Tender For Day To Day Maintenance Of Arboriculture Works Of Zone-Vii (Kharu) & Zone-Viii (Kanchiyara) Head Work Sites ( Each Approx Area 0.33 Acre) Within The Jurisdiction Of North 24-Pgs. Arsenic Area W/S Scheme Under North 24 Pgs. W/S Division-I, P
Tender Overview
Project Description
Tender for Day To Day Maintenance Of Arboriculture Works Of Zone-Vii (Kharu) & Zone-Viii (Kanchiyara) Head Work Sites ( Each Approx Area 0.33 Acre) Within The Jurisdiction Of North 24-Pgs. Arsenic Area W/S Scheme Under North 24 Pgs. W/S Division-I, P.H.E. Dte. [For 12 Months]
BOQ
| Sl. No. | Item Description |
| 1 | Description of Items |
| 2 | Day to day maintenance of lawn, garden, application of mannure, pesticides, weeding, watering shaping,cutting, repair, replacement of dead hedge etcpreparation and maintanance of seasonal flower bedindluding supply and plantation of flower plants also maintanance of specimen plants including cost ofmannure, pesticides, fertilizers plants etc. all complete as per direction of E.I.C.2 Nos. LaboursI) Labour for Zone-VII (Kharu)II) Labour for Zone-VIII (Kanchiyara)N.B. Daily Wage 487.00 + 8.33% bonus + 5% Overhead charges+ 10% contractors profit +EPF+ESI = Total Rs.685.84 ( Say Rs. 686.00 ) |
| 3 | If necessary Provision for making payment towards labour wages in case enhancement with in the stipulated period of the said work to be paid as perinstruction of EIC and as per G.O. on actual basis. |
| 4 | Maintenance of Hedge and Edge including reguler application of pesticides Insecticides, manure and weeding watering, shaping, cutting, repair/replacement of dead Hedge s and gap filling ete. All complete as per direction of EIC. |
| 5 | Maintenance of Trees and Shrubs including reguler, application of pesticides Insecticides, manure and weeding watering, shaping, cutting, repair/replacement of dead trees & shrubs and gap filling, rolling etc. All complete as per direction of EIC. |
| 6 | Preparation & Maintenance of seasonal flower bed including supply and plantation of Flower plant as per approved plant-reguler weeding watering, application of manure pesticides, insecticides removal of dead leaves and plant, replacement of dead plant etc. all complete before planting the next crop of seasonal flower, the beds are to be dug upto 45cm. deep and roots, stems of previous crop removed. The excavated earth is to placed on the side of the bed. Fresh manure is to be added and the soil refill back after sunning, etc. All complete as per direction of EIC. |
| 7 | Maintenance of speciman of speciman plants including reguler application of pesticides Insecticides, manure and weeding watering, shaping, cutting, and removal of dead branches of including cost of manure fartilizers and including repair/ replacement of dead plants and gap filling watering weeding all complete as per direction of EIC. |
| 8 | Cleaning of slits, jungles, shrubs, dead body of animal, removal of weeds trees etc. deposited through high tide & lone tide from toe - work and brick pitching area of River bank protaction, as per direction of EIC. |
| 9 | GST @ 18% |
| 10 | CESS @ 1% Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 13 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 15 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender