Tender For New Farm Pond Construction -
Tender Overview
Project Description
Tender For New Farm Pond Construction - Earthwork In Excavation (In Mass) In Any Kind Of Soil Including Hard Soil, Slushy Muck, Hard Moorum Soil With The Help Of Crawler Mounted Excavator Like Poclain/Tata Hitachi Up To A Depth Of 3 Meter From The Existing Bed Level & Disposing/Removing The Excavated Spoil On The Bund (Spoil-Bank). Only The Volume Of Excavated Soil Will Be Considered For Measurement Purpose Which Also Includes Marching Time Of Mechanical EquipmentS Fine Dressing & Levelling Of The Excavated Spoil On Bund(Spoil-Bank) With The Help Of Mechanical Excavator For Proper Compaction & Finally By Manual Labour As Per Direction. Rate Should Include The Earth Cutting & Filling 200Mm To Suit The Site Requirement Outlet Work - Supplying & Laying Np2 Rcc Spun Pipe 300Mm Dia With Collar In Lines And Level And Providing Approved Jointing Materials And Joint Properly As Per Direction Of E/I Supplying, Constructing Random Rubble Masonry Work Using Trap Stone Boulders Of 200 - 300 Mm Size / Brick Masonry (Clay/Ash) In Cement Sand Mortar (1:6) In Foundations, Super Structure, Manholes, Ducts, Drains Etc Including Fair Cutting, Waste, Bonding, Plumbing, Lining, Levelling, Flushing, Raking Joints, Scaffolding And Curing, All As Per Drawings, Specifications And Directions Of The Engineer/ Consultant, All Materials, Tools, Plant And Labour Complete In All Respect Inlet Pitching Work & Silt Trap - Earth Work Excavation In Ordinary Soil --- Do--- Dressing Of Soil As Per Direction Of E/I. Inlet Stone Pitching-Supplying And Laying (Properly As Per Design And Drawing) Rip-Rap With Good Quality Of Dry Boulders (200 - 300 Mm Size) Duly Packed Including The Cost Of Materials, Royalty All Taxes Etc. But Excluding The Cost Of Carriage All Complete As Per Specifications And Directions E/I. Display Board (1M X 1M X 0.3M) Earth Work In Excavation Supplying, Constructing One Or More Brick Thick Burnt Clay / Fly Ash Brickwork (Foundation And Superstructure) Supplying And Laying Plaster With (1:6) Cement Sand Mortar At And At All Heights And Depths Above And Below Finished Ground Level To Faces Of Walls, Pillars, Columns, A) 12 Mm Thick (In One Operation) Plastic Synthetic Putty And Paint (Asian/Berger/Nerolac) And Wall Writing
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Offline submission at the designated office.
Upcoming · 1 dayTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender