Tender For Procurement Of Iron Roughnecks
Tender Overview
Project Description
Tender for Procurement Of Iron Roughnecks , Item Rate Boq Boq_Ver4.0 Item Rate Normal Inr Only Inr Select, Excess (+), Less (-) Less (-) Tender Inviting Authority: Ongc Name Of Work: Procurement Of Iron Roughnecks Tender Ref. No: Name Of The Bidder/ Bidding Firm / Company : Price Schedule (On For Basis) (This Boq Template Must Not Be Modified/Replaced By The Bidder And The Same Should Be Uploaded After Filling The Relevent Columns, Else The Bidder Is Liable To Be Rejected For This Tender. Bidders Are Allowed To Enter The Bidder Name And Values Only) Notes: 1. Cost Of Iron Roughneck With Hpu Includes Cost Of Equipment (With Commissioning Spares/ Consumables And Tool Kit) 2. Bidders Are Advised To Verify The Applicable Gst Rates Before Submitting Their Quotes. It Shall Be The Sole Responsibility Of The Bidder To Ensure That The Correct Applicable Gst Rates And Corresponding Amounts Are Considered While Quoting.) 3. Bidder Must Quote Strictly As Per This Price Format. The Bids Which Do Not Comply With This Price Format Are Liable For Outright Rejection. 4. Bidder Must Quote All The Applicable Components Of Price Format Up To F.O.R. Destination Price Failing Which Their Offer Will Not Be Considered. 5. Ongc Will Not Entertain Any Future Claim On Account Of The Price Components Which Have Not Been Indicated In The Price-Bid Format. 6. Bidders Are Required To Quote For All The Items /Full Quantity As Per Specifications. Bidders Not Quoting All The Items/Full Quantity As Per Specification Will Be Rejected. 7. Evaluation Of Bids Will Be Total Value Wise Evaluation. 8. Bidders Are Required To Quote In Inr Only. 9. Bidders To Provide The List Of Oem Recommended One-Year Operational Spares For Each Unit, With Part Nos. And Qty. Along With Their Bid. Besides That, Supplier / Bidder Shall Provide *Total Cost Of Such Spares Per Unit In The Price Schedule, Whereas Break-Up Cost For Each Spares, In Such List, Shall Be As Per Attached Appendix - 1) 10. Bidders To Provide The List Of Additional Oem Recommended Operational Spares For Successive 4 Years (I.E. From 2Nd Year To 5Th Year) For Each Unit, With Part Nos. And Qty. Along With Their Bid. Besides That, Supplier / Bidder Shall Provide *Total Cost Of Such Spares Per Unit In The Price Schedule, Whereas Break-Up Cost For Each Spares, In Such List, Shall Be As Per Attached Appendix - 2) Number # Text # Text # Number # Text # Number Number Text Text # Number # Text# Text # Number # Number Number Number Number Text Text Number Number Number Number Text Text Number Number Number Number Text Text Number Number Number Number Text Text Number Number Number Number Text Text Number Number Number # Number # Text Text Number # Number # Date Number # Number # Text # Sl. No. Description Of The Item Item Code / Make Qty Quoted Uom Estimated Rate Addition / Deduction Addition / Deduction Values Currency Convertion Against Each Item Quoted Currency In Inr / Other Currency Unit Cost Of The Item (In Inr) To Be Entered By The Bidder Rs. P Gst % Gst (In Inr) Total Unit Cost (In Inr) Any Other Taxes/Duties/Levies Other Taxes 2 Iiird Party I.E Dgs&D / Rites Etc Inspection Charges @0.34%+Service Tax Less For Cenvat Credit,If Any Respect Of Supplies Under Full Excise Duty Category Total Cost Of Quoted Qty. (In Inr) Total Amount With Taxes Total Amount In Words , A. Irns For Offshore Rigs , Iron Roughneck With Hpu , Installation (Supervision Only), Commissioning And Testing , Oem Recommended One-Year Operational Spares (Supplier / Bidder / Manufacturer Shall Provide The List Of Such Spares, For Each Unit, With Part Nos. And Qty. Along With Their Bid. Besides That, Supplier / Bidder Shall Provide *Total Cost Of Such Spares Per Unit In The Price Schedule, Whereas Break-Up Cost For Each Spares, In Such List, Shall Be As Per Attached Appendix - 1) , Additional Oem Recommended Operational Spares For Successive 4 Years (I.E. From 2Nd Year To 5Th Year) (Supplier / Bidder / Manufacturer Shall Provide The List Of Such Spares, For Each Unit, With Part Nos. And Qty. Along With Their Bid. Besides That, Supplier / Bidder Shall Provide *Total Cost Of Such Spares Per Unit In The Price Schedule, Whereas Break-Up Cost For Each Spares, In Such List, Shall Be As Per Attached Appendix - 2) , B. Irns For Onshore Rigs , Iron Roughneck With Hpu , Installation (Supervision Only), Commissioning And Testing , Oem Recommended One-Year Operational Spares (Supplier / Bidder / Manufacturer Shall Provide The List Of Such Spares, For Each Unit, With Part Nos. And Qty. Along With Their Bid. Besides That, Supplier / Bidder Shall Provide *Total Cost Of Such Spares Per Unit In The Price Schedule, Whereas Break-Up Cost For Each Spares, In Such List, Shall Be As Per Attached Appendix - 1) , Additional Oem Recommended Operational Spares For Successive 4 Years (I.E. From 2Nd Year To 5Th Year) (Supplier / Bidder / Manufacturer Shall Provide The List Of Such Spares, For Each Unit, With Part Nos. And Qty. Along With Their Bid. Besides That, Supplier / Bidder Shall Provide *Total Cost Of Such Spares Per Unit In The Price Schedule, Whereas Break-Up Cost For Each Spares, In Such List, Shall Be As Per Attached Appendix - 2) Total In Figures 0.0 0.0 Inr Zero Only 4.0 Construction Of Chamber For 100Mm Sluice Plates Item5 10.0 Nos Quoted Rate In Figures Select 0.0 0.0 Zero Only Quoted Rate In Words Inr Zero Only Appendix - 1: Oem Recommended One-Year Operational Spares Sl. No. Name/ Short Description Of The Spare Part No. Qty. Per Unit Of Irn Uom Cost Of A Spare (In Inr) Total Cost Of Spare Per Unit Of Irn (In Inr) , * ** X Y Z Total Cost Of Oem Recommended One-Year Operational Spares Per Unit In Inr = Appendix - 2: Additional Oem Recommended Operational Spares For Successive 4 Years (I.E. From 2Nd Year To 5Th Year) Sl. No. Name/ Short Description Of The Spare Part No. Qty. Per Unit Of Irn Uom Cost Of A Spare (In Inr) Total Cost Of Spare Per Unit Of Irn (In Inr) , * ** X Y Z Total Cost Of Additional Oem Recommended Operational Spares For Successive 4 Years (I.E. From 2Nd Year To 5Th Year) Per Unit In Inr =
BOQ
| Sl. No. | Item Description |
| 1 | Item Rate BoQ BoQ_Ver4.0 Item Rate Normal INR Only INR Select, Excess (+), Less (-) Less (-) Tender Inviting Authority: ONGC Name of Work: Procurement of Iron Roughnecks Tender Ref. No: ZV3SC26036 Name of the Bidder/ Bidding Firm / Company : Price Schedule (on FOR Basis)(This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only)NOTEs: 1. Cost of Iron Roughneck with HPU includes cost of Equipment (with Commissioning Spares/ Consumables and Tool Kit)2. Bidders are advised to verify the applicable GST rates before submitting their quotes. It shall be the sole responsibility of the bidder to ensure that the correct applicable GST rates and corresponding amounts are considered while quoting.)3. Bidder must quote strictly as per this price format. The bids which do not comply with this price format are liable for outright rejection. 4. Bidder must quote all the applicable components of price format up to “F.O.R. Destination Price” failing which their offer will not be considered. 5. ONGC will not entertain any future claim on account of the price components which have not been indicated in the PRICE-BID FORMAT.6. Bidders are required to quote for all the items /full quantity as per specifications. Bidders not quoting all the items/full quantity as per specification will be rejected.7. Evaluation of bids will be Total value wise evaluation.8. Bidders are required to quote in INR only.9. Bidders to provide the list of OEM Recommended One-Year operational spares for each Unit, with Part Nos. and Qty. along with their bid. Besides that, Supplier / Bidder shall provide *Total Cost of such spares per Unit in the Price Schedule, whereas Break-up Cost for each Spares, in such List, shall be as per attached Appendix - 1)10. Bidders to provide the list of Additional OEM recommended operational spares for successive 4 years (i.e. from 2nd year to 5th year) for each Unit, with Part Nos. and Qty. along with their bid. Besides that, Supplier / Bidder shall provide *Total Cost of such spares per Unit in the Price Schedule, whereas Break-up Cost for each Spares, in such List, shall be as per attached Appendix - 2) NUMBER # TEXT # TEXT # NUMBER # TEXT # NUMBER NUMBER TEXT TEXT # NUMBER # TEXT# TEXT # NUMBER # NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER # NUMBER # TEXT TEXT NUMBER # NUMBER # DATE NUMBER # NUMBER # TEXT # Sl.No. Description of the Item Item Code / Make Qty quoted UOM Estimated Rate Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency Unit Cost of the item (in INR) To be entered by the Bidder Rs. P GST % GST (in INR) Total Unit Cost (in INR) Any Other Taxes/Duties/Levies Other Taxes 2 IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category Total Cost of Quoted Qty. (in INR) TOTAL AMOUNT With Taxes TOTAL AMOUNT In Words |
| 2 | A. IRNs for Offshore Rigs |
| 3 | Iron Roughneck with HPU |
| 4 | Installation (Supervision only), Commissioning and Testing |
| 5 | OEM Recommended One-Year operational spares (Supplier / Bidder / Manufacturer shall provide the list of such spares, for each Unit, with Part Nos. and Qty. along with their bid. Besides that, Supplier / Bidder shall provide *Total Cost of such spares per Unit in the Price Schedule, whereas Break-up Cost for each Spares, in such List, shall be as per attached Appendix - 1) |
| 6 | Additional OEM recommended operational spares for successive 4 years (i.e. from 2nd year to 5th year) (Supplier / Bidder / Manufacturer shall provide the list of such spares, for each Unit, with Part Nos. and Qty. along with their bid. Besides that, Supplier / Bidder shall provide *Total Cost of such spares per Unit in the Price Schedule, whereas Break-up Cost for each Spares, in such List, shall be as per attached Appendix - 2) |
| 7 | B. IRNs for Onshore Rigs |
| 8 | Iron Roughneck with HPU |
| 9 | Installation (Supervision only), Commissioning and Testing |
| 10 | OEM Recommended One-Year operational spares (Supplier / Bidder / Manufacturer shall provide the list of such spares, for each Unit, with Part Nos. and Qty. along with their bid. Besides that, Supplier / Bidder shall provide *Total Cost of such spares per Unit in the Price Schedule, whereas Break-up Cost for each Spares, in such List, shall be as per attached Appendix - 1) |
| 11 | Additional OEM recommended operational spares for successive 4 years (i.e. from 2nd year to 5th year) (Supplier / Bidder / Manufacturer shall provide the list of such spares, for each Unit, with Part Nos. and Qty. along with their bid. Besides that, Supplier / Bidder shall provide *Total Cost of such spares per Unit in the Price Schedule, whereas Break-up Cost for each Spares, in such List, shall be as per attached Appendix - 2) Total in Figures 0.0 0.0 INR Zero Only 4.0 Construction of chamber for 100mm sluice plates item5 10.0 Nos Quoted Rate in Figures Select 0.0 0.0 Zero Only Quoted Rate in Words INR Zero Only Appendix - 1: OEM Recommended One-Year operational spares Sl. No. Name/ Short Description of the spare Part No. Qty. per Unit of IRN UOM Cost of a spare (in INR) Total Cost of Spare per Unit of IRN (in INR) |
| 12 | * ** x y z Total Cost of OEM Recommended One-Year operational spares per unit in INR = Appendix - 2: Additional OEM recommended operational spares for successive 4 years (i.e. from 2nd year to 5th year) Sl. No. Name/ Short Description of the spare Part No. Qty. per Unit of IRN UOM Cost of a spare (in INR) Total Cost of Spare per Unit of IRN (in INR) |
| 13 | * ** x y z Total Cost of Additional OEM recommended operational spares for successive 4 years (i.e. from 2nd year to 5th year) per unit in INR = Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 37 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 39 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender