Power Government Departments Closing in 4 days TDR #58683632

Bids Are invited for Custom Bid For Services - Maintenance And Repairing Work Of Damaged 33 11 Kv Lt Line And Their Accessories Under Edd Kheragarh Agra - Carriage Of Following From 132 Kv Taj Agra To Work Site Through The Kacha And Pakka Road Includ

Issued by Government Departments · Agra, Uttar Pradesh
Tender Value
9.14 Lakhs
Estimated cost
Bid Submission
03 Dec 2026
4 days left
EMD
9200
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Gem

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Agra → Uttar Pradesh
EMD Exemption
Not Available
Quantity
1

Project Description

Bids Are invited for Custom Bid For Services - Maintenance And Repairing Work Of Damaged 33 11 Kv Lt Line And Their Accessories Under Edd Kheragarh Agra - Carriage Of Following From 132 Kv Taj Agra To Work Site Through The Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work.(Distance 00-70Kms.) A) St Pole 9/11 Mtr. Long , Carriage Of Following From 132 Kv Taj Agra To Dump Site Through The Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work.(Distance 00-70Kms.) A) Pcc Pole 8.5 Mtr. Long. , Carriage Of Following From 132 Kv Taj Agra To Dump Site Through The Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work.(Distance 00-70Kms.) I) 11 Kv 3×35/70/3×120/185/240 Sqmm Xlpe Cable , Carriage Of Following From 132 Kv Taj Agra To Dump Site Through The Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work.(Distance 00-70Kms.) J) Line Material Viz. Aerial Bunch Conductor/Weasal Conductor/Dog, G.I. Earth Wire, Cross Arm, Angle, Channel, Insulators, Clamps And Other Line Material, If Required , Cutting Of Kharanja/Mettalic Road/Concrete Portion While Digging Pit For Erection Of Pcc/Stp Poles, Stays Rod And Giving The Exact Shape After Exicution Work As Per Direction Of Supervising Engineer. It Includes The Cost Of Labour, T & P, Carrier Etc Reauired For Proper Completion Of Work. , Replacment Of Damage 8.5 Mtr. Long Pcc Single Poles With Erection And Grouting Poles In 1:2:4 Ratio (Cement, Sand And Bricks Balast) Including Fixing Of All Accessories For 11 Kv Line As Per Respo Norms.Labour, T &P And Carrier, Grouting Material Etc. Required For Proper Completion Of Work Shall Be Done By The Contractor At His Own Cost. , Replacment Of Damage 8.5 Mtr. Long Pcc Double Poles With Erection And Grouting Poles In 1:2:4 Ratio (Cement, Sand And Bricks Balast) Including Fixing Of All Accessories For 11 Kv Line As Per Respo Norms.Labour, T &P And Carrier, Grouting Material Etc. Required For Proper Completion Of Work Shall Be Done By The Contractor At His Own Cost. , Replacment Of Damage 11 Mtr. Stp Single Pole With Erection And Grouting Poles In 1:2:4 Ratio (Cement, Sand And Bricks Balast) Including Fixing Of All Accessories For 11 Kv Line As Per Respo Norms.Labour, T &P And Carrier, Grouting Material Etc. Required For Proper Completion Of Work Shall Be Done By The Contractor At His Own Cost. , Replacment Of Damage 11 Mtr. Stp Double Pole With Erection And Grouting Poles In 1:2:4 Ratio (Cement, Sand And Bricks Balast) Including Fixing Of All Accessories For 11 Kv Line As Per Respo Norms.Labour, T &P And Carrier, Grouting Material Etc. Required For Proper Completion Of Work Shall Be Done By The Contractor At His Own Cost. , Erection And Grouting Stay Of Ratio 1:2:4 (Cement, Sand And Bricks Balast) As Per Respo Norms Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work. Grouting Material I.E. Cement, Sand, Brick Ballast/Stone Ballast Etc. Shall Be Arranged By The Contractor At His Own Cost. , Fixing Of Earthing Rod (20X2500mm) As Per Respo Norms Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work. , Removal Of Following Damaged Conductor From The Line With Its Bundling And Stacking With The Work Of Carriage From Site To Concerning Je Store With The Work Of Loading And Unloading At Both Ends. (0-40 Km) A) Acsr Weasel Conductor , Removal Of Following Damaged Conductor From The Line With Its Bundling And Stacking With The Work Of Carriage From Site To Concerning Je Store With The Work Of Loading And Unloading At Both Ends. (0-40 Km) B) Acsr Dog/Racoon Conductor , Removal Of Following Damaged Conductor From The Line With Its Bundling And Stacking With The Work Of Carriage From Site To Concerning Je Store With The Work Of Loading And Unloading At Both Ends. (0-40 Km) C) 50/95/120 Sqmm Areal Bunch Conductor. , Laying Sagging Stringing And Binding And Jumpering Of Conductor In Lt Line As Per Respo Manual And As Per Direction Of Supervising Engineer. It Includes The Cost Of Labour, T & P, Carrier Etc Reauired For Proper Completion Of Work. A) Acsr Weasal Conductor , Laying Sagging Stringing And Binding And Jumpering Of Conductor In Lt Line As Per Respo Manual And As Per Direction Of Supervising Engineer. It Includes The Cost Of Labour, T & P, Carrier Etc Reauired For Proper Completion Of Work. C) Acsr Dog/Raccon Conductor , Laying Sagging Stringing And Binding And Jumpering Of Conductor In Lt Line As Per Respo Manual And As Per Direction Of Supervising Engineer. It Includes The Cost Of Labour, T & P, Carrier Etc Reauired For Proper Completion Of Work. A) Ab Conductor 3X50 Sqmm , Laying Sagging Stringing And Binding And Jumpering Of Conductor In Lt Line As Per Respo Manual And As Per Direction Of Supervising Engineer. It Includes The Cost Of Labour, T & P, Carrier Etc Reauired For Proper Completion Of Work. A) Ab Conductor 3X95 Sqmm , Laying Sagging Stringing And Binding And Jumpering Of Conductor In Lt Line As Per Respo Manual And As Per Direction Of Supervising Engineer. It Includes The Cost Of Labour, T & P, Carrier Etc Reauired For Proper Completion Of Work. A) Ab Conductor 3X120 Sqmm , Re- Sagging And Stringing Of Existing Conductor In 33 Kv/11Kv/Lt Line As Per Direction Of Supervising Engineer Including The Cost Of Arrangement Of Labour,T&P, Carrier Etc. Required For Proper Completion Of Work A) Acsr Weasel Conductor. , Re- Sagging And Stringing Of Existing Conductor In 33 Kv/11Kv/Lt Line As Per Direction Of Supervising Engineer Including The Cost Of Arrangement Of Labour,T&P, Carrier Etc. Required For Proper Completion Of Work A) Acsr Dog Conductor. , Re- Sagging And Stringing Of Existing Conductor In 33 Kv/11Kv/Lt Line As Per Direction Of Supervising Engineer Including The Cost Of Arrangement Of Labour,T&P, Carrier Etc. Required For Proper Completion Of Work A) 50/95/120 Sqqm Areal Bunch Conductor. , A) Digging Of Pit Around The 9/11/13 Mtr. Rusted St Pole/R.S. Joist (1.5X1.5) & Approximately 2 Feet Below The Ground Level B) Providing & Fixing Of 2 Nos. M.S. Angle Clamp (Each Clamp Having 2 No. M.S. Angle 65X65x8mm 3 Ft In Length Jointed In Round Shape By M.S. Flat Of 65X8 Mm) The Work Include Providing Material All Fabrication & Fixing Of Clamp By 4 No. Nut Bolt & Wahsers & Welding Work At Site C) Construction Of Plinth In Cc-1:4:8 2 Ft. Below The Ground Level And 2 Ft. Above The Ground Level Around The St Pole.D) Painting Of Plinth Above Ground Level By Yellow Enamel Paint Of Good Quality. , Installation Of 11 Kv Do Fuse Set As Per Respo Norms. , Laying Of 11 Kv Xlpe Cable 3X35/70/120/185/240 Sqmm Cable In Trench With Making Loop (At A Distance Of Approx. 4 Mtr.) Laying Of Bricks (18 Nos. In One Meter), Filling Of Sand In Trench Then Laying Earth And Its Levelling And Rammuring Etc., Complete Work As Resspo Norms. , Laying Of 11 Kv Xlpe Cable 3X35/70/120/185/240 Sqmm Overhead Cable Complete Work As Per Respo Norms And Direction By Supervising Engineer. , Laying And Dressing Of 11 Kv Xlpe Cable 3X35/70/120/185/240 Under Ground Cable In The Trench 450 Mm Fine Sand Cushion Beneath And 150 Mm Fine Sand Cushion Above The Cable. The Cable Shall Be Duly Protected By 1 Class Brick Two On Either Side And Third On Top Of The Cables. Laid In Series One After The Other. The Work Includes Supplying Of Fine Sand & Bricks Refilling And Ramming Of The Left Out Soil Closing The Trench And Leveling Spare Cable Shall Be Left And Buried In The Trench In The Shape Of Rings At Both Ends. Cables Laying Work Includes Unroling Cutting / Megaring & Sealing Both Ends Of The Cable. , Straightening Of 9/11 Mtr. Long Stp Tilted Pole At Various Places By Straightening Of Pole Including The Cost Of Labour ,T&P Charges Required For Proper Completion Of Work. , Straightening Of 8.5/9 Mtr. Long Pcc Tilted Pole At Various Places By Straightening Of Pole Including The Cost Of Labour ,T&P Charges Required For Proper Completion Of Work. , Cartiage Of 63 Kva, 100 Kva, 250 Kva, 400 Kva T/F From 132 Kv Taj Agra To Site Where T/F Got Theft Capacity Of 63 Kva, 100 Kva, 250 Kva, 400 Kva Through The Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work.(Distance 00-70Kms.). , Guarding Of Ht Line By Laying, Stringing, Sagging And Binding Of 2 Nos. Parallel Gi Wire 6 Swg After Providing, Fabrication And Fixing Of Guarding Angle And Fabrication And Fixing Of X-Guards (Tillis) Of Gi Wire At Distance Of 3 Mtr. Including The Cost Of Arrangement Of Abour, T&P Etc.Required For Proper Completion Of Work.

BOQ

Sl. No. Item TitleItem Description
1Carriage of following from 132 KV Taj Agra to work site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-70Kms.) a) ST pole 9/11 Mtr. longCarriage of following from 132 KV Taj Agra to work site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-70Kms.) a) ST pole 9/11 Mtr. long
2Carriage of following from 132 KV Taj Agra to dump site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-70Kms.) a) PCC Pole 8.5 Mtr. Long.Carriage of following from 132 KV Taj Agra to dump site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-70Kms.) a) PCC Pole 8.5 Mtr. Long.
3Carriage of following from 132 KV Taj Agra to dump site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-70Kms.) I) 11 KV 3×35/70/3×120/185/240 sqmm XLPE cableCarriage of following from 132 KV Taj Agra to dump site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-70Kms.) I) 11 KV 3×35/70/3×120/185/240 sqmm XLPE cable
4Carriage of following from 132 KV Taj Agra to dump site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-70Kms.) J) Line material viz. Aerial bunch conductor/Weasal conductor/Dog, G.I. earth wire, cross arm, angle, channel, insulators, clamps and other line material, if requiredCarriage of following from 132 KV Taj Agra to dump site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-70Kms.) J) Line material viz. Aerial bunch conductor/Weasal conductor/Dog, G.I. earth wire, cross arm, angle, channel, insulators, clamps and other line material, if required
5Cutting of kharanja/mettalic road/concrete portion while digging pit for erection of PCC/STP poles, stays rod and giving the exact shape after exicution work as per direction of supervising engineer. It includes the cost of labour, T & P, carrier etc reauired for proper completion of work.Cutting of kharanja/mettalic road/concrete portion while digging pit for erection of PCC/STP poles, stays rod and giving the exact shape after exicution work as per direction of supervising engineer. It includes the cost of labour, T & P, carrier etc reauired for proper completion of work.
6Replacment of Damage 8.5 Mtr. long PCC Single Poles with Erection and grouting poles in 1:2:4 ratio (cement, sand and bricks balast) including fixing of all accessories for 11 KV line as per RESPO norms.Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost.Replacment of Damage 8.5 Mtr. long PCC Single Poles with Erection and grouting poles in 1:2:4 ratio (cement, sand and bricks balast) including fixing of all accessories for 11 KV line as per RESPO norms.Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost.
7Replacment of Damage 8.5 Mtr. long PCC Double Poles with Erection and grouting poles in 1:2:4 ratio (cement, sand and bricks balast) including fixing of all accessories for 11 KV line as per RESPO norms.Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost.Replacment of Damage 8.5 Mtr. long PCC Double Poles with Erection and grouting poles in 1:2:4 ratio (cement, sand and bricks balast) including fixing of all accessories for 11 KV line as per RESPO norms.Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost.
8Replacment of Damage 11 Mtr. STP Single Pole with Erection and grouting poles in 1:2:4 ratio (cement, sand and bricks balast) including fixing of all accessories for 11 KV line as per RESPO norms.Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost.Replacment of Damage 11 Mtr. STP Single Pole with Erection and grouting poles in 1:2:4 ratio (cement, sand and bricks balast) including fixing of all accessories for 11 KV line as per RESPO norms.Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost.
9Replacment of Damage 11 Mtr. STP Double Pole with Erection and grouting poles in 1:2:4 ratio (cement, sand and bricks balast) including fixing of all accessories for 11 KV line as per RESPO norms.Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost.Replacment of Damage 11 Mtr. STP Double Pole with Erection and grouting poles in 1:2:4 ratio (cement, sand and bricks balast) including fixing of all accessories for 11 KV line as per RESPO norms.Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost.
10Erection and grouting stay of ratio 1:2:4 (cement, sand and bricks balast) as per RESPO norms including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work. Grouting material i.e. cement, sand, brick ballast/stone ballast etc. shall be arranged by the contractor at his own cost.Erection and grouting stay of ratio 1:2:4 (cement, sand and bricks balast) as per RESPO norms including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work. Grouting material i.e. cement, sand, brick ballast/stone ballast etc. shall be arranged by the contractor at his own cost.
11Fixing of earthing rod (20x2500mm) as per RESPO norms including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.Fixing of earthing rod (20x2500mm) as per RESPO norms including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.
12Removal of following damaged conductor from the line with its bundling and stacking with the work of carriage from site to concerning JE Store with the work of loading and unloading at both ends. (0-40 KM) A) ACSR Weasel ConductorRemoval of following damaged conductor from the line with its bundling and stacking with the work of carriage from site to concerning JE Store with the work of loading and unloading at both ends. (0-40 KM) A) ACSR Weasel Conductor
13Removal of following damaged conductor from the line with its bundling and stacking with the work of carriage from site to concerning JE Store with the work of loading and unloading at both ends. (0-40 KM) B) ACSR Dog/Racoon ConductorRemoval of following damaged conductor from the line with its bundling and stacking with the work of carriage from site to concerning JE Store with the work of loading and unloading at both ends. (0-40 KM) B) ACSR Dog/Racoon Conductor
14Removal of following damaged conductor from the line with its bundling and stacking with the work of carriage from site to concerning JE Store with the work of loading and unloading at both ends. (0-40 KM) C) 50/95/120 sqmm Areal Bunch Conductor.Removal of following damaged conductor from the line with its bundling and stacking with the work of carriage from site to concerning JE Store with the work of loading and unloading at both ends. (0-40 KM) C) 50/95/120 sqmm Areal Bunch Conductor.
15Laying sagging stringing and binding and jumpering of conductor in LT line as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T & P, carrier etc reauired for proper completion of work. a) ACSR Weasal conductorLaying sagging stringing and binding and jumpering of conductor in LT line as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T & P, carrier etc reauired for proper completion of work. a) ACSR Weasal conductor
16Laying sagging stringing and binding and jumpering of conductor in LT line as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T & P, carrier etc reauired for proper completion of work. c) ACSR DOG/Raccon ConductorLaying sagging stringing and binding and jumpering of conductor in LT line as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T & P, carrier etc reauired for proper completion of work. c) ACSR DOG/Raccon Conductor
17Laying sagging stringing and binding and jumpering of conductor in LT line as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T & P, carrier etc reauired for proper completion of work. A) AB Conductor 3x50 sqmmLaying sagging stringing and binding and jumpering of conductor in LT line as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T & P, carrier etc reauired for proper completion of work. A) AB Conductor 3x50 sqmm
18Laying sagging stringing and binding and jumpering of conductor in LT line as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T & P, carrier etc reauired for proper completion of work. A) AB Conductor 3x95 sqmmLaying sagging stringing and binding and jumpering of conductor in LT line as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T & P, carrier etc reauired for proper completion of work. A) AB Conductor 3x95 sqmm
19Laying sagging stringing and binding and jumpering of conductor in LT line as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T & P, carrier etc reauired for proper completion of work. A) AB Conductor 3x120 sqmmLaying sagging stringing and binding and jumpering of conductor in LT line as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T & P, carrier etc reauired for proper completion of work. A) AB Conductor 3x120 sqmm
20Re- sagging and stringing of existing conductor in 33 KV/11KV/LT line as per direction of supervising engineer including the cost of arrangement of labour,T&P, carrier etc. required for proper completion of work A) ACSR Weasel Conductor.Re- sagging and stringing of existing conductor in 33 KV/11KV/LT line as per direction of supervising engineer including the cost of arrangement of labour,T&P, carrier etc. required for proper completion of work A) ACSR Weasel Conductor.
21Re- sagging and stringing of existing conductor in 33 KV/11KV/LT line as per direction of supervising engineer including the cost of arrangement of labour,T&P, carrier etc. required for proper completion of work A) ACSR Dog Conductor.Re- sagging and stringing of existing conductor in 33 KV/11KV/LT line as per direction of supervising engineer including the cost of arrangement of labour,T&P, carrier etc. required for proper completion of work A) ACSR Dog Conductor.
22Re- sagging and stringing of existing conductor in 33 KV/11KV/LT line as per direction of supervising engineer including the cost of arrangement of labour,T&P, carrier etc. required for proper completion of work A) 50/95/120 sqqm Areal Bunch Conductor.Re- sagging and stringing of existing conductor in 33 KV/11KV/LT line as per direction of supervising engineer including the cost of arrangement of labour,T&P, carrier etc. required for proper completion of work A) 50/95/120 sqqm Areal Bunch Conductor.
23A) Digging of Pit around the 9/11/13 Mtr. Rusted ST Pole/R.S. JOIST (1.5\\"x1.5\\") & Approximately 2 feet below the ground level B) Providing & Fixing of 2 Nos. M.S. angle Clamp (each clamp having 2 no. M.S. angle 65x65x8mm 3 ft in length jointed in round shape by M.S. Flat of 65x8 mm) The work include providing material all fabrication & fixing of clamp by 4 No. Nut bolt & wahsers & welding work at site C) Construction of Plinth in CC-1:4:8 2 ft. Below the ground level and 2 ft. above the ground level around the ST Pole.D) Painting of Plinth above ground level by yellow enamel paint of good quality.A) Digging of Pit around the 9/11/13 Mtr. Rusted ST Pole/R.S. JOIST (1.5\\"x1.5\\") & Approximately 2 feet below the ground level B) Providing & Fixing of 2 Nos. M.S. angle Clamp (each clamp having 2 no. M.S. angle 65x65x8mm 3 ft in length jointed in round shape by M.S. Flat of 65x8 mm) The work include providing material all fabrication & fixing of clamp by 4 No. Nut bolt & wahsers & welding work at site C) Construction of Plinth in CC-1:4:8 2 ft. Below the ground level and 2 ft. above the ground level around the ST Pole.D) Painting of Plinth above ground level by yellow enamel paint of good quality.
24Installation of 11 KV DO Fuse Set as per RESPO Norms.Installation of 11 KV DO Fuse Set as per RESPO Norms.
25Laying of 11 KV XLPE Cable 3x35/70/120/185/240 sqmm cable in trench with making loop (at a distance of approx. 4 mtr.) laying of bricks (18 nos. in one meter), filling of sand in trench then laying earth and its levelling and rammuring etc., complete work as RESSPO norms.Laying of 11 KV XLPE Cable 3x35/70/120/185/240 sqmm cable in trench with making loop (at a distance of approx. 4 mtr.) laying of bricks (18 nos. in one meter), filling of sand in trench then laying earth and its levelling and rammuring etc., complete work as RESSPO norms.
26Laying of 11 KV XLPE Cable 3x35/70/120/185/240 sqmm overhead Cable complete work as per RESPO norms and direction by supervising Engineer.Laying of 11 KV XLPE Cable 3x35/70/120/185/240 sqmm overhead Cable complete work as per RESPO norms and direction by supervising Engineer.
27Laying and dressing of 11 KV XLPE Cable 3x35/70/120/185/240 under ground cable in the trench 450 mm fine sand cushion beneath and 150 mm fine sand cushion above the cable. The cable shall be duly protected by 1\\" class brick two on either side and third on top of the cables. Laid in series one after the other. The work includes supplying of fine sand & bricks refilling and ramming of the left out soil closing the trench and leveling Spare cable shall be left and buried in the trench in the shape of rings at both ends. Cables laying work includes unroling cutting / megaring & sealing both ends of the cable.Laying and dressing of 11 KV XLPE Cable 3x35/70/120/185/240 under ground cable in the trench 450 mm fine sand cushion beneath and 150 mm fine sand cushion above the cable. The cable shall be duly protected by 1\\" class brick two on either side and third on top of the cables. Laid in series one after the other. The work includes supplying of fine sand & bricks refilling and ramming of the left out soil closing the trench and leveling Spare cable shall be left and buried in the trench in the shape of rings at both ends. Cables laying work includes unroling cutting / megaring & sealing both ends of the cable.
28Straightening of 9/11 Mtr. Long STP tilted pole at various places by straightening of pole including the cost of labour ,T&P charges required for proper completion of work.Straightening of 9/11 Mtr. Long STP tilted pole at various places by straightening of pole including the cost of labour ,T&P charges required for proper completion of work.
29Straightening of 8.5/9 Mtr. Long PCC tilted pole at various places by straightening of pole including the cost of labour ,T&P charges required for proper completion of work.Straightening of 8.5/9 Mtr. Long PCC tilted pole at various places by straightening of pole including the cost of labour ,T&P charges required for proper completion of work.
30Cartiage of 63 KVA, 100 KVA, 250 KVA, 400 KVA T/F from 132 KV Taj Agra to Site Where T/F Got Theft Capacity of 63 KVA, 100 KVA, 250 KVA, 400 KVA through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-70Kms.).Cartiage of 63 KVA, 100 KVA, 250 KVA, 400 KVA T/F from 132 KV Taj Agra to Site Where T/F Got Theft Capacity of 63 KVA, 100 KVA, 250 KVA, 400 KVA through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-70Kms.).
31Guarding of HT line by laying, stringing, sagging and binding of 2 Nos. parallel GI wire 6 SWG after providing, fabrication and fixing of guarding angle and fabrication and fixing of X-guards (Tillis) of GI wire at distance of 3 Mtr. including the cost of arrangement of abour, T&P etc.required for proper completion of work.Guarding of HT line by laying, stringing, sagging and binding of 2 Nos. parallel GI wire 6 SWG after providing, fabrication and fixing of guarding angle and fabrication and fixing of X-guards (Tillis) of GI wire at distance of 3 Mtr. including the cost of arrangement of abour, T&P etc.required for proper completion of work.

AI Tender Summary

OUR REF NO 58683632
AUTHORITY Government Departments
TENDER VALUE 9.14 Lakhs
LAST DATE 03-12-2026
Authority
Authority Name Uttar Pradesh Power Corporation Limited
Work Description Bids Are invited for Custom Bid For Services - Maintenance And Repairing Work Of Damaged 33 11 Kv Lt Line And Their Accessories Under Edd Kheragarh Agra - Carriage Of Following From 132 Kv Taj Agra To Work Site Through The Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work.(Distance 00-70Kms.) A) St Pole 9/11 Mtr. Long , Carriage Of Following From 132 Kv Taj Agra To Dump Site Through The Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work.(Distance 00-70Kms.) A) Pcc Pole 8.5 Mtr. Long. , Carriage Of Following From 132 Kv Taj Agra To Dump Site Through The Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work.(Distance 00-70Kms.) I) 11 Kv 3×35/70/3×120/185/240 Sqmm Xlpe Cable , Carriage Of Following From 132 Kv Taj Agra To Dump Site Through The Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work.(Distance 00-70Kms.) J) Line Material Viz. Aerial Bunch Conductor/Weasal Conductor/Dog, G.I. Earth Wire, Cross Arm, Angle, Channel, Insulators, Clamps And Other Line Material, If Required , Cutting Of Kharanja/Mettalic Road/Concrete Portion While Digging Pit For Erection Of Pcc/Stp Poles, Stays Rod And Giving The Exact Shape After Exicution Work As Per Direction Of Supervising Engineer. It Includes The Cost Of Labour, T & P, Carrier Etc Reauired For Proper Completion Of Work. , Replacment Of Damage 8.5 Mtr. Long Pcc Single Poles With Erection And Grouting Poles In 1:2:4 Ratio (Cement, Sand And Bricks Balast) Including Fixing Of All Accessories For 11 Kv Line As Per Respo Norms.Labour, T &P And Carrier, Grouting Material Etc. Required For Proper Completion Of Work Shall Be Done By The Contractor At His Own Cost. , Replacment Of Damage 8.5 Mtr. Long Pcc Double Poles With Erection And Grouting Poles In 1:2:4 Ratio (Cement, Sand And Bricks Balast) Including Fixing Of All Accessories For 11 Kv Line As Per Respo Norms.Labour, T &P And Carrier, Grouting Material Etc. Required For Proper Completion Of Work Shall Be Done By The Contractor At His Own Cost. , Replacment Of Damage 11 Mtr. Stp Single Pole With Erection And Grouting Poles In 1:2:4 Ratio (Cement, Sand And Bricks Balast) Including Fixing Of All Accessories For 11 Kv Line As Per Respo Norms.Labour, T &P And Carrier, Grouting Material Etc. Required For Proper Completion Of Work Shall Be Done By The Contractor At His Own Cost. , Replacment Of Damage 11 Mtr. Stp Double Pole With Erection And Grouting Poles In 1:2:4 Ratio (Cement, Sand And Bricks Balast) Including Fixing Of All Accessories For 11 Kv Line As Per Respo Norms.Labour, T &P And Carrier, Grouting Material Etc. Required For Proper Completion Of Work Shall Be Done By The Contractor At His Own Cost. , Erection And Grouting Stay Of Ratio 1:2:4 (Cement, Sand And Bricks Balast) As Per Respo Norms Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work. Grouting Material I.E. Cement, Sand, Brick Ballast/Stone Ballast Etc. Shall Be Arranged By The Contractor At His Own Cost. , Fixing Of Earthing Rod (20X2500mm) As Per Respo