Tender For Supplying Installing, Testing And Commissioning Of A Power Distribution Units For Server Rack, Anti Static Flooring For Server Room, Fire Doors, Rodent Repellent System, Water Leakage Detection System, Gas Suppression System For Ups Room,

Issued by Government Departments · Ranchi, Jharkhand
Tender Value
2.27 Crore
Estimated cost
Bid Submission
27 Nov 2026
2 days left
EMD
4.55 Lakhs
Bank guarantee accepted
Document Fee
10000
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Ranchi → Jharkhand
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Tender for Supplying Installing, Testing And Commissioning Of A Power Distribution Units For Server Rack, Anti Static Flooring For Server Room, Fire Doors, Rodent Repellent System, Water Leakage Detection System, Gas Suppression System For Ups Room, Access Control Devices, Power Distribution Panel, Networked Visual Security Architecture, Physical Access Control System (Pacs), Multiple Input Display For Server Room In The Premises Of The Honorables Jharkahnd High Court Dhurwa, Ranchi

BOQ

Name of Work:- Supplying Installing, Testing and Commissioning of a power Distribution Units for Server Rack, Anti Static Flooring for Server Room, Fire Doors, Rodent Repellent System, Water Leakage Detection System, Gas Suppression System for UPS Room, Access Control Devices, Power Distribution Panel, Networked Visual Security Architecture, Physical Access Control System (PACS), Multiple Input Display for Server Room in the Premises of the Honorables Jharkahnd High Court Dhurwa, Ranchi
Sl. No. Item Description
1Supplying,Installation Testing & Commissioning Services for User Room, UPS Room, Server Room with 75 Inch Display Size & Type with Mutiple inputs display processors for (4 Input display)Screen Size: Minimum 75 inches (189 cm)Panel Type: Commercial-grade LED/LCD panelResolution: 3840 × 2160 (4K UHD)Brightness: Minimum 500 nitsContrast Ratio: OEM standard for commercial signage panelViewing Angle: 178° (H/V) or betterOperation: 24×7 continuous duty cycle2. Video & Picture Performance HDR support (HDR10 or equivalent) Anti-glare / haze treatment for professional use Landscape and portrait orientation support Color depth: 10-bit processing or higher3. Processor & Smart Features Built-in signage SoC (System on Chip) Integrated media player without external PC Support for remote device management software Compatible with centralized display control system
24. ConnectivityHDMI inputs: Minimum 3DisplayPort input: Minimum 1USB ports: Minimum 2LAN (RJ-45): 1Wi-Fi: Built-inAudio Out: RequiredRS-232C control port for professional integration5. Mounting & Physical RequirementsSlim industrial design suitable for control rooms / conference areasVESA wall-mount compatibilityNecessary mounting brackets to be includedProvision for cable management6. Power & Environmental ConditionsPower Supply: 100–240V AC, 50/60 HzLow power standby modeOperating temperature suitable for Indian conditions (minimum 0–40°C)7. Certification & ComplianceBIS certified productEnergy-efficient commercial displayOEM warranty: 1 Year
3Providing, Supplying, Installing, Testing and Commissioning of Main LT Power Distribution Panel and UPS Power Distribution Panel, fabricated from CRCA sheet steel, floor/wall mounted as required, dust and vermin proof, suitable for operation on 415V, 3 Phase, 4 Wire, 50 Hz AC supply system, complete with busbars of suitable current rating, MCCBs/MCBs, metering, indicating lamps, control wiring, cable alleys, earthing terminals, gland plates, danger notices, identification labels and all associated accessories, conforming to relevant IS/IEC standards and CPWD specifications, complete as required and as directed by the Engineer-in-Charge.Main LT Power Distribution PanelSupply, installation, testing and commissioning of Main LT Distribution Panel comprising the following:Incoming:01 No. 400A, 4 Pole MCCB, draw-out type, with adequate breaking capacity corresponding to the prospective fault level of the system, complete with all standard accessories.Outgoing Feeders:02 Nos. 250A, 4 Pole MCCBs for IT Load / UPS Input.04 Nos. 63A, 4 Pole TPN MCBs for In-Row Cooling Units.04 Nos. 32A, 4 Pole MCBs for small-capacity cooling units, control circuits, lighting and auxiliary loads.The panel shall be complete with suitably rated copper busbars, neutral and earth bars, interconnections, shrouding, internal wiring, engraved ferrules, terminal blocks, space heaters, ventilation arrangements and all accessories required
4for satisfactory operation.UPS Power Distribution Panel (UPS-PDB) for IT LoadSupply, installation, testing and commissioning of UPS Power Distribution Panel suitable for feeding critical IT loads, complete with the following configuration:Incoming:01 No. 250A, 4 Pole MCCB, draw-out type, having adequate rupturing capacity as per system fault level.Outgoing Feeders:14 Nos. 32A, TPN MCB outgoing feeders for feeding IT Rack Power Distribution Units (PDUs).The panel shall be complete with copper busbars, neutral and earth bars, interconnections, control wiring, identification labels, metering provisions and all accessories required for complete operation.Power CablingProviding, laying, dressing, clamping, glanding, terminating, testing and commissioning of the following FRLS/XLPE insulated, PVC sheathed, stranded copper conductor power cables of approved make, including cable trays, saddles, clamps, glands, lugs, ferruling, identification tags and all accessories required for complete installation:The scope shall include transportation, handling, installation, termination at both ends, insulation resistance testing, continuity testing, commissioning, submission of test reports and all incidental works required for completing the installation in a safe and workmanlike manner, complete in all respects and as approved by the Engineer-in-Charge.
5Power Cabling
64C x 16 Sqmm CU Flexible Cable for Cooling Unit
71C X 120 Sqmm CU Flexible Cable for UPS Input
85C X 6 Sqmm CU Flex Cable for Power Rack PDU
94C X 4Sqmm CU Flexible cable
10Supply, Installation, Testing and Commissioning of maintenance-free Chemical Earthing System specially designed for UPS, PAC Units, Server Racks, SRC Panels and other sensitive IT/Electrical equipment, comprising copper-bonded/GI earth electrode of approved make, earth enhancement compound, HDPE/PVC earth pit chamber with cover, watering arrangement, copper Strip/wire of required size, clamps, lugs, nuts, bolts, excavation, backfilling, interconnections and all other accessories complete.The item includes all labour, materials, tools, testing of earth resistance and commissioning complete in all respects as required at site.
11Maintenance free earth electrode with chemical treatment 3mtr long with earth chamber, disconnection link etc complete.
1250x6 mm GI Strip (Main Earth Grid Interconnection)
1325x3 mm GI Strip (Equipment Bonding)
148 Sq.mm Green Copper Cable (Rack Earthing)
1516 Sq.mm Green Copper Cable (UPS Earthing)
1616 Sq.mm Copper Cable (Main Panel Earth)
17Supply, Installation, Testing and Commissioning of Electronic Rodent Repellent System specially designed for Server Room/Data Centre environment, operating on ultrasonic and electromagnetic technology for effective deterrence of rodents without causing interference to IT, networking and communication equipment. The system shall comprise control unit(s), emitter/transmitter units, power supply arrangement, interconnecting cables, mounting accessories, fixtures and all necessary hardware required for complete installation. The item includes testing, commissioning, demonstration, warranty support and integration with existing electrical infrastructure, complete in all respects as per manufacturer's specifications and as required at site.(Server Room)
18Transducers
19Master Controller for the above Transduders-VHFO V2 -CONTROLLER
20Fittings and Accessories
21Rodent cable with PVC conduit
22Supply, Installation, Testing and Commissioning of Water Leak Detection System specially designed for Data Centre Server Room applications, comprising microprocessor-based leak detection monitoring panel/controller, sensing cable/probe type leak detectors, zone monitoring modules, alarm annunciation, power supply unit, interface with BMS/DCIM/EMS through potential-free contacts, audio-visual alarm system, communication cabling, conduits, mounting accessories, terminations and all associated hardware. The system shall be capable of detecting water leakage beneath raised floors, around PAC units, chilled water pipelines, CRAC/CRAH units, server racks and other critical areas. The item includes laying and fixing of sensing cable, calibration, testing, integration, commissioning and demonstration of satisfactory performance complete in all respects as per manufacturer's specifications and site requirements.
23Conventional Water Leak Detection Panel with Battery Backup
24WLD cable
25Fittings and Accessories
26Electronic Hooter cum Flasher
27Access Control System
28Supply, Installation, Testing and Commissioning of Spectra Make RFID-Based Access Control System for 4 Doors, comprising intelligent network-based access control panel/controller, RFID card readers on both entry and exit sides of each door, electromagnetic locks (EM Locks)/electromechanical locking devices, door position sensors, exit devices, power supply units with battery backup, communication cabling, conduits, mounting accessories, interface modules, software licenses and all associated hardware required for complete operation of the system. The system shall provide secure access management through RFID smart cards only, with configurable access levels, time schedules and authorization rights for designated personnel. No biometric authentication shall be included in the system.The system shall be provided for the following locations:#Main Entrance Door#Server Room Door#User Room Door#UPS Room DoorEach door shall be equipped with RFID card readers on both sides for controlled entry and exit, with centralized monitoring, event logging, user management and audit trail generation through the access control management software. The system shall support creation of individual user profiles, access groups, door-wise permissions, time-zone based access restrictions and reporting functions.The Access Control System shall be integrated with the Fire Alarm System such that, upon receipt of a fire alarm signal, all controlled doors shall automatically unlock/release to provide unrestricted emergency egress and comply with life safety requirements. Necessary interface modules, relay units and interconnecting cabling required for integration with the Fire Alarm System shall be included in the scope.Additionally, a dedicated remote door release/unlock switch shall be provided in the User Room for manual unlocking of the Main Entrance Door. The switch shall enable authorized personnel to release the lock of the Main Entrance Door remotely whenever required. The complete system shall include installation, wiring, programming, configuration, testing, integration, commissioning, user training and demonstration of satisfactory operation, complete in all respects as per Spectra manufacturer's specifications, approved drawings, statutory requirements and site conditions do all complete as required:-
29Proximity card Reader
30Egress Switch
31Accees Card
32Power Supply Unit
33Electromagnetic Lock –600lbs
34Access Software
356 Core x 0.75 Sq mm, multi strand, copper, sheilded,FRLS,Screened cable between the access controller and Card reader
36CAT 6 cable with PVC conduit
372 Core x 1.5 Sq mm, multi strand, copper, FRLS,sheilded cable between the access controller and EM Lock/ door sensor /Push Button
38Panic Bar
39Networked Visual Security Architecture
40Supply, Installation, Testing and Commissioning of IP-based Networked Visual Security Architecture comprising Honeywell make Network Video Recorder (NVR) with minimum 8-channel recording capability, integrated with 8 Nos. high-definition IP cameras, complete with minimum 2TB surveillance-grade hard disk storage, video management software, network switches (if required), power supplies, mounting brackets, junction boxes, communication cabling, conduits, connectors, terminations and all associated accessories. The system shall support continuous recording, motion detection, event-based recording, live monitoring, playback, remote viewing, user access management and video export functionalities. Cameras shall be suitable for indoor/outdoor installation as per site requirements and shall provide high-resolution day/night surveillance with infrared (IR) capability where applicable. The NVR shall support network-based video recording, storage, retrieval and monitoring of all connected cameras with provision for integration with Building Management System (BMS), Security Management System (SMS) or other monitoring platforms through standard network protocols, wherever required. The scope shall include laying and fixing of cables, configuration, programming, testing, commissioning, system integration, user training, demonstration of satisfactory performance and submission of all necessary documentation, complete in all respects as per Honeywell manufacturer's specifications, approved drawings and do complete as required at site.
412MP IP Dome cameras
4216 Channel Network Video Recorder
438 TB Hard Disc
4416 port POE Switch
4524 inch Monitor
4615 U rack
47CAT 6 cable with PVC conduit
48PDU Power Distribution Unit
49Supply, Installation, Testing and Commissioning of UL Certified Schneider Electric APC NetShelter Metered Rack PDU, 0U vertical mounting type, 3-Phase, 11kW, 230V, 16A, complete with 36 Nos. IEC C13 outlets and 6 Nos. IEC C19 outlets, provided with IEC 309 (3P+N+PE) input plug and cord, suitable for installation in standard 19-inch server racks for distribution of power to servers, storage, networking and other critical IT equipment. The PDU shall be equipped with an integrated digital metering facility for real-time monitoring of electrical parameters including voltage, current, frequency, power consumption and load utilization, with local display indication for efficient power management and load balancing. The scope shall include supply of all mounting accessories, fixing hardware, power connections, terminations, labeling, testing, commissioning, operational verification and integration with rack infrastructure, complete with all associated components and accessories required for satisfactory operation. The item includes installation, configuration, testing, demonstration and handing over of the system complete in all respects as per Schneider Electric APC manufacturer’s specifications and site requirements.
50Fire Doors
51STEEL FIRE DOOR OF 120 MIN. FIRE RATING STABILITY & INTEGRITYSupply of Navair make uninsulated fire rated GI Sheet doors conforming to FD 120-UD classification of IS 3614 :2021 with fire rating of 120 minutes integrity. The factory manufactured door frame and shutter assembly shall be made out of minimum 1.20 mm thick GI Sheet with minimum 120 g/m2 coating as per IS: 277.The Door should be finished with powder coating in standard RAL shade finish having DFT of minimum 50 microns. The door should carry a minimum 500 Hrs of salt spray test. All accressesories like hardware, vision panel, fire & smoke seal etc to be supplied by Fire door manufacturer only as per the guidelines laid down in IS 3614:2021. The offered door must carry a prior valid test evidence of 5 years from NABL Accredited Lab. No fresh testing is required within the validity of test report from NABL Accredited Lab.TheThe Door frame shall be single rebate grooved profile to accomodate 10x4mm Fire Seal, Size of Frame to be minimum 100mm x 57mm made out of minimum 1.20mm thick galvanized steel sheet. Frames shall be butt / mitered joint and field assembeled with bolting system. The frame should also be provided with fire rated smoke seal as per IS: 3614:2021 or as per test evidence. It shall be pasted on surface and perimeter of main frame. All provisions should be mortised & provided with necessary inbuilt reinforcement to receieve appropriate hardware. Frames should be provided with back plate bracket for anchor fastner with 8-10 mm dia and minimum 80 mm long HDG fasteners, with Polyamide sleeves for installation of frame in finished plastered masonary wall opening. Rate are Excluding Grouting.Door leaf should be minimum 46mm thick fully flush double skin door. Door leaf must be manufactured from 1.2mm(18gauge) thick galvanised steel sheet. The infill material shall be Honeycomb. All doors shall be factory prepped for receiving appropriate hardware and provided with necessary reinforcement for hinges, locks, and door closers. The edges should be interlocked with a bending radius of 1.4mm. For double leaf doors integrated astragals has to be provided on the meeting stile for both active and inactive leaf. The shutters shall be mounted to the frame with SS 304 grade ball bearing type hinges of size 100x75x3 mm alongwith all suitable hardware(Payable in extra item).Vision lite glass size 200mm x 300mm (max area upto 0.06sqm) wherever applicable should be provided with single layered clear fire rated glass panes as per guidelines laid down under IS 3614 : 2021 vide clause no. 7.2.7 table no. 2 with a clipon arrangement.The glass will be provided with fire rated ceramic tape of suitable size alround on either face. Every Glass pane must carry a permanent marking of SAINT GOBAIN. Door must be tested with vision panel- 6mm thick pyroswiss glass of Saint
521.Single rebated pressed steel frame of section 100x57mm finished with Powder Coating. 2. 46mm thick steel shutter finished with Powder coating. 3. SS Ball Bearing Hinges 100x75x3mm in of GEZE Make-04 Nos. Per Leaf. 4. Mortise Sash Lock With SS Lever Handle With 70mm Long Both Side Key Cylinder Of GEZE Make-01 No. Per Door. 5. SS Concealed Flush Bolt 300mm Long Of GEZE Make-01 No. Per Door. 6. SS Concealed Flush Bolt 600mm Long Of GEZE Make-01 No. Per Door. 7. Overhead Door Closer TS-1100 Of GEZE Make-01 No. Per Leaf 8. Vision Panel Of Size 200x300mm (Fitted With 6mm Thick 120 Min. Fire Rated Clear Toughened Glass PYROSWISS E120 Of SAINTGOBAIN Make)-01 No. Per Leaf
531200mm (W) X 2100mm (H)-Single Leaf
541200mm (W) X 2100mm (H)-Single Leaf with 30 Minutes Insulated
551000mm (W) X 2400mm (H)-
56900mm (W) X 2100mm (H)-Single Leaf with 30 Min Insulated
57Specially designed flooring for Anti Static Floor in Server Room
58The panels are all-steel welded construction, 600x600 mm in size, with the hollow core injected with a lightweight, fire-retardant, non-combustible cementitious compound to ensure support of at least 90% of the top surface area. The panel is factory-laminated with a floor-grade HPL anti-static laminate (typically 1.2mm thick) to the steel surface, and the edges feature an integral trim.The Edge Support Rigid Grid (ESRG) system is used, featuring a continuous box-type stringer for enhanced lateral stability and rolling load performance. The pedestal assembly allows for easy level adjustment for a finish floor height (FFH) up to 300mm (the system can accommodate a range of 65mm - 2000mm).The system is engineered to provide a Uniformly Distributed Load (UDL) of 1350 kg/sq.m with a maximum permissible deflection of 1.52 mm.
59Pedestal : the pedestal head assembly shall consist of a 75 x 75 mm x 3.5 mm embossed head mechanically riveted to a 100mm long 19 mm dia rolled formed stud and 2 check nuts for level adjustment and arresting vertical movement. the pedestal head shall consist of an anti-vibrational pvc cap, for panel and stringer location. the pedestal base assembly shall consist of 22.20 mm od pipe of thickness 1.6mm mechanically locked on a press for perpendicularity and then welded to a base plate of 100 x 100 x 2mm thick with stiffening folds.the sub structure assembly shall be suitably anchored to the floor with suitable adhesive or fastener as recommended by the manufacturer. all steel components shall be zinc electro plated.
60Providing and fixing hot-dip galvanized steel stringers manufactured from cold-rolled steel construction, specially designed with ribs embossed on three sides to provide strength, lateral stability and improved rolling load performance. The stringers shall support panels on all four sides to ensure proper alignment and rigidity of the raised flooring system.Each stringer shall be provided with countersunk holes at both ends to accommodate bolting with M6 machine screws to the pedestal head assembly. The size of the stringer shall be 21 mm × 32 mm × 0.8 mm thickness and 570 mm in length, complete as per manufacturer’s standard specifications and installation requirements.”
61The panels are size of 600 x 600mm
62Supply of Tile puller
63skirting to be included in Data center
642 to 3 mm anti-static epoxy flooring
65Providing, fixing of Blanking Plate of Blanking Plates for UPS Panel Boards with complete as accessories
66Suppyling, installation, testing and Commissioning of Monitoring of Temp Lamp Board for UPS near Main incomer of UPS from LT Panel with complete as reqired
67Supply, Installation, Testing & Commissioning of Communication Card compatible with Liberty APM2.3 120 kVA, 3-Phase Modular UPS, complete with all necessary hardware, interface cables, mounting accessories, configuration, programming, integration with the UPS monitoring system/BMS (where applicable), testing, commissioning, and satisfactory demonstration of all communication and monitoring functions, as required for complete operation, in accordance with the manufacturer's specifications and as directed by the Engineer-in-Charge.
68Supply, Installation, Testing & Commissioning of battery interlinking connectors for Connecting 2 UPS battery bank, comprising heavy-duty flexible copper interconnecting leads of suitable cross-sectional area with PVC/XLPE insulation, complete with tinned copper crimping lugs, nuts, bolts, spring washers, insulating sleeves, identification ferrules, heat-shrink sleeves and all other accessories required for interconnection of battery cells/monoblocks to form the complete battery bank, including termination, dressing, testing and commissioning, complete as required and as directed by the Engineer-in-Charge.
69Supply, Installation, Testing & Commissioning of Nyvin make battery interconnecting cables of suitable cross-sectional area for UPS battery bank, comprising multi-strand copper conductor with PVC/XLPE insulation, complete with tinned copper crimping lugs, nuts, bolts, washers, insulating sleeves, ferrules and all accessories required for interconnection of battery cells/blocks, including laying, termination, testing and commissioning, complete as required and as directed by the Engineer-in-Charge.
70Providing, Supplying, Installing, Testing and Commissioning of Automatic Clean Agent Fire Suppression System employing FK-5-1-12 extinguishing agent (or approved equivalent clean extinguishing medium) for protection of designated risk areas, UPS rooms and SRC Room other critical enclosures, complete with all necessary equipment, materials, accessories and incidentals required for a fully automatic, reliable and operational system, conforming to the latest relevant IS Codes, NBC provisions, TAC recommendations, manufacturer’s specifications and all applicable statutory requirements.The system shall comprise, but not be limited to, 80 kg capacity agent storage cylinders of approved make, complete with cylinder valves, pressure gauges, actuators, release mechanisms, manifold assembly, discharge piping network, discharge nozzles of suitable type and size, control and releasing panel, smoke and/or heat detectors, manual release stations, abort switches, sounder-cum-strobes/hooter units, pressure switches, supervisory and monitoring devices, interconnecting wiring and cabling, conduits, cable trays, supports, clamps, hangers, brackets, fittings, glands, lugs, ferrules, termination accessories, identification labels and all other hardware and accessories necessary for the proper functioning of the installation.The scope of work shall include complete system design, site survey, preparation of shop drawings, hydraulic calculations, selection and sizing of cylinders, piping and nozzles, coordination with architectural, electrical and fire alarm systems, fabrication, supply, transportation, unloading, storage, erection, fixing, alignment, wiring, termination, testing, flushing, calibration, commissioning and demonstration of the entire system in accordance with approved drawings and specifications. The installation shall be carried out in a neat, workmanlike and professional manner, ensuring proper accessibility, maintainability and safety of all components.The work shall further include integration of the clean agent suppression system with the existing or proposed Fire Detection and Alarm System, including necessary interface modules, shutdown logic, alarm annunciation, pre-discharge warning, time delay arrangement, manual override, abort function and all associated control functions required for safe and effective operation. The system shall be arranged to provide automatic detection and release, with suitable sequence of operation as per approved cause-and-effect matrix and as directed by the Engineer-in-Charge.The item shall also include all civil, structural and electrical incidental works required for successful execution of the system, including making openings, sleeves, supports, anchors, fasteners, sealing of penetrations, making good of disturbed surfaces, provision of earthing wherever required, and all minor works necessary for complete installation. All materials used shall be new, unused, of approved make and quality, and shall be accompanied by manufacturer’s test certificates, warranty certificates and relevant technical literature.The contractor shall carry out all pre-commissioning checks, pressure testing, functional testing, alarm testing, detector testing, release testing, interface testing and final commissioning tests in the presence of the Engineer-in-Charge or his authorized representative. The system shall be handed over only after successful completion of all tests and after obtaining satisfactory performance to the entire satisfaction of the Engineer-in-Charge.The scope shall also include submission of detailed design calculations, as-built drawings, operation and maintenance manuals, test reports, commissioning reports, warranty documents, training of client’s personnel in operation and emergency procedures, and all statutory approvals, certifications and documentation required for completion and handover of the installation.The work shall be deemed to include all labour, materials, tools, plants, scaffolding, lifting arrangements, transportation, loading, unloading, taxes, duties, levies, permits, consumables and sundry items whatsoever required for proper execution, completion and commissioning of the system in all respects, complete as required and as directed by the Engineer-in-Charge.
71Supply, Installation, Testing & Commissioning of ASPEN MAX HI-FLOW Condensate Drain Pump, specially designed and suitable for Vertiv SRC Precision Air Conditioning Units, complete with reservoir, float switch, anti-siphon device, power and control wiring, drain piping/tubing, fittings, clamps, supports, insulation, termination accessories, interconnections and all associated materials required for proper condensate drainage from the unit.The work shall include fixing of drain pump, laying and termination of drain line up to the designated discharge point, electrical wiring from source to pump, control integration with the Vertiv SRC unit, testing of automatic operation, leak testing, commissioning and satisfactory performance demonstration, complete in all respects as per manufacturer's recommendations and as directed by the Engineer-in-Charge. Please Enable Macros to View BoQ information
72Supply, Installation, Testing & Commissioning of ASPEN MAX HI-FLOW Condensate Drain Pump, specially designed and suitable for Vertiv SRC Precision Air Conditioning Units, complete with reservoir, float switch, anti-siphon device, power and control wiring, drain piping/tubing, fittings, clamps, supports, insulation, termination accessories, interconnections and all associated materials required for proper condensate drainage from the unit.The work shall include fixing of drain pump, laying and termination of drain line up to the designated discharge point, electrical wiring from source to pump, control integration with the Vertiv SRC unit, testing of automatic operation, leak testing, commissioning and satisfactory performance demonstration, complete in all respects as per manufacturer's recommendations and as directed by the Engineer-in-Charge. Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 58667705
AUTHORITY Government Departments
TENDER VALUE 2.27 Crore
LAST DATE 27-11-2026
Authority
Authority Name Building Construction Department
Work Description Tender for Supplying Installing, Testing And Commissioning Of A Power Distribution Units For Server Rack, Anti Static Flooring For Server Room, Fire Doors, Rodent Repellent System, Water Leakage Detection System, Gas Suppression System For Ups Room, Access Control Devices, Power Distribution Panel, Networked Visual Security Architecture, Physical Access Control System (Pacs), Multiple Input Display For Server Room In The Premises Of The Honorables Jharkahnd High Court Dhurwa, Ranchi
Basic Detail
Tender No BCD/Bld. Div-02-02/2026-27
Bidding Type Tender
Location
City Ranchi
State Jharkhand
Key Dates
Publish Date 21 Nov 2026
Submission Date 27 Nov 2026
Open Date 28 Nov 2026
Finance
Tender Value 2.27 Crore
Tender Fee 10000
EMD 4.55 Lakhs
Exemption Not Available
Document List
6d776f19-52a1-4a24-bf74-02a416dd940c.html
BOQ_164173.xls
F-2-02.pdf
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Nov 21, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Nov 27, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 2 days
Nov 28, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 3 days

Tender Documents

Download All (ZIP) ↓
html

6d776f19-52a1-4a24-bf74-02a416dd940c.html

xls

BOQ_164173.xls

pdf

F-2-02.pdf

pdf

Tendernotice_1.pdf