Bids Are invited for Custom Bid For Services - Maintenance And Repairing Work Of Damaged 33 11 Kv Lt Line And Their Accessories Under Edd Kheragarh Agra - Carriage Of Following From 132 Kv Taj Agra To Work Site Through The Kacha And Pakka Road Includ
Tender Overview
Project Description
Bids Are invited for Custom Bid For Services - Maintenance And Repairing Work Of Damaged 33 11 Kv Lt Line And Their Accessories Under Edd Kheragarh Agra - Carriage Of Following From 132 Kv Taj Agra To Work Site Through The Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work.(Distance 00-70Kms.) A) St Pole 9/11 Mtr. Long , Carriage Of Following From 132 Kv Taj Agra To Dump Site Through The Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work.(Distance 00-70Kms.) A) Pcc Pole 8.5 Mtr. Long. , Carriage Of Following From 132 Kv Taj Agra To Dump Site Through The Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work.(Distance 00-70Kms.) I) 11 Kv 3×35/70/3×120/185/240 Sqmm Xlpe Cable , Carriage Of Following From 132 Kv Taj Agra To Dump Site Through The Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work.(Distance 00-70Kms.) J) Line Material Viz. Aerial Bunch Conductor/Weasal Conductor/Dog, G.I. Earth Wire, Cross Arm, Angle, Channel, Insulators, Clamps And Other Line Material, If Required , Cutting Of Kharanja/Mettalic Road/Concrete Portion While Digging Pit For Erection Of Pcc/Stp Poles, Stays Rod And Giving The Exact Shape After Exicution Work As Per Direction Of Supervising Engineer. It Includes The Cost Of Labour, T & P, Carrier Etc Reauired For Proper Completion Of Work. , Replacment Of Damage 8.5 Mtr. Long Pcc Single Poles With Erection And Grouting Poles In 1:2:4 Ratio (Cement, Sand And Bricks Balast) Including Fixing Of All Accessories For 11 Kv Line As Per Respo Norms.Labour, T &P And Carrier, Grouting Material Etc. Required For Proper Completion Of Work Shall Be Done By The Contractor At His Own Cost. , Replacment Of Damage 8.5 Mtr. Long Pcc Double Poles With Erection And Grouting Poles In 1:2:4 Ratio (Cement, Sand And Bricks Balast) Including Fixing Of All Accessories For 11 Kv Line As Per Respo Norms.Labour, T &P And Carrier, Grouting Material Etc. Required For Proper Completion Of Work Shall Be Done By The Contractor At His Own Cost. , Replacment Of Damage 11 Mtr. Stp Single Pole With Erection And Grouting Poles In 1:2:4 Ratio (Cement, Sand And Bricks Balast) Including Fixing Of All Accessories For 11 Kv Line As Per Respo Norms.Labour, T &P And Carrier, Grouting Material Etc. Required For Proper Completion Of Work Shall Be Done By The Contractor At His Own Cost. , Replacment Of Damage 11 Mtr. Stp Double Pole With Erection And Grouting Poles In 1:2:4 Ratio (Cement, Sand And Bricks Balast) Including Fixing Of All Accessories For 11 Kv Line As Per Respo Norms.Labour, T &P And Carrier, Grouting Material Etc. Required For Proper Completion Of Work Shall Be Done By The Contractor At His Own Cost. , Erection And Grouting Stay Of Ratio 1:2:4 (Cement, Sand And Bricks Balast) As Per Respo Norms Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work. Grouting Material I.E. Cement, Sand, Brick Ballast/Stone Ballast Etc. Shall Be Arranged By The Contractor At His Own Cost. , Fixing Of Earthing Rod (20X2500mm) As Per Respo Norms Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work. , Removal Of Following Damaged Conductor From The Line With Its Bundling And Stacking With The Work Of Carriage From Site To Concerning Je Store With The Work Of Loading And Unloading At Both Ends. (0-40 Km) A) Acsr Weasel Conductor , Removal Of Following Damaged Conductor From The Line With Its Bundling And Stacking With The Work Of Carriage From Site To Concerning Je Store With The Work Of Loading And Unloading At Both Ends. (0-40 Km) B) Acsr Dog/Racoon Conductor , Removal Of Following Damaged Conductor From The Line With Its Bundling And Stacking With The Work Of Carriage From Site To Concerning Je Store With The Work Of Loading And Unloading At Both Ends. (0-40 Km) C) 50/95/120 Sqmm Areal Bunch Conductor. , Laying Sagging Stringing And Binding And Jumpering Of Conductor In Lt Line As Per Respo Manual And As Per Direction Of Supervising Engineer. It Includes The Cost Of Labour, T & P, Carrier Etc Reauired For Proper Completion Of Work. A) Acsr Weasal Conductor , Laying Sagging Stringing And Binding And Jumpering Of Conductor In Lt Line As Per Respo Manual And As Per Direction Of Supervising Engineer. It Includes The Cost Of Labour, T & P, Carrier Etc Reauired For Proper Completion Of Work. C) Acsr Dog/Raccon Conductor , Laying Sagging Stringing And Binding And Jumpering Of Conductor In Lt Line As Per Respo Manual And As Per Direction Of Supervising Engineer. It Includes The Cost Of Labour, T & P, Carrier Etc Reauired For Proper Completion Of Work. A) Ab Conductor 3X50 Sqmm , Laying Sagging Stringing And Binding And Jumpering Of Conductor In Lt Line As Per Respo Manual And As Per Direction Of Supervising Engineer. It Includes The Cost Of Labour, T & P, Carrier Etc Reauired For Proper Completion Of Work. A) Ab Conductor 3X95 Sqmm , Laying Sagging Stringing And Binding And Jumpering Of Conductor In Lt Line As Per Respo Manual And As Per Direction Of Supervising Engineer. It Includes The Cost Of Labour, T & P, Carrier Etc Reauired For Proper Completion Of Work. A) Ab Conductor 3X120 Sqmm , Re- Sagging And Stringing Of Existing Conductor In 33 Kv/11Kv/Lt Line As Per Direction Of Supervising Engineer Including The Cost Of Arrangement Of Labour,T&P, Carrier Etc. Required For Proper Completion Of Work A) Acsr Weasel Conductor. , Re- Sagging And Stringing Of Existing Conductor In 33 Kv/11Kv/Lt Line As Per Direction Of Supervising Engineer Including The Cost Of Arrangement Of Labour,T&P, Carrier Etc. Required For Proper Completion Of Work A) Acsr Dog Conductor. , Re- Sagging And Stringing Of Existing Conductor In 33 Kv/11Kv/Lt Line As Per Direction Of Supervising Engineer Including The Cost Of Arrangement Of Labour,T&P, Carrier Etc. Required For Proper Completion Of Work A) 50/95/120 Sqqm Areal Bunch Conductor. , A) Digging Of Pit Around The 9/11/13 Mtr. Rusted St Pole/R.S. Joist (1.5X1.5) & Approximately 2 Feet Below The Ground Level B) Providing & Fixing Of 2 Nos. M.S. Angle Clamp (Each Clamp Having 2 No. M.S. Angle 65X65x8mm 3 Ft In Length Jointed In Round Shape By M.S. Flat Of 65X8 Mm) The Work Include Providing Material All Fabrication & Fixing Of Clamp By 4 No. Nut Bolt & Wahsers & Welding Work At Site C) Construction Of Plinth In Cc-1:4:8 2 Ft. Below The Ground Level And 2 Ft. Above The Ground Level Around The St Pole.D) Painting Of Plinth Above Ground Level By Yellow Enamel Paint Of Good Quality. , Installation Of 11 Kv Do Fuse Set As Per Respo Norms. , Laying Of 11 Kv Xlpe Cable 3X35/70/120/185/240 Sqmm Cable In Trench With Making Loop (At A Distance Of Approx. 4 Mtr.) Laying Of Bricks (18 Nos. In One Meter), Filling Of Sand In Trench Then Laying Earth And Its Levelling And Rammuring Etc., Complete Work As Resspo Norms. , Laying Of 11 Kv Xlpe Cable 3X35/70/120/185/240 Sqmm Overhead Cable Complete Work As Per Respo Norms And Direction By Supervising Engineer. , Laying And Dressing Of 11 Kv Xlpe Cable 3X35/70/120/185/240 Under Ground Cable In The Trench 450 Mm Fine Sand Cushion Beneath And 150 Mm Fine Sand Cushion Above The Cable. The Cable Shall Be Duly Protected By 1 Class Brick Two On Either Side And Third On Top Of The Cables. Laid In Series One After The Other. The Work Includes Supplying Of Fine Sand & Bricks Refilling And Ramming Of The Left Out Soil Closing The Trench And Leveling Spare Cable Shall Be Left And Buried In The Trench In The Shape Of Rings At Both Ends. Cables Laying Work Includes Unroling Cutting / Megaring & Sealing Both Ends Of The Cable. , Straightening Of 9/11 Mtr. Long Stp Tilted Pole At Various Places By Straightening Of Pole Including The Cost Of Labour ,T&P Charges Required For Proper Completion Of Work. , Straightening Of 8.5/9 Mtr. Long Pcc Tilted Pole At Various Places By Straightening Of Pole Including The Cost Of Labour ,T&P Charges Required For Proper Completion Of Work. , Cartiage Of 63 Kva, 100 Kva, 250 Kva, 400 Kva T/F From 132 Kv Taj Agra To Site Where T/F Got Theft Capacity Of 63 Kva, 100 Kva, 250 Kva, 400 Kva Through The Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work.(Distance 00-70Kms.). , Guarding Of Ht Line By Laying, Stringing, Sagging And Binding Of 2 Nos. Parallel Gi Wire 6 Swg After Providing, Fabrication And Fixing Of Guarding Angle And Fabrication And Fixing Of X-Guards (Tillis) Of Gi Wire At Distance Of 3 Mtr. Including The Cost Of Arrangement Of Abour, T&P Etc.Required For Proper Completion Of Work.
BOQ
| Sl. No. | Item Title | Item Description |
| 1 | Carriage of following from 132 KV Taj Agra to work site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-70Kms.) a) ST pole 9/11 Mtr. long | Carriage of following from 132 KV Taj Agra to work site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-70Kms.) a) ST pole 9/11 Mtr. long |
| 2 | Carriage of following from 132 KV Taj Agra to dump site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-70Kms.) a) PCC Pole 8.5 Mtr. Long. | Carriage of following from 132 KV Taj Agra to dump site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-70Kms.) a) PCC Pole 8.5 Mtr. Long. |
| 3 | Carriage of following from 132 KV Taj Agra to dump site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-70Kms.) I) 11 KV 3×35/70/3×120/185/240 sqmm XLPE cable | Carriage of following from 132 KV Taj Agra to dump site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-70Kms.) I) 11 KV 3×35/70/3×120/185/240 sqmm XLPE cable |
| 4 | Carriage of following from 132 KV Taj Agra to dump site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-70Kms.) J) Line material viz. Aerial bunch conductor/Weasal conductor/Dog, G.I. earth wire, cross arm, angle, channel, insulators, clamps and other line material, if required | Carriage of following from 132 KV Taj Agra to dump site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-70Kms.) J) Line material viz. Aerial bunch conductor/Weasal conductor/Dog, G.I. earth wire, cross arm, angle, channel, insulators, clamps and other line material, if required |
| 5 | Cutting of kharanja/mettalic road/concrete portion while digging pit for erection of PCC/STP poles, stays rod and giving the exact shape after exicution work as per direction of supervising engineer. It includes the cost of labour, T & P, carrier etc reauired for proper completion of work. | Cutting of kharanja/mettalic road/concrete portion while digging pit for erection of PCC/STP poles, stays rod and giving the exact shape after exicution work as per direction of supervising engineer. It includes the cost of labour, T & P, carrier etc reauired for proper completion of work. |
| 6 | Replacment of Damage 8.5 Mtr. long PCC Single Poles with Erection and grouting poles in 1:2:4 ratio (cement, sand and bricks balast) including fixing of all accessories for 11 KV line as per RESPO norms.Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost. | Replacment of Damage 8.5 Mtr. long PCC Single Poles with Erection and grouting poles in 1:2:4 ratio (cement, sand and bricks balast) including fixing of all accessories for 11 KV line as per RESPO norms.Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost. |
| 7 | Replacment of Damage 8.5 Mtr. long PCC Double Poles with Erection and grouting poles in 1:2:4 ratio (cement, sand and bricks balast) including fixing of all accessories for 11 KV line as per RESPO norms.Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost. | Replacment of Damage 8.5 Mtr. long PCC Double Poles with Erection and grouting poles in 1:2:4 ratio (cement, sand and bricks balast) including fixing of all accessories for 11 KV line as per RESPO norms.Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost. |
| 8 | Replacment of Damage 11 Mtr. STP Single Pole with Erection and grouting poles in 1:2:4 ratio (cement, sand and bricks balast) including fixing of all accessories for 11 KV line as per RESPO norms.Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost. | Replacment of Damage 11 Mtr. STP Single Pole with Erection and grouting poles in 1:2:4 ratio (cement, sand and bricks balast) including fixing of all accessories for 11 KV line as per RESPO norms.Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost. |
| 9 | Replacment of Damage 11 Mtr. STP Double Pole with Erection and grouting poles in 1:2:4 ratio (cement, sand and bricks balast) including fixing of all accessories for 11 KV line as per RESPO norms.Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost. | Replacment of Damage 11 Mtr. STP Double Pole with Erection and grouting poles in 1:2:4 ratio (cement, sand and bricks balast) including fixing of all accessories for 11 KV line as per RESPO norms.Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost. |
| 10 | Erection and grouting stay of ratio 1:2:4 (cement, sand and bricks balast) as per RESPO norms including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work. Grouting material i.e. cement, sand, brick ballast/stone ballast etc. shall be arranged by the contractor at his own cost. | Erection and grouting stay of ratio 1:2:4 (cement, sand and bricks balast) as per RESPO norms including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work. Grouting material i.e. cement, sand, brick ballast/stone ballast etc. shall be arranged by the contractor at his own cost. |
| 11 | Fixing of earthing rod (20x2500mm) as per RESPO norms including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work. | Fixing of earthing rod (20x2500mm) as per RESPO norms including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work. |
| 12 | Removal of following damaged conductor from the line with its bundling and stacking with the work of carriage from site to concerning JE Store with the work of loading and unloading at both ends. (0-40 KM) A) ACSR Weasel Conductor | Removal of following damaged conductor from the line with its bundling and stacking with the work of carriage from site to concerning JE Store with the work of loading and unloading at both ends. (0-40 KM) A) ACSR Weasel Conductor |
| 13 | Removal of following damaged conductor from the line with its bundling and stacking with the work of carriage from site to concerning JE Store with the work of loading and unloading at both ends. (0-40 KM) B) ACSR Dog/Racoon Conductor | Removal of following damaged conductor from the line with its bundling and stacking with the work of carriage from site to concerning JE Store with the work of loading and unloading at both ends. (0-40 KM) B) ACSR Dog/Racoon Conductor |
| 14 | Removal of following damaged conductor from the line with its bundling and stacking with the work of carriage from site to concerning JE Store with the work of loading and unloading at both ends. (0-40 KM) C) 50/95/120 sqmm Areal Bunch Conductor. | Removal of following damaged conductor from the line with its bundling and stacking with the work of carriage from site to concerning JE Store with the work of loading and unloading at both ends. (0-40 KM) C) 50/95/120 sqmm Areal Bunch Conductor. |
| 15 | Laying sagging stringing and binding and jumpering of conductor in LT line as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T & P, carrier etc reauired for proper completion of work. a) ACSR Weasal conductor | Laying sagging stringing and binding and jumpering of conductor in LT line as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T & P, carrier etc reauired for proper completion of work. a) ACSR Weasal conductor |
| 16 | Laying sagging stringing and binding and jumpering of conductor in LT line as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T & P, carrier etc reauired for proper completion of work. c) ACSR DOG/Raccon Conductor | Laying sagging stringing and binding and jumpering of conductor in LT line as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T & P, carrier etc reauired for proper completion of work. c) ACSR DOG/Raccon Conductor |
| 17 | Laying sagging stringing and binding and jumpering of conductor in LT line as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T & P, carrier etc reauired for proper completion of work. A) AB Conductor 3x50 sqmm | Laying sagging stringing and binding and jumpering of conductor in LT line as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T & P, carrier etc reauired for proper completion of work. A) AB Conductor 3x50 sqmm |
| 18 | Laying sagging stringing and binding and jumpering of conductor in LT line as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T & P, carrier etc reauired for proper completion of work. A) AB Conductor 3x95 sqmm | Laying sagging stringing and binding and jumpering of conductor in LT line as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T & P, carrier etc reauired for proper completion of work. A) AB Conductor 3x95 sqmm |
| 19 | Laying sagging stringing and binding and jumpering of conductor in LT line as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T & P, carrier etc reauired for proper completion of work. A) AB Conductor 3x120 sqmm | Laying sagging stringing and binding and jumpering of conductor in LT line as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T & P, carrier etc reauired for proper completion of work. A) AB Conductor 3x120 sqmm |
| 20 | Re- sagging and stringing of existing conductor in 33 KV/11KV/LT line as per direction of supervising engineer including the cost of arrangement of labour,T&P, carrier etc. required for proper completion of work A) ACSR Weasel Conductor. | Re- sagging and stringing of existing conductor in 33 KV/11KV/LT line as per direction of supervising engineer including the cost of arrangement of labour,T&P, carrier etc. required for proper completion of work A) ACSR Weasel Conductor. |
| 21 | Re- sagging and stringing of existing conductor in 33 KV/11KV/LT line as per direction of supervising engineer including the cost of arrangement of labour,T&P, carrier etc. required for proper completion of work A) ACSR Dog Conductor. | Re- sagging and stringing of existing conductor in 33 KV/11KV/LT line as per direction of supervising engineer including the cost of arrangement of labour,T&P, carrier etc. required for proper completion of work A) ACSR Dog Conductor. |
| 22 | Re- sagging and stringing of existing conductor in 33 KV/11KV/LT line as per direction of supervising engineer including the cost of arrangement of labour,T&P, carrier etc. required for proper completion of work A) 50/95/120 sqqm Areal Bunch Conductor. | Re- sagging and stringing of existing conductor in 33 KV/11KV/LT line as per direction of supervising engineer including the cost of arrangement of labour,T&P, carrier etc. required for proper completion of work A) 50/95/120 sqqm Areal Bunch Conductor. |
| 23 | A) Digging of Pit around the 9/11/13 Mtr. Rusted ST Pole/R.S. JOIST (1.5\\"x1.5\\") & Approximately 2 feet below the ground level B) Providing & Fixing of 2 Nos. M.S. angle Clamp (each clamp having 2 no. M.S. angle 65x65x8mm 3 ft in length jointed in round shape by M.S. Flat of 65x8 mm) The work include providing material all fabrication & fixing of clamp by 4 No. Nut bolt & wahsers & welding work at site C) Construction of Plinth in CC-1:4:8 2 ft. Below the ground level and 2 ft. above the ground level around the ST Pole.D) Painting of Plinth above ground level by yellow enamel paint of good quality. | A) Digging of Pit around the 9/11/13 Mtr. Rusted ST Pole/R.S. JOIST (1.5\\"x1.5\\") & Approximately 2 feet below the ground level B) Providing & Fixing of 2 Nos. M.S. angle Clamp (each clamp having 2 no. M.S. angle 65x65x8mm 3 ft in length jointed in round shape by M.S. Flat of 65x8 mm) The work include providing material all fabrication & fixing of clamp by 4 No. Nut bolt & wahsers & welding work at site C) Construction of Plinth in CC-1:4:8 2 ft. Below the ground level and 2 ft. above the ground level around the ST Pole.D) Painting of Plinth above ground level by yellow enamel paint of good quality. |
| 24 | Installation of 11 KV DO Fuse Set as per RESPO Norms. | Installation of 11 KV DO Fuse Set as per RESPO Norms. |
| 25 | Laying of 11 KV XLPE Cable 3x35/70/120/185/240 sqmm cable in trench with making loop (at a distance of approx. 4 mtr.) laying of bricks (18 nos. in one meter), filling of sand in trench then laying earth and its levelling and rammuring etc., complete work as RESSPO norms. | Laying of 11 KV XLPE Cable 3x35/70/120/185/240 sqmm cable in trench with making loop (at a distance of approx. 4 mtr.) laying of bricks (18 nos. in one meter), filling of sand in trench then laying earth and its levelling and rammuring etc., complete work as RESSPO norms. |
| 26 | Laying of 11 KV XLPE Cable 3x35/70/120/185/240 sqmm overhead Cable complete work as per RESPO norms and direction by supervising Engineer. | Laying of 11 KV XLPE Cable 3x35/70/120/185/240 sqmm overhead Cable complete work as per RESPO norms and direction by supervising Engineer. |
| 27 | Laying and dressing of 11 KV XLPE Cable 3x35/70/120/185/240 under ground cable in the trench 450 mm fine sand cushion beneath and 150 mm fine sand cushion above the cable. The cable shall be duly protected by 1\\" class brick two on either side and third on top of the cables. Laid in series one after the other. The work includes supplying of fine sand & bricks refilling and ramming of the left out soil closing the trench and leveling Spare cable shall be left and buried in the trench in the shape of rings at both ends. Cables laying work includes unroling cutting / megaring & sealing both ends of the cable. | Laying and dressing of 11 KV XLPE Cable 3x35/70/120/185/240 under ground cable in the trench 450 mm fine sand cushion beneath and 150 mm fine sand cushion above the cable. The cable shall be duly protected by 1\\" class brick two on either side and third on top of the cables. Laid in series one after the other. The work includes supplying of fine sand & bricks refilling and ramming of the left out soil closing the trench and leveling Spare cable shall be left and buried in the trench in the shape of rings at both ends. Cables laying work includes unroling cutting / megaring & sealing both ends of the cable. |
| 28 | Straightening of 9/11 Mtr. Long STP tilted pole at various places by straightening of pole including the cost of labour ,T&P charges required for proper completion of work. | Straightening of 9/11 Mtr. Long STP tilted pole at various places by straightening of pole including the cost of labour ,T&P charges required for proper completion of work. |
| 29 | Straightening of 8.5/9 Mtr. Long PCC tilted pole at various places by straightening of pole including the cost of labour ,T&P charges required for proper completion of work. | Straightening of 8.5/9 Mtr. Long PCC tilted pole at various places by straightening of pole including the cost of labour ,T&P charges required for proper completion of work. |
| 30 | Cartiage of 63 KVA, 100 KVA, 250 KVA, 400 KVA T/F from 132 KV Taj Agra to Site Where T/F Got Theft Capacity of 63 KVA, 100 KVA, 250 KVA, 400 KVA through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-70Kms.). | Cartiage of 63 KVA, 100 KVA, 250 KVA, 400 KVA T/F from 132 KV Taj Agra to Site Where T/F Got Theft Capacity of 63 KVA, 100 KVA, 250 KVA, 400 KVA through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-70Kms.). |
| 31 | Guarding of HT line by laying, stringing, sagging and binding of 2 Nos. parallel GI wire 6 SWG after providing, fabrication and fixing of guarding angle and fabrication and fixing of X-guards (Tillis) of GI wire at distance of 3 Mtr. including the cost of arrangement of abour, T&P etc.required for proper completion of work. | Guarding of HT line by laying, stringing, sagging and binding of 2 Nos. parallel GI wire 6 SWG after providing, fabrication and fixing of guarding angle and fabrication and fixing of X-guards (Tillis) of GI wire at distance of 3 Mtr. including the cost of arrangement of abour, T&P etc.required for proper completion of work. |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 4 daysBid Opening Date
Technical bids will be opened and evaluated.