Norms Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work. , Removal Of Following Damaged Conductor From The Line With Its Bundling And Stacking With The Work Of Carriage From Site To Concerning Je Store With The Work Of Loading And Unloading At Both Ends. (0-40 Km) A) Acsr Weasel Conductor , Removal Of Following Damaged Conductor From The Line With Its Bundling And Stacking With The Work Of Carriage From Site To Concerning Je Store With The Work Of Loading And Unloading At Both Ends. (0-40 Km) B) Acsr Dog/Racoon Conductor , Removal Of Following Damaged Conductor From The Line With Its Bundling And Stacking With The Work Of Carriage From Site To Concerning Je Store With The Work Of Loading And Unloading At Both Ends. (0-40 Km) C) 50/95/120 Sqmm Areal Bunch Conductor. , Laying Sagging Stringing And Binding And Jumpering Of Conductor In Lt Line As Per Respo Manual And As Per Direction Of Supervising Engineer. It Includes The Cost Of Labour, T & P, Carrier Etc Reauired For Proper Completion Of Work. A) Acsr Weasal Conductor , Laying Sagging Stringing And Binding And Jumpering Of Conductor In Lt Line As Per Respo Manual And As Per Direction Of Supervising Engineer. It Includes The Cost Of Labour, T & P, Carrier Etc Reauired For Proper Completion Of Work. C) Acsr Dog/Raccon Conductor , Laying Sagging Stringing And Binding And Jumpering Of Conductor In Lt Line As Per Respo Manual And As Per Direction Of Supervising Engineer. It Includes The Cost Of Labour, T & P, Carrier Etc Reauired For Proper Completion Of Work. A) Ab Conductor 3X50 Sqmm , Laying Sagging Stringing And Binding And Jumpering Of Conductor In Lt Line As Per Respo Manual And As Per Direction Of Supervising Engineer. It Includes The Cost Of Labour, T & P, Carrier Etc Reauired For Proper Completion Of Work. A) Ab Conductor 3X95 Sqmm , Laying Sagging Stringing And Binding And Jumpering Of Conductor In Lt Line As Per Respo Manual And As Per Direction Of Supervising Engineer. It Includes The Cost Of Labour, T & P, Carrier Etc Reauired For Proper Completion Of Work. A) Ab Conductor 3X120 Sqmm , Re- Sagging And Stringing Of Existing Conductor In 33 Kv/11Kv/Lt Line As Per Direction Of Supervising Engineer Including The Cost Of Arrangement Of Labour,T&P, Carrier Etc. Required For Proper Completion Of Work A) Acsr Weasel Conductor. , Re- Sagging And Stringing Of Existing Conductor In 33 Kv/11Kv/Lt Line As Per Direction Of Supervising Engineer Including The Cost Of Arrangement Of Labour,T&P, Carrier Etc. Required For Proper Completion Of Work A) Acsr Dog Conductor. , Re- Sagging And Stringing Of Existing Conductor In 33 Kv/11Kv/Lt Line As Per Direction Of Supervising Engineer Including The Cost Of Arrangement Of Labour,T&P, Carrier Etc. Required For Proper Completion Of Work A) 50/95/120 Sqqm Areal Bunch Conductor. , A) Digging Of Pit Around The 9/11/13 Mtr. Rusted St Pole/R.S. Joist (1.5X1.5) & Approximately 2 Feet Below The Ground Level B) Providing & Fixing Of 2 Nos. M.S. Angle Clamp (Each Clamp Having 2 No. M.S. Angle 65X65x8mm 3 Ft In Length Jointed In Round Shape By M.S. Flat Of 65X8 Mm) The Work Include Providing Material All Fabrication & Fixing Of Clamp By 4 No. Nut Bolt & Wahsers & Welding Work At Site C) Construction Of Plinth In Cc-1:4:8 2 Ft. Below The Ground Level And 2 Ft. Above The Ground Level Around The St Pole.D) Painting Of Plinth Above Ground Level By Yellow Enamel Paint Of Good Quality. , Installation Of 11 Kv Do Fuse Set As Per Respo Norms. , Laying Of 11 Kv Xlpe Cable 3X35/70/120/185/240 Sqmm Cable In Trench With Making Loop (At A Distance Of Approx. 4 Mtr.) Laying Of Bricks (18 Nos. In One Meter), Filling Of Sand In Trench Then Laying Earth And Its Levelling And Rammuring Etc., Complete Work As Resspo Norms. , Laying Of 11 Kv Xlpe Cable 3X35/70/120/185/240 Sqmm Overhead Cable Complete Work As Per Respo Norms And Direction By Supervising Engineer. , Laying And Dressing Of 11 Kv Xlpe Cable 3X35/70/120/185/240 Under Ground Cable In The Trench 450 Mm Fine Sand Cushion Beneath And 150 Mm Fine Sand Cushion Above The Cable. The Cable Shall Be Duly Protected By 1 Class Brick Two On Either Side And Third On Top Of The Cables. Laid In Series One After The Other. The Work Includes Supplying Of Fine Sand & Bricks Refilling And Ramming Of The Left Out Soil Closing The Trench And Leveling Spare Cable Shall Be Left And Buried In The Trench In The Shape Of Rings At Both Ends. Cables Laying Work Includes Unroling Cutting / Megaring & Sealing Both Ends Of The Cable. , Straightening Of 9/11 Mtr. Long Stp Tilted Pole At Various Places By Straightening Of Pole Including The Cost Of Labour ,T&P Charges Required For Proper Completion Of Work. , Straightening Of 8.5/9 Mtr. Long Pcc Tilted Pole At Various Places By Straightening Of Pole Including The Cost Of Labour ,T&P Charges Required For Proper Completion Of Work. , Cartiage Of 63 Kva, 100 Kva, 250 Kva, 400 Kva T/F From 132 Kv Taj Agra To Site Where T/F Got Theft Capacity Of 63 Kva, 100 Kva, 250 Kva, 400 Kva Through The Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work.(Distance 00-70Kms.). , Guarding Of Ht Line By Laying, Stringing, Sagging And Binding Of 2 Nos. Parallel Gi Wire 6 Swg After Providing, Fabrication And Fixing Of Guarding Angle And Fabrication And Fixing Of X-Guards (Tillis) Of Gi Wire At Distance Of 3 Mtr. Including The Cost Of Arrangement Of Abour, T&P Etc.Required For Proper Completion Of Work.
Basic Detail
Tender No GEM/2026/B/8306563
Bidding Type Tender
Location
City Agra
State Uttar Pradesh
Key Dates
Publish Date 23 Nov 2026
Submission Date 03 Dec 2026
Open Date 04 Dec 2026
Finance
Tender Value 9.14 Lakhs
Tender Fee Ref. Documents
EMD 9200
Exemption Not Available
Document List
be6e29ae-c6bc-4059-9762-ca40f5e15f43.pdf
1795416895.xlsx
1795417055.pdf
1795417066.pdf
1795417094.pdf
1795417162.pdf
ATC_8d369d9e-62b1-49a5-b7d71795417544280_EDC1AGRABUYER.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Nov 23, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Dec 03, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 4 days
Dec 04, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 5 days

Tender Documents

Download All (ZIP) ↓
pdf

be6e29ae-c6bc-4059-9762-ca40f5e15f43.pdf

xlsx

1795416895.xlsx

pdf

1795417055.pdf

pdf

1795417066.pdf

pdf

1795417094.pdf

pdf

1795417162.pdf

pdf

ATC_8d369d9e-62b1-49a5-b7d71795417544280_EDC1AGRABUYER.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender