Tender For Repair/Maintenance Of Domestic Motor Starter, Blower Motor, Exhaust Fan, Ceiling Fan, Pedestal Fan Etc., Construction Of New Chemical Earthing-07 Nos., Fitting Of Lightning Arrester, At Mugma Re-Gional Workshop, Ecl
Tender Overview
Project Description
Tender for Repair/Maintenance Of Domestic Motor Starter, Blower Motor, Exhaust Fan, Ceiling Fan, Pedestal Fan Etc., Construction Of New Chemical Earthing-07 Nos., Fitting Of Lightning Arrester, At Mugma Re-Gional Workshop, Ecl
BOQ
| Sl. No. | Item Description |
| 1 | Based on analysis |
| 2 | JOB(A)Repair/maintenance of Starter, Motor, fan: Repair/maintenance of Domestic motor starter-01 no. of specification- 415Volt, 3phase, 50Hz, 40HP/30kW, NFLP- supply and fitting of ML3/4 contactor along with timer, including repair/maintenance labour charge |
| 3 | Blower motor-3HP, 3-phase, 415V complete new rewinding- new Copper rate-845, scrap copper rate- 535; net- 310 |
| 4 | Labour Charge for Sl.2 |
| 5 | Exhaust fan-1.5/2HP, 3-phase, 415V complete new rewinding- new Copper rate-845, scrap copper rate- 535; net- 310, |
| 6 | Labour Charge for Sl.4 |
| 7 | Changing of insulation, joints, nut-bolt, ball-bearing and complete repair/maintenance including labour charge for exhaust fan |
| 8 | Ceiling fan-06 Nos. and Pedestal fan- 01 no., Complete stator coil rewinding |
| 9 | Bearing change of suitable size- Ceiling fan-08 Nos. and Pedestal fan- 01 no. |
| 10 | Condenser change of adequate capacity- Ceiling fan-06 Nos. and Pedestal fan- 01 no. |
| 11 | Labour charge |
| 12 | 3-phase, 415V, 01kW fan- complete new rewinding- new Copper rate-845, scrap copper rate- 535; net- 310 |
| 13 | Labour charge |
| 14 | 3-phase 01kW fan-ball bearing change, cleaning, greasing, and necessary repair/maintenance including labour charge |
| 15 | JOB(B) Chemical earthing-07 nos. with lightning arrestor(04 nos.): Maintenance free Chemical for providing earthing to -gang operating switch and lightning arrester-providing electric rod, conforming to the standard as per Elec-tricity act 2003,CEAR-2023 and DMS(Ele) guidelines and circular. (Resistance less than 1 Ohm) |
| 16 | Betonite powder (For Chemical earthing) |
| 17 | GI Strip (20Kg Each) (For Chemical earthing) |
| 18 | Labour Charges(For Chemical earthing) |
| 19 | Supply and fixing of lightning arrestor at DC Worksop, GM Office, Pumping station, Office premise |
| 20 | JOB(C) Installation of new pump-motor set:Unloading of Pump-motor set with bedplate, starter from T/Truck at MRW, and placing it inside the Pumping section boundary wall, by crane.Manpower requirement |
| 21 | Dismantling the pump-motor, bedplate and manually pulling the Pump-motor, bedplate, starter, separately to the pump roomManpower requirement |
| 22 | Dismantling of old Pump-motor set, starter and placing it into spare room.Manpower requirement |
| 23 | Fitting of pump-motor set on bedplate and alignment of pump-motor set, fitting of delivery pipeline and suction pipeline |
| 24 | Profit/Overhead for Job(2) |
| 25 | Total impact of GST for the purpose of CTC Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 5 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 6 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender