from medium pressure Voltage 3 phase 4 wire system as per IE rules and ISS rules by 50 sq mm to 25 sq mm PVC single core wire on hire basis on Salbollah post including supply of wire installation of binding wire etc. as directed before 08-01-2027 average mm 90 mtr. X 15 Nos. School. |
| 303 | (DRIVER ROOM) Drawing of light point of 400 Watt sodium type flood light fixture and lamp, Gear complete set on hire basis from 08-01-2027 to 17-01-2027 = 10 days. X 2 Pts. = 20 Pts. |
| 304 | Drawing light points from different distribution and feeders lines to different places directed with supply on hire basis of 40 watt tube light, chock starter, bulb holder and necessary materials required to complete the work.From 08-01-2027 to 17-01-2027 = 10 days X 8 Pts. = 80 Pts. |
| 305 | Supply and fitting fixing of 2 Pin 5 Amps plug point for mobile charger & 3 pin & 12 Amps plug point the temporary driver room on hire basis. |
| 306 | S & F of 63 A 415V TPN main switch ; MaKE: Havells/ any other approved make [ LOT 8] |
| 307 | S & F of 32 A 415V TPN main switch ; MaKE: Havells/ any other approved make [LOT 8] |
| 308 | S & F of 32 A 415V DP main switch ; MaKE: Havells/ any other approved make [LOT 8] |
| 309 | S & F of 100 A 415V TPN main switch ; MaKE: Havells/ any other approved make [ LOT 8] |
| 310 | Supply and laying of 50 sqmm 3.5 core XLPE insulated 1.1 KV grade Al Armour cable as per latest IS Spec. Make: Any approved vendor of PHED [ Location : LOT 8 , Kakdwip] |
| 311 | Dismentling of the Item no. 42 to 45 after completion of mela and returned back to store including loading unloading at both ends all complete |
| 312 | Drawing of the above 70/50/35/10 sq mm 3.5 core Al. Ar. Cable departmental supply for power connection of VIP tents by supplying on hire basis & necessary salbollah on hire basis including binding the same as per direction of EIC.Transformer to different place VIP Tents. |
| 313 | Drawing of the flood light point as per direction of EIC and supply on hire basis of 400 Watt twin type flood light fixture and 2 Nos. Son T lamp with control gear box complete. From 07-01-2027 to 17-01-2027 = 11 Days.[ 11 days X 15 Pts.] [ Location : Around the area of LOT 8 ] |
| 314 | Supply and delivery at site the special type arm bracket made with 40mm dia Gl pipe x 2 mtr long for light fixture 250watt SV lamp including MS collar welded at neck of the bracket including painting by red oxide paint as per direction of EIC. |
| 315 | Making canopy type LED lighting arrangement at mela ground with different coloured (yellow/ Blue/Red) LED light to be fixed by suitable G.I. wire across the road with all interconnection complete for the entire mela period i.e. from 06-01-2027 to 16-01-2027 |
| 316 | Supply of 2 x 4 sq.mm. and 1 x 2.5 sq.mm. PVC insulated single core copper wire for main circuit line on hire basis |
| 317 | Supply on hire basis and drawing of L.T. distribution line from medium pressure line as per IE rules and ISS by suitable size PVC single core Aluminium wire and supply of binding wire insulation connection etc. as per direction of EIC on or before 06.01.2027 |
| 318 | Providing on hire basis including supplying, laying and transportation charges of 7/20 or 4 sq.mm 1.1 kv grade single core PVC instated and sheathed stranded aluminium wires/cables including dismantling the same after completion of the mela |
| 319 | Providing on hire basis including fitting fixing of 6 circuit running changer for changing design of the canopy lighting arrangement having output volatage 12 volt DC and input 230 volt, 50 Hz. AC from 06-01-2027 to 16-01-2027 |
| 320 | Providing on hire basis 30 Amps SMPS having input voltage 230 volt 50 Hz AC and out put voltage 12 volt DC for power supply to canopy lighting system |
| 321 | Dismantling of the entire installataion after completion of mela. |
| 322 | Supply on Hire basis 8 SWG GI wire |
| 323 | Supply on hire bases 4.88 M long 100 mm.. Dia. (AV). Bamboo post and erecting the same at different places in pilgrim shed as per IE rules and direction of EIC (AV distance from post to post is 20 M.) |
| 324 | Providing Guarding arrangement and deputing one no. electrician for the period of 06-01-2027 to 16-01-20207 |
| 325 | Rectification of 5 nos. 12 mtrHigh Mast at Harwood Point, Kakdwip in connection with Ganga Sagar Mela-2027 |
| 326 | Hiring charges of Hydra for upLifting-lowering of middle-top part of high mast and after repairing again lifting from ground with proper positioning of the parts including hiring of all tools-tackles-wire ropes etc all complete as per direction |
| 327 | Technician charges for repairing the lights , proper allignment of middle-top portion replacement of wire ropes as required length to complete the job as per direction. |
| 328 | Technician charges for overhauling of winch system , hoist pulleys , terminal box etc and throughly checkup of head frame , lantern carriage , compensator , winc bracket , winch , winch mounting plate , double drum winch ,trailing cable , rest clamp , terminal box , sleeve pipe , hoist & supply cable pulleys ,gusset plate , foundation nut-bolt etc to complete the job as per direction. |
| 329 | Supply & delivery of the following materials as per sample:- |
| 330 | 6 SWG stranded steel rope |
| 331 | 6 mm SWG wire \\"U\\" clamp |
| 332 | Superior quality Grease |
| 333 | Superior quality lubrricating oil |
| 334 | Technician charges for overhauling of winch system , hoist pulleys , terminal box etc and throughly checkup of head frame , lantern carriage , compensator , winc bracket , winch , winch mounting plate , double drum winch ,trailing cable , rest clamp , terminal box , sleeve pipe , hoist & supply cable pulleys ,gusset plate , foundation nut-bolt etc to complete the job as per direction |
| 335 | Technician charges for repairing the lights , proper allignment of middle-top portion replacement of wire ropes as required length ( above supplied) to complete the job as per direction. |
| 336 | Dismantling of the step motor from the unit, heat vernish and connected with the high mast unit. |
| 337 | Dismantling of the step motor from the unit, rewinding ,heat vernish and connected with the high mast unit. |
| 338 | Cleaning ,Overhauling , greasing , lubricating of the inner spare of the gearbox unit includig dismantling part by part with reassembling the same all complete |
| 339 | Dismentling and Fitting-fixing of the gearbox unit to the high mast with proper allignment all complete |
| 340 | Add GST @ 18% |
| 341 | Add CESS @ 1% Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 8 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 10 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender