Petroleum and Natural Gas Boards / Undertakings / PSU Closing in 37 days TDR #58682609

Tender For Procurement Of Iron Roughnecks

Issued by Boards / Undertakings / PSU · Delhi, Delhi
Tender Value
Ref. Documents
Estimated cost
Bid Submission
02 Jan 2027
37 days left
EMD
51.83 Lakhs
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Delhi → Delhi
EMD Exemption
Available
Quantity
Not Available

Project Description

Tender for Procurement Of Iron Roughnecks , Item Rate Boq Boq_Ver4.0 Item Rate Normal Inr Only Inr Select, Excess (+), Less (-) Less (-) Tender Inviting Authority: Ongc Name Of Work: Procurement Of Iron Roughnecks Tender Ref. No: Name Of The Bidder/ Bidding Firm / Company : Price Schedule (On For Basis) (This Boq Template Must Not Be Modified/Replaced By The Bidder And The Same Should Be Uploaded After Filling The Relevent Columns, Else The Bidder Is Liable To Be Rejected For This Tender. Bidders Are Allowed To Enter The Bidder Name And Values Only) Notes: 1. Cost Of Iron Roughneck With Hpu Includes Cost Of Equipment (With Commissioning Spares/ Consumables And Tool Kit) 2. Bidders Are Advised To Verify The Applicable Gst Rates Before Submitting Their Quotes. It Shall Be The Sole Responsibility Of The Bidder To Ensure That The Correct Applicable Gst Rates And Corresponding Amounts Are Considered While Quoting.) 3. Bidder Must Quote Strictly As Per This Price Format. The Bids Which Do Not Comply With This Price Format Are Liable For Outright Rejection. 4. Bidder Must Quote All The Applicable Components Of Price Format Up To F.O.R. Destination Price Failing Which Their Offer Will Not Be Considered. 5. Ongc Will Not Entertain Any Future Claim On Account Of The Price Components Which Have Not Been Indicated In The Price-Bid Format. 6. Bidders Are Required To Quote For All The Items /Full Quantity As Per Specifications. Bidders Not Quoting All The Items/Full Quantity As Per Specification Will Be Rejected. 7. Evaluation Of Bids Will Be Total Value Wise Evaluation. 8. Bidders Are Required To Quote In Inr Only. 9. Bidders To Provide The List Of Oem Recommended One-Year Operational Spares For Each Unit, With Part Nos. And Qty. Along With Their Bid. Besides That, Supplier / Bidder Shall Provide *Total Cost Of Such Spares Per Unit In The Price Schedule, Whereas Break-Up Cost For Each Spares, In Such List, Shall Be As Per Attached Appendix - 1) 10. Bidders To Provide The List Of Additional Oem Recommended Operational Spares For Successive 4 Years (I.E. From 2Nd Year To 5Th Year) For Each Unit, With Part Nos. And Qty. Along With Their Bid. Besides That, Supplier / Bidder Shall Provide *Total Cost Of Such Spares Per Unit In The Price Schedule, Whereas Break-Up Cost For Each Spares, In Such List, Shall Be As Per Attached Appendix - 2) Number # Text # Text # Number # Text # Number Number Text Text # Number # Text# Text # Number # Number Number Number Number Text Text Number Number Number Number Text Text Number Number Number Number Text Text Number Number Number Number Text Text Number Number Number Number Text Text Number Number Number # Number # Text Text Number # Number # Date Number # Number # Text # Sl. No. Description Of The Item Item Code / Make Qty Quoted Uom Estimated Rate Addition / Deduction Addition / Deduction Values Currency Convertion Against Each Item Quoted Currency In Inr / Other Currency Unit Cost Of The Item (In Inr) To Be Entered By The Bidder Rs. P Gst % Gst (In Inr) Total Unit Cost (In Inr) Any Other Taxes/Duties/Levies Other Taxes 2 Iiird Party I.E Dgs&D / Rites Etc Inspection Charges @0.34%+Service Tax Less For Cenvat Credit,If Any Respect Of Supplies Under Full Excise Duty Category Total Cost Of Quoted Qty. (In Inr) Total Amount With Taxes Total Amount In Words , A. Irns For Offshore Rigs , Iron Roughneck With Hpu , Installation (Supervision Only), Commissioning And Testing , Oem Recommended One-Year Operational Spares (Supplier / Bidder / Manufacturer Shall Provide The List Of Such Spares, For Each Unit, With Part Nos. And Qty. Along With Their Bid. Besides That, Supplier / Bidder Shall Provide *Total Cost Of Such Spares Per Unit In The Price Schedule, Whereas Break-Up Cost For Each Spares, In Such List, Shall Be As Per Attached Appendix - 1) , Additional Oem Recommended Operational Spares For Successive 4 Years (I.E. From 2Nd Year To 5Th Year) (Supplier / Bidder / Manufacturer Shall Provide The List Of Such Spares, For Each Unit, With Part Nos. And Qty. Along With Their Bid. Besides That, Supplier / Bidder Shall Provide *Total Cost Of Such Spares Per Unit In The Price Schedule, Whereas Break-Up Cost For Each Spares, In Such List, Shall Be As Per Attached Appendix - 2) , B. Irns For Onshore Rigs , Iron Roughneck With Hpu , Installation (Supervision Only), Commissioning And Testing , Oem Recommended One-Year Operational Spares (Supplier / Bidder / Manufacturer Shall Provide The List Of Such Spares, For Each Unit, With Part Nos. And Qty. Along With Their Bid. Besides That, Supplier / Bidder Shall Provide *Total Cost Of Such Spares Per Unit In The Price Schedule, Whereas Break-Up Cost For Each Spares, In Such List, Shall Be As Per Attached Appendix - 1) , Additional Oem Recommended Operational Spares For Successive 4 Years (I.E. From 2Nd Year To 5Th Year) (Supplier / Bidder / Manufacturer Shall Provide The List Of Such Spares, For Each Unit, With Part Nos. And Qty. Along With Their Bid. Besides That, Supplier / Bidder Shall Provide *Total Cost Of Such Spares Per Unit In The Price Schedule, Whereas Break-Up Cost For Each Spares, In Such List, Shall Be As Per Attached Appendix - 2) Total In Figures 0.0 0.0 Inr Zero Only 4.0 Construction Of Chamber For 100Mm Sluice Plates Item5 10.0 Nos Quoted Rate In Figures Select 0.0 0.0 Zero Only Quoted Rate In Words Inr Zero Only Appendix - 1: Oem Recommended One-Year Operational Spares Sl. No. Name/ Short Description Of The Spare Part No. Qty. Per Unit Of Irn Uom Cost Of A Spare (In Inr) Total Cost Of Spare Per Unit Of Irn (In Inr) , * ** X Y Z Total Cost Of Oem Recommended One-Year Operational Spares Per Unit In Inr = Appendix - 2: Additional Oem Recommended Operational Spares For Successive 4 Years (I.E. From 2Nd Year To 5Th Year) Sl. No. Name/ Short Description Of The Spare Part No. Qty. Per Unit Of Irn Uom Cost Of A Spare (In Inr) Total Cost Of Spare Per Unit Of Irn (In Inr) , * ** X Y Z Total Cost Of Additional Oem Recommended Operational Spares For Successive 4 Years (I.E. From 2Nd Year To 5Th Year) Per Unit In Inr =

BOQ

Name of Work:- Procurement of Iron Roughnecks
Sl. No. Item Description
1Item Rate BoQ BoQ_Ver4.0 Item Rate Normal INR Only INR Select, Excess (+), Less (-) Less (-) Tender Inviting Authority: ONGC Name of Work: Procurement of Iron Roughnecks Tender Ref. No: ZV3SC26036 Name of the Bidder/ Bidding Firm / Company : Price Schedule (on FOR Basis)(This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only)NOTEs: 1. Cost of Iron Roughneck with HPU includes cost of Equipment (with Commissioning Spares/ Consumables and Tool Kit)2. Bidders are advised to verify the applicable GST rates before submitting their quotes. It shall be the sole responsibility of the bidder to ensure that the correct applicable GST rates and corresponding amounts are considered while quoting.)3. Bidder must quote strictly as per this price format. The bids which do not comply with this price format are liable for outright rejection. 4. Bidder must quote all the applicable components of price format up to “F.O.R. Destination Price” failing which their offer will not be considered. 5. ONGC will not entertain any future claim on account of the price components which have not been indicated in the PRICE-BID FORMAT.6. Bidders are required to quote for all the items /full quantity as per specifications. Bidders not quoting all the items/full quantity as per specification will be rejected.7. Evaluation of bids will be Total value wise evaluation.8. Bidders are required to quote in INR only.9. Bidders to provide the list of OEM Recommended One-Year operational spares for each Unit, with Part Nos. and Qty. along with their bid. Besides that, Supplier / Bidder shall provide *Total Cost of such spares per Unit in the Price Schedule, whereas Break-up Cost for each Spares, in such List, shall be as per attached Appendix - 1)10. Bidders to provide the list of Additional OEM recommended operational spares for successive 4 years (i.e. from 2nd year to 5th year) for each Unit, with Part Nos. and Qty. along with their bid. Besides that, Supplier / Bidder shall provide *Total Cost of such spares per Unit in the Price Schedule, whereas Break-up Cost for each Spares, in such List, shall be as per attached Appendix - 2) NUMBER # TEXT # TEXT # NUMBER # TEXT # NUMBER NUMBER TEXT TEXT # NUMBER # TEXT# TEXT # NUMBER # NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER # NUMBER # TEXT TEXT NUMBER # NUMBER # DATE NUMBER # NUMBER # TEXT # Sl.No. Description of the Item Item Code / Make Qty quoted UOM Estimated Rate Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency Unit Cost of the item (in INR) To be entered by the Bidder Rs. P GST % GST (in INR) Total Unit Cost (in INR) Any Other Taxes/Duties/Levies Other Taxes 2 IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category Total Cost of Quoted Qty. (in INR) TOTAL AMOUNT With Taxes TOTAL AMOUNT In Words
2A. IRNs for Offshore Rigs
3Iron Roughneck with HPU
4Installation (Supervision only), Commissioning and Testing
5OEM Recommended One-Year operational spares (Supplier / Bidder / Manufacturer shall provide the list of such spares, for each Unit, with Part Nos. and Qty. along with their bid. Besides that, Supplier / Bidder shall provide *Total Cost of such spares per Unit in the Price Schedule, whereas Break-up Cost for each Spares, in such List, shall be as per attached Appendix - 1)
6Additional OEM recommended operational spares for successive 4 years (i.e. from 2nd year to 5th year) (Supplier / Bidder / Manufacturer shall provide the list of such spares, for each Unit, with Part Nos. and Qty. along with their bid. Besides that, Supplier / Bidder shall provide *Total Cost of such spares per Unit in the Price Schedule, whereas Break-up Cost for each Spares, in such List, shall be as per attached Appendix - 2)
7B. IRNs for Onshore Rigs
8Iron Roughneck with HPU
9Installation (Supervision only), Commissioning and Testing
10OEM Recommended One-Year operational spares (Supplier / Bidder / Manufacturer shall provide the list of such spares, for each Unit, with Part Nos. and Qty. along with their bid. Besides that, Supplier / Bidder shall provide *Total Cost of such spares per Unit in the Price Schedule, whereas Break-up Cost for each Spares, in such List, shall be as per attached Appendix - 1)
11Additional OEM recommended operational spares for successive 4 years (i.e. from 2nd year to 5th year) (Supplier / Bidder / Manufacturer shall provide the list of such spares, for each Unit, with Part Nos. and Qty. along with their bid. Besides that, Supplier / Bidder shall provide *Total Cost of such spares per Unit in the Price Schedule, whereas Break-up Cost for each Spares, in such List, shall be as per attached Appendix - 2) Total in Figures 0.0 0.0 INR Zero Only 4.0 Construction of chamber for 100mm sluice plates item5 10.0 Nos Quoted Rate in Figures Select 0.0 0.0 Zero Only Quoted Rate in Words INR Zero Only Appendix - 1: OEM Recommended One-Year operational spares Sl. No. Name/ Short Description of the spare Part No. Qty. per Unit of IRN UOM Cost of a spare (in INR) Total Cost of Spare per Unit of IRN (in INR)
12 * ** x y z Total Cost of OEM Recommended One-Year operational spares per unit in INR = Appendix - 2: Additional OEM recommended operational spares for successive 4 years (i.e. from 2nd year to 5th year) Sl. No. Name/ Short Description of the spare Part No. Qty. per Unit of IRN UOM Cost of a spare (in INR) Total Cost of Spare per Unit of IRN (in INR)
13 * ** x y z Total Cost of Additional OEM recommended operational spares for successive 4 years (i.e. from 2nd year to 5th year) per unit in INR = Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 58682609
AUTHORITY Boards / Undertakings / PSU
TENDER VALUE Ref. Documents
LAST DATE 02-01-2027
Authority
Authority Name Oil And Natural Gas Corporation Limited
Work Description Tender for Procurement Of Iron Roughnecks , Item Rate Boq Boq_Ver4.0 Item Rate Normal Inr Only Inr Select, Excess (+), Less (-) Less (-) Tender Inviting Authority: Ongc Name Of Work: Procurement Of Iron Roughnecks Tender Ref. No: Name Of The Bidder/ Bidding Firm / Company : Price Schedule (On For Basis) (This Boq Template Must Not Be Modified/Replaced By The Bidder And The Same Should Be Uploaded After Filling The Relevent Columns, Else The Bidder Is Liable To Be Rejected For This Tender. Bidders Are Allowed To Enter The Bidder Name And Values Only) Notes: 1. Cost Of Iron Roughneck With Hpu Includes Cost Of Equipment (With Commissioning Spares/ Consumables And Tool Kit) 2. Bidders Are Advised To Verify The Applicable Gst Rates Before Submitting Their Quotes. It Shall Be The Sole Responsibility Of The Bidder To Ensure That The Correct Applicable Gst Rates And Corresponding Amounts Are Considered While Quoting.) 3. Bidder Must Quote Strictly As Per This Price Format. The Bids Which Do Not Comply With This Price Format Are Liable For Outright Rejection. 4. Bidder Must Quote All The Applicable Components Of Price Format Up To F.O.R. Destination Price Failing Which Their Offer Will Not Be Considered. 5. Ongc Will Not Entertain Any Future Claim On Account Of The Price Components Which Have Not Been Indicated In The Price-Bid Format. 6. Bidders Are Required To Quote For All The Items /Full Quantity As Per Specifications. Bidders Not Quoting All The Items/Full Quantity As Per Specification Will Be Rejected. 7. Evaluation Of Bids Will Be Total Value Wise Evaluation. 8. Bidders Are Required To Quote In Inr Only. 9. Bidders To Provide The List Of Oem Recommended One-Year Operational Spares For Each Unit, With Part Nos. And Qty. Along With Their Bid. Besides That, Supplier / Bidder Shall Provide *Total Cost Of Such Spares Per Unit In The Price Schedule, Whereas Break-Up Cost For Each Spares, In Such List, Shall Be As Per Attached Appendix - 1) 10. Bidders To Provide The List Of Additional Oem Recommended Operational Spares For Successive 4 Years (I.E. From 2Nd Year To 5Th Year) For Each Unit, With Part Nos. And Qty. Along With Their Bid. Besides That, Supplier / Bidder Shall Provide *Total Cost Of Such Spares Per Unit In The Price Schedule, Whereas Break-Up Cost For Each Spares, In Such List, Shall Be As Per Attached Appendix - 2) Number # Text # Text # Number # Text # Number Number Text Text # Number # Text# Text # Number # Number Number Number Number Text Text Number Number Number Number Text Text Number Number Number Number Text Text Number Number Number Number Text Text Number Number Number Number Text Text Number Number Number # Number # Text Text Number # Number # Date Number # Number # Text # Sl. No. Description Of The Item Item Code / Make Qty Quoted Uom Estimated Rate Addition / Deduction Addition / Deduction Values Currency Convertion Against Each Item Quoted Currency In Inr / Other Currency Unit Cost Of The Item (In Inr) To Be Entered By The Bidder Rs. P Gst % Gst (In Inr) Total Unit Cost (In Inr) Any Other Taxes/Duties/Levies Other Taxes 2 Iiird Party I.E Dgs&D / Rites Etc Inspection Charges @0.34%+Service Tax Less For Cenvat Credit,If Any Respect Of Supplies Under Full Excise Duty Category Total Cost Of Quoted Qty. (In Inr) Total Amount With Taxes Total Amount In Words , A. Irns For Offshore Rigs , Iron Roughneck With Hpu , Installation (Supervision Only), Commissioning And Testing , Oem Recommended One-Year Operational Spares (Supplier / Bidder / Manufacturer Shall Provide The List Of Such Spares, For Each Unit, With Part Nos. And Qty. Along With Their Bid. Besides That, Supplier / Bidder Shall Provide *Total Cost Of Such Spares Per Unit In The Price Schedule, Whereas Break-Up Cost For Each Spares, In Such List, Shall Be As Per Attached Appendix - 1) , Additional Oem Recommended Operational Spares For Successive 4 Years (I.E. From 2Nd Year To 5Th Year) (Supplier / Bidder / Manufacturer Shall Provide The List Of Such Spares, For Each Unit, With Part Nos. And Qty. Along With Their Bid. Besides That, Supplier / Bidder Shall Provide *Total Cost Of Such Spares Per Unit In The Price Schedule, Whereas Break-Up Cost For Each Spares, In Such List, Shall Be As Per Attached Appendix - 2) , B. Irns For Onshore Rigs , Iron Roughneck With Hpu , Installation (Supervision Only), Commissioning And Testing , Oem Recommended One-Year Operational Spares (Supplier / Bidder / Manufacturer Shall Provide The List Of Such Spares, For Each Unit, With Part Nos. And Qty. Along With Their Bid. Besides That, Supplier / Bidder Shall Provide *Total Cost Of Such Spares Per Unit In The Price Schedule, Whereas Break-Up Cost For Each Spares, In Such List, Shall Be As Per Attached Appendix - 1) , Additional Oem Recommended Operational Spares For Successive 4 Years (I.E. From 2Nd Year To 5Th Year) (Supplier / Bidder / Manufacturer Shall Provide The List Of Such Spares, For Each Unit, With Part Nos. And Qty. Along With Their Bid. Besides That, Supplier / Bidder Shall Provide *Total Cost Of Such Spares Per Unit In The Price Schedule, Whereas Break-Up Cost For Each Spares, In Such List, Shall Be As Per Attached Appendix - 2) Total In Figures 0.0 0.0 Inr Zero Only 4.0 Construction Of Chamber For 100Mm Sluice Plates Item5 10.0 Nos Quoted Rate In Figures Select 0.0 0.0 Zero Only Quoted Rate In Words Inr Zero Only Appendix - 1: Oem Recommended One-Year Operational Spares Sl. No. Name/ Short Description Of The Spare Part No. Qty. Per Unit Of Irn Uom Cost Of A Spare (In Inr) Total Cost Of Spare Per Unit Of Irn (In Inr) , * ** X Y Z Total Cost Of Oem Recommended One-Year Operational Spares Per Unit In Inr = Appendix - 2: Additional Oem Recommended Operational Spares For Successive 4 Years (I.E. From 2Nd Year To 5Th Year) Sl. No. Name/ Short Description Of The Spare Part No. Qty. Per Unit Of Irn Uom Cost Of A Spare (In Inr) Total Cost Of Spare Per Unit Of Irn (In Inr) , * ** X Y Z Total Cost Of Additional Oem Recommended Operational Spares For Successive 4 Years (I.E. From 2Nd Year To 5Th Year) Per Unit In Inr =
Basic Detail
Tender No ZV3SC26036
Bidding Type Tender
Location
City Delhi
State Delhi
Key Dates
Publish Date 23 Nov 2026
Submission Date 02 Jan 2027
Open Date 04 Jan 2027
Finance
Tender Value Ref. Documents
Tender Fee Ref. Documents
EMD 51.83 Lakhs
Exemption Available
Document List
06caf792-f3c3-4c21-b35c-b119ed737bc8.html
BOQ_347979.xls
TenderDocuments.rar
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Nov 23, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Jan 02, 2027
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 37 days
Jan 04, 2027

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 39 days

Tender Documents

Download All (ZIP) ↓
html

06caf792-f3c3-4c21-b35c-b119ed737bc8.html

xls

BOQ_347979.xls

rar

TenderDocuments.rar

pdf

Tendernotice_1.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender